HomeMy WebLinkAboutFOOTHILLS MALL REDEVELOPMENT, MULTI-FAMILY - FDP - FDP150048 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSREVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
STANFORD RD
STANFORD RD
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
ACCESS EASEMENT TO BE VACATED
UTILITY EASEMENT TO BE VACATED
EXISTING FIRE ACCESS EASEMENT
EXISTING UTILITY EASEMENT
EASEMENT LEGEND
EXISTING CONDITIONS AND DEMOLITION PLAN
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
C2.1 C2.2
C2.3
C2.4
LEGEND
EXISTING
C2.5
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
SEE SHEET C2.2
MATCHLINE
LOT 3 WEST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
MATCHLINE
SEE SHEET C2.1
LOT 3 EAST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 4
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 5
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 6
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
CP/SSA
VTC/CWA
VTC/CWA
VTC/CWA
VTC/CWA
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
SF/SCL
TP
TP
TP
TP TP
TP
TP TP
TP
TP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TP
TP
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD RD
STANFORD RD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
C6.1 C6.2
C6.3
C6.4
GRADING PLAN
LEGEND
EXISTING PROPOSED
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
CURB CUT
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
EXISTING
SAND FILTER
-5.0%
-1.8% -2.0%
-1.9%
-1.9%
-3.0%
-4.9%
-4.3%
-2.6%
-1.4% -2.0% -1.7%
-2.6%
-1.0% -1.0%
-1.0% -1.1%
-0.6%
-0.7%
-2.0% -2.0%
-1.0%
-2.0%
-2.0%
-1.0%
-1.0%
-2.0%
-4.7%
-2.1%
-1.1%
-4.3%
-1.4%
-4.3%
-4.1%
-1.8%
-2.0%
-2.4%
-2.0%
-2.0%
-2.0%
-2.0%
-2.0%
-2.0% -1.0% -1.0% -2.0%
-1.0%
-1.0%
-1.0% -1.0% -1.0%
-2.1%
-2.0%
-2.0%
-3.2%
-2.0%
-2.0%
PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD ROAD
RG-33.0
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
EXISTING
SAND FILTER
EXISTING
RAIN GARDEN
-1.0%
-1.0%
-1.7%
-1.0%
-4.4%
-2.0%
-1.0%
-1.0%
-1.0%
-2.0%
-5.3%
-0.5%
-2.0%
-2.0%
-3.3%
-2.0%
-4.8%
-3.1%
-3.3%
-1.0% -1.0% -1.0%
-1.7% -1.0% -2.8%
-1.0%
-1.0%
-0.9%
-2.0%
-3.3%
-1.0%
-1.0%
-1.0%
-4.7%
-2.3%
-1.0%
-1.0%
-1.0%
-4.5%
-1.8% -2.0%
-1.9%
-1.7%
-3.0%
-4.3%
-3.8%
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 4
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 5
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
BUILDING 18
-3.9% BUILDING 19
-3.6%
-3.7%
-2.0% -2.0%
-2.0%
-4.4%
-4.5%
-2.0%
-1.0% -1.0%
-2.2%
-1.0%
-2.3%
-1.4%
-2.0%
-3.3%
-2.0%
-1.7%
-2.0%
-2.0%
-2.0%
-2.0%
-2.0%
-2.5%
-2.0%
-2.0%
-1.7%
-2.0%
-0.7%
-1.0% -1.0%
-2.0%
-1.3%
-2.0%
-0.0%
-2.0%
-1.0%
-1.3%
-1.0%
-1.0%
-2.0%
-1.0%
-2.0%
-1.0%
-2.0%
-2.3%
-2.0%
-4.4%
-4.4%
-2.0%
-2.0% -2.0%
-1.0%
-1.0%
-4.4%
-1.9%
-2.0%
-2.0%
-1.0%
-1.0%
-0.9%
-1.2%
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD RD
STANFORD RD
TAP TO MAIN TAP TO MAIN
MAIN
GATE VALVE
DOMESTIC SERVICE
DOMESTIC SERVICE METER
SEE PLAN FOR SIZE
THRUST BLOCK
CURB STOP AT EASEMENT
OR ROAD LINE
FIRE LINE
PROPOSED UTILITY EASEMENT
PROPOSED FIRE ACCESS EASEMENT
EXISTING FIRE ACCESS EASEMENT
EXISTING UTILITY EASEMENT
EASEMENT LEGEND
UTILITY PLAN
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
C8.1 C8.2
C8.3
C8.4
LEGEND
EXISTING PROPOSED
C8.5
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
EXISTING 10" WATERLINE
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
SEE STORM PLAN AND
PROFILES FOR DETAIL
SEE STORM PLAN AND
PROFILES FOR DETAIL
FIRE HYDRANT
SEE STORM PLAN AND
PROFILES FOR DETAIL
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
SEE SHEET C8.2
MATCHLINE
LOT 3 WEST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
SEE STORM PLAN AND
PROFILES FOR DETAIL
SEE STORM PLAN AND
PROFILES FOR DETAIL
SEE STORM PLAN AND
PROFILES FOR DETAIL
CUT AND PATCH
STREET
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
MATCHLINE
SEE SHEET C8.1
LOT 3 EAST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 4
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 5
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 6
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD RD
STANFORD RD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
LOT 8 +
VAC TULANE
PORTION LOT 1 +
VAC TULANE
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 9
DEMO APPROX. 10.9 LF OF
8" DIAMETER PVC PIPE
DEMO EXISTING
SS MANHOLE
4980
4984
4988
4992
4996
5000
5004
5008
5012
5016
4980
4984
4988
4992
4996
5000
5004
5008
5012
5016
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80 7+20 7+60 8+00 8+40
EXISTING MH 1
STA 1+50.00
RIM EL 5006.02
EXISTING 8" DIA PVC
INSTALL SS MANHOLE
SSMH 3-1
STA 2+77.78
RIM EL 5003.03
129.09 L.F. OF 8" DIA
SDR 35 PVC @ 0.45%
INSTALL SS MANHOLE
SSMH 3-2
STA 4+06.87
RIM EL 5004.85
386.43 L.F. OF 8" DIA
SDR 35 PVC @ 2.18%
INSTALL SS MANHOLE
SSMH 3-3
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
DEMO APPROX. 10.9 LF OF
8" DIAMETER PVC PIPE
DEMO EXISTING
SS MANHOLE
4980
4984
4988
4992
4996
5000
5004
5008
5012
4980
4984
4988
4992
4996
5000
5004
5008
5012
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60
INV OUT W 4994.30
INV OUT S 4992.44
INV IN W 4992.64
INV IN E 4992.64
INSTALL SS MANHOLE
SSMH 3-4
STA 4+92.63
RIM EL 4998.96
342.63 L.F. OF 8" DIA
SDR 35 PVC @ 0.48%
INSTALL SS MANHOLE
SSMH 3-2
STA 1+50.00
RIM EL 5004.85
PROPOSED GRADE
EXISTING GRADE
PROPOSED SANITARY
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD RD
STANFORD RD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
INSTALL FIRE HYDRANT ASSEMBLY
23.98 LF OF 6" DIA
DIP CLASS 50 W/POLYWRAP
STA 6+94.97
N 1441774.80
E 3119221.05
INSTALL FIRE HYDRANT ASSEMBLY
8.58 LF OF 6" DIA
DIP CLASS 50 W/POLYWRAP
STA 10+41.61
N 1441742.10
E 3118874.42
15.0 L.F. 1.5"
WATER SERVICE
15.0 L.F. 1.5"
WATER SERVICE
15.0 L.F. 1.5"
WATER SERVICE
15.0 L.F. 1.5"
WATER SERVICE
15.0 L.F. 1.5"
WATER SERVICE
15.1 L.F. 1.5"
WATER SERVICE
10.1 L.F. 4"
FIRE SERVICE
10.0 L.F. 4"
FIRE SERVICE
10.1 L.F. 4"
FIRE SERVICE 10.0 L.F. 4"
FIRE SERVICE
10.0 L.F. 4"
FIRE SERVICE
10.0 L.F. 4"
FIRE SERVICE
1.5" SERVICE
METER PIT
1.5" SERVICE
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
BUILDING 5
TYPE D3
LOT 8 +
VAC TULANE
PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
16.0 L.F. 1.5"
WATER SERVICE
16.0 L.F. 4"
FIRE SERVICE
1.5" SERVICE
METER PIT
4984
4988
4992
4996
5000
5004
5008
5012
5016
4984
4988
4992
4996
5000
5004
5008
5012
5016
TOP 5000.06'
1+20 1+60 2+00 2+40 2+80 3+20
8" TEE w/TB
STA 2+94.35
4" TAP W/ VALVE AND TB
STA 2+87.86
1.5" TAP
STA 2+82.86
104.25 LF OF
8" C900 PVC
%(1'Z7%
STA 1+77.74
%(1'Z7%
STA 1+70.00
TOP 4999.16'
TOP 4999.96'
5.32 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
TOP 5000.08'
TOP 4999.03'
7.16 LF OF
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
BUILDING 10
BUILDING 11 TYPE D2
BUILDING 12 TYPE C2
TYPE E1
BUILDING 13
TYPE D1
BUILDING 14
TYPE D1
BUILDING 9
INSTALL FIRE HYDRANT ASSEMBLY
22.12 LF OF 6" DIA
DIP CLASS 50 W/POLYWRAP
STA 2+34.49
N 1441085.41
E 3119361.41
33.6 L.F. 4"
FIRE SERVICE
30.3 L.F. 4"
FIRE SERVICE
35.8 L.F. 4"
FIRE SERVICE
43.9 L.F. 4"
FIRE SERVICE
35.8 L.F. 1.5"
38.6 L.F. 1.5" WATER SERVICE
WATER SERVICE
28.7 L.F. 1.5"
WATER SERVICE
38.9 L.F. 1.5"
WATER SERVICE
1.5" SERVICE
METER PIT
1.5" SERVICE
1.5" SERVICE METER PIT
METER PIT
1.5" SERVICE
METER PIT
1.5" SERVICE
METER PIT
TIE TO EXISTING WATERMAIN
TIE TO EXISTING WATERMAIN
4984
4988
4992
4996
5000
5004
5008
5012
5016
5020
4984
4988
BUILDING 12
TYPE E1
BUILDING 13
TYPE D1
BUILDING 14
TYPE D1
BUILDING 15
TYPE C1
BUILDING 16
TYPE B
BUILDING 17
TYPE A
BUILDING 18
BUILDING 19
TIE TO EXISTING WATERMAIN
TIE TO EXISTING WATERMAIN
1.5" SERVICE
METER PIT
8.3 L.F. 1.5"
WATER SERVICE
8.2 L.F. 4"
FIRE SERVICE
LOT 5 WATER MAIN
4992
4996
5000
5004
5008
5012
5016
5020
5024
5028
4992
4996
5000
5004
5008
5012
5016
5020
5024
5028
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80 7+20
EXISTING GRADE
PROPOSED GRADE
MIN 5'
MAX 6'
8" TEE w/TB
STA 6+96.49
8" TEE w/TB
STA 1+50.00
%(1'Z7%
STA 2+67.56
%(1'Z7%
STA 6+05.29
%(1'Z7%
STA 3+91.81
%(1'Z7%
STA 2+69.43
BUILDING 18
BUILDING 19
INSTALL FIRE HYDRANT ASSEMBLY
0.00 LF OF 6" DIA
DIP CLASS 50 W/POLYWRAP
STA 3+13.63
N 1440082.68
E 3119168.17
TIE TO EXISTING WATERMAIN
USE EXISTING WATER LINE
FOR FIRE SERVICE
5000
5004
5008
5012
5016
5020
5024
5028
5000
5004
5008
5012
5016
5020
5024
5028
1+20 1+60 2+00 2+40 2+80 3+20 3+40
%(1'Z7%
STA 1+74.74
%(1'Z7%
STA 1+78.39
2" TAP
STA 1+86.47
2" TAP
STA 2+97.43 4" TAP W/ VALVE AND TB
STA 3+02.43
3.08 LF OF
8" C900 PVC
109.79 LF OF
8" C900 PVC
10.61 LF OF
8" C900 PVC
TOP 5009.38'
TOP 5009.38'
TOP 5009.48'
TOP 5009.83'
TOP 5009.83'
TOP 5009.90'
MIN 5'
MAX 6'
PROPOSED 12"
STORM CROSSING
8" TEE w/TB
STA 1+50.00
CONNECT TO EXISTING
8" DIA WATERLINE
CONSTRUCT WATERLINE
LOWERING
23.87 LF OF
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD RD
STANFORD RD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
LOT 8 +
VAC TULANE
PORTION LOT 1 +
VAC TULANE
LOT 2
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
BUILDING 5
TYPE D3
SEE WEST MEW DETAIL
NEXT SHEET
SEE COURTYARD DETAIL
NEXT SHEET
SEE NORTH MEW DETAIL
NEXT SHEET
4992
4996
5000
5004
5008
5012
5016
4992
4996
5000
5004
5008
5012
5016
1+00 1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80
INSTALL 24" DRAIN BASIN
INLET 3-1.0
STA 6+58.84
RIM EL 5008.74
76.50 L.F. 12"
HDPE PIPE @ 1.66%
INSTALL 24" DRAIN BASIN
INLET 3-2.0
STA 5+82.34
RIM EL 5007.94
123.72 L.F. 18"
HDPE PIPE @ 1.96%
INSTALL 4' DIA MANHOLE
SDMH 3-3.0
STA 4+58.62
RIM EL 5006.51
114.65 L.F. 18"
HDPE PIPE @ 0.82%
INSTALL 30" DRAIN BASIN
INLET 3-4.0
STA 3+43.96
RIM EL 5004.60
112.28 L.F. 24"
HDPE PIPE @ 0.18%
BUILDING 3
TYPE E2
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
LOT 8 +
VAC TULANE
PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
SEE COURTYARD DETAIL
NEXT SHEET
SEE WEST MEW DETAIL
NEXT SHEET
SEE EAST MEW DETAIL
NEXT SHEET
