Loading...
HomeMy WebLinkAboutHOME2 SUITES AT HARMONY VILLAGE - PDP - PDP150031 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPDP DRAINAGE REPORT FOR HOME2 SUITES AT HARMONY VILLAGE Prepared For: East Avenue Development LLC 1001 Cypress Creek Road #203 Cedar Park, TX 78613 November 10, 2015 Project No. 39705.01 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................................... i Vicinity Map ......................................................................................................................................................... 1 General Description and Location .................................................................................................................. 2 Location And Existing Site Characteristics ................................................................................................. 2 Site Soils ........................................................................................................................................................... 2 Floodplain ........................................................................................................................................................ 2 Drainage Basins and Sub-Basins ....................................................................................................................... 3 Major Basin ...................................................................................................................................................... 3 Historic Sub-Basins ........................................................................................................................................ 3 Developed Sub-Basins.................................................................................................................................... 4 Drainage Design Criteria .................................................................................................................................. 5 Regulations ...................................................................................................................................................... 5 Low-Impact Development ............................................................................................................................ 5 Hydrologic Criteria ........................................................................................................................................ 5 Hydraulic Criteria........................................................................................................................................... 5 Drainage Facility Design .................................................................................................................................... 7 General Concept ............................................................................................................................................ 7 Water Quality/ Detention Facilities ............................................................................................................ 7 Stormwater Pollution Prevention .................................................................................................................... 8 Temporary Erosion Control ........................................................................................................................ 8 Permanent Erosion Control ......................................................................................................................... 8 Summary & Conclusions ................................................................................................................................... 9 References .........................................................................................................................................................10 APPENDIX Appendix A – Site & Soil Descriptions and Characteristics Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Existing & Proposed Drainage Plans Appendix E – LID Exhibit Page ii Engineer’s Certification Block I hereby certify that this Project Development Plan Drainage Report for Home2 Suites at Harmony Village was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Timothy J. Halopoff, PE Registered Professional Engineer State of Colorado No. 37953 Page 1 VICINITY MAP Page 2 GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS The proposed Home2 Suites at Harmony Village is located in the northeast one-quarter of Section 6, Township 6 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Home2 Suites site is a 1.85 acre property that is currently partially undeveloped with an existing 96 space parking lot. The site is bounded by