Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutHARMONY COMMONS - PDP - PDP150027 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYHARMONY TECHNOLOGY PARK RETAIL
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
SEPTEMBER 2015
Prepared for:
Brinkman Partners Development
3528 Precision Drive
Fort Collins, CO 80528
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
Project #1556
DELICH HTP Retail TIS, September 2015
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pederstrian Facilities ....................................................................................................... 9
Bicycle Facilities .............................................................................................................. 9
Transit Facilities .............................................................................................................. 9
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 10
Trip Assignment ............................................................................................................ 10
Background Traffic Projections ..................................................................................... 10
Total Traffic Forecasts ................................................................................................... 18
Signal Warrants ............................................................................................................. 18
Geometry ...................................................................................................................... 21
Operation Analysis ........................................................................................................ 21
Pedestrian Level of Service ........................................................................................... 29
Bicycle Level of Service ................................................................................................ 29
Transit Level of Service ................................................................................................. 36
IV. CONCLUSIONS .................................................................................................... 37
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 12
3. Short Range (2020) Background Peak Hour Operation ......................................... 24
4. Long Range (2035) Background Peak Hour Operation ........................................... 26
5. Short Range (2020) Total Peak Hour Operation ..................................................... 30
6. Long Range (2035) Total Peak Hour Operation ...................................................... 33
DELICH HTP Retail TIS, September 2015
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Geometry ..................................................................................................... 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Balanced Recent Peak Hour Traffic .......................................................................... 7
5. Site Plan .................................................................................................................. 11
6. Trip Distribution ....................................................................................................... 13
7. Short Range (2020) Site Generated Peak Hour Traffic ........................................... 14
8. Long Range (2035) Site Generated Peak Hour Traffic ............................................ 15
9. Short Range (2020) Background Peak Hour Traffic ................................................ 16
10. Long Range (2035) Background Peak Hour Traffic................................................. 17
11. Short Range (2020) Total Peak Hour Traffic ........................................................... 19
12. Long Range (2035) Total Peak Hour Traffic ............................................................ 20
13. Short Range (2020) Geometry ................................................................................ 22
14. Long Range (2035) Geometry ................................................................................. 23
APPENDICES
A. Base Assumptions Form
B. Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor
Vehicle LOS Standards (Intersections)
D. Peak Hour Signal Warrant
E. Short Range (2020) Background Peak Hour Operation
F. Long Range (2035) Background Peak Hour Operation
G. Short Range (2020) Total Peak Hour Operation
H. Long Range (2035) Total Peak Hour Operation
I. Pedestrian/Bicycle Level of Service Worksheets
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements for the proposed Harmony Technology Park (HTP) Retail. The
proposed HTP Retail site is located in the southwest quadrant of the Harmony/Lady Moon-
HP East intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the
developer’s representative (Brinkman Partners Development), the project planning
consultant (TB Group), the project engineering consultant (Northern Engineering), and
Fort Collins Traffic Engineering. The Transportation Impact Study Base Assumptions form
and related documents are provided in Appendix A. This study generally conforms to the
format set forth in the Fort Collins TIS Guidelines in the “Larimer County Urban Area Street
Standards” (LCUASS). The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the HTP Retail site is shown in Figure 1. It is important that a
thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial, industrial, and residential. There
are residential uses to the south of the site. There are commercial and industrial uses
to the north, south, and west of the site. The center of Fort Collins lies to the northwest
of the proposed HTP Retail site.
Streets
The primary streets near the HTP Retail site are Harmony Road, Ziegler Road,
and Lady Moon Drive. Figure 2 shows a schematic of the existing geometry at the key
intersections.
Harmony Road is to the north of (adjacent to) the HTP Retail site. It is an east-
west street designated as a six-lane arterial street on the Fort Collins Master Street
Plan. Currently, it has a six-lane cross section with an existing speed limit of 55 mph in
this area. At the Harmony/Ziegler intersection, Harmony Road has eastbound and
westbound left-turn lanes, three through lanes in each direction, and a westbound right-
turn lane. At the Harmony/Lady Moon intersection, Harmony Road has eastbound and
westbound left-turn lanes, three through lanes in each direction, and eastbound and
westbound right-turn lanes. The Harmony/Ziegler and Harmony/Lady Moon
intersections have signal control. At the Harmony/HP West intersection, Harmony Road
has an eastbound left-turn lane and three through lanes in each direction. The
Harmony/HP West intersection has stop sign control on the HP West Access.
Ziegler Road is to the west of the HTP Retail site. It is a north-south street
designated as a four-lane arterial street north of Rock Creek Drive, and designated as a
two-lane arterial street south of Rock Creek Drive on the Fort Collins Master Street
Plan. Currently, Ziegler has a four-lane cross section and an existing speed of 40 mph.
At the Harmony/Ziegler intersection, Ziegler Road has dual northbound and southbound
left-turn lanes, two through lanes in each direction, and a southbound right-turn lane.
Lady Moon Drive is a north-south street designated as a collector street south of
Harmony Road on the Fort Collins Master Street Plan. Currently, Lady Moon Drive has
a two-lane cross section, with a center continuous two-way left-turn lane, south of the
Banner Medical Campus driveway. The north leg of the Harmony/Lady Moon
intersection serves the Hewlett-Packard campus. At the Harmony/Lady Moon
intersection, Lady Moon Drive has northbound and southbound left-turn lanes, a
northbound through lane, a southbound combined through/right-turn lane, and a
northbound right-turn lane. The existing posted speed is 30 mph on Lady Moon Drive.
Harmony
Strauss Cabin
Kechter
Rock Creek
Ziegler
Timberwood
Lady Moon
Precision
Le Fever
Cinquefoil
Fossil Ridge
High School
Timberwood
Technology Technology
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
HTP Retail TIS, August 2015
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
HTP Retail TIS, August 2015
Page 4
- Denotes Lane
Ziegler
Harmony
HP
East
HP
West
Lady
Moon
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 5
Existing Traffic
Recent peak hour traffic volumes at the Harmony/Ziegler, Harmony/HP West,
and Harmony/Lady Moon-HP East intersections are shown in Figure 3. The counts at
the Harmony/Ziegler and Harmony/Lady Moon-HP East intersections were obtained by
the City of Fort Collins in April and May 2013, respectively. The turning movement
counts at the Harmony/HP West intersection were obtained in February 2015. Raw
traffic count data is provided in Appendix B. Since there are no accesses or
intersections between Lady Moon Drive and the HP West Access, the link volumes from
the Harmony/Lady Moon intersection were used to determine the through volumes at
the Harmony/HP West intersections. The traffic volumes were averaged/balanced
between the key intersections, since the recent counts were performed on different
days. The balanced recent peak hour traffic is shown in Figure 4.
Existing Operation
The Harmony/Ziegler, Harmony/HP West, and Harmony/Lady Moon-HP East
intersections were evaluated and the peak hour operation is displayed in Table 1.
Calculation forms are provided in Appendix C. The key intersections are currently
operating acceptably with existing control, geometry, and signal timing in the morning
and afternoon peak hours, except for the Harmony/Ziegler and Harmony/HP West
intersections during the afternoon peak hour. With a small adjustment in the signal
timing, the Harmony/Ziegler intersection can achieve acceptable operation. It is
important to note that eastbound and northbound right-turn deceleration lanes are
warranted with the existing traffic volumes. At the Harmony/HP West intersection, some
movements (EB LT and SB LT) are shown to experience calculated delays
commensurate with LOS F. During traffic counting, the actual observed delays for
these movements averaged ≤20 seconds per vehicle. The calculated delays do not
reflect the substantial gaps created by the Harmony/Lady Moon signal. Delays
commensurate with level of service F are normal at stop sign controlled intersections
along arterial streets in an urban area. The intersections were evaluated using
techniques provided in the 2010 Highway Capacity Manual. A description of level of
service for signalized and unsignalized intersections from the 2010 Highway Capacity
Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. The HTP Retail site is in an area
termed “employment district,” which puts it in the category of “other” for analysis
purposes. In areas termed “other,” acceptable operation at signalized intersections
during the peak hours is defined as level of service D or better for the overall
intersection, and level of service E or better for any leg or movement. At unsignalized
intersections, acceptable operation during the peak hours is defined as level of service
E or better for any approach leg for an arterial/collector and level of service C or better
for any approach leg for a local and collector/local intersection.
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
HTP Retail TIS, August 2015
Page 6
Ziegler
Harmony
HP
East
49/34
46/5
39/41
5/96
3/40
6/152
30/7
1392/2057
33/69
150/12
1805/1878
26/28
HP
Wast
221/230
340/265
47/71
61/120
208/403
537/608
106/108
1043/1460
148/222
462/743
1287/1275
87/99
10/112
1/15
33/3
1826/2005
173/21
1454/2118
Lady
Moon
AM/PM
BALANCED RECENT PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 7
Ziegler
Harmony
HP
East
49/34
46/5
39/41
5/96
3/40
6/152
30/7
1392/2057
33/69
150/12
1805/1878
26/28
HP
Wast
221/230
340/265
47/71
61/120
208/403
537/608
106/108
1043/1460
148/222
462/743
1287/1275
87/99
10/112
1/15
33/3
1826/2005
173/21
1454/2118
Lady
Moon
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Ziegler
(signal)
EB LT E 55.0 E (E) 58.2 (59.2)
EB T C 27.8 C (D) 29.1 (35.3)
EB T/RT C 29.8 C (D) 32.2 (39.9)
EB APPROACH C 30.7 C (D) 31.9 (38.2)
WB LT E 60.6 F (E) 105.5 (70.6)
WB T C 34.2 C (C) 30.3 (33.2)
WB RT A 0.0 A (A) 0.0 (0.0)
WB APPROACH D 35.9 D (D) 35.7 (35.9)
NB LT D 37.2 D (D) 51.9 (48.0)
NB T E 64.0 E (E) 63.1 (63.1)
NB T/RT E 65.0 E (E) 65.1 (65.1)
NB APPROACH D 54.4 E (E) 59.0 (57.3)
SB LT E 69.6 F (E) 128.0 (78.4)
SB T D 50.5 D (D) 54.5 (52.7)
SB RT A 0.0 A (A) 0.0 (0.0)
SB APPROACH E 64.3 F (E) 98.7 (68.2)
OVERALL D 42.3 D (D) 50.5 (46.2)
Harmony/HP West
(stop sign)
SB LT F 162.2 F 98.5
SB RT C 24.4 E 44.6
SB APPROACH E 36.9 F 51.0
EB LT F 396.0 E 42.2
Harmony/Lady Moon-HP East
(signal)
EB LT E 60.4 E 62.9
EB T B 17.0 C 21.7
EB RT A 6.3 A 3.6
EB APPROACH B 17.9 C 21.7
WB LT D 37.3 D 46.6
WB T A 7.2 A 9.2
WB RT A 4.6 A 0.0
WB APPROACH A 7.4 A 9.7
NB LT D 46.1 D 53.1
NB T D 50.6 E 55.7
NB RT A 0.0 A 0.0
NB APPROACH D 48.3 D 53.4
SB LT D 49.3 D 47.7
SB T/RT D 51.0 D 50.1
SB APPROACH D 49.8 D 48.4
OVERALL B 13.0 B 18.0
(*) Adjusted Timing
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 9
Pedestrian Facilities
There are sidewalks along Harmony Road and Ziegler Road, adjacent to
developed properties (Intel, Hewlett-Packard, etc.). There are sidewalks along the east
side of Lady Moon Drive, between Harmony Road and Precision Drive. South of
Precision Drive, there are sidewalks along both sides of Lady Moon Drive.
Bicycle Facilities
There are bicycle lanes along Harmony Road, Ziegler Road, and Lady Moon
Drive within the study area.
Transit Facilities
Currently, this area of Fort Collins is served by Transfort Route 16. Route 16
operates along Harmony Road, Ziegler Road, Rock Creek Drive, and Lady Moon Drive.
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The proposed HTP Retail development will include retail, restaurant, hotel, and
general office uses. Figure 5 shows a conceptual site plan of the HTP Retail site. The
short range analysis (Year 2020) includes development of the HTP Retail site and an
appropriate increase in background traffic due to normal growth and other potential
developments in the area. The long range analysis year is considered to be 2035. The
site plan shows that there will be two full-movement accesses to/from future
Timberwood Drive and a right-in/right-out access to/from Lady Moon Drive.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9
th
Edition, ITE was used to estimate the trips that would be
generated by the proposed/expected uses at the HTP Retail site. A trip is defined as a
one-way vehicle movement from origin to destination. Table 2 shows the expected trip
generation for the HTP Retail site on a daily and peak hour basis. The trip generation for
full development of the HTP Retail site resulted in 4308 daily trip ends, 360 morning peak
hour trip ends, and 361 afternoon peak hour trip ends.