4984
4988
4992
4996
5000
5004
5008
5012
4984
4988
4992
4996
5000
5004
5008
5012
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00
INV OUT E 4998.82
INV OUT E 4998.44
INV IN W 4998.44
INV OUT E 4996.82
INV IN W 4997.32
INV IN S 4997.32
INV OUT E 4995.44
INV IN W 4995.44
INV IN S 4995.94
INV OUT E 4994.25
INV IN S 4995.25
INV IN N 4995.25
INV IN W 4994.75
INV OUT N 4994.05
INV IN W 4994.10
INV IN S 4994.00
BUILDING 5
TYPE D3
BUILDING 7
TYPE E2
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
BUILDING 10
TYPE D2
BUILDING 11
TYPE C2
BUILDING 12
TYPE E1
BUILDING 13
BUILDING 9 TYPE D1
SEE POOL DETAIL
NEXT SHEET
SEE NORTH MEW DETAIL
NEXT SHEET
SEE SOUTH MEW DETAIL
NEXT SHEET
4992
4996
5000
5004
5008
5012
5016
4992
4996
5000
5004
5008
5012
5016
1+00 1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80 7+20
WALL PENETRATION
STA 1+50.00
80.93 L.F. 24"
HDPE PIPE @ 0.50%
INSTALL 4' DIA MANHOLE
SDMH 4-1.0
STA 2+30.93
RIM EL 5004.69
71.35 L.F. 24"
HDPE PIPE @ 0.30%
INSTALL 4' DIA MANHOLE
SDMH 4-2.0
STA 3+02.28
RIM EL 5004.26
INSTALL 30" DRAIN BASIN
INLET 4-3.0
STA 3+37.13
RIM EL 5003.42
58.14 L.F. 24"
HDPE PIPE @ 0.20%
47.59 L.F. 24"
HDPE PIPE @ 0.50%
INSTALL 30" DRAIN BASIN
INLET 4-5.0
STA 4+42.86
RIM EL 5003.56
62.40 L.F. 18"
HDPE PIPE @ 1.54%
131.72 L.F. 12"
HDPE PIPE @ 0.50%
INSTALL 4' DIA MANHOLE
BUILDING 12
TYPE E1
BUILDING 13
TYPE D1
BUILDING 10
TYPE D2
BUILDING 11
TYPE C2
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
BUILDING 14
TYPE D1
BUILDING 15
TYPE C1
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
BUILDING 16
TYPE B
BUILDING 17
TYPE A
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
BUILDING 18
BUILDING 19
5000
5004
5008
5012
5016
5020
5024
5000
5004
5008
5012
5016
5020
5024
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80
INV IN NW 5008.00
INV OUT SE 5008.06
INV IN SW 5008.06
INV IN NW 5009.20
119.75 L.F. 30"
HDPE PIPE @ 0.20%
INV OUT NE 5008.29
INV IN W 5008.29
INV OUT E 5008.35
INV IN W 5008.35
67.41 L.F. 30"
HDPE PIPE @ 0.21%
INV OUT E 5008.49
INV IN N 5008.50
75.15 L.F. 30"
HDPE PIPE @ 0.19%
INV OUT S 5008.64
INV IN N 5008.64
INV IN W 5010.14
INV IN E 5010.64
INV OUT S 5008.69
INV IN N 5008.69
INV IN E 5010.69
INV OUT S 5008.76
INV IN W 5009.76
INV IN N 5009.26
INV IN E 5010.76
INV OUT S 5009.40
INV IN N 5009.40
INV IN E 5010.90
INV OUT S 5009.63
INV IN NW 5010.63
INV IN N 5009.63
INV IN E 5011.13
61.07 L.F. 24"
HDPE PIPE @ 0.50%
INV OUT S 5009.94
INV IN E 5009.94
WALL PENETRATION
STA 1+50.00
INSTALL 4' DIA MANHOLE
SDMH 6-1.0
STA 1+61.03
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
STANFORD RD
STANFORD RD
5.0'
TYP.
8.0'
TYP.
5.0'
TYP.
PER PLAN
VARIES
8.0'
TYP.
3.0'
12.0"
TYP.
PER PLAN
PER PLAN
12.0"
TYP.
12.0"
TYP.
12.0"
TYP.
17
20
(TYP.)
3
3
17
17
17
3
3
10 10
15 15
PER PLAN
PER PLAN
2
26.0'
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
24.0'
17.0'
(TYP)
21.5'
1
10.6'
62.6' 26.0' 54.8' 63.7'
12.8'
9.0' 81.0' 55.0' 90.0' 126.0'
12
12
5
10
10
21.8'
8
8
9
9 9
10
7
10
11
BUILDING 1
TYPE D3
BUILDING 2
TYPE C3
BUILDING 3
TYPE E2
BUILDING 4
TYPE D2
3 2
1
9.4'
10.5'
62.6' 26.0' 62.6' 19.7'
10.6' 11.0'
81.0'
SEE LANDSCAPE PLANS
FOR COURTYARD DETAIL
EXISTING FENCE TO REMAIN
CONTRATOR TO PROTECT IN PLACE
12
3.0'
3
3
3 3 3
13
14
14
14 14 14
13
15
15
15 15
15
17
PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
24.0'
17.0'
(TYP)
21.5'
STANFORD ROAD
135.0' 81.0' 48.4' 120.8' 50.4'
62.6'
9.4'
63.7'
12.6'
26.0'
10.6'
62.6'
14.0'
12
12
1
5
10
22.7'
8
8
10
11
BUILDING 5
TYPE D3
BUILDING 6
TYPE C3
BUILDING 7
TYPE E2
BUILDING 8
TYPE D2
1
13
62.6' 47.4' 26.0'
10.5'
14
14
14
14
14 14
1 1 1
5.2'
13
9 9 9
10 10
12
17
1.0'
15
17
30.5'
30.8'
18
17.6'
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 4
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 5
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
BUILDING 18
BUILDING 19
21.9'
23.0'
23.0'
24.0'
36.0'
24.0'
36.0'
24.0'
59.6'
24.0'
5.0'
36.0'
85.3'
24.3'
58.2'
68.8'
135.0'
27.0'
18.0'
TYP.
55.8'
1
1
12
3
9
11
3
3
3
12
9.0'
TYP.
9
9
9
9
9
9
9
9
9
31.0' 23.0' 115.0'
33.5' 32.3'
1
1
9.8'
12.3'
10
10
10
10
10
10
10
10
14
14
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.1
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.2
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.3
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.4
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.5
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.6
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.7
A
12/21/2015
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
DETAILS R
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DTL.dwg
JG
MH
C20.8
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
STRUCTURE SIZE H-10 GRATE OPTIONS
12" PEDESTRIAN
15" PEDESTRIAN
18" PEDESTRIAN
24" PEDESTRIAN
STRUCTURE SIZE
12" N/A STANDARD SOLID 2X2 R&H N/A
15" N/A STANDARD SOLID 2X2 R&H N/A
18" N/A STANDARD SOLID 2X2 R&H 2X3 R&H
24" N/A STANDARD SOLID 2X2 R&H 2X3 R&H
30" PEDESTRIAN STANDARD SOLID 2X2 R&H 2X3 R&H
H-20 GRATE OPTIONS
STRUCTURE
SIZE
A°
ANGLE BETWEEN
HOLES
B
NUMBER OF
HOLES
8" 90° 4
10" 90° 4
12" 60° 6
15" 60° 6
18" 45° 8
24" 45° 8
30" 36° 10
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
Section 2721
Engineered Surface Drainage Products
GENERAL
PVC surface drainage inlets shall include the drain basin type as indicated on the contract drawing and referenced within the contract specifications. The ductile
iron grates for each of these fittings are to be considered an integral part of the surface drainage inlet and shall be furnished by the same manufacturer. The
surface drainage inlets shall be as manufactured by Nyloplast a division of Advanced Drainage Systems, Inc., or prior approved equal.
MATERIALS
The drain basins required for this contract shall be manufactured from PVC pipe stock, utilizing a thermoforming process to reform the pipe stock to the specified
configuration. The drainage pipe connection stubs shall be manufactured from PVC pipe stock and formed to provide a watertight connection with the specified
pipe system. This joint tightness shall conform to ASTM D3212 for joints for drain and sewer plastic pipe using flexible elastomeric seals. The flexible elastomeric
seals shall conform to ASTM F477. The pipe bell spigot shall be joined to the main body of the drain basin or catch basin. The raw material used to manufacture
the pipe stock that is used to manufacture the main body and pipe stubs of the surface drainage inlets shall conform to ASTM D1784 cell class 12454.
The grates and frames furnished for all surface drainage inlets shall be ductile iron for sizes 8”, 10”, 12”, 15”, 18”, 24” and 30” and shall be made specifically for
each basin so as to provide a round bottom flange that closely matches the diameter of the surface drainage inlet. Grates for drain basins shall be capable of
supporting various wheel loads as specified by Nyloplast. 12” and 15” square grates will be hinged to the frame using pins. Ductile iron used in the manufacture of
the castings shall conform to ASTM A536 grade 70-50-05. Grates and covers shall be provided painted black.
INSTALLATION
The specified PVC surface drainage inlet shall be installed using conventional flexible pipe backfill materials and procedures. The backfill material shall be
crushed stone or other granular material meeting the requirements of class 1 or class 2 material as defined in ASTM D2321. Bedding and backfill for surface
drainage inlets shall be well placed and compacted uniformly in accordance with ASTM D2321. The drain basin body will be cut at the time of the final grade. No
brick, stone or concrete block will be required to set the grate to the final grade height. For load rated installations, a concrete slab shall be poured under and
around the grate and frame. The concrete slab must be designed taking into consideration local soil conditions, traffic loading, and other applicable design factors.
For other installation considerations such as migration of fines, ground water, and soft foundations refer to ASTM D2321 guidelines.
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
March 19, 2011
BIORETENTION SAND MEDIA SPECIFICATION 1
CITY OF FORT COLLINS
BIORETENTION SAND MEDIA SPECIFICATION
PART 1 - GENERAL
A. Bioretention Sand Media (BSM) shall be uniformly mixed, uncompacted, free of stones,
stumps, roots, or other similar objects larger than two inches. No other materials or
substances shall be mixed or dumped within the bioretention area that may be harmful to plant
growth or prove a hindrance to the facility’s function and maintenance.
B. BSM shall be free of plant or seed material of non-native, invasive species, or weeds.
C. Fully mixed BSM shall be tested prior to installation and meet the following criteria:
1. P-Index of less than 30
2. pH of 5.5-6.5. Should pH fall outside of the acceptable range, it may be modified with
lime (to raise) or iron sulfate plus sulfur (to lower). The lime or iron sulfate must be mixed
uniformly into the BSM prior to use in the bioretention facility.
3. Cation Exchange Capacity (CEC) greater than 10
4. Phosphorous (Phosphate, P2O5) not to exceed 69 ppm
5. BSM that fails to meet the minimum requirements shall be replaced at the Contractor’s
expense.
D. BSM shall be delivered fully mixed in a drum mixer. Onsite mixing of piles will not be allowed.
Mixing of the BSM to a homogeneous consistency shall be done to the satisfaction of the
Owner.
PART 2 - SOIL MATERIALS
A. Sand
1. BSM shall consist of 60-70% sand by volume meeting ASTM C-33.
B. Shredded Paper
1. BSM shall consist of 5-10% shredded paper by volume.
2. Shredded paper shall be loosely packed, approximate bulk density of 50-100 lbs/CY.
3. Shredded paper shall consist of loose leaf paper, not shredded phone books, and shall
be thoroughly and mechanically mixed to prevent clumping.