Texas Roadhouse on the north, Delany Drive on the east, shopping centers to the west, and Cinemark Theater to the south. The site is zoned HC – Harmony Corridor and will support the proposed hotel and associated parking requirements. The proposed use of the site is a 4 story extended stay hotel. The existing site generally slopes from the northwest to southeast with slopes ranging between 1% and 2.0%. Undeveloped portions of the property are generally covered with sparse native grasses. The western half of the site currently drains to the south lot line where runoff is collected in an existing sump area before exiting onto existing parking lots, both east and west of the Cinemark Theater. No existing storm infrastructure exists. All surface runoff infiltrates or exits the site via overland flow in the parking lots to the south and southeast. Due to the existing topography of the vacant land, the existing facilities allow standing water without treatment or a sufficient path for exiting the site without encroachment on to the Cinemark property. Special considerations are being taken to ensure the current situation is improved to provide better conveyance away from the Cinemark property. SITE SOILS The Home2 Suites at Harmony Village site soils consist of loamy soil, predominately Nunn clay loam. Nunn clay loam belongs to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Supporting figures can be found in the Appendix, page A-1. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C1000F, eff. December 19, 2006. The site lies within an area determined to be outside the 100yr floodplain, and in an area of minimal flood hazard. The “City of Fort Collins Floodplain Review Checklist for 50% Submittals” checklist is not applicable for this PDP Drainage Report. Page 3 DRAINAGE BASINS AND SUB-BASINS MAJOR BASIN The proposed Home2 Suites at Harmony Village site is located in the McClellands Drainage Basin. The master study for this area is the “McClellands Basin Master Drainage Plan” by Greenhorn and O’Mara, Inc., 1986. Harmony Village is sub-basin 301 and the detention pond associated with Harmony Village P.U.D. is conveyance element 301 of the most recent SWMM model for the McClellands Basin, dated July 1997. The majority of the Harmony Village P.U.D basin is developed and includes commercial and residential uses. Detention for the site is provided within the existing regional detention Pond A, located in the southeast corner of the Harmony Village Site There are no major drainageways located within or immediately adjacent to the site. The site is shown on FEMA FIRM panel 08069C1000F, eff. December 19, 2006. An annotated FIRM exhibit is included in Appendix A-2. HISTORIC SUB-BASINS Home2 Suites at Harmony Village is an infill development. It is governed by the City’s Reasonable Use policy, in which the proposed drainage basins will need to follow the generally accepted principle. Note: The release rate for the regional detention pond was limited to 0.5 cfs/acre for the 100-year event and 0.2 cfs/acre for the 10-year event in accordance with the “McClellands Basin Master Drainage Plan”. Therefore, historic (existing) runoff calculations are included solely as reference in this report. There are no substantial offsite areas that flow across the proposed development site. Referring to the “Existing Drainage Plan”, included in Appendix D, the following describes the existing condition drainage basins. Existing Onsite Sub-Basins: The site has two existing drainage basins. Sub-basin EX1 consists of a 1.67 acre area. The western half of Basin EX1 is undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to be 2% impervious. The eastern half of this basin is an existing asphalt parking lot and is assumed to be 90% impervious. Runoff generally flows to the southeast across basin EX-1, at slopes ranging from 0.50% to 2.0%, generally leaving the site at the southeast corner, where it is enters the right-of-way of Delany Drive. This basin also includes runoff from the Cinemark Theater property crossing onto the southern boundary of the Home2 Suites site. Currently this runoff pools in an existing sump area before overtopping into the existing parking lot to the east. Adding to this poor drainage situation, the sidewalk and landscaping areas along the north end of the theater hardly drain to away from the building foundation. Page 4 Sub-basin EX2 consists of a 0.28 acre area of undeveloped open space with the same ground cover and percentage imperviousness as sub-basin EX-1. Runoff in sub-basin EX-1 collects in an existing sump area north of the Cinemark Theater. Overflow from the sump area flows south to the southwest corner of the site where it conveyed