HomeMy WebLinkAboutFOOTHILLS MALL REDEVELOPMENT, MULTI-FAMILY - FDP - FDP150048 - SUBMITTAL DOCUMENTS - ROUND 1 - STORMWATER-RELATED DOCUMENTS5285 McWhinney Blvd., Suite 160 TEL 970.461.7733
Loveland, CO 80538 FAX 970.635.3709 www.olssonassociates.com
December 18, 2015
Stormwater Engineering
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80524
RE: Addendum 2
Low Impact Design Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, 5, and 6 of Foothills Mall Redevelopment)
Dear Sir or Madam:
Per the City of Fort Collins Ordinance #152: No less than fifty percent (50%) of any newly added
impervious area must be treated using one or a combination of low impact design (LID)
techniques; and no less than twenty five percent (25%) of any newly added pavement areas
must be treated using permeable pavement.
In order to determine if the intent of the ordinance for Lot 3, 4, 5 and 6 (a portion of the Foothills
Redevelopment Planning Area 3) was being met:
• We reviewed the original design as defined within the following drainage report: Storm
Water Management Plan for Foothills Redevelopment, prepared by R.A. Smith National,
dated Revised December 5, 2013 (existing drainage report),
• We analyzed the conditions of the mall that existed prior to the ordinance, and
• We analyzed the proposed design submitted as part of the major amendment.
Based on the review and evaluation, the following conclusions were made:
Per the ordinance, no less than fifty percent (50%) of any newly added impervious area must be
treated using one or a combination of LID techniques. Based on our analysis of the existing
drainage report, a series of rain gardens and sand filters (SF-1.0, SF-2.0, SF-4.0, RG–29, RG–
31, and RG-33) were designed to capture and treat on-site runoff. See Exhibit B for original
drainage basin map and Exhibit C for location of the lots. As part of the analysis, it was noted in
the original report, the overall average tributary imperviousness was assumed to be equivalent
to 90% for the calculations. This was a conservative approach. In addition, the rain gardens
were designed to treat 100 percent of the contributing area. Based on the analysis, the
proposed site layout and grading will be consistent with the intent of the LID techniques.
However, a reduction in the overall percent imperviousness from the planned percent
imperviousness will reduce the impact to the rain gardens and sand filters. See Exhibit D. Since
Rain Garden 33 falls within the proposed development, the rain garden was updated to fit within
the proposed site plan design. Calculations were completed to verify the updated rain garden
Addendum 2
Low Impact Design Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, and 5 of Foothills Mall Redevelopment)
Page 2
would meet the intent of the ordinance. The rain garden is designed to treat 100 percent of the
contributing area. See Exhibit E and F for those calculations. Based on the analysis, the LID
techniques provided exceed the intent of the ordinance.
Per the ordinance, no less than twenty five percent (25%) of any newly added pavement areas
must be treated using permeable pavement technology. The existing pavement area prior to the
ordinance was calculated to be 413,920 square feet. The proposed pavement area is 195,336
square feet. See Exhibit D for pavement area calculations. Based on our analysis of the existing
and proposed pavement, there is no newly added pavement. No permeable pavement is
required. See Exhibit G and H for a graphical representation of the pavement areas. However,
to meet the intent and essence of the ordinance, permeable pavement has been provided
throughout the project. In order to meet the 25% requirement 48,862 square feet of permeable
pavement has been added. See Exhibit I and J permeable pavement calculations and areas.
The following supporting materials are attached for your reference:
• Exhibit A – Vicinity Map
• Exhibit B – Original Drainage Basin Map
• Exhibit C – Lot Map
• Exhibit D – Percent Imperviousness
• Exhibit E – Revised Rain Garden RG-33 Treatment Area
• Exhibit F – Revised Rain Garden, RG33 (updated), Calculations
• Exhibit G – Existing Pavement
• Exhibit H – Proposed Pavement
• Exhibit I – Permeable Pavement Calculations
• Exhibit J – Permeable Pavement Areas
In conclusion, the stormwater quality as a result of the proposed major amendment will be an
improvement to the intent of the original approved design as well as an improvement to the
existing condition prior to the ordinance. Overall the proposed design will have a significant
improvement to stormwater quality. If you have any questions or need additional information,
please contact me.