C. Topsoil
1. BSM shall consist of 5-10% topsoil by volume.
2. Topsoil shall be classified as sandy loam, loamy sand, or loam per USDA textural triangle
with less than 5% clay material.
3. Onsite, native material shall not be used as topsoil.
4. Textural analysis shall be performed on topsoil, preferably at its source, prior to including
topsoil in the mix. Topsoil shall be free of subsoil, debris, weeds, foreign matter, and any
other material deleterious to plant health.
5. Topsoil shall have a pH range of 5.5 to 7.5 and moisture content between 25-55%.
6. Contractor shall certify that topsoil meets these specifications.
D. Leaf Compost
1. BSM shall consist of 10-20% leaf compost by volume.
2. Leaf compost shall consist of Class 1 organic leaf compost consisting of aged leaf mulch
resulting from biological degradation and transformation of plant-derived materials under
controlled conditions designed to promote aerobic decomposition.
March 19, 2011
BIORETENTION SAND MEDIA SPECIFICATION 2
3. The material shall be well composted, free of viable weed seeds and contain material of a
generally humus nature capable of sustaining growth of vegetation, with no materials
toxic to plant growth.
4. Compost shall be provided by a local US Composting Council Seal of Testing Assurance
(STA) member. A copy of the provider’s most recent independent STA test report shall
be submitted to and approved by the Owner prior to delivery of BSM to the project site.
5. Compost material shall also meet the following criteria:
a. 100 percent of the material shall pass through a 1/2 inch screen
b. PH of the material shall be between 6.0 and 8.4
c. Moisture content shall be between 35 and 50 percent
d. Maturity greater than 80 percent (maturity indicator expressed as percentage of
germination/vigor, 80+/80+)
e. Maturity indicator expressed as Carbon to Nitrogen ration < 12
f. Maturity indicator expressed as AmmoniaN/NitrateN Ratio <4
g. Minimum organic matter shall be 40 percent dry weight basis
h. Soluble salt content shall be no greater than 5500 parts per million or 0-5
mmhos/cm
i. Phosphorus content shall be no greater than 325 parts per million
j. Heavy metals (trace) shall not exceed 0.5 parts per million
k. Chemical contaminants: meet or exceed US EPA Class A standard, 40 CFR
503.13, Tables 1 & 3 levels
l. Pathogens: meet or exceed US EPA Class A standard, 40 CFR 503.32(a) levels
PART 3 - EXECUTION
A. General
1. Refer to project specifications for excavation requirements.
B. Placement Method
1. BSM material shall be spread evenly in horizontal layers.
2. Thickness of loose material in each layer shall not exceed 9-inches.
3. Compaction of BSM material is not required.
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
drawn by:
date:
JD
6/25/2015
DETAIL
0014
STAIR AND HANDRAIL DETAIL
SCALE: 1"=1' R
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
SCALE: N.T.S.
DRAWN BY:
DATE: 04/20/15
JD
DETAIL
THICKENED EDGE SIDEWALK
DETAIL R 0003
TEL 970.461.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
CURB DETAILS
6"
37
8"
1
2"
103
8" 7
5
8"
R10"
R10"
1'-6"
WHEELSTOP
CURB
6"
1
4" PER
FOOT
1'-6"
OUTFLOW
CURB
INFLOW
CURB
6"
1
4" PER
FOOT
1'-6"
PAVER
EDGING
6"
1'
1. MAXIMUM SPACING OF CONTRACTION JOINTS - TEN (10) FEET.
2. EXPANSION JOINTS ARE REQUIRED, SEE JOINT DETAILS.
3. CONCRETE SURFACES TO RECEIVE A LIGHT BROOM FINISH.
4. COMPACT SUBGRADE PER GEOTECHNICAL RECOMMENDATIONS.
NOTES
14
14
14
14 14
14
14
14
14
14
15
14
15
16
16
16
16
17
17
17
16
16
16
16
14
14 14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
14
16
16
16
16
17
17
17
17
17
17
17
17
17
17
14
14
14
14
14
14
16
16
15
15
15
15
14
14
14
14
14
14
14
14
16
16
21
21
4
4
12
50.5'
14.5'
131.5'
14.5'
79.0'
14.5'
50.5'
3
24.5' 61.4'
KEYNOTE 22
40.0 L.F.
3
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 6
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
PAVING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_PAV04.dwg
JG
MH
C14.5
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 6
JD
1. INSTALL PAVEMENT. SEE PAVEMENT TABLE.
2. INSTALL PERMEABLE PAVERS. SEE DETAIL.
3. INSTALL CONCRETE SIDEWALK WIDTH = 5.0'.
4. INSTALL CONCRETE SIDEWALK WIDTH = 6.0'.
5. INSTALL HANDICAP ACCESSIBLE LOADING ZONE, INSTALL HC STRIPING PER MUTCD STANDARDS.
6. INSTALL HANDICAP RAMP.
7. INSTALL HANDICAP PARKING SIGN.
8. INSTALL TRASH ENCLOSURE. SEE ARCHITECTURE PLANS.
9. INSTALL PARKING STRIPING, TYPICAL.
10. INSTALL BICYCLE RACK PER SITE PLAN.
11. INSTALL STOP SIGN.
12. MEW PAVING. SEE DETAIL.
13. INSTALL CONCRETE PAN. SEE DETAIL.
14. INSTALL WHEELSTOP CURB. SEE DETAIL.
15. INSTALL OUTFLOW CURB. SEE DETAIL.
16. INSTALL INFLOW CURB. SEE DETAIL.
17. INSTALL PAVER EDGING. SEE DETAIL.
18. INSTALL CONCRETE APRON. SEE PAVING TABLE.
19. INSTALL RETAINING WALL. SEE LANDSCAPE PLANS.
20. INSTALL CONCRETE DRIVE. SEE PAVING TABLE.
21. INSTALL THICKENED EDGE SIDEWALK. SEE DETAIL.
22. INSTALL VERTICAL CURB AND GUTTER. SEE DETAIL.
KEYNOTES
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
PAVING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_PAV02.dwg
JG
MH
C14.4
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 5
JD
1. INSTALL PAVEMENT. SEE PAVEMENT TABLE.
2. INSTALL PERMEABLE PAVERS. SEE DETAIL.
3. INSTALL CONCRETE SIDEWALK WIDTH = 5.0'.
4. INSTALL CONCRETE SIDEWALK WIDTH = 6.0'.
5. INSTALL HANDICAP ACCESSIBLE LOADING ZONE, INSTALL HC STRIPING PER MUTCD STANDARDS.
6. INSTALL HANDICAP RAMP.
7. INSTALL HANDICAP PARKING SIGN.
8. INSTALL TRASH ENCLOSURE. SEE ARCHITECTURE PLANS.
9. INSTALL PARKING STRIPING, TYPICAL.
10. INSTALL BICYCLE RACK PER SITE PLAN.
11. INSTALL STOP SIGN.
12. MEW PAVING. SEE DETAIL.
13. INSTALL CONCRETE PAN. SEE DETAIL.
14. INSTALL WHEELSTOP CURB. SEE DETAIL.
15. INSTALL OUTFLOW CURB. SEE DETAIL.
16. INSTALL INFLOW CURB. SEE DETAIL.
17. INSTALL PAVER EDGING. SEE DETAIL.
18. INSTALL CONCRETE APRON. SEE PAVING TABLE.
19. INSTALL RETAINING WALL. SEE LANDSCAPE PLANS.
20. INSTALL CONCRETE DRIVE. SEE PAVING TABLE.
21. INSTALL THICKENED EDGE SIDEWALK. SEE DETAIL.
22. INSTALL VERTICAL CURB AND GUTTER. SEE DETAIL.
KEYNOTES
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
PAVING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_PAV02.dwg
JG
MH
C14.3
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 4
JD
1. INSTALL PAVEMENT. SEE PAVEMENT TABLE.
2. INSTALL PERMEABLE PAVERS. SEE DETAIL.
3. INSTALL CONCRETE SIDEWALK WIDTH = 5.0'.
4. INSTALL CONCRETE SIDEWALK WIDTH = 6.0'.
5. INSTALL HANDICAP ACCESSIBLE LOADING ZONE, INSTALL HC STRIPING PER MUTCD STANDARDS.
6. INSTALL HANDICAP RAMP.
7. INSTALL HANDICAP PARKING SIGN.
8. INSTALL TRASH ENCLOSURE. SEE ARCHITECTURE PLANS.
9. INSTALL PARKING STRIPING, TYPICAL.
10. INSTALL BICYCLE RACK PER SITE PLAN.
11. INSTALL STOP SIGN.
12. MEW PAVING. SEE DETAIL.
13. INSTALL CONCRETE PAN. SEE DETAIL.
14. INSTALL WHEELSTOP CURB. SEE DETAIL.
15. INSTALL OUTFLOW CURB. SEE DETAIL.
16. INSTALL INFLOW CURB. SEE DETAIL.
17. INSTALL PAVER EDGING. SEE DETAIL.
18. INSTALL CONCRETE APRON. SEE PAVING TABLE.
19. INSTALL RETAINING WALL. SEE LANDSCAPE PLANS.
20. INSTALL CONCRETE DRIVE. SEE PAVING TABLE.
21. INSTALL THICKENED EDGE SIDEWALK. SEE DETAIL.
22. INSTALL VERTICAL CURB AND GUTTER. SEE DETAIL.
KEYNOTES
14.9' 11.2'
30.4'
17.6'
13.9' 12.1'
35.6'
18
17
17
17
17
17
17
17
17
15
SEE LANDSCAPE PLANS
FOR COURTYARD DETAIL
3
3
15
3
3 3
3
3
3
1
1 1
15
15
15
19 15
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
MATCHLINE
SEE SHEET C14.1
LOT 3 EAST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
PAVING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_PAV03.dwg
JG
MH
C14.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST
JD
1. INSTALL PAVEMENT. SEE PAVEMENT TABLE.
2. INSTALL PERMEABLE PAVERS. SEE DETAIL.
3. INSTALL CONCRETE SIDEWALK WIDTH = 5.0'.
4. INSTALL CONCRETE SIDEWALK WIDTH = 6.0'.
5. INSTALL HANDICAP ACCESSIBLE LOADING ZONE, INSTALL HC STRIPING PER MUTCD STANDARDS.
6. INSTALL HANDICAP RAMP.
7. INSTALL HANDICAP PARKING SIGN.
8. INSTALL TRASH ENCLOSURE. SEE ARCHITECTURE PLANS.
9. INSTALL PARKING STRIPING, TYPICAL.
10. INSTALL BICYCLE RACK PER SITE PLAN.
11. INSTALL STOP SIGN.
12. MEW PAVING. SEE DETAIL.
13. INSTALL CONCRETE PAN. SEE DETAIL.
14. INSTALL WHEELSTOP CURB. SEE DETAIL.
15. INSTALL OUTFLOW CURB. SEE DETAIL.
16. INSTALL INFLOW CURB. SEE DETAIL.
17. INSTALL PAVER EDGING. SEE DETAIL.
18. INSTALL CONCRETE APRON. SEE PAVING TABLE.
19. INSTALL RETAINING WALL. SEE LANDSCAPE PLANS.
20. INSTALL CONCRETE DRIVE. SEE PAVING TABLE.
21. INSTALL THICKENED EDGE SIDEWALK. SEE DETAIL.
22. INSTALL VERTICAL CURB AND GUTTER. SEE DETAIL.
KEYNOTES
17
14
SEE LANDSCAPE
PLANS
13 13 13
14
20.3'
25.5'
1 1 1 1
1
14
18 18
5.2'
30.5'
36.0'
14
14
14
14
17
17
17
17
19
1.0'