off-site into an existing parking lot. DEVELOPED SUB-BASINS The proposed developed condition sub-basins have been designed to mimic the historic basins’ runoff patterns. The following describes the proposed conditions on-site drainage basins. Refer to the “Proposed Drainage Plan” in Appendix D for review. Proposed Onsite Sub-Basins: Sub-basin A1 consists of 0.41 acres on the northwest portion of the subject property. Runoff from the proposed building, drive lanes, and parking lot travels west and south to an proposed bioretention basin along the southern property line. From the bioretention basin, runoff flows east in a bioswale through another bioretention basin and into the existing parking lot on the southern edge of the property. Sub-basin A2 consists of 0.52 acres on the southwest corner of the subject property. Runoff from this sub-basin, primarily the roof, is collected in an bioretention basin composing the southern half of this basin. From the bioretention basin, runoff flows south in a bioswale through another bioretention basin and into the exiting parking lot on the southern edge of the property. Sub-basin B1 consists of 0.21 acres near the northern boundary of the subject property. Runoff from the proposed building and drive lane travels east through pervious pavers on the northern edge of the property. From the previous pavers, runoff continues sheet flowing east through the existing parking lot and into sub-basin B2. Sub-basin B2 consists of 0.88 acres on the eastern half of the subject property. Runoff from the building entrance is captured in pervious pavers, and joins with runoff from sub-basin B2, continuing to flow east through the existing parking lot to the eastern edge of the property into Delany Drive. Sub-basin C2 consists of 0.02 acres in the western portion of the subject property. Runoff from the proposed landscaping area is conveyed to an existing parking lot paralleling the western site boundary. This runoff is deemed nuisance flow and therefore considered negligible. Page 5 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. LOW-IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP). The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. Site-specific LID BMPs are discussed in the following sections of this report and an illustrative LID/Surface map is provided in Appendix E. In summary, the site is treating approximately 98% of the new impervious area with a variety of LID measures. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-year, 1-hour rainfall depth of 0.82 inches and a 100-year, 1- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA This report demonstrates that the proposed stormwater concept is in compliance with the 100- year developed runoff condition planned for Lot 11A within the Master report. The Rational Method was used to determine both 10-year and 100-year peak runoff values for each sub-basin. Runoff coefficients were assigned using Table 3-2 of the SDDCCS Manual. The Rational Method is Page 6 based on the Rational Formula, Q = CfCIA (1) where Q is the maximum rate of runoff in cfs, A is the total area of the basin in acres, Cf is the storm frequency adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration. The frequency adjustment factor, Cf, is 1.0 for the initial 10-year storm and 1.25 for the major 100-year storm. The runoff coefficient is dependent on land use or surface characteristics. The rainfall intensity is selected from Rainfall Intensity Duration Curves for the City of Fort Collins (Figure 3.1 of SDDCCS). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration tc = ti + tt (2) where tc is the time of concentration in minutes, ti is the initial or overland flow time in minutes, and tt is the travel time in the ditch, channel, or gutter in minutes. The initial or overland flow time is calculated with the SDDCCS Manual equation: ti = [1.87(1.1 - CCf)L0.5]/(S)0.33 (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cf are as defined previously. All hydrologic calculations associated with the sub-basins shown on the attached drainage plan are included in Appendix B of this report. The Home2 Suites at Harmony Village surface drainage system will be designed to convey the minor and major storm events through the property with the curb and gutter, soft swales, and LID measures for the flows being calculated by this report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, conveyance elements will be designed to convey the 100-year storm flows. During the major developed condition 100-year storm, the accumulated water depth in the ponds will be held to a maximum level of one-foot below all building finished floor elevations. Additionally, this report summarizes if any, the expected changes to offsite conditions or flows. All swale outlets will be protected with turf mat or riprap; whichever is most appropriate. Lid measures have been integrated into this design on higher levels than most City of Fort Collin’s projects to date. In all, 98% of this project’s impervious areas pass through and are treated in LID’s prior to reaching their historic outfall locations. Page 7 DRAINAGE FACILITY DESIGN GENERAL CONCEPT The proposed improvements to the Home2 Suites at Harmony Village site will result in developed condition runoff being conveyed around the proposed buildings and to the southeast via curb and gutter and sheet flow across paving. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, permeable pavement systems are proposed for portions of the drive lanes along the northern property line, parking lot to the west, and near the eastern entrance. The permeable pavement systems will not include underdrains because no storm sewer systems exist in the area to accommodate system outfall. Two bioretention basins and one bioswale are proposed on the southern side of the site to improve storm runoff water quality. The western bioretention basin will include an underdrain that will outfall into the eastern bioretention basin. The bioswale will provide overflow conveyance from the western to eastern basin. The east basin will incorporate a rock infiltration gallery to increase soil absorption rates of detained runoff. The rock gallery is proposed because an underdrain cannot be provided since no storm sewers exist in the area. Large runoff events will overtop the eastern basin and flow into the parking lot to the east. WATER QUALITY/ DETENTION FACILITIES Water quality will be provided for the site through the use of the bioretention basins and the bioswale. Detention will be provided for the site through the existing regional detention Pond A in the southeast corner of the Harmony Village site. The proposed bioretention basins will retain minor storm runoff from the site and release the major storm runoff to the regional detention facility. Page 8 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed LID basins, boulder linking placed for overflow protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. JR will provide a detailed Storm Water Management and Erosion Control Plan at the time of the FDP submittal that will meet all requirements of the City of Fort Collins. Page 9 SUMMARY & CONCLUSIONS The existing conditions drainage has two onsite sub-basins with nearby outfall points along the southern boundary of the subject property. The proposed drainage condition was designed to mimic the historic basins’ runoff patterns. The existing conditions drainage patterns are maintained in the design of the project. The proposed improvements will have positive impacts on the timing, flow rate, and quality of runoff leaving the site; and will reduce potential impacts for minor storm flooding downstream of this site. The hydrologic and LID calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements. This PDP Drainage Report and the complimenting drainage plans and LID plans propose appropriate grading, permanent landscaping, LID BMPs, and onsite facilities (e.g. pervious paver, lid basins, etc.) that are shown in their preliminary configuration and will be designed for construction in the Final Drainage Report along with supporting calculations. The proposed concept for the development of the Home2 Suites at Harmony Village site involves routing developed condition flows to proposed onsite LID basins. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the existing outfall points in the parking lot. The site’s stormwater surface facilities are sized to meet the City of Fort Collins “Storm Drainage Criteria Manual and Construction Standards”. Page 10 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, Updated November 2010. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated February, 2013. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [Sept 25, 2010] 4. Final Drainage and Erosion Control Report for Harmony Village P.U.D., prepared by JR Engineering, Ltd., Updated September, 2014. APPENDIX A SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS HOME2 SUITES HARMONY VILLAGE DRAINAGE REPORT Project No. 39705.01 FIGURE 3 - FIRM MAP APPENDIX B HYDROLOGIC CALCULATIONS Subdivision: Harmony Village Project Name: Home2Suites Location: Fort Collins Project No.: Calculated By: DRC Checked By: 0 Date: 10/30/15 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) EX1 1.67 C 52.0 0.61 0.35 180 0.1 39.7 260 0.6 20.0 1.5 2.8 42.5 440.0 12.4 12.4 EX2 0.28 C 5.0 0.52 0.08 40 0.5 14.9 60 0.5 5.0 0.4 2.8 