Trip Distribution
Trip distribution for the HTP Retail site was based on existing/future travel
patterns, land uses in the area, consideration of trip attractions/productions in Fort
Collins, and engineering judgment. Figure 6 shows the trip distribution for the short
range (2020) and long range (2035) analysis futures. The trip distribution was agreed to
by City of Fort Collins staff in the scoping discussions.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figures 7 and 8 show the short range (2020) and long range (2035) full
development site generated peak hour traffic assignment, respectively.
Background Traffic Projections
Figures 9 and 10 show the respective short range (2020) and long range (2035)
background traffic projections. The short range (2020) background traffic was
developed by generally increasing the existing traffic counts by two percent per year.
The background traffic growth was agreed to by City of Fort Collins staff in the scoping
SCALE: 1"=100'
SITE PLAN Figure 5
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 11
Bldg. A Bldg. B Bldg. C Bldg. D
Bldg. E
Bldg. F
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 12
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
Building A
932 Sit-down
Restaurant
4.14
KSF 127.15 526 5.95 25 4.86 20 5.91 24 3.94 16
826 Specialty Retail 2.76
KSF 44.32 122 0.761 2 0.601 2 1.19 3 1.52 4
710 General Office 1.25
KSF 11.03 14 1.37 2 0.19 0 0.25 0 1.24 2
Building A Subtotal 662 29 22 27 22
Building B
932 Sit-down
Restaurant
4.05
KSF 127.15 514 5.95 24 4.86 20 5.91 24 3.94 16
826 Specialty Retail 2.7 KSF 44.32 120 0.761 2 0.601 2 1.19 3 1.52 4
710 General Office 1.25
KSF 11.03 14 1.37 2 0.19 0 0.25 0 1.24 2
Building B Subtotal 648 28 22 27 22
Building C
932 Sit-down
Restaurant
4.05
KSF 127.15 514 5.95 24 4.86 20 5.91 24 3.94 16
826 Specialty Retail 2.7 KSF 44.32 120 0.761 2 0.601 2 1.19 3 1.52 4
710 General Office 1.25
KSF 11.03 14 1.37 2 0.19 0 0.25 0 1.24 2
Building C Subtotal 648 28 22 27 22
Building D
932 Sit-down
Restaurant
9.81
KSF 127.15 1248 5.95 58 4.86 48 5.91 58 3.94 39
826 Specialty Retail 6.54
KSF 44.32 290 0.761 5 0.601 4 1.19 8 1.52 10
710 General Office 1.25
KSF 11.03 14 1.37 2 0.19 0 0.25 0 1.24 2
Building D Subtotal 1552 65 52 66 51
Building E
310 Hotel 100
Rooms EQ 522 0.31 31 0.22 22 0.31 31 0.29 29
Building F
710 General Office 25.0
KSF 11.03 276 1.37 34 0.19 5 0.25 6 1.24 31
Total 4308 215 145 184 177
1 0.5 (PM Rate) & Reverse Directional Split
Harmony
Rock Creek
Lady Moon
Cinquefoil
Technology
Timberwood
Le Fever
Precision
55% 20%
nominal
25%
SCALE: 1"=500'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 13
SHORT RANGE (2020) SITE
GENERATED PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 14
Ziegler
HP
West
Harmony
Lady
Moon
42/58
RT
Access
HP
East
38/33
29/26
11/10
RT
Access
Timberwood
47/49
28/32
39/38
28/40
60/57
44/33
34/23
39/38
28/40
31/46
44/33
28/32
Access A
Access B
Timberwood
Intel
Banner
AM/PM
104/90
75/89
Technology
27/19
27/19
45/32
17/19
29/31
17/19
-10/-19
2/2
-3/-18
102/88
73/88
2/1
-15/-25
54/50
-14/-26
13/9
LONG RANGE (2035) SITE
GENERATED PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 15
Ziegler
52/57
13/9
13/19
RT
Access
HP
West
Harmony
Lady
Moon
RT
Access
HP
East
RT
Access
Timberwood
Intel
Banner
AM/PM
Rounded to Nearest
5 Vehicles
Access A
Access B
Timberwood
9/6
27/19
45/32
17/19
29/31
6/6
41/58
38/33
28/26
7/6
47/46
24/28
29/29
27/36
64/61
46/35
25/17
29/29
27/36
27/42
46/35
24/28
-11/-19
2/2
-4/-18
85/75
63/75
2/1
SHORT RANGE (2020) BACKGROUND
PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 16
254/264
392/307
56/86
74/165
242/466
590/679
164/133
1153/1645
170/255
514/834
1449/1434
103/118
Ziegler
HP
West
2/36
NOM
1/10
12/134
NOM
4/58
173/21
1596/2382
30/7
52/7
2052/2216
9/2
Harmony
Lady
Moon
204/130
10/6
24/46
RT
Access
HP
East
104/101
46/5
78/70
1483/2319
88/124
5/96
3/40
5/106
30/7
150/12
2004/2028
66/78
Intel
Banner
AM/PM
39/9
3/46
LONG RANGE (2035) BACKGROUND
PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 17
255/335
485/455
85/115
85/180
370/575
625/570
175/145
1935/1735
245/285
440/860
1370/2160
130/160
Ziegler
65/525
5/0
15/50
RT
Access
HP
West
50/365
NOM
30/210
15/135
NOM
10/75
175/25
2125/2315
345/80
55/10
1875/2680
225/50
50/15
385/90
135/25
15/60
NOM
5/20
20/5
45/395
85/35
10/70
NOM
15/95
Harmony
Lady
Moon
295/630
20/15
55/120
RT
Access
HP
East
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 18
discussions. With the construction of Technology Parkway, a portion of the site traffic
to/from the Intel facility will use the Harmony/Technology intersection. Redistribution of
Intel traffic was based upon the number of parking spaces in the various lots around the
site. In the long range (2035) future, existing traffic volumes were factored by one
percent per year and the entire Harmony Tech Park was assumed to be built and
occupied. For Harmony Road, the existing volumes east of Lady Moon Drive were
factored by one percent per year to get the long range (2035) total traffic (site plus
background). The site traffic was then backed out of the volumes to get the long range
(2035) background peak hour traffic at the intersections along Harmony Road.
Total Traffic Forecasts
Figures 11 and 12 show the respective short range (2020) and long range (2035)
total (site plus background) peak hour traffic assignment.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. The Harmony/
Ziegler and Harmony/Lady Moon-HP East intersections are currently signalized. In the
short range (2020) future at the Harmony/Technology intersection, it is important to
determine the level of development that will trigger the installation of the signal. The short
range (2020) total peak hour signal warrant for the Harmony/Technology intersection is
provided in Appendix D. The threshold volume for warranting a signal is 75 vehicles per
hour (vph). With the Intel traffic redistribution, the number of northbound left-turning
vehicles at the Harmony/Technology intersection would be 2 in the morning peak hour and
36 in the afternoon peak hour. Therefore, a total of 73 morning peak hour and 39
afternoon peak hour northbound left-turning vehicles would need to be produced by the
HTP Retail development in order to warrant a signal at the Harmony/Technology
intersection. It is difficult to determine a flat level of development of the HTP Retail site to
warrant the signal since some of the land uses have passby traffic rates applied to them.
However, based upon the short range (2020) site generated peak hour traffic, generally
development of approximately 45 percent of the HTP Retail site will warrant the signal at
the Harmony/Technology-HP West intersection. For example, construction of Buildings A,
B, C, and the Hotel would warrant the signal; or construction of Building D and the Hotel
(or almost any other single building) would warrant the signal. It is important to note that it
is likely that more of the site traffic from HP/Avago will utilize the Harmony/Technology-HP
West intersection when it is signalized. This assumed redistribution of HP/Avago traffic is
reflected in the short range (2020) peak hour traffic forecasts.
SHORT RANGE (2020) TOTAL
PEAK HOUR TRAFFIC Figure 11
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 19
Ziegler
HP
West
75/124
NOM
3/11
12/134
NOM
4/58
173/21
1593/2364
132/95
52/7
2042/2197
11/4
Harmony
Lady
Moon
246/188
10/6
24/46
RT
Access
HP
East
38/33
186/268
11/10
RT
Access
Timberwood
29/26
97/212
71/40
42/58
NOM
17/20
44/35
208/124
42/24
6/12
NOM
28/52
111/109
46/5
113/120
1469/2293
101/133
5/96
3/40
5/106
30/7
150/12
1989/2003
LONG RANGE (2035) TOTAL
PEAK HOUR TRAFFIC Figure 12
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 20
255/335
485/455
95/120
85/180
370/575
650/590
175/145
1980/1770
245/285
460/880
1400/2195
135/165
Ziegler
115/580
20/10
30/70
RT
Access
HP
West
115/440
NOM
30/210
15/135
NOM
10/75
175/25
2120/2300
430/155
55/10
1865/2665
225/50
50/15
385/90
220/100
15/60
NOM
5/20
20/5
60/405
110/55
60/125
NOM
40/120
Harmony
Lady
Moon
335/690
20/15
55/120
RT
Access
HP
East
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 21
Geometry
Figure 13 shows a schematic of the short range (2020) geometry. As mentioned
earlier, eastbound and northbound right-turn deceleration/storage lanes are warranted
with the existing traffic volumes at the Harmony/Ziegler intersection. According to Figure
8-4, LCUASS, a right-turn deceleration lane is required on an arterial street with three
through-lanes in each direction when the right-turn volume exceeds 200 vph.
Figure 14 shows a schematic of the long range (2035) geometry. The geometry at
the Harmony/Ziegler intersection in the long range future reflects the maximum practical
geometry.
Operation Analysis
Operation analyses were performed at the Harmony/Ziegler, Harmony/Technology-
HP West, Harmony/Lady Moon-HP East, Lady Moon/Timberwood, Technology/
Timberwood, and the Site Access intersections. The operations analyses were
conducted for the short range and long range futures, reflecting year 2020 and 2035
conditions, respectively. The long range (2035) analyses are provided for informational
purposes.
Using the traffic volumes shown in Figure 9, the key intersections operate in the
short range (2020) background traffic future as indicated in Table 3. Calculation forms for
these analyses are provided in Appendix E. The key intersections will operate acceptably
during the peak hours, except for the Harmony/Ziegler intersection during the afternoon
peak hour. As mentioned with the current traffic volumes and under the Geometry
section, eastbound and northbound right-turn deceleration/storage lanes are warranted
with the existing traffic volumes. Providing these right-turn lanes will improve the
operation/reduce the delay of the LOS F movements, with adjustments to the signal
timing.
Using the traffic volumes shown in Figure 10, the key intersections operate in the
long range (2035) background traffic future as indicated in Table 4. Calculation forms for
these analyses are provided in Appendix F. The analysis assumed right-turn lanes on all
legs of the Harmony/Ziegler intersection. The Harmony/Ziegler intersection will not
achieve level of service E or better for all movements or achieve level of service D or
better overall during both peak hours with single eastbound and westbound left-turn lanes.
The intersection was also analyzed with dual eastbound and westbound left-turn lanes.
This helped to mitigate most of the unacceptable levels of service. Selected traffic
movements at the Harmony/Ziegler intersection are very high. Unless some traffic
seeks alternative routes, there is little that can be practically done to mitigate the
calculated delay. The Lady Moon/Timberwood-Banner intersection will not achieve level
of service E or better for the eastbound approach during the afternoon peak hour. The
other key intersections will operate acceptably.