15
15
17
17
17
17
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
SEE SHEET C14.2
MATCHLINE
LOT 3 WEST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
PAVING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_PAV03.dwg
JG
MH
C14.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST
JD
1. INSTALL PAVEMENT. SEE PAVEMENT TABLE.
2. INSTALL PERMEABLE PAVERS. SEE DETAIL.
3. INSTALL CONCRETE SIDEWALK WIDTH = 5.0'.
4. INSTALL CONCRETE SIDEWALK WIDTH = 6.0'.
5. INSTALL HANDICAP ACCESSIBLE LOADING ZONE, INSTALL HC STRIPING PER MUTCD STANDARDS.
6. INSTALL HANDICAP RAMP.
7. INSTALL HANDICAP PARKING SIGN.
8. INSTALL TRASH ENCLOSURE. SEE ARCHITECTURE PLANS.
9. INSTALL PARKING STRIPING, TYPICAL.
10. INSTALL BICYCLE RACK PER SITE PLAN.
11. INSTALL STOP SIGN.
12. MEW PAVING. SEE DETAIL.
13. INSTALL CONCRETE PAN. SEE DETAIL.
14. INSTALL WHEELSTOP CURB. SEE DETAIL.
15. INSTALL OUTFLOW CURB. SEE DETAIL.
16. INSTALL INFLOW CURB. SEE DETAIL.
17. INSTALL PAVER EDGING. SEE DETAIL.
18. INSTALL CONCRETE APRON. SEE PAVING TABLE.
19. INSTALL RETAINING WALL. SEE LANDSCAPE PLANS.
20. INSTALL CONCRETE DRIVE. SEE PAVING TABLE.
21. INSTALL THICKENED EDGE SIDEWALK. SEE DETAIL.
22. INSTALL VERTICAL CURB AND GUTTER. SEE DETAIL.
KEYNOTES
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
C14.1 C14.2
C14.3
C14.4
PAVEMENT TABLE
LOCATION
COMPOSTIE SECTION
(INCHES ASPHALT/
INCHES AGGREGATE BASE)
RIGID SECTION
(INCHES CONCRETE)
PRIVATE PARKING LOT 4.5/6 5
PRIVATE DRIVE
LANES AND HEAVY
TRUCK TRAFFIC
5/6 6
NOTES:
1. FOR PRICING SET, CONTRACTOR TO USE RIGID SECTION FOR PRIVATE PARKING
2. FOR PRICING SET, CONTRACTOR TO INCLUDE COMPOSITE SECTION FOR ALTERNATE
PRICING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
OVERALL PAVING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_PAV01.dwg
JG
MH
C14.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
C14.5
PAVING PLAN
ASPHALT PAVEMENT
PERMEABLE PAVEMENT
CONCRETE
TYPICAL MEW PAVING
1" = 10'
1. INSTALL PAVEMENT. SEE PAVEMENT TABLE.
2. INSTALL PERMEABLE PAVERS. SEE DETAIL.
3. INSTALL CONCRETE SIDEWALK WIDTH = 5.0'.
4. INSTALL CONCRETE SIDEWALK WIDTH = 6.0'.
5. INSTALL HANDICAP ACCESSIBLE LOADING ZONE, INSTALL HC STRIPING PER MUTCD STANDARDS.
6. INSTALL HANDICAP RAMP.
7. INSTALL HANDICAP PARKING SIGN.
8. INSTALL TRASH ENCLOSURE. SEE ARCHITECTURE PLANS.
9. INSTALL PARKING STRIPING, TYPICAL.
10. INSTALL BICYCLE RACK PER SITE PLAN.
11. INSTALL STOP SIGN.
12. MEW PAVING. SEE DETAIL.
13. INSTALL CONCRETE PAN. SEE DETAIL.
14. INSTALL WHEELSTOP CURB. SEE DETAIL.
15. INSTALL OUTFLOW CURB. SEE DETAIL.
16. INSTALL INFLOW CURB. SEE DETAIL.
17. INSTALL PAVER EDGING. SEE DETAIL.
18. INSTALL CONCRETE APRON. SEE PAVING TABLE.
19. INSTALL RETAINING WALL. SEE LANDSCAPE PLANS.
20. INSTALL CONCRETE DRIVE. SEE PAVING TABLE.
21. INSTALL THICKENED EDGE SIDEWALK. SEE DETAIL.
22. INSTALL VERTICAL CURB AND GUTTER. SEE DETAIL.
KEYNOTES
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM04.dwg
JG
MH
C12.11
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 6 DETAIL
JD
LOT 6 SOUTH DETAIL
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM04.dwg
JG
MH
C12.10
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 6 MEW
JD
LOT 6 MEW DETAIL
RIM EL 5014.30
INSTALL 4' DIA MANHOLE
SDMH 6-2.0
STA 2+80.78
RIM EL 5013.61
INSTALL 30" DRAIN BASIN
INLET 6-3.0
STA 3+07.16
RIM EL 5013.33
INSTALL 4' DIA MANHOLE
SDMH 6-4.0
STA 3+74.58
RIM EL 5014.66
INSTALL 30" DRAIN BASIN
INLET 6-5.0
STA 4+49.73
RIM EL 5013.82
INSTALL 4' DIA MANHOLE
SDMH 6-6.0
STA 4+83.82
RIM EL 5014.47
INSTALL 30" DRAIN BASIN
INLET 6-7.0
STA 5+09.84
RIM EL 5013.82
INSTALL 4' DIA MANHOLE
SDMH 6-8.0
STA 5+42.63
RIM EL 5014.44
INSTALL 24" DRAIN BASIN
INLET 6-9.0
STA 5+84.92
RIM EL 5013.85
INSTALL 4' DIA MANHOLE
SDMH 6-10.0
STA 6+45.99
RIM EL 5014.51
PROPOSED SANITARY
SEWER CROSSING
PROPOSED GRADE
EXISTING GRADE
11.03 L.F. 30"
HDPE PIPE @ 0.50%
26.38 L.F. 30"
HDPE PIPE @ 0.21%
34.09 L.F. 30"
HDPE PIPE @ 0.15%
26.01 L.F. 30"
HDPE PIPE @ 0.26%
32.80 L.F. 24"
HDPE PIPE @ 0.43%
42.29 L.F. 24"
HDPE PIPE @ 0.55%
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM04.dwg
JG
MH
C12.9
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 6 MAIN
LOT 6 MAIN PROFILE JD
LOT 6 MAIN PLAN
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM03.dwg
JG
MH
C12.8
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 5 SOUTH
JD
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM03.dwg
JG
MH
C12.7
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 5 NORTH
JD
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM02.dwg
JG
MH
C12.6
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 4 MEWS
JD
LOT 4 POOL DETAIL
LOT 4 NORTH MEW DETAIL
LOT 4 SOUTH MEW DETAIL
SDMH 4-7.0
STA 6+36.98
RIM EL 5005.61
INSTALL 4' DIA MANHOLE
SDMH 4-4.0
STA 3+95.27
RIM EL 5004.02
INSTALL 4' DIA MANHOLE
SDMH 4-6.0
STA 5+05.26
RIM EL 5004.27
INV IN S 4999.00
INV OUT N 4999.40
INV IN W 4999.40
INV OUT E 4999.61
INV IN S 4999.61
INV OUT N 4999.68
INV IN S 4999.68
INV OUT N 5000.04
INV IN SW 5000.54
INV OUT N 5002.66
INV IN E 5002.66
INV OUT N 4999.80
INV IN S 4999.80
INV IN E 5000.80
INV OUT NE 5001.50
INV IN S 5002.00
INV IN E 5002.00
34.85 L.F. 24"
HDPE PIPE @ 0.20%
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 4 MAIN PROFILE
LOT 4 MAIN PLAN
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM02.dwg
JG
MH
C12.5
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 4 MAIN
JD
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM01A.dwg
JG
MH
C12.4
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST MEWS
JD
WEST MEW DETAIL
COURTYARD DETAIL
EAST MEW DETAIL
SAND FILTER 4 DETAIL
INSTALL WALL PENETRATION
STA 1+50.00
RIM EL 4996.16
INSTALL 4' DIA MANHOLE
SDMH 3-13.0
STA 1+70.53
RIM EL 4998.50
INSTALL 4' DIA MANHOLE
SDMH 3-12.0
STA 2+28.93
RIM EL 4998.17
INSTALL 4' DIA MANHOLE
SDMH 3-11.0
STA 3+37.65
RIM EL 4999.64
INSTALL 24" DRAIN BASIN
INLET 3-10.0
STA 4+53.51
RIM EL 5000.85
INSTALL 24" DRAIN BASIN
INLET 3-9.0
STA 4+86.48
RIM EL 5001.44
INSTALL 24" DRAIN BASIN
INLET 3-8.0
STA 5+58.48
RIM EL 5001.44
72.00 L.F. 12"
HDPE PIPE @ 0.53%
32.96 L.F. 12"
HDPE PIPE @ 3.41%
115.84 L.F. 18"
HDPE PIPE @ 1.19%
108.72 L.F. 18"
HDPE PIPE @ 0.63%
58.41 L.F. 24"
HDPE PIPE @ 0.25%
20.53 L.F. 24"
HDPE PIPE @ 0.25%
PROPOSED
GRADE
EXISTING
GRADE
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 3 EAST MAIN PROFILE
LOT 3 EAST MAIN PLAN
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM01A.dwg
JG
MH
C12.3
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST MAIN
JD
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM01.dwg
JG
MH
C12.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST MEWS
JD
WEST MEW DETAIL
COURTYARD DETAIL
EAST MEW DETAIL
INSTALL 4' DIA MANHOLE
SDMH 3-5.0
STA 2+31.68
RIM EL 5004.59
70.67 L.F. 24"
HDPE PIPE @ 0.21%
INSTALL 4' DIA MANHOLE
SDMH 3-6.0
STA 1+61.01
RIM EL 5003.67
11.01 L.F. 24"
HDPE PIPE @ 0.15%
WALL PENETRATION
STA 1+50.00
INV OUT E 5006.00
INV OUT E 5004.23
INV IN W 5004.73
INV IN S 5004.73
INV OUT E 5001.80
INV IN W 5001.80
INV IN S 5001.80
INV OUT E 5000.37
INV IN W 5000.87
INV IN S 5001.37
INV OUT S 5000.16
INV IN W 5000.16
INV OUT SE 5000.02
INV IN N 5000.02
INV IN NW 5000.00
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 3 WEST MAIN PROFILE
LOT 3 WEST MAIN PLAN
STORM PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM01.dwg
JG
MH
C12.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST MAIN
JD
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
OVERALL STORM PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_STM00.dwg
JG
MH
C12.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
STORM PLAN
C12.1
C12.2
C12.3
C12.4
C12.5
C12.6
C12.7
C12.8
8" C900 PVC
7.17 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
LOT 6 PROFILE
LOT 6 PLAN
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER SHEET
LOT 6
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_WAT04.dwg
JG
MH
C10.5
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
WATERLINE PLAN AND PROFILE
JD
1.5" TAP
STA 1+78.37
4" TAP W/ VALVE AND TB
STA 1+83.37
1.5" TAP
STA 3+22.74
4" TAP W/ VALVE AND TB
STA 3+27.74
4" TAP W/ VALVE AND TB
STA 5+27.58
1.5" TAP
STA 5+32.48
4" TAP W/ VALVE AND TB
STA 6+82.58
1.5" TAP
STA 6+77.58
12.74 LF OF
8" C900 PVC
71.41 LF OF
8" C900 PVC
63.24 LF OF
8" C900 PVC
3.74 LF OF
8" C900 PVC
62.90 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
52.15 LF OF
8" C900 PVC
83.33 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
27.20 LF OF
8" C900 PVC
TOP 5009.38'
TOP 5009.50'
TOP 5009.44'
TOP 5008.05'
TOP 5008.01'
TOP 5006.74'
TOP 5006.64'
TOP 5005.54'
TOP 5005.80'
TOP 5005.79'
TOP 5005.46'
TOP 5005.05'
TOP 5004.42'
TOP 5004.38'
3.83 LF OF
8" C900 PVC
0.74 LF OF
8" C900 PVC
TOP 5004.38'
CONNECT TO EXISTING
8" DIA WATERLINE
CONNECT TO EXISTING
8" DIA WATERLINE
%(1'Z7%
STA 5+01.87
108.89 LF OF
8" C900 PVC
8.12 LF OF
8" C900 PVC
%(1'Z7%
STA 5+41.47
24.54 LF OF
8" C900 PVC
TOP 5005.38'
CONSTRUCT WATERLINE
LOWERING
CONSTRUCT WATERLINE
LOWERING
CONSTRUCT WATERLINE
LOWERING
PROPOSED 6"
STORM CROSSING PROPOSED 10"
STORM CROSSING
PROPOSED 12"
STORM CROSSING
PROPOSED 12"
STORM CROSSING
PROPOSED 6"
STORM CROSSING
PROPOSED 6"
STORM CROSSING
PROPOSED 18"
STORM CROSSING
LOT 5 PROFILE
LOT 5 PLAN
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER SHEET
LOT 5
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_WAT03.dwg