17.7 100.0 10.6 10.6 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 (Tt) Tillage/field Short pasture and lawns Nearly bare ground Grassed waterway Paved areas and shallow paved swales DATA Heavy Meadow (URBANIZED BASINS) Type of Land Surface STANDARD FORM SF-2 EXISTING TIME OF CONCENTRATION 39705.01 SUB-BASIN INITIAL/OVERLAND TRAVEL TIME Tc CHECK (Ti) X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/10/2015 Subdivision: Harmony Village Project Name: Home2Suites Location: Fort Collins Project No.: Calculated By: DRC Checked By: 0 Date: A1 0.41 100 0.28 68.29 5 0.05 0.60 90 0.08 17.60 86.49 A2 0.52 100 0.06 11.54 5 0.21 2.00 90 0.25 43.30 56.84 B1 0.21 100 0.09 42.86 5 0.03 0.70 90 0.09 38.60 82.16 B2 0.88 100 0.83 94.32 5 0.05 0.30 90 0.00 0.00 94.62 C1 0.02 100 0.00 0.00 5 0.02 5.00 90 0.00 0.00 5.00 COMPOSITE % IMPERVIOUS CALCULATIONS 39705.01 10/30/15 % Imp. Area (ac) Weighted % Imp. % Imp. Pavement & Sidewalk Lawns Roofs Area (ac) Weighted % Imp. Basin ID Total Area (ac) % Imp. Area (ac) Basins Total Weighted % Imp. Weighted % Imp. X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/9/2015 Subdivision: Harmony Village Project Name: Home2Suites Location: Fort Collins Project No.: Calculated By: DRC Checked By: 0 Date: 10/30/15 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) A1 0.41 C 86.5 0.80 0.68 15 2.0 2.4 120 0.5 20.0 1.4 1.4 3.8 135.0 10.8 5.0 A2 0.52 C 56.8 0.62 0.38 10 5.0 2.4 175 0.6 15.0 1.2 2.5 4.9 185.0 11.0 5.0 B1 0.21 C 82.2 0.76 0.62 7 2.0 1.8 90 0.5 20.0 1.4 1.1 2.9 97.0 10.5 5.0 B2 0.88 C 94.6 0.89 0.80 150 1.0 6.7 175 0.8 20.0 1.7 1.7 8.4 325.0 11.8 8.4 C1 0.02 C 5.0 0.52 0.08 5 10.0 1.9 5 10.0 15.0 4.7 0.0 2.0 10.0 10.1 5.0 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Tc CHECK 39705.01 DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) Grassed waterway TRAVEL TIME (Tt) Paved areas and shallow paved swales Type of Land Surface Heavy Meadow Tillage/field Short pasture and lawns Nearly bare ground X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/9/2015 APPENDIX C HYDRAULIC CALCULATIONS Project Name: Home2Suites Subdivision: Harmony Village Project No.: Location: Fort Collins Calculated By: DRC Design Storm: Checked By: 0 Date: 10/30/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS Existing 2-yr Flows EX1 EX1 1.67 0.35 12.4 0.58 2.03 1.2 EX2 0.28 0.08 10.6 0.02 2.17 0.0 12.4 0.60 2.03 1.2 Existing 100-yr Flows EX1 EX1 1.67 0.61 12.4 1.02 7.07 7.2 EX2 0.28 0.52 10.6 0.15 7.57 1.1 12.4 1.17 7.07 8.3 STANDARD FORM SF-3 EXISTING STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 39705.01 2-Year DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/10/2015 Project Name: Home2Suites Subdivision: Harmony Village Project No.: Location: Fort Collins Calculated By: DRC Design Storm: Checked By: 0 Date: 10/30/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS Flow passing over pavers through chase drain into LID 1 A1 0.41 0.68 5.0 0.28 2.78 0.8 0.5 75 1.4 0.9 Total flows entering LID 2 A2 0.52 0.38 5.0 0.20 2.78 0.6 5.0 0.48 2.78 1.3 0.6 Flow passing over pavers 3 B1 0.21 0.62 5.0 0.13 2.78 0.4 0.5 170 1.4 2.0 Flow exiting off-site to Delany Drive 4 B2 0.88 0.80 8.4 0.70 2.37 1.7 8.41 0.83 2.37 2.0 0.75 Undeveloped flows off-site to west 5 C1 0.02 0.08 5.0 0.00 2.78 0.0 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year 39705.01 DIRECT RUNOFF TOTAL RUNOFF STREET/SWALE PIPE X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/9/2015 Project Name: Home2Suites Subdivision: Harmony Village Project No.: Location: Fort Collins Calculated By: DRC Design Storm: Checked By: 0 Date: ##### TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS Flow passing over pavers through chase drain into LID 1 A1 0.41 0.80 5.0 0.33 9.70 3.2 0.5 75 1.4 0.9 Total flows entering LID 2 A2 0.52 0.62 5.0 0.32 9.70 3.1 5.00 0.65 9.70 6.3 0.6 Flow passing over pavers 3 B1 0.21 0.76 5.0 0.16 9.70 1.6 0.5 170 1.4 2.0 Flow exiting off-site to Delany Drive 4 B2 0.88 0.89 8.4 0.78 8.26 6.4 8.41 0.94 8.26 7.8 0.75 Undeveloped flows off-site to west 5 C1 0.02 0.52 5.0 0.01 9.70 0.1 STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 39705.01 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/9/2015 Weir Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Monday, Nov 9 2015 Chase Drain - Basin A1 (3.2 cfs) Rectangular Weir Crest = Sharp Bottom Length (ft) = 3.