Sincerely,
Olsson Associates
Daniel Hull, PE
Senior Project Engineer
Enclosures
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family R
Exhibit A
Vicinity Map
Map taken from Storm Water Management Plan for Foothills Redevelopment,
prepared by R.A. Smith National, dated Revised December 5, 2013
Lot 3, 4, 5 and 6
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
Foothills Mall 5285 McWhinney Boulevard
Multi-Family
Exhibit B
Original Drainage Basin Map
Map taken from Foothills Redevelopment Planning PA2
Final Plans, dated 04/25/2014, prepared by R.A. Smith National
Sand Filter 2
Basin 11.47 acres
Rain Garden 29
Basin 6.22 acres
Sand Filter 4
Basin 4.38 acres
Rain Garden 31
Basin 1.36 acres
Rain Garden 33
Basin 1.76 acres
Sand Filter 1
Basin 22.72 acres
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family Exhibit C R
Lot Map
LOT 3
LOT 4
LOT 5
SAND
FILTER 2.0
SAND
FILTER 4.0
RAIN
GARDEN 29.0
RAIN
GARDEN 31.0
RAIN
GARDEN 33.0
LOT 6
SAND
FILTER 1.0
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Famliy Exhibit D R
Percent Imperviousness
Lot Area (SF) AREA (AC) Landscape Paved Roof Walks
Porous
Paving
Percent
Impervious
0% 100% 90% 90% 90%
3 170,929 3.92 47,519 47,007 58,191 18,212 0 68%
4 112,588 2.58 36,461 1,162 66,796 8,169 0 61%
5 101,716 2.34 15,199 1,782 68,600 16,135 0 77%
6 134,248 3.08 33,514 2,263 89,864 8,607 0 68%
Total 519,481 8.84 132,693 52,214 283,451 51,123 0 68%
Lot Area (SF) AREA (AC) Landscape Paved Roof Walks
Porous
Paving
Percent
Impervious
0% 100% 90% 90% 90%
3 170,929 3.92 60,271 44,931 42,897 3,831 18,999 61%
4 112,588 2.58 44,439 25,197 29,278 5,663 8,011 57%
5 101,716 2.34 26,054 29,121 32,548 4,580 9,413 70%
6 134,248 3.08 30,846 47,255 38,542 5,166 12,439 73%
Total 519,481 8.84 161,610 146,504 143,265 19,240 48,862 65%
Existing Design
Proposed Design
Imperviousness
Imperviousness
12/12/2015
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
R
T T
Foothills Mall Multi-Family
Exhibit E
Revised Rain Garden RG-33
Contributing Area
1.56 acres
Rain Garden
RG-33.0
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 68.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.680
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 68,348 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,213 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.00 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum) DWQCV = 12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin = 809 sq ft
D) Actual Flat Surface Area AActual = 993 sq ft
E) Area at Design Depth (Top Surface Area) ATop = 1692 sq ft
F) Rain Garden Total Volume VT= 1,343 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 60.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 1,213 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 0.40 in
Design Procedure Form: Rain Garden (RG)
Daniel Hull
Olsson Associates
April 24, 2015
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
Modified Rain Garden 33
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Rain Garden 33.0 Calcs.xlsm, RG 4/24/2015, 1:57 PM
Exhibit F
Modified Rain Garden, RG33
1of 2
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Daniel Hull
Olsson Associates
April 24, 2015
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
Modified Rain Garden 33
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Rain Garden 33.0 Calcs.xlsm, RG 4/24/2015, 1:57 PM
Exhibit F
Modified Rain Garden, RG33
1of 2
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
09/28/2015
Foothills Mall Multi-Family Exhibit G
Existing Pavement
-Pavement
Lot 3
Lot 4
Lot 5
Lot 6
11/10/2015
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
Foothills Mall Multi-Family
09/28/2015
Lot 3
Lot 4
Lot 5
Lot 6
12/12/2015
Exhibit H
Proposed Pavement
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family Exhibit I
Permeable Pavement Calculations
Lot Details
Lot
Total
Pavement
Area
Permeable
Pavement
Provided
%
Permeable
3 63930 18999 30%
4 33208 8011 24%
5 38534 9413 24%
6 59694 12439 21%
Total 195366 48862 25%
New Pavement Area 195,366.00 sq. ft.
Required Minimum Area of Porous Pavement 48,841.50 sq. ft.
Area of Paver Section #1 48,862.00 sq. ft.
Area of Paver Section #2 (and so on for all paver sections) NA sq. ft.
Total Porous Pavement Area 48,862.00 sq. ft.
Actual % of Porous Pavement Provided 25.01 %
City 25% Porous Pavement Requirement
12/12/2015
R
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
LOT 8 +
VAC TULANE PORTION LOT 1 +
VAC TULANE
PORTION
LOT 1 +
LOT 2
Foothills Mall Multi-Family Exhibit J
Permeable Pavement Areas
Permeable Pavement Areas
Lot 3
Lot 4
Lot 5
Lot 6
12/12/2015