JG
MH
C10.4
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
WATERLINE PLAN AND PROFILE
JD
4992
4996
5000
5004
5008
5012
5016
5020
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40
8" TEE w/TB
STA 6+00.09
8" TEE w/TB
STA 1+50.00
%(1'Z7%
STA 2+04.66
%(1'Z7%
STA 5+55.34
%(1'Z7%
STA 4+38.93
1.5" TAP
STA 2+24.66
4" TAP W/ VLAVE AND TB
STA 2+29.66
1.5" TAP
STA 2+67.51
4" TAP W/ VLAVE AND TB
STA 2+72.51
4" TAP W/ VLAVE AND TB
STA 4+82.94
1.5" TAP
STA 4+87.94
4" TAP W/ VLAVE AND TB
STA 5+20.23
1.5" TAP
STA 5+25.23
1.5" TAP
STA 5+81.30
17.62 LF OF
8" C900 PVC
42.84 LF OF
8" C900 PVC
165.26 LF OF
8" C900 PVC
31.68 LF OF
8" C900 PVC
53.49 LF OF
8" C900 PVC
TOP 5003.02'
TOP 5001.17'
TOP 5000.97'
TOP 5000.58'
TOP 5000.64'
TOP 5000.59'
TOP 4998.88'
TOP 4998.95'
TOP 4998.96'
28.94 LF OF
8" C900 PVC
31.13 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
18.83 LF OF
8" C900 PVC
TOP 4999.02'
TOP 4999.05'
TOP 4998.55'
TOP 4998.15'
24.80 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
TOP 4997.09'
EXISTING GRADE
PROPOSED GRADE
MIN 5'
MAX 6'
CONNECT TO EXISTING
8" DIA WATERLINE
CONNECT TO EXISTING
8" DIA WATERLINE
LOT 4 PROFILE
LOT 4 PLAN
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER SHEET
LOT 4
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_WAT02.dwg
JG
MH
C10.3
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
WATERLINE PLAN AND PROFILE
JD
8" C900 PVC
EXISTING GRADE
PROPOSED GRADE
CONNECT TO EXISTING
8" DIA WATERLINE MIN 5'
MAX 6'
LOT 3 PROFILE
LOT 3 PLAN
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER SHEET
LOT 3
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_WAT01.dwg
JG
MH
C10.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
WATERLINE PLAN AND PROFILE
JD
METER PIT
1.5" SERVICE
METER PIT
1.5" SERVICE
METER PIT
1.5" SERVICE
1.5" SERVICE METER PIT
METER PIT
TIE TO EXISTING WATERMAIN
4984
4988
4992
4996
5000
5004
5008
5012
5016
4984
4988
4992
4996
5000
5004
5008
5012
5016
1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80 7+20 7+60 8+00 8+40 8+80 9+20 9+60 10+00 10+40 10+80 11+20
8" TEE w/TB
STA 1+70.00
40.27 LF OF
8" C900 PVC
1.5" TAP
STA 2+11.44
4" TAP W/ VALVE AND TB
STA 2+16.44
170.15 LF OF
8" C900 PVC
4" TAP W/ VALVE AND TB
STA 3+87.76
1.5" TAP
STA 3+92.75
4" TAP W/ VALVE AND TB
STA 4+36.96
1.5" TAP
STA 4+31.96
177.50 LF OF
8" C900 PVC
4" TAP W/ VALVE AND TB
STA 6+15.63
1.5" TAP
STA 6+20.63
8"x6" TEE w/TB
STA 6+94.97
8" TEE w/TB
STA 7+26.73
192.08 LF OF
8" C900 PVC
4" TAP W/ VALVE AND TB
STA 9+19.98
1.5" TAP
STA 9+24.98
1.5" TAP
STA 9+67.75
4" TAP W/ VALVE AND TB
STA 9+72.75
67.69 LF OF
8" C900 PVC
4" TAP W/ VALVE AND TB
STA 10+82.44
1.5" TAP
STA 10+77.44
TOP 4993.25'
TOP 4993.48'
TOP 4994.03'
TOP 4994.03'
TOP 4996.03'
TOP 4996.38'
TOP 4996.89'
TOP 4996.94'
TOP 4998.74'
TOP 5000.08'
TOP 5001.03'
38.04 LF OF
8" C900 PVC
73.17 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
30.60 LF OF
8" C900 PVC
TOP 5001.31'
3.83 LF OF
8" C900 PVC
TOP 5003.38'
TOP 5003.66'
TOP 5003.61'
3.83 LF OF
8" C900 PVC
3.83 LF OF
8" C900 PVC
TOP 5003.97'
EXISTING GRADE
PROPOSED GRADE
MIN 5'
MAX 6'
TOP 4989.90'
CONNECT TO EXISTING
8" DIA WATERLINE
34.67 LF OF
8" C900 PVC
8"X6" TEE w/TB
STA 10+41.61
TOP 5003.85'
PROPOSED 8"
SANITARY CROSSING
41.60 LF OF
8" C900 PVC
CONSTRUCT WATERLINE
LOWERING
CONSTRUCT WATERLINE
LOWERING
CONSTRUCT WATERLINE
LOWERING
CONSTRUCT WATERLINE
LOWERING
CONSTRUCT WATERLINE
LOWERING
PROPOSED 12"
STORM CROSSING
PROPOSED 12"
STORM CROSSING
PROPOSED 12"
STORM CROSSING
PROPOSED 24"
STORM CROSSING
PROPOSED 12"
STORM CROSSING
PROPOSED 18"
STORM CROSSING
PROPOSED 12"
STORM CROSSING
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER SHEET
LOT 3
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_WAT01.dwg
JG
MH
C10.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
WATERLINE PLAN AND PROFILE
JD
LOT 3 PROFILE
LOT 3 PLAN
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
OVERALL WATER PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_WAT00.dwg
JG
MH
C10.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
WATER PLAN
C10.1
C10.2
C10.3
C10.4
C10.5
SERVICE LOCATION
L
R
2+99
3+92
5+18
PROPOSED 24"
STORM CROSSING
PROPOSED 18"
STORM CROSSING PROPOSED 18"
STORM CROSSING
PROPOSED 6"
WATERLINE CROSSING
LOT 3 EAST PROFILE
LOT 3 EAST PLAN
SANITARY SEWER PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_SAN01.dwg
JG
MH
C9.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST
JD
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
STA 7+93.30
RIM EL 5009.16
INV OUT E 4990.64
INV IN N 4991.00
INV IN W 4990.97
INV OUT S 4991.66
INV IN N 4991.86
INV OUT S 4992.44
INV IN W 4992.64
INV IN E 4992.64
INV OUT E 5001.08
PROPOSED GRADE
EXISTING GRADE
PROPOSED SANITARY
SERVICE LOCATION
L
R
4+77
5+71
7+01
7+93
PROPOSED 12"
STORM CROSSING
PROPOSED 18"
STORM CROSSING
PROPOSED 18"
STORM CROSSING
PROPOSED 8"
WATERLINE CROSSING
LOT 3 WEST PROFILE
LOT 3 WEST PLAN
SANITARY SEWER PLAN AND PROFILE
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_SAN01.dwg
JG
MH
C9.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST
JD
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
OVERALL SANITARY SEWER PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_SAN00.dwg
JG
MH
C9.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
SANITARY SEWER PLAN
C9.1
C8.3
C9.2
C8.4
C8.5
C8.2
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 6
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_UTL04.dwg
JG
MH
C8.5
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
UTILITY PLAN
JD
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 5
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_UTL02.dwg
JG
MH
C8.4
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
UTILITY PLAN
JD
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
UTILITY PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_UTL02.dwg
JG
MH
C8.3
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 4
JD
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
UTILITY PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_UTL03.dwg
JG
MH
C8.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST
JD
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
UTILITY PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_UTL03.dwg
JG
MH
C8.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST
JD
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
OVERALL UTILITY PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_UTL01.dwg
JG
MH
C8.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
WATER SERVICE AND FIRE DETAIL
PARKS AND RECREATION
TRAFFIC ENGINEER
DRAINAGE PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_DRN01.dwg
JG
MH
C7.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
DRAINAGE NOTES
1. Reference Addendum 2
Drainage Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5, and 6 of Foothills Mall Redevelopment)
2. Reference Addendum 2
Low Impact Design Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5, and 6 of Foothills Mall Redevelopment)
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
Foothills Mall 5285 McWhinney Boulevard
Multi-Family
Exhibit B
Original Drainage Basin Map
Map taken from Foothills Redevelopment Planning PA2
Final Plans, dated 04/25/2014, prepared by R.A. Smith National
Sand Filter 2
Basin 11.47 acres
Rain Garden 29
Basin 6.22 acres
Sand Filter 4
Basin 4.38 acres
Rain Garden 31
Basin 1.36 acres
Rain Garden 33
Basin 1.76 acres
Sand Filter 1
Basin 22.72 acres
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family R
Exhibit A
Vicinity Map
Map taken from Storm Water Management Plan for Foothills Redevelopment,
prepared by R.A. Smith National, dated Revised December 5, 2013
Lot 3, 4, 5 and 6
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family Exhibit C R
Lot Map
LOT 3
LOT 4
LOT 5
SAND
FILTER 2.0
SAND
FILTER 4.0
RAIN
GARDEN 29.0
RAIN
GARDEN 31.0
RAIN
GARDEN 33.0
LOT 6
SAND
FILTER 1.0
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Famliy Exhibit D R
Percent Imperviousness
Lot Area (SF) AREA (AC) Landscape Paved Roof Walks
Porous
Paving
Percent
Impervious
0% 100% 90% 90% 90%
3 170,929 3.92 47,519 47,007 58,191 18,212 0 68%
4 112,588 2.58 36,461 1,162 66,796 8,169 0 61%
5 101,716 2.34 15,199 1,782 68,600 16,135 0 77%
6 134,248 3.08 33,514 2,263 89,864 8,607 0 68%
Total 519,481 8.84 132,693 52,214 283,451 51,123 0 68%
Lot Area (SF) AREA (AC) Landscape Paved Roof Walks
Porous
Paving
Percent
Impervious
0% 100% 90% 90% 90%
3 170,929 3.92 60,271 44,931 42,897 3,831 18,999 61%
4 112,588 2.58 44,439 25,197 29,278 5,663 8,011 57%
5 101,716 2.34 26,054 29,121 32,548 4,580 9,413 70%
6 134,248 3.08 30,846 47,255 38,542 5,166 12,439 73%
Total 519,481 8.84 161,610 146,504 143,265 19,240 48,862 65%
Existing Design
Proposed Design
Imperviousness
Imperviousness
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family Exhibit I
Permeable Pavement Calculations
Lot Details
Lot
Total
Pavement
Area
Permeable
Pavement
Provided
%
Permeable
3 63930 18999 30%
4 33208 8011 24%
5 38534 9413 24%
6 59694 12439 21%
Total 195366 48862 25%
New Pavement Area 195,366.00 sq. ft.
Required Minimum Area of Porous Pavement 48,841.50 sq. ft.
Area of Paver Section #1 48,862.00 sq. ft.
Area of Paver Section #2 (and so on for all paver sections) NA sq. ft.
Total Porous Pavement Area 48,862.00 sq. ft.