SHORT RANGE (2020) GEOMETRY Figure 13
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 22
Ziegler
HP
West
Harmony
Lady
Moon HP
East
Timberwood
Access A
Access B
Timberwood
Intel
Banner
Technology
RT
Access
RT
Access
- Required/Proposed Lane
- Existing Lane
LONG RANGE (2035) GEOMETRY Figure 14
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Page 34
Ziegler
HP
West
Harmony
Lady
Moon HP
East
Timberwood
Intel
Banner
Access A
Access B
Timberwood
Technology
RT
Access
RT
Access
RT
Access
- Denotes Lane
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 24
TABLE 3
Short Range (2020) Background Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Ziegler
(signal)
(With existing geometry)
EB LT E 77.3 F† 82.2
EB T C 34.7 D 49.5
EB T/RT D 38.0 E 59.9
EB APPROACH D 40.5 D 55.0
WB LT E 60.3 F† 89.5
WB T D 45.1 D 37.1
WB RT A 0.0 A 0.0
WB APPROACH D 46.1 D 41.1
NB LT D 38.2 D 47.4
NB T E 68.6 E 68.0
NB T/RT E 69.6 E 70.5
NB APPROACH E 57.8 E 60.2
SB LT E 70.8 F† 82.8
SB T D 54.6 D 51.7
SB RT A 0.0 A 0.0
SB APPROACH E 66.1 E 70.2
OVERALL D 49.7 D 54.8
Harmony/Ziegler
(signal)
(With EB & NB RT Lanes)
EB LT E 77.3 E 66.2
EB T C 31.6 D 37.9
EB RT C 25.4 C 25.5
EB APPROACH D 36.5 D 39.0
WB LT E 60.3 E 69.6
WB T D 45.1 D 38.5
WB RT A 0.0 A 0.0
WB APPROACH D 46.1 D 40.9
NB LT D 38.7 D 49.2
NB T E 59.8 E 60.6
NB RT A 0.0 A 0.0
NB APPROACH D 51.5 E 55.3
SB LT E 62.8 E 71.9
SB T D 54.6 D 52.2
SB RT A 0.0 A 0.0
SB APPROACH E 60.4 E 63.9
OVERALL D 46.5 D 46.8
Continued on next page
† Does not meet the LOS standard
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 25
Continued from previous page
TABLE 3
Short Range (2020) Background Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Technology-HP
West
(signal)
EB LT E 56.9 E 58.6
EB T B 13.0 B 19.0
EB RT A 8.3 A 0.0
EB APPROACH B 17.3 B 19.4
WB LT D 53.8 D 53.3
WB T C 20.9 A 7.7
WB T/RT C 22.3 A 7.7
WB APPROACH C 21.6 A 8.1
NB LT D 40.9 D 39.2
NB T/RT A 0.0 A 0.0
NB APPROACH D 40.9 D 39.2
SB LT D 41.0 D 40.3
SB T/RT A 0.0 A 0.0
SB APPROACH D 41.0 D 40.3
OVERALL B 19.6 B 19.2
Harmony/Lady Moon-HP East
(signal)
EB LT E 62.8 E 59.9
EB T A 0.9 A 1.7
EB RT A 0.1 A 0.1
EB APPROACH A 2.1 A 1.9
WB LT D 40.8 D 46.4
WB T A 8.7 A 8.6
WB RT A 5.0 A 0.0
WB APPROACH A 9.5 A 9.9
NB LT D 51.7 D 51.9
NB T D 52.2 D 54.9
NB RT A 0.0 A 0.0
NB APPROACH D 51.9 D 52.1
SB LT D 54.3 D 49.0
SB T/RT E 55.9 E 60.3
SB APPROACH D 54.8 D 53.2
OVERALL A 8.2 A 8.3
Lady Moon/RT Access
(RT-in/RT-out) WB RT A 9.7 A 9.3
Lady Moon/Banner
(stop sign)
WB LT/RT B 12.7 B 12.4
SB LT A 8.0 A 7.7
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 26
TABLE 4
Long Range (2035) Background Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Ziegler
(signal)
(With single EB & WB LT
Lanes)
EB LT E 68.6 F‡ 90.2
EB T D 46.4 C 31.3
EB RT C 23.2 C 21.1
EB APPROACH D 46.8 C 34.8
WB LT E 76.5 E 58.2
WB T D 37.0 D 40.4
WB RT A 0.0 A 0.0
WB APPROACH D 40.4 D 41.6
NB LT D 43.1 F‡ 100.7
NB T E 57.2 F‡ 135.4
NB RT A 0.0 A 0.0
NB APPROACH E 56.5 F‡ 120.7
SB LT F‡ 222.0 F‡ 91.3
SB T D 53.3 F‡ 85.7
SB RT A 0.0 A 0.0
SB APPROACH F‡ 159.3 F‡ 88.5
OVERALL E‡ 67.2 E‡ 57.9
Harmony/Ziegler
(signal)
(With dual EB & WB LT
Lanes)
EB LT E 61.2 F‡ 82.7
EB T D 48.9 C 31.0
EB RT C 23.6 C 20.9
EB APPROACH D 48.4 C 34.1
WB LT E 58.2 E 56.4
WB T C 34.7 D 40.4
WB RT A 0.0 A 0.0
WB APPROACH D 36.7 D 41.5
NB LT D 37.8 E 64.4
NB T E 69.0 E 74.1
NB RT A 0.0 A 0.0
NB APPROACH E 67.4 E 70.0
SB LT E 63.3 E 67.4
SB T D 52.6 E 60.3
SB RT A 0.0 A 0.0
SB APPROACH E 59.3 E 63.8
OVERALL D 49.0 D 46.8
Continued on next page
‡ Does not meet LOS standard
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 27
Continued from previous page
TABLE 4
Long Range (2035) Background Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Technology-HP
West
(signal)
EB LT D 53.2 E 61.6
EB T A 9.2 C 24.1
EB RT A 5.9 B 12.4
EB APPROACH B 12.0 C 24.4
WB LT E 66.8 E 61.5
WB T A 6.9 C 29.2
WB T/RT A 7.0 C 33.0
WB APPROACH B 13.2 C 31.1
NB LT E 59.0 E 59.3
NB T/RT A 0.0 D 43.3
NB APPROACH E 59.0 E 55.5
SB LT E 64.0 E 69.7
SB T/RT A 0.0 A 0.0
SB APPROACH E 64.0 E 69.7
OVERALL B 13.2 C 30.9
Harmony/Lady Moon-HP East
(signal)
EB LT E 57.7 E 61.0
EB T A 0.6 D 36.3
EB RT A 0.4 A 6.1
EB APPROACH A 4.0 C 35.0
WB LT D 48.6 D 52.2
WB T B 14.1 B 16.1
WB RT A 8.9 A 0.0
WB APPROACH B 18.6 B 19.6
NB LT E 55.6 E 62.6
NB T/RT D 49.5 D 52.6
NB APPROACH D 54.1 E 61.1
SB LT E 62.8 E 69.3
SB T E 0.055.8 E 59.5
SB RT A 0.0 A 0.0
SB APPROACH E 59.3 E 67.1
OVERALL B 14.7 C 32.6
Continued on next page
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 28
Continued from previous page
TABLE 4
Long Range (2035) Background Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Lady Moon/RT Access
(RT-in/RT-out) WB RT B 10.4 C 15.9
Lady Moon/Timberwood-
Banner
(stop sign)
EB LT/T E 46.3 F§ 132.8
EB RT B 11.3 B 10.8
EB APPROACH E 36.8 F§ 96.2
WB LT/T/RT E 47.6 F§ 53.9
NB LT A 8.6 A 8.1
SB LT A 8.5 A 8.8
Timberwood/Access A
(stop sign)
NB LT/RT A 9.5 A 9.8
WB LT/T A 7.6 A 7.4
Timberwood/Access B
(stop sign)
NB LT/T/RT B 10.4 A 9.5
SB LT/T/RT A 8.4 A 9.2
EB LT/T/RT A 7.4 A 7.5
WB LT/T/RT A 7.5 A 7.3
Technology/Timberwood-Intel
(stop sign)
EB LT/T/RT C 18.1 C 15.6
WB LT/T C 20.2 C 17.4
WB RT A 8.8 B 11.6
WB APPROACH C 15.6 B 14.9
NB LT A 8.3 A 7.4
SB LT A 7.8 A 8.3
Technology/RT Access
(RT-in/RT-out) WB RT A 8.7 B 12.5
§ Does not meet LOS standard
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 29
Using the traffic volumes shown in Figure 11, the key intersections operate in the
short range (2020) total traffic future, with recommended control, as indicated in Table 5.
Calculation forms for these analyses are provided in Appendix G. The key intersections
will operate acceptably during the peak hours, except for the Harmony/Ziegler intersection.
The southbound left-turn movement will experience delays commensurate with level of
service F during the morning peak hour. Many movements, as well as the overall
operation of the intersection will operate unacceptably during the afternoon peak hour. As
mentioned earlier, eastbound and northbound right-turn deceleration/storage lanes are
warranted with the existing traffic volumes. Providing these right-turn lanes will improve
the operation/reduce the delay of the LOS F movements, with adjustments to the signal
timing.
Using the traffic volumes shown in Figure 12, the key intersections operate in the
long range (2035) total traffic future as indicated in Table 6. Calculation forms for these
analyses are provided in Appendix H. The analysis assumed right-turn lanes on all legs of
the Harmony/Ziegler intersection. As with the long range (2035) background traffic, the
Harmony/Ziegler intersection will not achieve level of service E or better for all movements
or achieve level of service D or better overall during both peak hours with single eastbound
and westbound left-turn lanes. The intersection was also analyzed with dual eastbound
and westbound left-turn lanes. This helped to mitigate most of the unacceptable levels of
service. Selected traffic movements at the Harmony/Ziegler intersection are very high.
Unless some traffic seeks alternative routes, there is little that can be practically done to
mitigate the calculated delay. The Lady Moon/Timberwood-Banner intersection will not
achieve level of service E or better for the eastbound approach during the afternoon peak
hour. The other key intersections will operate acceptably.
Pedestrian Level of Service
Appendix I shows a map of the area that is within 1320 feet of the HTP Retail
site. There will be three pedestrian destinations within 1320 feet of the HTP Retail.
These are: 1) Avago to the north of the site; 2) the Banner Medical Campus to the east
of the site; and 3) Intel. This site is in an area type termed “other.” The level of service
determination assumes that future developments will build their streets and adjacent
streets in accordance with Fort Collins Standards. This being the case, pedestrian
facilities will exist where they currently do not. This is a reasonable assumption. The
Pedestrian LOS Worksheet is provided in Appendix I. The minimum level of service for
“other” is C for all categories. With the assumed future pedestrian facilities along future
streets, the pedestrian level of service will be acceptable.
Bicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there are no bicycle destinations
within 1320 feet of the HTP Retail.