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 3.20 Highlighted Depth (ft) = 0.47 Q (cfs) = 3.200 Area (sqft) = 1.40 Velocity (ft/s) = 2.28 Top Width (ft) = 3.00 0 .5 1 1.5 2 2.5 3 3.5 4 Depth (ft) Chase Drain - Basin A1 (3.2 cfs) Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft) Weir W.S. Weir Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Monday, Nov 9 2015 Chase Drain - Basin A2 (6.3 cfs) - 2 in. overtop Sidewalk Compound Weir Crest = Sharp Bottom Length (ft) = 16.00 Total Depth (ft) = 0.67 Length, x (ft) = 3.00 Depth, a (ft) = 0.50 Calculations Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 6.30 Highlighted Depth (ft) = 0.61 Q (cfs) = 6.300 Area (sqft) = 3.26 Velocity (ft/s) = 1.93 Top Width (ft) = 16.00 0 2 4 6 8 10 12 14 16 18 20 Depth (ft) Chase Drain - Basin A2 (6.3 cfs) - 2 in. overtop Sidewalk Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft) Weir W.S. Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Monday, Nov 9 2015 Bio-Swale Section - at Southern Property Line (6.3 cs) Rectangular Bottom Width (ft) = 4.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 4960.50 Slope (%) = 0.60 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 6.30 Highlighted Depth (ft) = 0.73 Q (cfs) = 6.300 Area (sqft) = 2.92 Velocity (ft/s) = 2.16 Wetted Perim (ft) = 5.46 Crit Depth, Yc (ft) = 0.43 Top Width (ft) = 4.00 EGL (ft) = 0.80 0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5 Elev (ft) Depth (ft) Section 4960.00 -0.50 4960.50 0.00 4961.00 0.50 4961.50 1.00 4962.00 1.50 4962.50 2.00 4963.00 2.50 Reach (ft) Subdivision Harmony Village Project Name: Home2Suites Location Fort Collins Project No. 39705.01 By: DRC Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: 0 A - Upper Surface Date: 10/30/15 B - Lower Surface LID Basin (East) Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet) (cubic feet) (cubic feet) (acre feet) 0.00 4959.50 270 0 0 0.00 0.25 4959.75 360 78 78 0.00 0.50 4960.00 427 98 176 0.00 0.75 4960.25 497 115 291 0.01 1.00 4960.50 610 138 429 0.01 1.25 4960.75 816 178 607 0.01 1.50 4961.00 1,190 249 856 0.02 Volume (acre feet) Volume Water Surface Elevation POND VOLUME CALCULATIONS X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/10/2015 Subdivision Harmony Village Project Name: Home2Suites Location Fort Collins Project No. 39705.01 By: DRC Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: 0 A - Upper Surface Date: 10/30/15 B - Lower Surface LID Basin (West) Stage Stage Elevation Stage Surface Area Stage Volume Cumulative Volume Cumulative Volume (square feet) (cubic feet) (cubic feet) (acre feet) 0.00 4960.00 100 0 0 0.00 0.50 4960.50 396 116 116 0.00 1.00 4961.00 958 328 444 0.01 1.50 4961.50 1,480 605 1,049 0.02 2.00 4962.00 2,013 870 1,919 0.04 Volume (acre feet) Volume Water Surface Elevation POND VOLUME CALCULATIONS X:\3970000.all\3970501\Excel\Drainage\3970501Drainage_Calcs.xls Page 1 of 1 11/10/2015 APPENDIX D EXISTING & PROPOSED DRAINAGE PLANS FINAL DRAINAGE AND EROSION CONTROL REPORT HARMONY VILLAGE P.U.D. Prepared for: Dial Companies 11506 Nicholas St., #200 Omaha, Nebraska 68154 (402) 493-2800 Prepared by: JR Engineering, Ltd. 2620 E. Prospect Road, Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 November 6, 1998 Revised January 6, 1999 Revised February 6, 1999 Revised September 15, 2014 Job Number 9168.00 2 Local drainage facilities were designed to convey peak flows from the 100-year storm event calculated using the Rational Method. Regional hydrology was evaluated using UDSWM2- PC Rainfall/Runoff Prediction and Watershed Simulations Program (SWMM) endorsed by the Urban Drainage and Flood Control District. 1.5 Master Drainage Basin Harmony Village P.U.D. is included in the McClellands Drainage Basin. The master study for this area is the “McClellands Basin Master Drainage Plan” by Greenhorn and O’Mara, Inc., 1986. Harmony Village is sub-basin 301 and the detention pond associated with Harmony Village P.U.D. is conveyance element 301 of the most recent SWM model for the McClellands Basin, dated July 1997. 2. HISTORIC (EXISTING) DRAINAGE The historic (existing) flows for this site consist of the flows from the site. There are no off- site flows entering the property. The drainage pattern for the property is via overland flow in a southeasterly direction at approximately 1- percent slope. The existing drainage from the existing warehouse site to the west of Harmony Village P.U.D. is routed southerly in an existing swale around the east edge of the warehouse site onto the Harmony Village P.U.D. property, diverted westerly to the railroad right-of-way, diverted southerly and conveyed along the railroad tracks to an existing downstream detention pond. This drainage pattern is being maintained with the development of the Harmony Village P.U.D. site. Note: The release rate for the detention pond was limited to 0.5 cfs/acre for the 100-year event and 0.2 cfs/acre for the 10-year event in accordance with the “McClellands Basin Master Drainage Plan”. Therefore, historic (existing) runoff calculations are not included as part of this report. 