Actual % of Porous Pavement Provided 25.01 %
City 25% Porous Pavement Requirement
12/12/2015
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
Foothills Mall Multi-Family Exhibit J
Permeable Pavement Areas
Permeable Pavement Areas
Lot 3
Lot 4
Lot 5
Lot 6
12/12/2015
-1.0%
-1.9%
-2.0%
-1.4% -2.0%
-2.0%
-1.9%
-2.0% -2.0%
-1.2%
-2.0%
-4.7%
-2.2%
-1.6%
-2.0%
-2.0%
-2.0%
-4.1%
-1.6%
-4.3%
-2.0%
-4.5%
-1.0% -1.0%
-2.0%
-2.0%
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 6
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LOT 6
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_GRD04.dwg
JG
MH
C6.5
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
GRADING PLAN
JD
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
GRADING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_GRD02.dwg
JG
MH
C6.4
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 5
JD
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
GRADING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_GRD02.dwg
JG
MH
C6.3
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 4
JD
-2.6%
-1.0% -2.0% -1.6%
-2.4%
-1.5% -2.0%
-2.9%
-2.1%
-2.4%
-1.0% -1.1%
-1.0% -1.1%
-0.6%
-0.7%
-1.0%
-1.0%
-1.5%
-1.5%
-2.2%
-2.1%
-1.5% -2.7%
-1.5%
-1.0%
-0.9%
-2.7%
-5.0%
-1.8% -2.0%
-2.0%
-2.0%
-3.0%
-4.8%
-2.6% -7.2%
-1.0% -2.0% -1.6%
-3.4%
-2.0%
-2.0%
-3.0%
-2.1%
-2.6%
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
MATCHLINE
SEE SHEET C6.1
LOT 3 EAST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
GRADING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_GRD03.dwg
JG
MH
C6.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST
JD
-3.7%
-1.0%
-1.0%
-4.7%
-2.9%
-2.1%
-5.0%
-1.8% -2.1%
-1.9%
-1.6%
-3.0%
-4.9%
-4.8%
-2.6%
-1.4% -2.1% -1.6%
-3.4%
-2.0% -2.0%
-3.0%
-2.1%
-2.5%
-1.3%
-1.2%
-3.0%
-1.0%
-1.0%
-1.3% -1.3%
-2.0% -2.0%
-1.5% -2.7%
-1.5% -1.0%
-0.9%
-2.4%
-2.6%
-0.9%
SEE SHEET C6.2
MATCHLINE
LOT 3 WEST
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
GRADING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_GRD03.dwg
JG
MH
C6.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST
JD
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
OVERALL GRADING PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_GRD01.dwg
JG
MH
C6.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
C6.5
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_ERC01.dwg
JG
BM
C4.3
A
12/21/2015
1ST FDP SUBMITTAL
JD
EROSION AND SEDIMENT CONTROL PLAN
Concrete Washout Area (CWA) MM-1
November 2010 Urban Drainage and Flood Control District CWA-3
Urban Storm Drainage Criteria Manual Volume 3
MM-1 Concrete Washout Area (CWA)
CWA-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
SM-4 Vehicle Tracking Control (VTC)
VTC-6 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
SM-4 Vehicle Tracking Control (VTC)
VTC-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_ERC01.dwg
JG
BM
C4.2
A
12/21/2015
1ST FDP SUBMITTAL
JD
EROSION AND SEDIMENT CONTROL PLAN
SC-6 Inlet Protection (IP)
IP-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
Inlet Protection (IP) SC-6
November 2010 Urban Drainage and Flood Control District IP-5
Urban Storm Drainage Criteria Manual Volume 3
SC-6 Inlet Protection (IP)
IP-6 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
Inlet Protection (IP) SC-6
November 2010 Urban Drainage and Flood Control District IP-7
Urban Storm Drainage Criteria Manual Volume 3
Sediment Control Log (SCL) SC-2
November 2010 Urban Drainage and Flood Control District SCL-3
Urban Storm Drainage Criteria Manual Volume 3
SC-2 Sediment Control Log (SCL)
SCL-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
Sediment Control Log (SCL) SC-2
November 2010 Urban Drainage and Flood Control District SCL-5
Urban Storm Drainage Criteria Manual Volume 3
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_ERC01.dwg
JG
BM
C4.1
A
12/21/2015
1ST FDP SUBMITTAL
JD
EROSION AND SEDIMENT CONTROL PLAN
Stabilized Staging Area (SSA) SM-6
November 2010 Urban Drainage and Flood Control District SSA-3
Urban Storm Drainage Criteria Manual Volume 3
SM-6 Stabilized Staging Area (SSA)
SSA-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
Construction Phasing/Sequencing (CP) SM-1
November 2010 Urban Drainage and Flood Control District CP-3
Urban Storm Drainage Criteria Manual Volume 3
Table CP-1. Typical Phased BMP Installation for Construction Projects
Project
Phase BMPs
Pre-
disturbance,
Site Access
Install sediment controls downgradient of access point (on paved streets this may consist
of inlet protection).
Establish vehicle tracking control at entrances to paved streets. Fence as needed.
Use construction fencing to define the boundaries of the project and limit access to areas of
the site that are not to be disturbed.
Note: it may be necessary to protect inlets in the general vicinity of the site, even if not
downgradient, if there is a possibility that sediment tracked from the site could contribute
to the inlets.
Site Clearing
and Grubbing
Install perimeter controls as needed on downgradient perimeter of site (silt fence, wattles,
etc).
Limit disturbance to those areas planned for disturbance and protect undisturbed areas
within the site (construction fence, flagging, etc).
Preserve vegetative buffer at site perimeter.
Create stabilized staging area.
Locate portable toilets on flat surfaces away from drainage paths. Stake in areas
susceptible to high winds.
Construct concrete washout area and provide signage.
Establish waste disposal areas.
Install sediment basins.
Create dirt perimeter berms and/or brush barriers during grubbing and clearing.
Separate and stockpile topsoil, leave roughened and/or cover.
Protect stockpiles with perimeter control BMPs. Stockpiles should be located away from
drainage paths and should be accessed from the upgradient side so that perimeter controls
can remain in place on the downgradient side. Use erosion control blankets, temporary
seeding, and/or mulch for stockpiles that will be inactive for an extended period.
Leave disturbed area of site in a roughened condition to limit erosion. Consider temporary
revegetation for areas of the site that have been disturbed but that will be inactive for an
extended period.
Water to minimize dust but not to the point that watering creates runoff.
SM-1 Construction Phasing/Sequencing (CP)
CP-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
Project
Phase BMPs
Utility And
Infrastructure
Installation
In Addition to the Above BMPs:
Close trench as soon as possible (generally at the end of the day).
Use rough-cut street control or apply road base for streets that will not be promptly paved.
Provide inlet protection as streets are paved and inlets are constructed.
Protect and repair BMPs, as necessary.
Perform street sweeping as needed.
Building
Construction
In Addition to the Above BMPs:
Implement materials management and good housekeeping practices for home building
activities.
Use perimeter controls for temporary stockpiles from foundation excavations.
For lots adjacent to streets, lot-line perimeter controls may be necessary at the back of
curb.
Final Grading
In Addition to the Above BMPs:
Remove excess or waste materials.
Remove stored materials.
Final
Stabilization
In Addition to the Above BMPs:
Seed and mulch/tackify.
Seed and install blankets on steep slopes.
Remove all temporary BMPs when site has reached final stabilization.
Silt Fence (SF) SC-1
November 2010 Urban Drainage and Flood Control District SF-3
Urban Storm Drainage Criteria Manual Volume 3
SC-1 Silt Fence (SF)
SF-4 Urban Drainage and Flood Control District November 2010
Urban Storm Drainage Criteria Manual Volume 3
1. THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS
SITE.
2. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS.
3. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE
APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS,
AND EROSION CONTROL REPORT.
4. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION
INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO
BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
5. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
6. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.)
SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTSOF-WAY SHALL REMAIN
EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION
CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE LOCAL ENTITY.
7. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL:
a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR
RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
b. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY
THE EROSION CONTROL INSPECTOR.
c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
8. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND
REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
9. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSITED MATERIAL IMMEDIATELY AND MAKE SURE STREETS ARE FREE OF ALL
MATERIALS BY THE END OF EACH WORKING DAY.
10. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER
AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES.
11. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT
BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL
BE SEEDED AND MULCHED.
12. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON
COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION
(HOA).
13. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW
THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT
LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND
DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
14. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS
TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON
COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF
PRIOR TO THE AREA BEING RESTORED.
15. TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL
BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL
INSPECTOR, (WITHIN LOVELAND GMA AND CITY LIMITS ONLY).
a. BELOW ALL GUTTER DOWNSPOUTS.
b. OUT TO DRAINAGE SWALES.
c. ALONG LOT PERIMETER.
d. OTHER LOCATIONS, IF NEEDED.
16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE
DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
17. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED
TO PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB &
GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE
WASHOUT AREAS, AND/OR BUILDING SITES.
18. ADD NOTES TO REFLECT THE STORMWATER RUNOFF CONTROL PLAN OF THE INDIVIDUAL DEVELOPMENT.
STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
LEGEND
EXISTING PROPOSED
REVISIONS
NO.
REV.
DATE REVISIONS DESCRIPTION
project no.:
approved by:
checked by:
drawn by:
drawing no.:
QA/QC by:
date:
SHEET
TEL 970.461.7733 www.olssonassociates.com
5285 McWhinney Boulevard, Suite 160
Loveland, CO 80538
OLSSON ASSOCIATES ASSUMES
NO RESPONSIBILITY FOR
EXISTING UTILITY LOCATIONS
(HORIZONTAL OR VERTICAL). THE
EXISTING UTILITIES SHOWN ON
THIS DRAWING HAVE BEEN
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_ERC01.dwg
JG
BM
C4.0
A
12/21/2015
1ST FDP SUBMITTAL
JD
EROSION AND SEDIMENT CONTROL PLAN
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
EXISTING CONDITIONS AND DEMOLITION PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_EXC04.dwg
JG
MH
C2.5
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 6
JD
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
EXISTING CONDITIONS AND DEMOLITION PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_EXC02.dwg
JG
MH
C2.4
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 5
JD
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
EXISTING CONDITIONS AND DEMOLITION PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_EXC02.dwg
JG
MH
C2.3
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 4
JD
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
EXISTING CONDITIONS AND DEMOLITION PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_EXC03.dwg
JG
MH
C2.2
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 EAST
JD
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
EXISTING CONDITIONS AND DEMOLITION PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_EXC03.dwg
JG
MH
C2.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
LOT 3 WEST
JD
PLOTTED FROM THE BEST
AVAILABLE INFORMATION. IT IS
HOWEVER THE RESPONSIBILITY
OF THE CONTRACTOR TO FIELD
VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION ACTIVITIES.
NOTE
THIS DOCUMENT HAS BEEN
RELEASED BY OLSSON
ASSOCIATES ONLY FOR REVIEW
BY REGULATORY AGENCIES AND
OTHER PROFESSIONALS, AND IS
SUBJECT TO CHANGE. THIS
DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION.
CALL 811 SEVENTY-TWO HOURS
PRIOR TO DIGGING, GRADING OR
EXCAVATING FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
DATE
DATE
DATE
DATE
DATE
DATE
CITY ENGINEER
WATER AND WASTEWATER UTILITY
STORMWATER UTILITY
PARKS AND RECREATION
TRAFFIC ENGINEER
EXISTING CONDITIONS AND DEMOLITION PLAN
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_EXC01.dwg
JG
MH
C2.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
GENERAL NOTES
1. ALL GRAYED OUT UTILITIES ARE EITHER ABANDON IN PLACE OR TO BE REMOVED BY MASTER DEVELOPER.
2. CONTRACTOR TO COORDINATE WITH ENGINEER WHEN DISCREPANCIES ARE DISCOVERED.
PARKS AND RECREATION
TRAFFIC ENGINEER
GENERAL NOTES
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_NTS.dwg
JG
MH
C1.1
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND
SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL
REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE
MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY.
2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY
STATED OTHERWISE.
3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY
THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL
PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO
THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND
APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF
ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND
INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH
MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.
5. $//6$1,7$5<6(:(5672506(:(5$1':$7(5/,1(&216758&7,21$6:(//$632:(5$1'27+(5³'5<´87,/,7<,167$//$7,216
SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE
LOCAL ENTITY ENGINEER.
6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS.
IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES
ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN
UNDERGROUND UTILITIES.
7. THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS
PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY
ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE
LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE
APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED.
9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER
SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY
PRIOR TO BEGINNING CONSTRUCTION.
10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE
THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE
RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE
UTILITY COMPANIES.
11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER
NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT
THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF
ANY WORK.
12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN
GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY
UTILITIES.
13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS
AND APPROVED BY THE WATER UTILITY.
14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO
INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED
STATES.
15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE
(CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT
PLAN, AND THE EROSION CONTROL PLAN.
16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE
PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED
ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED
TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR
SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT
AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER
THE DEVELOPMENT AGREEMENT.
18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF
GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS
SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER,
WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19. ALL RECOMMENDATIONS OF THE FOOTHILLS REDEVELOPMENT FINAL DRAINAGE AND EROSION CONTROL STUDY PREPARED DECEMBER 5,
2013 BY R.A. SMITH NATIONAL, INC. SHALL BE FOLLOWED AND IMPLEMENTED. ALL RECOMMENDATIONS OF THE MAJOR AMENDMENT TO A
PORTION OF FOOTHILLS MALL REDEVELOPMENT PLANNING AREA 3 (LOTS 3, 4, 5, AND 6 OF FOOTHILLS MALL REDEVELOPMENT) FINAL
DRAINAGE AND EROSION CONTROL STUDY PREPARED FOR DECEMBER 18, 2015 BY OLSSON ASSOCIATES SHALL BE FOLLOWED AND
IMPLEMENTED.
20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL
EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED
AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING.
21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC
STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE
BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR
DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO
COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS -
221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE
START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY
ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY
COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT
IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.
24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY
GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF
THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT,
THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE
LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN
REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR
A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND
ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT.
25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET
SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY
INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO
THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL
ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS.
26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL
STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS
CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE
EXCAVATION NECESSARY FOR BUILDING CONNECTIONS.
27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE
REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS.
28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE
CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL
PLAT APPROVAL.
29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO
SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT.
30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING,
SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE
RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR
AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS
MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES.
32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL
CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO
THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE
LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE
DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL
COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY
ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE
LOCAL ENTITY.