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 30
TABLE 5
Short Range (2020) Total Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Ziegler
(signal)
(With existing geometry)
EB LT E 77.3 F** 82.2
EB T D 36.4 D 52.2
EB T/RT D 40.2 E 63.5
EB APPROACH D 42.0 E 57.8
WB LT E 66.6 F** 109.0
WB T D 48.1 D 36.3
WB RT A 0.0 A 0.0
WB APPROACH D 49.5 D 42.5
NB LT D 37.5 D 46.9
NB T E 72.7 E 69.2
NB T/RT E 74.7 E 72.4
NB APPROACH E 61.0 E 61.0
SB LT F** 81.4 F** 90.8
SB T D 54.6 D 51.7
SB RT A 0.0 A 0.0
SB APPROACH E 73.8 E 75.2
OVERALL D 53.3 E** 57.4
Harmony/Ziegler
(signal)
(With EB & NB RT Lanes)
EB LT E 77.3 E 62.4
EB T C 32.9 D 39.0
EB RT C 25.0 C 25.6
EB APPROACH D 37.6 D 39.6
WB LT E 66.6 E 70.0
WB T D 48.1 D 37.6
WB RT A 0.0 A 0.0
WB APPROACH D 49.5 D 40.4
NB LT D 38.7 D 49.2
NB T E 59.8 E 60.6
NB RT A 0.0 A 0.0
NB APPROACH D 51.5 E 55.3
SB LT E 70.4 E 79.0
SB T D 54.6 D 52.2
SB RT A 0.0 A 0.0
SB APPROACH E 66.0 E 68.3
OVERALL D 49.1 D 47.8
Continued on next page
** Does not meet LOS standard
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 31
Continued from previous page
TABLE 5
Short Range (2020) Total Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Technology-HP
West
(signal)
EB LT E 56.0 E 58.4
EB T B 12.9 B 18.9
EB RT A 8.8 B 10.2
EB APPROACH B 16.8 B 19.0
WB LT D 53.9 D 53.4
WB T C 20.8 B 13.4
WB T/RT C 22.2 B 13.9
WB APPROACH C 21.5 B 13.7
NB LT D 45.5 D 46.9
NB T/RT A 0.0 A 0.0
NB APPROACH D 45.5 D 46.9
SB LT D 41.0 D 40.3
SB T/RT A 0.0 D 39.5
SB APPROACH D 41.0 D 40.0
OVERALL B 19.8 B 17.7
Harmony/Lady Moon-HP East
(signal)
EB LT E 62.7 E 60.1
EB T A 0.9 A 1.8
EB RT A 0.1 A 0.1
EB APPROACH A 2.0 A 1.9
WB LT D 42.7 D 48.8
WB T A 8.6 A 8.5
WB RT A 5.0 A 0.0
WB APPROACH B 10.3 B 10.9
NB LT D 52.8 D 53.1
NB T D 52.2 D 54.9
NB RT A 0.0 A 0.0
NB APPROACH D 52.6 D 53.2
SB LT D 54.3 D 49.0
SB T/RT E 55.9 E 60.3
SB APPROACH D 54.8 D 53.2
OVERALL A 8.8 A 8.9
Continued on next page
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 32
Continued from previous page
TABLE 5
Short Range (2020) Total Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Lady Moon/RT Access
(RT-in/RT-out)
EB RT A 9.6 B 10.2
WB RT B 10.0 A 9.7
Lady Moon/Timberwood-
Banner
(stop sign)
EB LT/T C 17.5 C 16.5
EB RT A 9.0 A 9.8
EB APPROACH C 15.1 B 14.8
WB LT/T/RT C 15.9 C 15.3
NB LT A 7.6 A 7.9
SB LT A 8.0 A 7.7
Timberwood/Access A
(stop sign)
SB LT/RT A 9.6 A 9.6
EB LT/T A 7.5 A 7.4
Timberwood/Access B
(stop sign)
SB LT/RT A 9.6 A 9.7
EB LT/T A 7.5 A 7.5
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 33
TABLE 6
Long Range (2035) Total Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Ziegler
(signal)
(With single EB & WB LT
Lanes)
EB LT E 68.6 F†† 90.2
EB T D 50.6 C 32.3
EB RT C 23.2 C 21.4
EB APPROACH D 50.4 D 35.6
WB LT F†† 81.6 E 58.0
WB T D 37.5 D 43.3
WB RT A 0.0 A 0.0
WB APPROACH D 41.4 D 44.3
NB LT D 47.0 F†† 100.7
NB T E 57.1 F†† 135.4
NB RT A 0.0 A 0.0
NB APPROACH D 53.6 F†† 120.7
SB LT F†† 244.9 F†† 101.2
SB T D 53.3 F†† 85.7
SB RT A 0.0 A 0.0
SB APPROACH F†† 175.4 F†† 93.6
OVERALL E†† 71.2 E†† 60.0
Harmony/Ziegler
(signal)
(With Dual EB-WB LT Lanes)
EB LT E 61.2 F†† 82.7
EB T D 54.9 C 31.8
EB RT C 23.7 C 21.1
EB APPROACH D 53.5 C 34.7
WB LT E 58.1 E 55.8
WB T C 34.9 D 42.1
WB RT A 0.0 A 0.0
WB APPROACH D 37.0 D 43.0
NB LT D 40.9 E 64.4
NB T E 69.0 E 74.1
NB RT A 0.0 A 0.0
NB APPROACH E 59.3 E 70.0
SB LT E 69.8 E 73.4
SB T D 52.6 E 60.3
SB RT A 0.0 A 0.0
SB APPROACH E 63.6 E 67.0
OVERALL D 51.6 D 48.1
Continued on next page
†† Does not meet LOS standard
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 34
Continued from previous page
TABLE 6
Long Range (2035) Total Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Harmony/Technology-HP
West
(signal)
EB LT D 53.2 E 61.2
EB T B 10.6 C 23.8
EB RT A 7.1 B 13.0
EB APPROACH B 13.2 C 23.8
WB LT E 66.9 E 61.6
WB T A 8.1 C 28.7
WB T/RT A 8.3 C 32.3
WB APPROACH B 14.3 C 30.5
NB LT E 58.5 E 64.6
NB T/RT A 0.0 D 43.3
NB APPROACH E 58.5 E 60.2
SB LT E 64.0 E 69.7
SB T/RT A 0.0 A 0.0
SB APPROACH E 64.0 E 69.7
OVERALL B 14.9 C 31.1
Harmony/Lady Moon-HP East
(signal)
EB LT E 57.7 E 61.0
EB T A 0.6 D 35.0
EB RT A 0.4 A 6.2
EB APPROACH A 4.0 C 33.6
WB LT D 52.4 E 57.2
WB T B 14.1 B 16.1
WB RT A 9.0 A 0.0
WB APPROACH B 20.0 C 20.9
NB LT E 55.7 E 64.8
NB T/RT D 50.1 E 67.1
NB APPROACH D 54.1 E 65.3
SB LT E 62.8 E 69.3
SB T E 55.7 E 58.8
SB RT A 0.0 A 0.0
SB APPROACH E 59.3 E 67.0
OVERALL B 15.6 C 33.2
Lady Moon/RT Access
(RT-in/RT-out)
EB RT B 14.1 B 11.7
WB RT B 10.8 C 17.2
Continued on next page
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 35
Continued from previous page
TABLE 6
Long Range (2035) Total Peak Hour Operation
Intersection Movement Level of Service
AM Delay (secs) PM Delay (secs)
Lady Moon/Timberwood-
Banner
(stop sign)
EB LT/T F‡‡ 122.1 F‡‡ 426.6
EB RT B 11.6 B 11.1
EB APPROACH F‡‡ 95.8 F‡‡ 322.7
WB LT/T/RT F‡‡ 63.7 F‡‡ 70.8
NB LT A 8.8 A 8.2
SB LT A 8.5 A 8.8
Timberwood/Access A
(stop sign)
NB LT/T/RT B 10.5 B 11.1
SB LT/T/RT B 11.6 B 11.1
EB LT/T/RT A 7.5 A 7.5
WB LT/T/RT A 7.7 A 7.4
Timberwood/Access B
(stop sign)
NB LT/T/RT B 12.8 B 11.2
SB LT/T/RT B 11.5 B 11.1
EB LT/T/RT A 7.7 A 7.8
WB LT/T/RT A 7.6 A 7.4
Technology/Timberwood-Intel
(stop sign)
EB LT/T/RT D 26.2 C 23.4
WB LT/T C 20.5 D 28.4
WB RT A 8.1 B 12.6
WB APPROACH C 20.5 C 20.3
NB LT A 8.3 A 7.4
SB LT A 8.1 A 8.7
Technology/RT Access
(RT-in/RT-out) WB RT A 9.1 B 13.6
‡‡ Does not meet LOS standard
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 36
Transit Level of Service
Currently, this area of Fort Collins is served by Transfort Route 16. Route 16
operates along Harmony Road, Ziegler Road, Rock Creek Drive, and Lady Moon Drive.
According to the Fort Collins Transit System Plan, Harmony Road will be an enhanced
transit corridor with 10 minute service and Ziegler Road will have a feeder route with 30
minute service. Transit level of service will be in the B category.
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 37
IV. CONCLUSIONS
This study assessed the impacts of the HTP Retail site on the street system in the
vicinity of the proposed development in the short range (2020) and long range (2035)
future. As a result of this analysis, the following is concluded:
- The development of HTP Retail is feasible from a traffic engineering standpoint.
The trip generation for the HTP Retail development resulted in 4308 daily trip ends,
360 morning peak hour trip ends, and 361 afternoon peak hour trip ends.
- The key intersections operate acceptably with the existing traffic and geometry, with
timing adjustments at the Harmony/Ziegler intersection.
- The Harmony/Ziegler and Harmony/Lady Moon-HP East intersections are currently
signalized. A signal will be warranted at the Harmony/Technology-HP West
intersection. It is difficult to determine a flat level of development of the HTP Retail
site to warrant the signal since some of the land uses have passby traffic rates
applied to them. However, based upon the short range (2020) site generated peak
hour traffic, generally development of approximately 45 percent of the HTP Retail
site will warrant the signal at the Harmony/Technology-HP West intersection. For
example, construction of Buildings A, B, C, and the Hotel would warrant the signal;
or construction of Building D and the Hotel (or almost any other single building)
would warrant the signal. It is important to note that it is likely that more of the site
traffic from HP/Avago will utilize the Harmony/Technology-HP West intersection
when it is signalized.
- In the short range (2020) future, given development of the HTP Retail site and an
increase in background traffic, the key intersections will operate acceptably, except
for the Harmony/Ziegler intersection during the afternoon peak hour. Eastbound
and northbound right-turn deceleration/storage lanes are warranted with the
existing traffic volumes. Providing these right-turn lanes will improve the
operation/reduce the delay of the LOS F movements, with adjustments to the
signal timing. Selected traffic movements at the Harmony/Ziegler intersection
are very high. Unless some traffic seeks alternative routes, there is little that can
be practically done to mitigate the calculated delay.
- In the long range (2035) future, given development of the HTP Retail site and an
increase in background traffic, the Harmony/Ziegler intersection will not achieve
level of service E or better for all movements or achieve level of service D or better
overall during both peak hours with single eastbound and westbound left-turn lanes.
The intersection was also analyzed with dual eastbound and westbound left-turn
lanes. This helped to mitigate most of the unacceptable levels of service. Selected
traffic movements at the Harmony/Ziegler intersection are very high. Unless
some traffic seeks alternative routes, there is little that can be practically done to
mitigate the calculated delay. The Lady Moon/Timberwood-Banner intersection
will not achieve level of service E or better for the eastbound approach during the
afternoon peak hour. The other key intersections will operate acceptably.
DELICH HTP Retail TIS, September 2015
ASSOCIATES Page 38
- The short range (2020) geometry is shown in Figure 13. As mentioned earlier,
eastbound and northbound right-turn deceleration/storage lanes are warranted
with the existing traffic volumes at the Harmony/Ziegler intersection. According to
Figure 8-4, LCUASS, a right-turn deceleration lane is required on an arterial street
with three through-lanes in each direction when the right-turn volume exceeds 200
vph.
- The long range (2035) geometry is shown in Figure 14. This is the maximum
practical geometry at the key intersections.
- Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi-modal transportation guidelines and future
improvements to the street system in the area.
APPENDIX A
HARMONY TECH PARK I FORT COLLINS
-------------------------------------------------HARMONY -----ROAD --------------------------------------
PEDESTRIAN CONNECTION
PEO€STiIJAN CONNfCTION I
~
~ "
~
~.,.
t
~o I 110 I &I OFEI!T CD HOATli
t •
~ tl ""~O
HA f< votV P
.,----.
I~CL.f ~i2r~ l?e'AIL / (!OMi'1&f?(' rile
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate
In Rate Out
@
Cf~2. 'S I r -'towlJ ~ es T 4.14 ~f: IZ7.tS 52to 6'/f~ 26 4.8ft> 2.D 5'. q ( 2.4- !I..Cf4 10
~z(o ~e-TAIL Z."7fJ> ~J: 44."£ IZl-
O.7U/ z o·(pd z: I.{ ~ .3
1••52- 4-
710 01= F (CG" I.Z'5 'f$~ II.v3 /4- I. ?> 7 z. O.let 0 o.es 0 1..24- 2-
/p(p2. z1 22. 27 zZ-
/B)
93Z ~)l\ -i::o~eesr. 4.os-~ IZ7. t5 G"j4- £,;q;;- 2.4-
4.86> 2.0 5,9 , 24- ~.q4
/(0
~Z~ f2€-rAII..... ~. 7~SF 44.~
12.0
--I Z I),bet z. 1.( g 3 4-
(J.76 I.!TZ
110 Dr- PIGF J .2";)-(::5P- 11.03 14 1.37
Z. t>.l'f 0 o. t;:r 0 I.z4-
Z-
048 28 zZ- 27 z.z..
(9
q~2 S, r- ~AA) eeS7 4~o~ I z7.(~ tt/4 cse 2.4- 4.8(0 1.0 f:.q ( l&- ~.q4 )~
6Z~ Re--r-A IL. Z.7 jJ.-SJ: 44.-32- 12-0 t>.76 'f Z. o.bO" z.