3 3. LOCAL DEVELOPED DRAINAGE DESIGN 3.1 Method The Rational Method was used to determine both the 10-year and 100-year flows for the sub- basins indicated in this drainage report. A detailed description of the hydrologic analysis is provided in Section 3.4 of this report. 3.2 General Flow Routing Flows within this site will take the form of overlot, swale, gutter, and pipe flow. The existing drainage patterns have been maintained where possible. All grading has been designed to carry flows away from structures to the proposed drainage facilities. The proposed drainage facilities for this site consist of proposed sump inlets, curb cuts, swales, drainage pipes and a box culvert. The majority of the site will drain to the proposed detention pond located in the southeast corner of the property. The detention pond outlets to the existing storm system for the Harmony Crossing Subdivision located to the south. Flows from Harmony Village P.U.D. and Harmony Crossing enter the McClellands Drainageway and eventually reach the Cache La Poudre River. The southern portion of the site was included in the detention calculations and drainage report for Harmony Crossing. This includes the assisted living area, Wilmington Drive, the tot lot, and the western parking lot. This area will be free released to the south and detained in the existing pond for Harmony Crossing as stated in the Final Drainage and Erosion Control Study for Harmony Crossing, P.U.D. (RBD, 1994). 3.3 Proposed Drainage Plan A qualitative summarization of the drainage patterns within each sub-basin and at each design point is provided in the following paragraphs. Discussions of the detailed design of drainage facilities identified in this section are included in the following sections. Runoff from Subbasin 101 is conveyed via sheet flow, gutter flow and through cross- pans to a proposed sump condition curb cut located at Design Point 1. The curb cut outlets into a proposed grouted boulder channel in Subbasin 105, the upper portion of the large detention pond (Pond B). 5 Runoff from Subbasin 110, the large detention pond (Pond A) is conveyed to the outlet structure in the southeast corner of the said pond at Design Point 10. (See below for discussion of Detention Pond.) Subbasin 111 includes the west half of Timberline Road adjacent to the southerly portion of Harmony Village P.U.D. Runoff is conveyed via gutter flow along the west side of Timberline to an existing detention pond in the southeast corner of Harmony Crossing as described in the approved drainage report for that development. Calculations in Appendix C show that the additional flow to the 10’ curb inlet will not exceed its capacity for the 100-year event. Subbasin 112 is conveyed via sheet flow and gutter flow to a proposed curb cut located at Design Point 12. The curb cut outlets into a proposed concrete channel in Subbasin 105, the upper portion of the large detention pond (Pond B). Runoff from Subbasin 113, is conveyed via sheet flow and gutter flow to a proposed sump condition inlet on the east side of Delany Street south of Timberwood Drive at Design Point 13. The inlet outfalls into a proposed underground storm sewer pipe system that outlets into Subbasin 110, the large detention pond (Pond A). Any flow that is unable to enter the inlet during the 100-year event will proceed easterly into the proposed parking lot via sheet flow and gutter flow to the proposed inlet in Subbasin 109. Runoff from Subbasin 114, is conveyed via sheet flow and gutter flow to a proposed sump condition inlet on the east side of parking lot adjacent to Delany Street south of Timberwood Drive at Design Point 14. The inlet outfalls into a proposed underground storm sewer pipe system that joins the storm sewer pipe from Subbasin 113 and outlets into Subbasin 110, the large detention pond (Pond A). If any clogging of the inlet occurs, the runoff will begin to pond in the parking lot until it begins to flow out the entrance to Delany. At this point, the runoff will flow easterly across Delany Drive toward Design Point 13 in Subbasin 113. The excess flow proceeds east into the proposed parking lot via sheet flow and gutter flow to the proposed inlet in Subbasin 109. Runoff from Subbasin 115 is conveyed via sheet flow and gutter flow south along Delany Drive to Design Point 15. From here, runoff is conveyed to the existing detention pond in the southeast corner of Harmony Crossing as described in the approved drainage report for that development. Runoff from Subbasin 116 is conveyed via sheet flow and gutter flow to Wilmington Drive. Flows are conveyed easterly along Wilmington Drive to Delany Drive within Harmony Crossing at Design Point 16. The flows are then conveyed to the existing detention pond in the southeast corner of Harmony Crossing as described in the approved drainage report for that development. 