35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED
IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY
NOTED OTHERWISE.
36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT
SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE
APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT
IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER
IMMEDIATELY.
39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE
CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE
CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40. SEE PROJECT CONTROL ON COVER SHEET FOR HORIZONTAL AND VERTICAL INFORMATION.
41. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAYS UNLESS OTHERWISE NOTED.
42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS,
SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO
CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS OTHERWISE
INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE
FIRST CERTIFICATE OF OCCUPANCY.
43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS
ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR
BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE
FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT
LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE
PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY
ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.
44. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN,
THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45. 67$1'$5'+$1',&$35$036$5(72%(&216758&7('$7$//&85%5(78516$1'$7$//³7´,17(56(&7,216
46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE
FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING
STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (N/A).
CITY OF FORT COLLINS GENERAL NOTE
1. THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS
SITE.
2. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS.
3. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE
APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS,
AND EROSION CONTROL REPORT.
4. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION
INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO
BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
5. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING
VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
6. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.)
SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER
PERMANENT EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTSOF-WAY SHALL REMAIN
EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION
CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE LOCAL ENTITY.
7. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL:
a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR
RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
b. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY
THE EROSION CONTROL INSPECTOR.
c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
8. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND
REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
9. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSITED MATERIAL IMMEDIATELY AND MAKE SURE STREETS ARE FREE OF ALL
MATERIALS BY THE END OF EACH WORKING DAY.
10. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER
AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES.
11. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT
BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL
BE SEEDED AND MULCHED.
12. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON
COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION
(HOA).
13. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW
THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT
LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND
DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
14. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS
TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON
COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF
PRIOR TO THE AREA BEING RESTORED.
15. TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL
BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL
INSPECTOR, (WITHIN LOVELAND GMA AND CITY LIMITS ONLY).
a. BELOW ALL GUTTER DOWNSPOUTS.
b. OUT TO DRAINAGE SWALES.
c. ALONG LOT PERIMETER.
d. OTHER LOCATIONS, IF NEEDED.
16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE
DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
17. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED
TO PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB &
GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE
WASHOUT AREAS, AND/OR BUILDING SITES.
STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES
1. ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET
IMPROVEMENTS NOTES LISTED HERE.
2. A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY
ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A
DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY
ASPHALT.
3. WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES
FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING
PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS
APPROVED BY THE LOCAL ENTITY ENGINEER IN LOVELAND.
4. STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE
MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER.
5. FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR
OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED.
6. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS
ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE.
CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH
SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY
THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE
PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK.
7. ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING
COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN.
8. THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND
35,2572,167$//$7,212)$63+$/7*877(567+$7+2/'025(7+$1ó,1&+'((325)((7/21*,78',1$//<2):$7(56+$//%(
COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY.
9. PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE
SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE
SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE
ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST
/%6:,7+31(80$7,&7,5(6,1)/$7('72127/(667+$136,*³3522)52//´9(+,&/(66+$//12775$9(/$763(('6
GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION,
AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH,
121<,(/',1*685)$&(7+(/2&$/(17,7<(1*,1((56+$//%(127,),('$7/($67+285635,25727+(³3522)52//´$//³3522)
52//6´6+$//%(3(5)250(',17+(35(6(1&(2)$1,163(&725
STREET IMPROVEMENT NOTES
1. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC
SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE.
2. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC.
3. ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD.
4. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS.
5. ALL LANE LINES FOR CONCRETE PAVEMENT SHOULD BE EPOXY PAINT.
6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE
DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL ENTITY ENGINEER PRIOR
TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS.
7. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS.
8. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
9. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS.
10. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS.
11. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL
DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN.
12. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES.
13. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN.
14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE
WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE
LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR
THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD
FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS).
15. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR
ADDITIONAL DETAIL.
TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES
1. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE
PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
2. ALL RECOMMENDATIONS OF THE FOOTHILLS REDEVELOPMENT FINAL DRAINAGE AND EROSION CONTROL STUDY PREPARED DECEMBER 5,
2013 BY R.A. SMITH NATIONAL, INC. SHALL BE FOLLOWED AND IMPLEMENTED. ALL RECOMMENDATIONS OF THE MAJOR AMENDMENT TO A
PORTION OF FOOTHILLS MALL REDEVELOPMENT PLANNING AREA 3 (LOTS 3, 4, 5, AND 6 OF FOOTHILLS MALL REDEVELOPMENT) FINAL
DRAINAGE AND EROSION CONTROL STUDY PREPARED FOR DECEMBER 18, 2015 BY OLSSON ASSOCIATES SHALL BE FOLLOWED AND
IMPLEMENTED.
3. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A
REGISTERED ENGINEER, MUST BY SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE
SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF
OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BY SUBMITTED TO THE STORMWATER
UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR
TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
4. CERTIFYING ENGINEER SHALL BE PRESENT TO OBSERVE THE CONSTRUCTION OF THE STORM DRAINAGE IMPROVEMENTS. CONTRACTOR
TO COORDINATE WITH CERTIFYING ENGINEER.
5. CONTRACTOR SHALL COMPLETE DURING CONSTRUCTION INSPECTION CHECKLIST.
6. CERTIFYING ENGINEER SHALL COMPLETE THE THE OVERALL SITE AND DRAINAGE CERTIFICATION FORM AND CHECKLIST AND
CERTIFICATIONS OF LOT GRADING.
7. AS-BUILT SURVEY OF GRADING, DRAINAGE IMPROVEMENTS, AND DRAINAGE FACILITIES SHALL BE COMPLETED. SURVEY TO COORDINATE
WITH CERTIFYING ENGINEER.
8. ALL STORMWATER AND UNDERDRAIN PIPE SHALL BE ADS N-12 ST IB OR EQUIVALENT. PIPE SHALL BE INSTALLED PER MANUFACTURES
RECOMMENDATIONS.
STORM DRAINAGE NOTES
1. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS
AND APPROVED BY THE WATER UTILITY.
2. ALL WATER MAINS TO BE INSTALLED PER CITY OF FORT COLLINS SPECIFICATIONS.
3. ALL WATER SERVICES SHALL BE INSTALLED PER CITY OF FORT COLLINS WATER METER INSTALLATION PROCEDURES AND SPECIFICATION
2646 "SERVICE LINES, METERS, AND APPURTENANCES."
4. CONTRACTOR TO COORDINATE WET TAPS & ABANDOMENTS WITH CITY OF FORT COLLINS (970-416-2165).
5. ABANDON WATER SERVICES SHALL BE REMOVED TO THE MAIN. REMOVE CURB STOP BOXES FROM ABANDONED WATER SERVICES.
6. ALL WATER MAINS SHALL BE PVC C900 PRESSURE CLASS 150
7. ALL WATER MAINS SHALL BE INSTALLED WITH TRACER WIRE.
8. ALL WATER MAIN VALVES SHALL HAVE VALVE BLOCKING. SEE DETAILS.
9. ALL FIRE LINES SHALL BE PVC C900 PRESSURE CLASS 150.
10. ALL SERVICES SHALL BE TYPE K COPPER.
WATERLINE NOTES
1. MOISTURE DENSITY TESTS: TESTS SHALL BE CONDUCTED ON REPRESENTATIVE SAMPLES OF EACH TYPE OF MATERIAL ENCOUNTERED
OR UTILIZED.
2. COMPACTION CONTROL: FIELD TESTS SHALL BE CONDUCTED TO DETERMINE COMPLIANCE WITH PROJECT REQUIREMENTS AND
GEOTECHNICAL REPORT.
3. ALL MATERIAL TESTS SHALL BE MADE BY THE GEOTECHNICAL ENGINEER. QUANTITY AND LOCATIONS SHALL BE AT THE DIRECTION OF THE
GEOTECHNICAL ENGINEER.
4. DENSITY TESTS SHALL BE TAKEN IN COMPACTED MATERIAL BELOW THE DISTURBED SURFACE. WHEN DENSITY TESTS INDICATE THAT THE
DRY DENSITY OR MOISTURE CONTENT OF ANY LAYER OF FILL OR PORTION THEREOF IS BELOW THAT REQUIRED, THE PARTICULAR LAYER
OR PORTION SHALL BE REWORKED UNTIL THE REQUIRED DRY DENSITY OR MOISTURE CONTENT HAS BEEN ACHIEVED.
5. UNLESS OTHERWISE DIRECTED BY GEOTECHNICAL ENGINEER, COMPACTION SHALL BE MINIMUM OF 95% OF OPTIMUM DENSITY, IN
ACCORDANCE WITH ASTM D 698, AT A MOISTURE CONTENT OF NOT LESS THAN 2% BELOW AND NOT MORE THAN 2% ABOVE THE OPTIMUM
MOISTURE CONTENT.
6. PARKING SUBGRADE SHALL BE PROOF ROLLED TO DETECT ANY AREAS OF INSUFFICIENT COMPACTION. PROOF ROLLING SHALL BE
ACCOMPLISHED BY MAKING A MINIMUM OF TWO (2) COMPLETE PASSES WITH A FULLY LOADED TANDEM AXLE DUMP TRUCK, OR APPROVED
EQUIVALENT, IN EACH OF THE TWO PERPENDICULAR DIRECTIONS UNDER THE SUPERVISION AND DIRECTION OF THE GEOTECHNICAL
ENGINEER. AREAS OF FAILURE SHALL BE SCARIFIED, RECOMPACTED, AND RETESTED.
7. REFERENCE GEOTECHNICAL REPORT PREPARED BY GROUND ENGINEERING, DATED NOVEMBER 20, 2012, JOB NUMBER 12-3649A
QUALITY CONTROL NOTES
1) LOCATIONS AND ELEVATIONS OF EXISTING IMPROVEMENTS TO BE MET (OR AVOIDED) BY WORK TO BE DONE SHALL BE CONFIRMED BY
THE CONTRACTOR THROUGH FIELD EXPLORATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REPORT TO THE ENGINEER ANY
DISCREPANCIES BETWEEN HIS MEASUREMENTS AND THESE PLANS.
2) THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE APPROPRIATE FIRE DEPARTMENT OF ALL STREET CLOSURES AND
EXISTING FIRE HYDRANTS TAKEN OUT OF SERVICE AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.
3) ANY CONSTRUCTION DEBRIS OR MUD DROPPED INTO MANHOLES, INLETS, PIPES OR TRACKED ONTO EXISTING ROADWAYS SHALL BE
REMOVED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY EXCAVATIONS OR PAVEMENT FAILURES CAUSED BY
HIS CONSTRUCTION. THE CONTRACTOR SHALL PROPERLY BARRICADE THE CONSTRUCTION SITE UNTIL CONSTRUCTION IS COMPLETE.
4) PRIOR TO BEGINNING THE WORK, THE CONTRACTOR SHALL OBTAIN ANY WRITTEN AGREEMENTS FOR INGRESS AND EGRESS TO THE
WORK FORM ADJACENT PRIVATE PROPERTY OWNERS. ACCESS TO ANY ADJACENT PRIVATE PROPERTY SHALL BE MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD.
5) THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS NOT OBTAINED BY THE OWNER OR OWNER'S REPRESENTATIVES
AND PAY ALL FEES AS REQUIRED BY THE CONSTRUCTION COVERED IN THESE PLANS.
6) EXCEPT FOR MATERIALS DESIGNED TO BE RELOCATED ON THIS PLAN, ALL OTHER CONSTRUCTION MATERIALS SHALL BE NEW.
7) SHOP DRAWINGS AND MATERIAL SPECIFICATIONS SHALL BE SUBMITTED TO OWNER/ENGINEER FOR REVIEW AND APPROVAL PRIOR TO
PLACEMENT OF MATERIAL.
8) ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND FEDERAL APPLICABLE LAWS AND REGULATIONS.
9) ALL ESTIMATES OF QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR AND SUBCONTRACTORS SHALL BE
RESPONSIBLE FOR DETERMINING ALL QUANTITIES. CONTRACTOR SHALL PROVIDE ALL WORK AND MATERIALS AS SHOWN ON THESE
PLANS.
10) CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SITE IMPROVEMENTS (INCLUDING BUT NOT LIMITED TO: UTILITIES,
STRUCTURES, PAVING, LANDSCAPING, ETC.) SUCH THAT NO DAMAGE IS DONE TO SITE IMPROVEMENTS (I.E.: SAWCUTTING NEW
PAVEMENT). SITE IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE
OWNER AT NO ADDITIONAL COST TO THE OWNER.
11) IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE THAT A PRIOR UNIDENTIFIED
SITUATION IS PRESENT, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.