1.(9 3 1.52 .4-
710 C) J:"'F let I. Z t;"1t) 1=
il.03 14- 1;~7 Z O. r~ 0 0.2£ o /.24 z,
~48 z8 zz.. 27
z.2:
(f5)
932 Srr~ ~.., q.8(~P
127.(5 /24.B 5~9~-~73~.&Y~ 48 6:q J 5"8 3.Q4- 31
S2G eETA If..- t..".~4~p4432-
l'to
O.7b">J 5"" O.~tI~ 4- /.1 q 8 1.6-:2, 10
710 OFP-IC€ 1.-ZS-rsP I(.O~ 14 /.37 Z ~.19 0 o.zs: 0 t.e« Z
155l (OS" 5Z ~b 51
(9
310 J-Io.19 ......,• -e c- loO~~ 1;6- 522- c>•.~1 5 I O.,Zl zz o.3f 31 D.ZCj 29
itO OFf:IC.& 2.,~£)~F tl. 03 Z7f9 1.~7 34 D. [~
~ 0,2-6 (p /.2. + 31
-r~-rAL- 4305 .2.\6" 14s f~ 4-
/71
-
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 4/11/2013 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Harmony/Ziegler
S = straight
L = left turn
Time Northbound: Ziegler Southbound: Ziegler Total Eastbound: Harmony Westbound: Harmony Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 73 106 20 199 163 68 6 237 436 31 291 48 370 21 326 122 469 839 1275
7:45 65 111 10 186 141 66 11 218 404 19 258 50 327 27 375 148 550 877 1281
8:00 48 69 9 126 120 45 20 185 311 25 248 30 303 29 302 105 436 739 1050
8:15 31 48 7 86 120 45 24 189 275 31 259 31 321 17 308 95 420 741 1016
7:30-8:30 217 334 46 597 544 224 61 829 1426 106 1056 159 1321 94 1311 470 1875 3196 4622
PHF 0.74 0.75 0.58 0.75 0.83 0.82 0.64 0.87 0.85 0.91 0.8 0.89 0.81 0.87 0.79 0.85 0.9
4:30 56 68 16 140 148 89 29 266 406 25 386 34 445 22 321 172 515 960 1366
4:45 69 75 18 162 171 107 27 305 467 25 318 58 401 22 335 151 508 909 1376
5:00 58 72 32 162 131 83 35 249 411 32 426 50 508 25 342 256 623 1131 1542
5:15 73 80 14 167 172 112 29 313 480 26 363 73 462 27 352 208 587 1049 1529
4:30-5:30 256 295 80 631 622 391 120 1133 1764 108 1493 215 1816 96 1350 787 2233 4049 5813
PHF 0.88 0.92 0.63 0.94 0.9 0.87 0.86 0.9 0.84 0.88 0.74 0.89 0.89 0.96 0.77 0.9 0.94
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 5-21-13 Observer: City of Fort Collins
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: Harmony/Lady Moon-HP East Access
S = straight
L = left turn
Time Northbound: Lady Moon Southbound: HP East Acces Total Eastbound: Harmony Westbound: Harmony Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 13 10 20 43 0 0 1 1 44 11 437 6 454 8 458 35 501 955 999
7:45 12 12 11 35 1 1 1 3 38 8 340 10 358 9 471 38 518 876 914
8:00 14 14 6 34 2 2 1 5 39 7 288 8 303 2 420 51 473 776 815
8:15 9 10 2 21 3 0 2 5 26 4 307 9 320 7 417 26 450 770 796
7:30-8:30 48 46 39 133 6 3 5 14 147 30 1372 33 1435 26 1766 150 1942 3377 3524
PHF 0.86 0.82 0.49 0.77 0.5 0.38 0.63 0.7 0.68 0.78 0.83 0.79 0.72 0.94 0.74 0.94 0.88
4:30 7 1 14 22 36 4 25 65 87 1 478 9 488 12 445 3 460 948 1035
4:45 5 0 11 16 30 8 14 52 68 2 482 14 498 5 492 2 499 997 1065
5:00 11 1 12 24 56 17 29 102 126 0 508 23 531 8 433 5 446 977 1103
5:15 9 3 4 16 30 11 28 69 85 4 534 21 559 3 393 2 398 957 1042
4:30-5:30 32 5 41 78 152 40 96 288 366 7 2002 67 2076 28 1763 12 1803 3879 4245
PHF 0.73 0.42 0.73 0.81 0.68 0.59 0.83 0.71 0.44 0.94 0.73 0.93 0.58 0.9 0.6 0.9 0.96
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 2/3/2015 Observer: Matt
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: Harmony/HP-Avago West
S = straight
L = left turn
Time Northbound: Southbound: HP-Avago Wes Total Eastbound: Harmony Westbound: Harmony Total Total
Begins L S R Total L S R Total north/south UT L S R Total L S R Total east/west All
7:30 0 0 1 1 1 0 31 454 485 466 6 472 957 958
7:45 0 0 4 4 4 1 53 358 412 473 11 484 896 900
8:00 0 1 1 2 2 0 42 302 344 425 10 435 779 781
8:15 0 0 4 4 4 0 46 320 366 422 6 428 794 798
7:30-8:30 0 0 0 0 1 0 10 11 11 1 172 1434 0 1607 0 1786 33 1819 3426 3437
PHF n/a n/a n/a n/a 0.25 n/a 0.63 0.69 0.25 0.81 0.79 n/a 0.83 n/a 0.94 0.75 0.94 0.9
4:30 0 6 27 33 33 1 3 482 486 477 0 477 963 996
4:45 0 2 15 17 17 2 3 496 501 510 1 511 1012 1029
5:00 0 3 39 42 42 0 5 528 533 473 0 473 1006 1048
5:15 0 4 31 35 35 2 5 555 562 428 2 430 992 1027
4:30-5:30 0 0 0 0 15 0 112 127 127 5 16 2061 0 2082 0 1888 3 1891 3973 4100
PHF n/a n/a n/a n/a 0.63 n/a 0.72 0.76 0.63 0.8 0.93 n/a 0.93 n/a 0.93 0.38 0.93 0.98
APPENDIX C
HCM 2010 Signalized Intersection Summary Recent AM
12: Harmony & Ziegler
8/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 106 1043 148 87 1287 462 221 340 47 537 208 61
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 118 1159 145 97 1430 0 246 378 42 597 231 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 176 1874 234 137 1849 599 725 459 51 626 339 152
Arrive On Green 0.10 0.41 0.40 0.08 0.36 0.00 0.21 0.14 0.13 0.18 0.10 0.00
Sat Flow, veh/h 1845 4579 573 1774 5085 1647 3442 3215 355 3442 3539 1583
Grp Volume(v), veh/h 118 858 446 97 1430 0 246 207 213 597 231 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1762 1774 1695 1647 1721 1770 1800 1721 1770 1583
Q Serve(g_s), s 6.8 22.0 22.1 5.9 27.4 0.0 6.7 12.5 12.7 18.9 6.9 0.0
Cycle Q Clear(g_c), s 6.8 22.0 22.1 5.9 27.4 0.0 6.7 12.5 12.7 18.9 6.9 0.0
Prop In Lane 1.00 0.33 1.00 1.00 1.00 0.20 1.00 1.00
Lane Grp Cap(c), veh/h 176 1388 721 137 1849 599 725 253 257 626 339 152
V/C Ratio(X) 0.67 0.62 0.62 0.71 0.77 0.00 0.34 0.82 0.83 0.95 0.68 0.00
Avail Cap(c_a), veh/h 201 1388 721 161 1849 599 725 257 262 626 708 317
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 48.1 25.7 25.8 49.6 31.0 0.0 36.9 45.8 45.9 44.5 48.1 0.0
Incr Delay (d2), s/veh 6.9 2.1 4.0 11.1 3.2 0.0 0.3 18.2 19.1 25.1 2.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.8 10.6 11.5 3.3 13.3 0.0 3.2 7.4 7.6 11.1 3.5 0.0
LnGrp Delay(d),s/veh 55.0 27.8 29.8 60.6 34.2 0.0 37.2 64.0 65.0 69.6 50.5 0.0
LnGrp LOS E C C E C D E E E D
Approach Vol, veh/h 1422 1527 666 828
Approach Delay, s/veh 30.7 35.9 54.4 64.3
Approach LOS C D D E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 29.2 16.5 11.5 51.0 24.0 21.7 16.5 46.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 21.0 9.0 44.0 19.0 15.0 11.0 39.0
Max Q Clear Time (g_c+I1), s 8.7 8.9 7.9 24.1 20.9 14.7 8.8 29.4
Green Ext Time (p_c), s 0.6 0.6 0.0 5.2 0.0 0.1 1.0 4.3
Intersection Summary
HCM 2010 Ctrl Delay 42.3
HCM 2010 LOS D
Timing Report, Sorted By Phase Recent AM
12: Harmony & Ziegler
8/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 28 13 51 24 22 18 46
Maximum Split (%) 16.4% 25.5% 11.8% 46.4% 21.8% 20.0% 16.4% 41.8%
Minimum Split (s) 11 39 11 34 11 39 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 12 94 30 43 94 8 76 30
End Time (s) 30 12 43 94 8 30 94 76
Yield/Force Off (s) 23 5 39 87 3 23 87 69
Yield/Force Off 170(s) 23 5 39 68 3 23 87 53
Local Start Time (s) 53 25 71 84 25 49 7 71
Local Yield (s) 64 46 80 18 44 64 18 0
Local Yield 170(s) 64 46 80 109 44 64 18 94
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 105
Offset: 69 (63%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Recent PM
12: Harmony & TZiegler
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 108 1460 222 99 1275 743 230 265 71 608 403 120
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 115 1553 218 105 1356 0 245 282 54 647 429 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 185 2105 295 118 2076 672 418 361 68 574 531 238
Arrive On Green 0.10 0.47 0.46 0.07 0.41 0.00 0.12 0.12 0.11 0.17 0.15 0.00
Sat Flow, veh/h 1845 4510 632 1774 5085 1647 3442 2972 561 3442 3539 1583
Grp Volume(v), veh/h 115 1167 604 105 1356 0 245 166 170 647 429 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1751 1774 1695 1647 1721 1770 1764 1721 1770 1583
Q Serve(g_s), s 7.2 33.6 33.8 7.0 25.8 0.0 8.1 10.9 11.2 20.0 14.1 0.0
Cycle Q Clear(g_c), s 7.2 33.6 33.8 7.0 25.8 0.0 8.1 10.9 11.2 20.0 14.1 0.0
Prop In Lane 1.00 0.36 1.00 1.00 1.00 0.32 1.00 1.00
Lane Grp Cap(c), veh/h 185 1582 817 118 2076 672 418 215 215 574 531 238
V/C Ratio(X) 0.62 0.74 0.74 0.89 0.65 0.00 0.59 0.77 0.79 1.13 0.81 0.00
Avail Cap(c_a), veh/h 185 1582 817 118 2076 672 418 251 250 574 708 317
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.8 26.0 26.2 55.6 28.6 0.0 49.8 51.1 51.4 50.0 49.3 0.0
Incr Delay (d2), s/veh 6.4 3.1 5.9 49.9 1.6 0.0 2.1 12.0 13.8 78.0 5.1 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.0 16.4 17.7 5.1 12.4 0.0 4.0 6.1 6.3 15.7 7.2 0.0
LnGrp Delay(d),s/veh 58.2 29.1 32.2 105.5 30.3 0.0 51.9 63.1 65.1 128.0 54.5 0.0
LnGrp LOS E C C F C D E E F D
Approach Vol, veh/h 1886 1461 581 1076
Approach Delay, s/veh 31.9 35.7 59.0 98.7
Approach LOS C D E F
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 20.6 24.0 11.0 62.0 24.0 20.6 18.0 55.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 10.0 23.0 7.0 55.0 19.0 16.0 11.0 48.0
Max Q Clear Time (g_c+I1), s 10.1 16.1 9.0 35.8 22.0 13.2 9.2 27.8
Green Ext Time (p_c), s 0.0 0.9 0.0 7.6 0.0 0.4 1.3 5.6
Intersection Summary
HCM 2010 Ctrl Delay 50.5
HCM 2010 LOS D
Timing Report, Sorted By Phase Recent PM
12: Harmony & TZiegler
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 17 30 11 62 24 23 18 55
Maximum Split (%) 14.2% 25.0% 9.2% 51.7% 20.0% 19.2% 15.0% 45.8%
Minimum Split (s) 11 39 11 34 11 39 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 15 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 96 66 113 4 66 90 48 113
End Time (s) 113 96 4 66 90 113 66 48
Yield/Force Off (s) 106 89 0 59 85 106 59 41
Yield/Force Off 170(s) 106 89 0 40 85 106 59 25
Local Start Time (s) 55 25 72 83 25 49 7 72
Local Yield (s) 65 48 79 18 44 65 18 0
Local Yield 170(s) 65 48 79 119 44 65 18 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 125
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & TZiegler
HCM 2010 Signalized Intersection Summary Recent PM
12: Harmony & TZiegler Adjusted Timing
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm adj timing.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 108 1460 222 99 1275 743 230 265 71 608 403 120
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 115 1553 218 105 1356 0 245 282 54 647 429 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 179 1917 268 143 1949 631 499 361 68 660 537 240
Arrive On Green 0.10 0.43 0.42 0.08 0.38 0.00 0.15 0.12 0.11 0.19 0.15 0.00
Sat Flow, veh/h 1845 4510 632 1774 5085 1647 3442 2972 561 3442 3539 1583
Grp Volume(v), veh/h 115 1167 604 105 1356 0 245 166 170 647 429 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1751 1774 1695 1647 1721 1770 1764 1721 1770 1583
Q Serve(g_s), s 7.2 36.2 36.4 6.9 26.9 0.0 7.9 10.9 11.2 22.5 14.0 0.0
Cycle Q Clear(g_c), s 7.2 36.2 36.4 6.9 26.9 0.0 7.9 10.9 11.2 22.5 14.0 0.0
Prop In Lane 1.00 0.36 1.00 1.00 1.00 0.32 1.00 1.00