9 Table 3.1 – Drainage Summary Table Design Tributary Area C (10) tc (10) Q(10)tot C (100) tc (100) Q(100)tot DRAINAGE Sub-basin STRUCTURE Point (ac) (min) (cfs) (min) (cfs) /REMARKS 1 101 11.72 0.72 14.4 32.06 0.89 11.6 70.4 10' Curb Cut 2 102 0.65 0.84 5.0 3.05 1.00 10.0 4.6 2' Curb Cut 3 103 0.53 0.95 5.0 2.80 1.00 10.0 3.8 5' Curb Cut & Sidewalk Chase 4 104 3.84 0.68 7.5 15.00 0.86 10.0 27.2 10' Curb Cut 105 0.66 0.13 12.4 0.35 0.16 12.4 0.7 5 101-105 + 112 17.88 0.70 18.8 42.18 0.88 18.8 84.1 2'x8' box 6 106 0.39 0.88 5.0 14.07 1.00 10.0 50.6 8' Curb Cut 7 107 0.25 0.50 5.7 0.67 0.62 10.0 1.1 Double Combination inlet 8 108 0.39 0.82 5.0 1.78 1.00 10.0 2.8 Double Combination inlet 9 109 0.60 0.64 5.9 2.04 0.80 10.0 9.2 8’ Type R inlet 110 1.28 0.10 11.6 0.54 0.13 10.0 1.1 10 101-114 29.00 0.71 18.9 69.14 0.89 18.9 137.9 11 111 0.45 0.95 7.5 2.11 1.00 10.0 4.1 free release 12 112 0.48 0.91 5.0 2.45 1.00 10.0 3.4 2' Curb Cut 13 113 1.16 0.68 8.9 3.67 0.85 10.0 14.5 5' Type R inlet 14 114 6.46 0.84 16.4 19.50 1.00 14.0 39.9 15' Type R inlet 15 115 0.19 0.59 5.0 0.61 0.74 10.0 1.0 free release 16 116 2.83 0.74 8.7 9.88 0.93 10.0 18.7 free release 17 117 0.81 0.27 13.9 0.84 0.34 13.9 1.7 free release 18 118 0.88 0.95 5.0 4.66 1.00 10.0 6.3 2' Curb Cut & Sidewalk Chase 19 119 1.60 0.44 12.1 2.90 0.55 11.1 6.0 free release 20 120 0.10 0.10 5.6 0.05 0.13 10.0 0.1 O-1 OS-1 4.54 0.71 16.8 11.44 0.89 16.8 22.8 O-2 OS-2 1.02 0.49 10.6 2.19 0.62 10.2 27.2 4. REGIONAL DRAINAGE EVALUATION 4.1 Detention Pond Design Detention is required and will be provided for on the Harmony Village site. The proposed detention pond area is located in the southeast corner of the site. The proposed outlet structure connects to the existing pipe under Rockport Court and outlets into an existing swale parallel to Timberline Road that drains to the existing detention pond for the Harmony Crossing Subdivision. The proposed detention pond for Harmony Village consists of two areas that are interconnected by a box culvert under Timberwood Drive. The box culvert connecting the ponds was sized so that peak 100-year flow can pass freely without being 15 7. REFERENCES 1. City of Fort Collins, “Storm Drainage Design Criteria and Construction Standards” (SDDCCS), May 1984. 2. “Preliminary Drainage and Erosion Control Report for Harmony Village P.U.D.”, JR Engineering, Ltd., May 1, 1998, Revised July 15, 1998. 3. “Final Drainage and Erosion Control Study for Harmony Crossing P.U.D., Fort Collins, Colorado”, RBD, Inc. Engineering Consultants, January 28, 1994. 4. “McClellands Basin Master Drainage Plan”, Greenhorn and O’Mara, 1986. 5. Soil Survey of Larimer County Area, Colorado. United States Department of Agriculture Soil Conservation Service and Forest Service, 1980. 6. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated March 1969, and Volume 3, dated September 1992. A Westrian Company HOME2 SUITES HARMONY VILLAGE EXISTING CONDITIONS DRAINAGE MAP Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer tc Q5 Q100 C100 C5 (min) (cfs) (cfs) EX1 1.67 0.61 0.35 12.44 1.2 7.2 EX2 0.28 0.52 0.08 10.56 0.0 1.1 Existing Runoff Summary Table Basin ID Area (acres) HOME2 SUITES X:\3970000.all\3970501\Drawings\Sheet Dwgs\Drainage Report\3970501DRH.dwg, EXISTING DRAINAGE (24X36), 11/10/2015 11:47:42 AM A Westrian Company HOME2 SUITES HARMONY VILLAGE PROPOSED CONDITIONS DRAINAGE MAP tc Q5 Q100 C100 C5 (min) (cfs) (cfs) A1 0.41 0.80 0.68 5.00 0.78 3.20 A2 0.52 0.62 0.38 5.00 0.56 3.10 B1 0.21 0.76 0.62 5.00 0.36 1.55 B2 0.88 0.89 0.80 8.41 1.66 6.44 C1 0.02 0.52 0.08 5.00 0.00 0.10 Runoff Summary Table Basin ID Area (acres) Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer HOME2 SUITES X:\3970000.all\3970501\Drawings\Sheet Dwgs\Drainage Report\3970501DRF.dwg, Proposed Drainage (24X36), 11/10/2015 12:01:31 PM APPENDIX E LID EXHIBITS AREA DESCRIPTION AREA (SF) % OF TOTAL NEW IMPERVIOUS AREA AFFLUENT TO L.I.D. BMP'S 34,862 89% PICP AREA 3,700 9% TOTAL TREATED AREA 38,562 98% NEW IMPERVIOUS AREA NOT TREATED BY L.I.D. OR WQ 632 2% TOTAL IMPERVIOUS AREA 39,194 100% IMPERVIOUS AREA TREATMENT RATIO Know what's City of Fort Collins, Colorado UTILITY PLAN APPROVAL CityDate Engineer WaterDate & Wastewater Utility StormwaterDate Utility ParksDate & Recreation TrafficDate Engineer Date EnvironmentalDate Planner Date Larimer County, Colorado UTILITY PLAN APPROVAL LarimerDate County Engineer X:\3970000.all\3970501\Drawings\Sheet Dwgs\PDP\3970501LID-ImperviousArea.dwg, LID-Impervious Area, 11/10/2015 12:02:07 PM