12) THE CONTRACTOR SHALL REMOVE ALL DEBRIS RESULTING FROM WORK UNDER THIS CONTRACT TO AN APPROVED DUMP SITE.
13) DIMENSIONS SHOWN ON THE PLANS ARE TO BACK OF CURB, EDGE OF ASPHALT, EDGE OF CONCRETE, AND EXTERIOR FACE OF BUILDING,
AND TO CENTERLINE OF UTILITIES, UNLESS OTHERWISE SPECIFIED.
14) USE ONLY DIMENSIONS PROVIDED ON THESE PLANS. DO NOT SCALE DRAWINGS. INFORM ENGINEER OF ANY DISCREPANCIES AND/OR
MISSING INFORMATION.
15) THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ACCESS TO ADJACENT PARCELS DURING ALL HOURS OF OPERATION FOR
THE BUSINESSES LOCATED ON THOSE PARCELS.
16) CONTRACTOR TO OBTAIN TEMPORARY POWER, TELEPHONE AND WATER FOR THE SITE.
17) CONTRACTOR TO REFER TO DRAWINGS ISSUED BY THE ARCHITECT, TO ENSURE COORDINATION OF EXACT LOCATION AND DIMENSIONS
OF BUILDING EXITS, RAMPS, UTILITY ENTRANCE LOCATIONS AND GRADES AROUND THE BUILDING. IMMEDIATELY NOTIFY ENGINEER AND
ARCHITECT OF ANY DISCREPANCIES.
18) REFER TO ARCHITECTURAL AND LANDSCAPE DRAWINGS FOR ALL IMPROVEMENTS BETWEEN THE BUILDING AND THE SIDEWALK
SURROUNDING THE BUILDING.
19) THE CONTRACTOR IS RESPONSIBLE FOR REMOVING EXISTING IRRIGATION SYSTEM IN THE AREAS OF PROPOSED IMPROVEMENTS. THE
CONTRACTOR SHALL CAP THE EXISTING IRRIGATION SYSTEM TO REMAIN SUCH THAT THE REMAINING SYSTEM SHALL CONTINUE TO
FUNCTION PROPERLY. IN CASES WHERE ISLAND, ROADWAYS, PARKING LOTS, AND OTHER IMPROVEMENTS NOT MENTIONED ARE MOVED
OR ADJUSTED TO GRADE, CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL LANDSCAPED AREAS ARE PROPERLY
IRRIGATED & THAT IRRIGATION SYSTEM FUNCTIONS PROPERLY.
20) THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ADJACENT CITY STREETS FREE AND CLEAN OF ALL DEBRIS AND DIRT FROM THE
JOB SITE.
1. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR.
2. ALL REPAIRS AND REPLACEMENT OF SIDEWALK, CURB, GUTTER AND ASPHALT SHALL BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS.
3. FOR LOCATIONS WHERE SERVICES ARE SHOWN UNDER SIDEWALK, SIDEWALK SHALL BE REMOVED AND REPLACED.
4. PERMIT(S) FOR ALL WORK SHOWN ON THESE PLANS SHALL BE OBTAINED PRIOR TO THE START OF ANY WORK SHOWN ON THESE PLANS.
5. CLEANOUTS LOCATED WITHIN SIDEWALK OR DRIVEWAY SHALL HAVE A TRAFFIC RATED LID.
6. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND
GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY
OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR
PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
GENERAL UTILITY NOTES
OLSSON ASSOCIATES GENERAL NOTES
1. ALL SEWER MAINS AND SERVICES TO BE INSTALLED PER CITY OF FORT COLLINS SPECIFICATIONS.
2. CONTRACTOR TO COORDINATE WET TAPS & ABANDOMENTS WITH CITY OF FORT COLLINS (970-416-2165).
3. ALL SANITARY SEWER MAINS AND SERVICES SHALL BE PVC SDR 35.
SANITARY SEWER NOTES
1. THE TOP OF FOUNDATIONS ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM.
TOP OF FOUNDATIONS NOTE
PARKS AND RECREATION
TRAFFIC ENGINEER
COVER SHEET
FORT COLLINS, CO 2015
12/21/2015
015-0720
FOOTHILLS MALL MULTI-FAMILY
DH
150720_TTL.dwg
JG
MH
C1.0
A
12/21/2015
1ST FDP SUBMITTAL
CONSTRUCTION DOCUMENTS
JD
PROJECT CONTROL:
NOTE: IF NAVD88 DATUM IS REQUIRED FOR ANY PRUPOSE, THE FOLLING EQUATION SHOULD BE USED.
NAVD88 = NGVD29 UNADJUSTED + 3.19'
BASIS OF BEARING:
BEARINGS ARE BASED ON THE WEST LINE OF THE SOUTHWEST QUARTER OF SECTION 25
BEING MONUMENTED AT THE WEST QUARTER CORNER BY A 3-INCH ALUMINUM CAP IN A
MONUMENT BOX STAMPED "LS 20123" AND AT THE SOUTHWEST CORNER BY A 2.25-INCH
ALUMINUM CAP IN A RANGE BOX STAMPED "LS 14823" HAS HAVING AN ASSUMED BEARING
2)6
(:,7+$//%($5,1*&217$,1('+(5(,15(/$7,9(7+(5(72
CONTROL POINTS:
CONTROL POINT 1
CONTROL POINT 2
VERTICAL CONTROL:
PROJECT DATUM: NGVD 1929 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM)
LOT 3, 4, 5, & 6 OF FOOTHILLS MALL REDEVELOPMENT
SUBDIVISION LOCATED IN THE SOUTHWEST QUARTER OF
SECTION 25, TOWNSHIP 5 NORTH, RANGE 69 WEST OF
THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
12/21/2015
MAJOR AMENDMENT
FOOTHILLS MALL REDEVELOPMENT,
A PORTION OF PLANNING AREA 3
ARCHITECT
OLSSON ASSOCIATES
5285 McWHINNEY BOULEVARD, SUITE 160
LOVELAND, CO 80538
PHONE: (970) 461-7733
ENGINEER
OWNER LANDSCAPE
PROJECT TEAM CONTACTS
VICINITY MAP
SCALE=1"=1000'
PROPOSED SITE
JOHNSON NATHAN STROHE ARCHITECTS
1600 WYNKOOP ST. SUITE 100
DENVER, CO 80202
PHONE: (303) 892-7062
TB GROUP
444 MOUNTAIN AVENUE
BERTHOUD, CO 80513
PHONE: (970) 532-5891
DEVELOPER
MCWHINNEY REAL ESTATE SERVICES
2725 ROCKY MOUNTAIN AVENUE
SUITE #200
LOVELAND, CO 80538
PHONE: (970) 962-9990
WALTON FOOTHILLS HOLDINGS VI, LLC
5750 DTC PARKWAY
SUITE 210
GREENWOOD VILLAGE, CO 80111
PHONE: (303) 771-4004
REVISIONS
A
12/21/2015
SHEET LIST TABLE
Sheet Number Sheet Title
C1.0 COVER SHEET
C1.1 GENERAL NOTES
C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN
C2.1 EXISTING CONDITIONS AND DEMOLITION PLAN
C2.2 EXISTING CONDITIONS AND DEMOLITION PLAN
C2.3 EXISTING CONDITIONS AND DEMOLITION PLAN
C2.4 EXISTING CONDITIONS AND DEMOLITION PLAN
C2.5 EXISTING CONDITIONS AND DEMOLITION PLAN
C4.0 EROSION AND SEDIMENT CONTROL PLAN
C4.1 EROSION AND SEDIMENT CONTROL PLAN
C4.2 EROSION AND SEDIMENT CONTROL PLAN
C4.3 EROSION AND SEDIMENT CONTROL PLAN
C6.0 OVERALL GRADING PLAN
C6.1 LOT 3 WEST
C6.2 LOT 3 EAST
C6.3 LOT 4
C6.4 LOT 5
C6.5 LOT 6
C7.0 DRAINAGE PLAN
C8.0 OVERALL UTILITY PLAN
C8.1 LOT 3 WEST
C8.2 LOT 3 EAST
C8.3 LOT 4
C8.4 LOT 5
C8.5 LOT 6
SANITARY SEWER PLAN AND PROFILE
C9.0 OVERALL SANITARY SEWER PLAN
C9.1 LOT 3 WEST
C9.2 LOT 3 EAST
WATERLINE PLAN AND PROFILE
C10.0 OVERALL WATER PLAN
C10.1 LOT 3
C10.2 LOT 3
C10.3 LOT 4
C10.4 LOT 5
C10.5 LOT 6
STORM PLAN AND PROFILE
C12.0 OVERALL STORM PLAN
C12.1 LOT 3 WEST MAIN
C12.2 LOT 3 WEST MEWS
C12.3 LOT 3 EAST MAIN
C12.4 LOT 3 EAST MEWS
C12.5 LOT 4 MAIN
C12.6 LOT 4 MEWS
C12.7 LOT 5 NORTH
C12.8 LOT 5 SOUTH
C12.9 LOT 6 MAIN
C12.10 LOT 6 MEW
C12.11 LOT 6 DETAIL
C14.0 OVERALL PAVING PLAN
C14.1 PAVING PLAN
C14.2 PAVING PLAN
C14.3 PAVING PLAN
C14.4 PAVING PLAN
C14.5 PAVING PLAN
C20.1 DETAILS
C20.2 DETAILS
C20.3 DETAILS
C20.4 DETAILS
C20.5 DETAILS
C20.6 DETAILS
C20.7 DETAILS
C20.8 DETAILS
D-322: 5.4 KM (3.35 MI) SOUTH ALONG U.S. HIGHWAY 287 FROM ITS JUNCTION WITH
STATE HIGHWAY 14 IN FORT COLLINS, IN THE NORTH END OF THE EAST CONCRETE
HEADWALL OF AN 8-BY-24 FOOT BOX CULVERT, 6.1 METERS (20.0 FT) EAST OF THE
CENTERLINE OF THE NORTH BOUND LANES OF THE HIGHWAY, AND 1.7 METERS (5.6
FT) SOUTH OF THE NORTH END OF THE HEADWALL. THE MARK IS ABOVE LEVEL WITH
THE HIGHWAY.
BENCHMARK #1
ELEVATION: 5031.28 FEET
E-322: 5.9 KM (3.65 MI) SOUTH ALONG U.S. HIGHWAY 287 FROM ITS JUNCTION WITH
STATE HIGHWAY 14 IN FORT COLLINS, IN THE SOUTH END OF THE WEST CONCRETE
HEADWALL OF AN 8-BY-24 FOOT BOX CULVERT, 51.0 METERS (167.3 FT) SOUTH OF
THE CENTERLINE OF THE EAST BOUND LANES OF HORSETOOTH ROAD, AND 5.7
METERS (18.7 FT) WEST OF THE CENTERLINE OF THE SOUTH BOUND LANES OF THE
HIGHWAY. THE MARK IS ABOVE LEVER WITH THE HIGHWAY.
BENCHMARK #2
ELEVATION: 5031.21 FEET
NORTHWEST CORNER OF LOT 3 OF THE FOOTHILLS MALL REDEVELOPMENT SUBDIVISION
N: 1441791.48
E: 3118722.24
NORTHEAST CORNER OF LOT 3 OF THE FOOTHILLS MALL REDEVELOPMENT SUBDIVISION
N: 1441793.59
E: 3119718.34
I HEREBY AFFIRM THAT THESE FINAL
CONSTRUCTION PLANS WERE PREPARED
UNDER MY DIRECT SUPERVISION, IN
ACCORDANCE WITH ALL APPLICABLE CITY OF
FORT COLLINS AND STATE OF COLORADO
STANDARDS AND STATUES, RESPECTIVELY;
AND THAT I AM FULLY RESPONSIBLE FOR THE
ACCURACY OF ALL DESIGN, REVISIONS, AND
RECORD CONDITIONS THAT I HAVE NOTED ON
THESE PLANS.
THESE PLANS HAVE BEEN REVIEWED BY THE
LOCAL ENTITY FOR CONCEPT ONLY. THE
REVIEW DOES NOT IMPLY RESPONSIBILITY BY
THE REVIEWING DEPARTMENT, THE LOCAL
ENTITY ENGINEER, OR THE LOCAL ENTITY
FOR ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. FURTHERMORE, THE REVIEW
DOES NOT IMPLY THAT QUANTITIES OF ITEMS
ON THE PLANS ARE THE FINAL QUANTITIES
REQUIRED. THE REVIEW SHALL NOT BE
CONSTRUED IN ANY REASON AS
ACCEPTANCE OF FINANCIAL RESPONSIBILITY
BY THE LOCAL ENTITY FOR ADDITIONAL
QUANTITIES OF ITEMS SHOWN THAT MAY BE
REQUIRED DURING THE CONSTRUCTION
PHASE.