Lane Grp Cap(c), veh/h 179 1441 744 143 1949 631 499 215 215 660 537 240
V/C Ratio(X) 0.64 0.81 0.81 0.73 0.70 0.00 0.49 0.77 0.79 0.98 0.80 0.00
Avail Cap(c_a), veh/h 185 1441 744 148 1949 631 499 251 250 660 796 356
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 52.1 30.2 30.5 53.9 31.1 0.0 47.2 51.1 51.4 48.3 49.1 0.0
Incr Delay (d2), s/veh 7.0 5.0 9.4 16.7 2.1 0.0 0.7 12.0 13.8 30.1 3.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.0 17.9 19.4 4.1 12.9 0.0 3.8 6.1 6.3 13.5 7.1 0.0
LnGrp Delay(d),s/veh 59.2 35.3 39.9 70.6 33.2 0.0 48.0 63.1 65.1 78.4 52.7 0.0
LnGrp LOS E D D E C D E E E D
Approach Vol, veh/h 1886 1461 581 1076
Approach Delay, s/veh 38.2 35.9 57.3 68.2
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 23.4 24.2 12.7 57.0 27.0 20.6 17.7 52.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 10.0 26.0 9.0 50.0 22.0 16.0 11.0 45.0
Max Q Clear Time (g_c+I1), s 9.9 16.0 8.9 38.4 24.5 13.2 9.2 28.9
Green Ext Time (p_c), s 0.0 1.2 0.0 5.9 0.0 0.4 1.3 5.2
Intersection Summary
HCM 2010 Ctrl Delay 46.2
HCM 2010 LOS D
Timing Report, Sorted By Phase Recent PM
12: Harmony & TZiegler Adjusted Timing
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm adj timing.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 17 33 13 57 27 23 18 52
Maximum Split (%) 14.2% 27.5% 10.8% 47.5% 22.5% 19.2% 15.0% 43.3%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 8 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 99 66 116 9 66 93 48 116
End Time (s) 116 99 9 66 93 116 66 48
Yield/Force Off (s) 109 92 5 59 88 109 59 41
Yield/Force Off 170(s) 109 92 5 40 88 109 59 25
Local Start Time (s) 58 25 75 88 25 52 7 75
Local Yield (s) 68 51 84 18 47 68 18 0
Local Yield 170(s) 68 51 84 119 47 68 18 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & TZiegler
HCM 2010 TWSC Recent AM
8: Harmony & HP West
8/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Intersection
Int Delay, s/veh 19.7
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 173 1454 1826 33 1 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 250 - - - 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 192 1616 2029 37 1 11
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 2066 0 - 0 3078 1033
Stage 1 - - - - 2047 -
Stage 2 - - - - 1031 -
Critical Hdwy 5.34 - - - 5.74 7.14
Critical Hdwy Stg 1 - - - - 6.64 -
Critical Hdwy Stg 2 - - - - 6.04 -
Follow-up Hdwy 3.12 - - - 3.82 3.92
Pot Cap-1 Maneuver ~ 116 - - - 24 197
Stage 1 - - - - 53 -
Stage 2 - - - - 275 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 116 - - - 24 197
Mov Cap-2 Maneuver - - - - 24 -
Stage 1 - - - - 53 -
Stage 2 - - - - 275 -
Approach EB WB SB
HCM Control Delay, s 42.1 0 36.9
HCM LOS E
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) ~ 116 - - - 24 197
HCM Lane V/C Ratio 1.657 - - - 0.046 0.056
HCM Control Delay (s) $ 396 - - - 162.2 24.4
HCM Lane LOS F - - - F C
HCM 95th %tile Q(veh) 14.5 - - - 0.1 0.2
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Lanes and Geometrics Recent AM
8: Harmony & HP West
8/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 250 0 0 0
Storage Lanes 1 0 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 0.91 0.91 0.91 1.00 1.00
Ped Bike Factor
Frt 0.997 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 5085 5070 0 1770 1583
Flt Permitted 0.950 0.950
Satd. Flow (perm) 1770 5085 5070 0 1770 1583
Link Speed (mph) 45 55 30
Link Distance (ft) 1281 1273 484
Travel Time (s) 19.4 15.8 11.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent PM
8: Harmony & HP West
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm.syn
Intersection
Int Delay, s/veh 1.7
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 21 2118 2005 3 15 112
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 250 - - - 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 21 2161 2046 3 15 114
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 2049 0 - 0 2954 1024
Stage 1 - - - - 2047 -
Stage 2 - - - - 907 -
Critical Hdwy 5.34 - - - 5.74 7.14
Critical Hdwy Stg 1 - - - - 6.64 -
Critical Hdwy Stg 2 - - - - 6.04 -
Follow-up Hdwy 3.12 - - - 3.82 3.92
Pot Cap-1 Maneuver 118 - - - 28 200
Stage 1 - - - - 53 -
Stage 2 - - - - 320 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 118 - - - 23 200
Mov Cap-2 Maneuver - - - - 53 -
Stage 1 - - - - 53 -
Stage 2 - - - - 263 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 51
HCM LOS F
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 118 - - - 53 200
HCM Lane V/C Ratio 0.182 - - - 0.289 0.571
HCM Control Delay (s) 42.2 - - - 98.5 44.6
HCM Lane LOS E - - - F E
HCM 95th %tile Q(veh) 0.6 - - - 1 3.1
Lanes and Geometrics Recent PM
8: Harmony & HP West
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 250 0 0 0
Storage Lanes 1 0 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 0.91 0.91 0.91 1.00 1.00
Ped Bike Factor
Frt 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 5085 5085 0 1770 1583
Flt Permitted 0.950 0.950
Satd. Flow (perm) 1770 5085 5085 0 1770 1583
Link Speed (mph) 55 55 30
Link Distance (ft) 1342 1303 506
Travel Time (s) 16.6 16.2 11.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Recent AM
1: Lady Moon & Harmony
8/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 30 1392 33 26 1805 150 49 46 39 6 3 5
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 34 1582 1 30 2051 123 56 52 0730
Adj No. of Lanes 131131111110
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 60 2797 871 328 3686 1148 205 134 114 148 74 0
Arrive On Green 0.03 0.55 0.55 0.18 0.72 0.72 0.05 0.07 0.00 0.02 0.04 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1583 1774 1863 1583 1774 1863 0
Grp Volume(v), veh/h 34 1582 1 30 2051 123 56 52 0730
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1583 1774 1863 1583 1774 1863 0
Q Serve(g_s), s 2.0 22.4 0.0 1.5 20.5 2.6 3.2 2.9 0.0 0.4 0.2 0.0
Cycle Q Clear(g_c), s 2.0 22.4 0.0 1.5 20.5 2.6 3.2 2.9 0.0 0.4 0.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 60 2797 871 328 3686 1148 205 134 114 148 74 0
V/C Ratio(X) 0.56 0.57 0.00 0.09 0.56 0.11 0.27 0.39 0.00 0.05 0.04 0.00
Avail Cap(c_a), veh/h 252 2797 871 328 3686 1148 249 169 144 248 169 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 52.4 16.2 6.3 37.2 7.0 4.5 45.4 48.7 0.0 49.2 50.8 0.0
Incr Delay (d2), s/veh 8.0 0.8 0.0 0.1 0.2 0.0 0.7 1.8 0.0 0.1 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 10.6 0.0 0.8 9.6 1.1 1.6 1.6 0.0 0.2 0.1 0.0
LnGrp Delay(d),s/veh 60.4 17.0 6.3 37.3 7.2 4.6 46.1 50.6 0.0 49.3 51.0 0.0
LnGrp LOS E B A D A A D D D D
Approach Vol, veh/h 1617 2204 108 10
Approach Delay, s/veh 17.9 7.4 48.3 49.8
Approach LOS B A D D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.3 9.4 26.3 66.0 4.8 12.9 6.6 85.7
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 7.0 9.0 11.0 59.5 7.0 9.0 14.0 59.0
Max Q Clear Time (g_c+I1), s 5.2 2.2 3.5 24.4 2.4 4.9 4.0 22.5
Green Ext Time (p_c), s 0.0 0.0 0.1 7.8 0.0 0.0 0.0 13.1
Intersection Summary
HCM 2010 Ctrl Delay 13.0
HCM 2010 LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Recent AM
1: Lady Moon & Harmony
8/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 11 15 18 66 11 15 18 66
Maximum Split (%) 10.0% 13.6% 16.4% 60.0% 10.0% 13.6% 16.4% 60.0%
Minimum Split (s) 11 15 11 25.5 11 15 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 29 12 29 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 24.5 35.5 6.5 50.5 24.5 35.5 50.5 68.5
End Time (s) 35.5 50.5 24.5 6.5 35.5 50.5 68.5 24.5
Yield/Force Off (s) 31.5 44.5 17.5 0 31.5 44.5 64.5 17.5
Yield/Force Off 170(s) 31.5 15.5 17.5 98 31.5 15.5 64.5 5.5
Local Start Time (s) 24.5 35.5 6.5 50.5 24.5 35.5 50.5 68.5
Local Yield (s) 31.5 44.5 17.5 0 31.5 44.5 64.5 17.5
Local Yield 170(s) 31.5 15.5 17.5 98 31.5 15.5 64.5 5.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 0 (0%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 1: Lady Moon & Harmony
HCM 2010 Signalized Intersection Summary Recent PM
1: Lady Moon & Harmony
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 7 2057 69 28 1878 12 34 5 41 152 40 96
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1788 1863 1863 1863 1863 1863 1863 1863 1863 1824
Adj Flow Rate, veh/h 7 2143 14 29 1956 0 35 5 0 158 42 25
Adj No. of Lanes 131131111110
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 222222222222
Cap, veh/h 28 2860 855 227 3539 1102 172 76 64 302 125 75
Arrive On Green 0.02 0.56 0.56 0.13 0.70 0.00 0.03 0.04 0.00 0.11 0.11 0.11
Sat Flow, veh/h 1845 5085 1520 1774 5085 1583 1774 1863 1583 1774 1096 652
Grp Volume(v), veh/h 7 2143 14 29 1956 0 35 5 0 158 0 67
Grp Sat Flow(s),veh/h/ln 1845 1695 1520 1774 1695 1583 1774 1863 1583 1774 0 1748
Q Serve(g_s), s 0.5 38.2 0.3 1.7 22.8 0.0 2.2 0.3 0.0 9.8 0.0 4.2
Cycle Q Clear(g_c), s 0.5 38.2 0.3 1.7 22.8 0.0 2.2 0.3 0.0 9.8 0.0 4.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.37
Lane Grp Cap(c), veh/h 28 2860 855 227 3539 1102 172 76 64 302 0 200
V/C Ratio(X) 0.25 0.75 0.02 0.13 0.55 0.00 0.20 0.07 0.00 0.52 0.00 0.34
Avail Cap(c_a), veh/h 200 2860 855 227 3539 1102 232 155 132 306 0 218
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 58.4 19.8 3.6 46.4 9.0 0.0 52.5 55.4 0.0 46.1 0.0 49.1
Incr Delay (d2), s/veh 4.5 1.8 0.0 0.3 0.2 0.0 0.6 0.4 0.0 1.6 0.0 1.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 18.3 0.1 0.9 10.6 0.0 1.1 0.2 0.0 5.0 0.0 2.1
LnGrp Delay(d),s/veh 62.9 21.7 3.6 46.6 9.2 0.0 53.1 55.7 0.0 47.7 0.0 50.1
LnGrp LOS E C A D A D E D D
Approach Vol, veh/h 2164 1985 40 225
Approach Delay, s/veh 21.7 9.7 53.4 48.4
Approach LOS C A D D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 6.9 18.7 21.4 73.0 15.8 9.9 4.8 89.5
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 7.0 14.0 9.0 66.5 12.0 9.0 12.0 66.0
Max Q Clear Time (g_c+I1), s 4.2 6.2 3.7 40.2 11.8 2.3 2.5 24.8
Green Ext Time (p_c), s 0.0 0.1 0.0 11.7 0.0 0.1 0.0 11.6
Intersection Summary
HCM 2010 Ctrl Delay 18.0
HCM 2010 LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Recent PM
1: Lady Moon & Harmony
8/21/2015 Synchro 8 Light Report
Delich Associates recent pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 11 20 16 73 16 15 16 73
Maximum Split (%) 9.2% 16.7% 13.3% 60.8% 13.3% 12.5% 13.3% 60.8%
Minimum Split (s) 11 15 11 25.5 11 15 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 29 12 29 10
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 17.5 28.5 1.5 48.5 17.5 33.5 48.5 64.5
End Time (s) 28.5 48.5 17.5 1.5 33.5 48.5 64.5 17.5
Yield/Force Off (s) 24.5 42.5 10.5 115 29.5 42.5 60.5 10.5
Yield/Force Off 170(s) 24.5 13.5 10.5 103 29.5 13.5 60.5 0.5
Local Start Time (s) 22.5 33.5 6.5 53.5 22.5 38.5 53.5 69.5
Local Yield (s) 29.5 47.5 15.5 0 34.5 47.5 65.5 15.5
Local Yield 170(s) 29.5 18.5 15.5 108 34.5 18.5 65.5 5.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 1: Lady Moon & Harmony
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Intersection type
Land Use (from structure plan)
Commercial
corridors
Other corridors within:
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
D E* D D
Any Leg E E D E
Any Movement E E D E
Stop sign control
(arterial/arterial,
arterial/collector or local-
any approach leg)
N/A F** F** E
Stop sign control
(collector/local--any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
APPENDIX D
300 400 500 600 700 800 900 1000 1100 1200 1300
100
200
300
400
500
AM 4002 VPH
*75
*100
1 LANE & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
NB AM 78 VPH
PM 4746 VPH
2 OR MORE LANES & 1 LANE
NB PM 135 VPH
SB AM 16 VPH
SB PM 192 VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR
ABOVE 70 KM/H (40 MPH) ON MAJOR STREET)
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 100 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 75 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE TOTAL PEAK HOUR WARRANT AT HARMONY/TECHNOLOGY
MUTCD, 2003 EDITION, PAGE 4C-7
APPENDIX E
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 164 1153 170 103 1449 514 254 392 56 590 242 74
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 182 1281 171 114 1610 0 282 436 52 656 269 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 215 1766 236 153 1695 549 820 512 61 688 374 167
Arrive On Green 0.12 0.39 0.38 0.09 0.33 0.00 0.24 0.16 0.15 0.20 0.11 0.00
Sat Flow, veh/h 1845 4540 606 1774 5085 1647 3442 3187 378 3442 3539 1583
Grp Volume(v), veh/h 182 957 495 114 1610 0 282 241 247 656 269 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1756 1774 1695 1647 1721 1770 1796 1721 1770 1583
Q Serve(g_s), s 11.6 28.8 28.9 7.5 37.1 0.0 8.2 15.9 16.1 22.6 8.8 0.0
Cycle Q Clear(g_c), s 11.6 28.8 28.9 7.5 37.1 0.0 8.2 15.9 16.1 22.6 8.8 0.0
Prop In Lane 1.00 0.35 1.00 1.00 1.00 0.21 1.00 1.00
Lane Grp Cap(c), veh/h 215 1319 683 153 1695 549 820 284 288 688 374 167
V/C Ratio(X) 0.85 0.73 0.73 0.75 0.95 0.00 0.34 0.85 0.86 0.95 0.72 0.00
Avail Cap(c_a), veh/h 215 1319 683 163 1695 549 820 295 299 688 885 396
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.39 0.39 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.9 31.2 31.4 53.6 39.0 0.0 37.9 48.9 49.1 47.4 51.9 0.0
Incr Delay (d2), s/veh 25.4 3.5 6.6 6.7 6.1 0.0 0.2 19.6 20.5 23.4 2.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.4 14.1 15.2 4.0 18.3 0.0 3.9 9.3 9.6 13.0 4.5 0.0
LnGrp Delay(d),s/veh 77.3 34.7 38.0 60.3 45.1 0.0 38.2 68.6 69.6 70.8 54.6 0.0
LnGrp LOS E C D E D D E E E D
Approach Vol, veh/h 1634 1724 770 925
Approach Delay, s/veh 40.5 46.1 57.8 66.1
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 34.6 18.7 13.3 52.7 28.0 25.3 20.0 46.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 29.0 10.0 45.0 23.0 19.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 10.2 10.8 9.5 30.9 24.6 18.1 13.6 39.1
Green Ext Time (p_c), s 0.3 0.8 0.0 5.5 0.0 0.2 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 49.7
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Bkgrd AM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 36 14 52 28 26 20 46
Maximum Split (%) 15.0% 30.0% 11.7% 43.3% 23.3% 21.7% 16.7% 38.3%
Minimum Split (s) 11 39 11 34 11 39 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 12 96 30 44 96 4 76 30
End Time (s) 30 12 44 96 4 30 96 76
Yield/Force Off (s) 23 5 40 89 119 23 89 69
Yield/Force Off 170(s) 23 5 40 70 119 23 89 53
Local Start Time (s) 63 27 81 95 27 55 7 81
Local Yield (s) 74 56 91 20 50 74 20 0
Local Yield 170(s) 74 56 91 1 50 74 20 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 125
Offset: 69 (58%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 133 1645 255 118 1434 834 264 307 86 679 466 165
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 141 1750 253 126 1526 0 281 327 68 722 496 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 169 1835 264 148 1907 618 538 399 82 717 608 272
Arrive On Green 0.09 0.41 0.40 0.08 0.38 0.00 0.16 0.14 0.13 0.21 0.17 0.00
Sat Flow, veh/h 1845 4494 645 1774 5085 1647 3442 2925 601 3442 3539 1583
Grp Volume(v), veh/h 141 1318 685 126 1526 0 281 196 199 722 496 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1749 1774 1695 1647 1721 1770 1757 1721 1770 1583
Q Serve(g_s), s 9.0 45.1 45.8 8.4 32.2 0.0 9.0 12.9 13.2 25.0 16.2 0.0
Cycle Q Clear(g_c), s 9.0 45.1 45.8 8.4 32.2 0.0 9.0 12.9 13.2 25.0 16.2 0.0
Prop In Lane 1.00 0.37 1.00 1.00 1.00 0.34 1.00 1.00
Lane Grp Cap(c), veh/h 169 1384 714 148 1907 618 538 241 240 717 608 272
V/C Ratio(X) 0.83 0.95 0.96 0.85 0.80 0.00 0.52 0.81 0.83 1.01 0.82 0.00
Avail Cap(c_a), veh/h 169 1384 714 148 1907 618 538 251 249 717 885 396
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 53.6 34.4 34.7 54.3 33.5 0.0 46.5 50.3 50.6 47.5 47.9 0.0
Incr Delay (d2), s/veh 28.6 15.1 25.2 35.2 3.6 0.0 0.9 17.6 19.9 35.3 3.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.9 24.0 27.1 5.6 15.6 0.0 4.4 7.5 7.7 15.4 8.3 0.0
LnGrp Delay(d),s/veh 82.2 49.5 59.9 89.5 37.1 0.0 47.4 68.0 70.5 82.8 51.7 0.0
LnGrp LOS F D E F D D E E F D
Approach Vol, veh/h 2144 1652 676 1218
Approach Delay, s/veh 55.0 41.1 60.2 70.2
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 24.7 26.6 13.0 55.0 29.0 22.4 17.0 51.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 9.0 29.0 9.0 48.0 24.0 16.0 10.0 44.0
Max Q Clear Time (g_c+I1), s 11.0 18.2 10.4 47.8 27.0 15.2 11.0 34.2
Green Ext Time (p_c), s 0.0 1.4 0.0 0.2 0.0 0.1 0.0 4.6
Intersection Summary
HCM 2010 Ctrl Delay 54.8
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Bkgrd PM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 16 36 13 55 29 23 17 51
Maximum Split (%) 13.3% 30.0% 10.8% 45.8% 24.2% 19.2% 14.2% 42.5%
Minimum Split (s) 11 39 11 34 11 39 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 101 65 117 10 65 94 48 117
End Time (s) 117 101 10 65 94 117 65 48
Yield/Force Off (s) 110 94 6 58 89 110 58 41
Yield/Force Off 170(s) 110 94 6 39 89 110 58 25
Local Start Time (s) 60 24 76 89 24 53 7 76
Local Yield (s) 69 53 85 17 48 69 17 0
Local Yield 170(s) 69 53 85 118 48 69 17 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 145
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates sb am nb rt & eb rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 164 1153 170 103 1449 514 254 392 56 590 242 74
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 182 1281 108 114 1610 0 282 436 0 656 269 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 215 1978 603 153 1695 549 804 522 220 717 374 167
Arrive On Green 0.12 0.39 0.38 0.09 0.33 0.00 0.23 0.15 0.00 0.21 0.11 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 182 1281 108 114 1610 0 282 436 0 656 269 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 11.6 24.7 5.4 7.5 37.1 0.0 8.2 14.4 0.0 22.4 8.8 0.0
Cycle Q Clear(g_c), s 11.6 24.7 5.4 7.5 37.1 0.0 8.2 14.4 0.0 22.4 8.8 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 215 1978 603 153 1695 549 804 522 220 717 374 167
V/C Ratio(X) 0.85 0.65 0.18 0.75 0.95 0.00 0.35 0.84 0.00 0.91 0.72 0.00
Avail Cap(c_a), veh/h 215 1978 603 163 1695 549 804 560 237 717 885 396
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.39 0.39 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.9 29.9 24.7 53.6 39.0 0.0 38.4 49.7 0.0 46.5 51.9 0.0
Incr Delay (d2), s/veh 25.4 1.7 0.7 6.7 6.1 0.0 0.3 10.0 0.0 16.4 2.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.4 11.8 2.5 4.0 18.3 0.0 3.9 7.8 0.0 12.3 4.5 0.0
LnGrp Delay(d),s/veh 77.3 31.6 25.4 60.3 45.1 0.0 38.7 59.8 0.0 62.8 54.6 0.0
LnGrp LOS E C C E D D E E D
Approach Vol, veh/h 1571 1724 718 925
Approach Delay, s/veh 36.5 46.1 51.5 60.4
Approach LOS D D D E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 34.0 18.7 13.3 52.7 29.0 23.7 20.0 46.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 29.0 10.0 45.0 24.0 18.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 10.2 10.8 9.5 26.7 24.4 16.4 13.6 39.1
Green Ext Time (p_c), s 0.3 0.8 0.0 6.1 0.0 0.3 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 46.5
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Bkgrd AM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates sb am nb rt & eb rt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 36 14 52 29 25 20 46
Maximum Split (%) 15.0% 30.0% 11.7% 43.3% 24.2% 20.8% 16.7% 38.3%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 12 96 30 44 96 5 76 30
End Time (s) 30 12 44 96 5 30 96 76
Yield/Force Off (s) 23 5 40 89 0 23 89 69
Yield/Force Off 170(s) 23 5 40 70 0 23 89 53
Local Start Time (s) 63 27 81 95 27 56 7 81
Local Yield (s) 74 56 91 20 51 74 20 0
Local Yield 170(s) 74 56 91 1 51 74 20 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 69 (58%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates sb pm nb rt & eb rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 133 1645 255 118 1434 834 264 307 86 679 466 165
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 141 1750 151 126 1526 0 281 327 0 722 496 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 188 2035 621 165 1865 604 499 412 171 746 607 271
Arrive On Green 0.10 0.40 0.39 0.09 0.37 0.00 0.15 0.12 0.00 0.22 0.17 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 141 1750 151 126 1526 0 281 327 0 722 496 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 8.9 37.8 7.7 8.3 32.6 0.0 9.1 10.8 0.0 25.0 16.2 0.0
Cycle Q Clear(g_c), s 8.9 37.8 7.7 8.3 32.6 0.0 9.1 10.8 0.0 25.0 16.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 188 2035 621 165 1865 604 499 412 171 746 607 271
V/C Ratio(X) 0.75 0.86 0.24 0.76 0.82 0.00 0.56 0.79 0.00 0.97 0.82 0.00
Avail Cap(c_a), veh/h 200 2035 621 177 1865 604 499 442 185 746 855 383
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 52.4 32.9 24.5 53.1 34.4 0.0 47.7 51.6 0.0 46.6 47.9 0.0
Incr Delay (d2), s/veh 13.8 5.0 0.9 16.5 4.1 0.0 1.4 9.0 0.0 25.3 4.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.3 18.6 3.5 4.9 16.0 0.0 4.4 5.8 0.0 14.4 8.3 0.0
LnGrp Delay(d),s/veh 66.2 37.9 25.5 69.6 38.5 0.0 49.2 60.6 0.0 71.9 52.2 0.0
LnGrp LOS E D C E D D E E D
Approach Vol, veh/h 2042 1652 608 1218
Approach Delay, s/veh 39.0 40.9 55.3 63.9
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 23.4 26.6 14.2 54.0 30.0 20.0 18.2 50.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 9.0 28.0 11.0 47.0 25.0 14.0 12.0 43.0
Max Q Clear Time (g_c+I1), s 11.1 18.2 10.3 39.8 27.0 12.8 10.9 34.6
Green Ext Time (p_c), s 0.0 1.4 0.0 4.7 0.0 0.2 0.4 4.2
Intersection Summary
HCM 2010 Ctrl Delay 46.8
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Bkgrd PM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates sb pm nb rt & eb rt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 16 35 15 54 30 21 19 50
Maximum Split (%) 13.3% 29.2% 12.5% 45.0% 25.0% 17.5% 15.8% 41.7%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 102 67 118 13 67 97 48 118
End Time (s) 118 102 13 67 97 118 67 48
Yield/Force Off (s) 111 95 9 60 92 111 60 41
Yield/Force Off 170(s) 111 95 9 41 92 111 60 25
Local Start Time (s) 61 26 77 92 26 56 7 77
Local Yield (s) 70 54 88 19 51 70 19 0
Local Yield 170(s) 70 54 88 0 51 70 19 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 173 1596 30 9 2052 52 2014012
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 192 1773 2 10 2280 56 200400
Adj No. of Lanes 131130110110
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 234 3199 996 103 2942 72 307 326 0 307 326 0
Arrive On Green 0.13 0.63 0.63 0.06 0.58 0.57 0.17 0.00 0.00 0.17 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5106 125 1412 1863 0 1412 1863 0
Grp Volume(v), veh/h 192 1773 2 10 1512 824 200400
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1841 1412 1863 0 1412 1863 0
Q Serve(g_s), s 12.6 23.8 0.1 0.6 40.9 41.3 0.1 0.0 0.0 0.3 0.0 0.0
Cycle Q Clear(g_c), s 12.6 23.8 0.1 0.6 40.9 41.3 0.1 0.0 0.0 0.3 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.07 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 234 3199 996 103 1954 1061 307 326 0 307 326 0
V/C Ratio(X) 0.82 0.55 0.00 0.10 0.77 0.78 0.01 0.00 0.00 0.01 0.00 0.00
Avail Cap(c_a), veh/h 310 3199 996 103 1954 1061 307 326 0 307 326 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.47 0.47 0.47 0.75 0.75 0.75 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 50.7 12.7 8.3 53.5 19.4 19.5 40.9 0.0 0.0 41.0 0.0 0.0
Incr Delay (d2), s/veh 6.2 0.3 0.0 0.3 1.5 2.8 0.0 0.0 0.0 0.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.6 11.1 0.0 0.3 19.5 21.7 0.1 0.0 0.0 0.1 0.0 0.0
LnGrp Delay(d),s/veh 56.9 13.0 8.3 53.8 20.9 22.3 40.9 0.0 0.0 41.0 0.0 0.0
LnGrp LOS E B A DCCD D
Approach Vol, veh/h 1967 2346 2 4
Approach Delay, s/veh 17.3 21.6 40.9 41.0
Approach LOS B C D D
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 26.0 13.0 81.0 26.0 18.8 75.2
Change Period (Y+Rc), s 6.0 7.0 6.5 6.0 4.0 7.0
Max Green Setting (Gmax), s 20.0 6.0 74.5 20.0 20.0 63.0
Max Q Clear Time (g_c+I1), s 2.3 2.6 25.8 2.1 14.6 43.3
Green Ext Time (p_c), s 0.0 2.0 9.8 0.0 0.2 10.4
Intersection Summary
HCM 2010 Ctrl Delay 19.6
HCM 2010 LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Bkgrd AM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 234678
Movement SBTL WBL EBT NBTL EBL WBT
Lead/Lag Lag Lead Lead Lag
Lead-Lag Optimize
Recall Mode Max None C-Max Max None None
Maximum Split (s) 26 13 81 26 24 70
Maximum Split (%) 21.7% 10.8% 67.5% 21.7% 20.0% 58.3%
Minimum Split (s) 15 11 25.5 15 8 26
Yellow Time (s) 3 5.5 5.5 3 3 5.5
All-Red Time (s) 3 1.5 1 3 1 1.5
Minimum Initial (s) 444444
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 29 12 29 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 61 48 87 61 87 111
End Time (s) 87 61 48 87 111 61
Yield/Force Off (s) 81 54 41.5 81 107 54
Yield/Force Off 170(s) 52 54 29.5 52 107 42
Local Start Time (s) 19.5 6.5 45.5 19.5 45.5 69.5
Local Yield (s) 39.5 12.5 0 39.5 65.5 12.5
Local Yield 170(s) 10.5 12.5 108 10.5 65.5 0.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 41.5 (35%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 8: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 21 2382 7 2 216 7 36 0 10 58 0 134
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 21 2431 0 2 220 4 37 0 0 59 0 0
Adj No. of Lanes 131130110110
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 45 3030 943 103 3343 61 354 388 0 354 388 0
Arrive On Green 0.03 0.60 0.00 0.06 0.65 0.64 0.21 0.00 0.00 0.21 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5143 93 1412 1863 0 1412 1863 0
Grp Volume(v), veh/h 21 2431 0 2 145 79 37 0 0 59 0 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1846 1412 1863 0 1412 1863 0
Q Serve(g_s), s 1.4 44.4 0.0 0.1 1.9 1.9 2.6 0.0 0.0 4.1 0.0 0.0
Cycle Q Clear(g_c), s 1.4 44.4 0.0 0.1 1.9 1.9 2.6 0.0 0.0 4.1 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.05 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 45 3030 943 103 2203 1200 354 388 0 354 388 0
V/C Ratio(X) 0.47 0.80 0.00 0.02 0.07 0.07 0.10 0.00 0.00 0.17 0.00 0.00
Avail Cap(c_a), veh/h 148 3030 943 103 2203 1200 354 388 0 354 388 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.11 0.11 0.00 0.78 0.78 0.78 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 57.7 18.8 0.0 53.3 7.7 7.7 38.6 0.0 0.0 39.2 0.0 0.0
Incr Delay (d2), s/veh 0.9 0.3 0.0 0.1 0.0 0.0 0.6 0.0 0.0 1.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 20.8 0.0 0.1 0.9 1.0 1.1 0.0 0.0 1.7 0.0 0.0
LnGrp Delay(d),s/veh 58.6 19.0 0.0 53.3 7.7 7.7 39.2 0.0 0.0 40.3 0.0 0.0
LnGrp LOS E B D A A D D
Approach Vol, veh/h 2452 226 37 59
Approach Delay, s/veh 19.4 8.1 39.2 40.3
Approach LOS B A D D
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 30.0 13.0 77.0 30.0 6.0 84.0
Change Period (Y+Rc), s 6.0 7.0 6.5 6.0 4.0 7.0
Max Green Setting (Gmax), s 24.0 6.0 70.5 24.0 9.0 70.0
Max Q Clear Time (g_c+I1), s 6.1 2.1 46.4 4.6 3.4 3.9
Green Ext Time (p_c), s 0.2 0.0 13.4 0.2 0.0 0.7
Intersection Summary
HCM 2010 Ctrl Delay 19.2
HCM 2010 LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Bkgrd PM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 234678
Movement SBTL WBL EBT NBTL EBL WBT
Lead/Lag Lag Lead Lead Lag
Lead-Lag Optimize
Recall Mode Max None C-Max Max None None
Maximum Split (s) 30 13 77 30 13 77
Maximum Split (%) 25.0% 10.8% 64.2% 25.0% 10.8% 64.2%
Minimum Split (s) 15 11 25.5 15 8 26
Yellow Time (s) 3 5.5 5.5 3 3 5.5
All-Red Time (s) 3 1.5 1 3 1 1.5
Minimum Initial (s) 444444
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 29 12 29 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 14.5 1.5 44.5 14.5 44.5 57.5
End Time (s) 44.5 14.5 1.5 44.5 57.5 14.5
Yield/Force Off (s) 38.5 7.5 115 38.5 53.5 7.5
Yield/Force Off 170(s) 9.5 7.5 103 9.5 53.5 115.5
Local Start Time (s) 19.5 6.5 49.5 19.5 49.5 62.5
Local Yield (s) 43.5 12.5 0 43.5 58.5 12.5
Local Yield 170(s) 14.5 12.5 108 14.5 58.5 0.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 8: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 30 1483 88 66 2004 150 104 46 78 5 3 5
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 34 1685 53 75 2277 118 118 52 0630
Adj No. of Lanes 131131111110
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 59 2733 851 348 3674 1144 229 167 142 136 69 0
Arrive On Green 0.06 1.00 1.00 0.20 0.72 0.72 0.07 0.09 0.00 0.01 0.04 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1583 1774 1863 1583 1774 1863 0
Grp Volume(v), veh/h 34 1685 53 75 2277 118 118 52 0630
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1583 1774 1863 1583 1774 1863 0
Q Serve(g_s), s 2.1 0.0 0.0 4.3 27.0 2.7 7.5 3.1 0.0 0.4 0.2 0.0
Cycle Q Clear(g_c), s 2.1 0.0 0.0 4.3 27.0 2.7 7.5 3.1 0.0 0.4 0.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 59 2733 851 348 3674 1144 229 167 142 136 69 0
V/C Ratio(X) 0.58 0.62 0.06 0.22 0.62 0.10 0.52 0.31 0.00 0.04 0.04 0.00
Avail Cap(c_a), veh/h 231 2733 851 348 3674 1144 229 248 211 229 248 0
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.86 0.86 0.86 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 55.4 0.0 0.0 40.5 8.4 5.0 49.7 51.2 0.0 54.1 55.7 0.0
Incr Delay (d2), s/veh 7.4 0.9 0.1 0.3 0.3 0.0 2.0 1.1 0.0 0.1 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 0.2 0.0 2.1 12.5 1.2 3.8 1.7 0.0 0.2 0.1 0.0
LnGrp Delay(d),s/veh 62.8 0.9 0.1 40.8 8.7 5.0 51.7 52.2 0.0 54.3 55.9 0.0
LnGrp LOS E A A D A A D D D E
Approach Vol, veh/h 1772 2470 170 9
Approach Delay, s/veh 2.1 9.5 51.9 54.8
Approach LOS A A D D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 9.5 29.5 70.0 4.7 15.8 6.8 92.7
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 7.0 15.0 11.0 63.5 7.0 15.0 14.0 63.0
Max Q Clear Time (g_c+I1), s 9.5 2.2 6.3 2.0 2.4 5.1 4.1 29.0
Green Ext Time (p_c), s 0.0 0.1 0.1 9.4 0.0 0.1 0.0 15.5
Intersection Summary
HCM 2010 Ctrl Delay 8.2
HCM 2010 LOS A
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Bkgrd AM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 11 21 18 70 11 21 18 70
Maximum Split (%) 9.2% 17.5% 15.0% 58.3% 9.2% 17.5% 15.0% 58.3%
Minimum Split (s) 11 42 11 25.5 11 42.5 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 29 12 29 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 66.5 77.5 48.5 98.5 66.5 77.5 98.5 116.5
End Time (s) 77.5 98.5 66.5 48.5 77.5 98.5 116.5 66.5
Yield/Force Off (s) 73.5 92.5 59.5 42 73.5 92.5 112.5 59.5
Yield/Force Off 170(s) 73.5 63.5 59.5 30 73.5 63.5 112.5 47.5
Local Start Time (s) 24.5 35.5 6.5 56.5 24.5 35.5 56.5 74.5
Local Yield (s) 31.5 50.5 17.5 0 31.5 50.5 70.5 17.5
Local Yield 170(s) 31.5 21.5 17.5 108 31.5 21.5 70.5 5.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 125
Offset: 42 (35%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 1: Lady Moon & Harmony
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 7 2319 124 78 2028 12 101 5 70 106 40 96
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 7 2416 64 81 2112 0 105 5 0 110 42 22
Adj No. of Lanes 131131111110
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 222222222222
Cap, veh/h 28 2860 891 261 3638 1133 212 87 74 266 70 37
Arrive On Green 0.03 1.00 1.00 0.15 0.72 0.00 0.07 0.05 0.00 0.08 0.06 0.05
Sat Flow, veh/h 1845 5085 1583 1774 5085 1583 1774 1863 1583 1774 1153 604
Grp Volume(v), veh/h 7 2416 64 81 2112 0 105 5 0 110 0 64
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1583 1774 1863 1583 1774 0 1756
Q Serve(g_s), s 0.4 0.0 0.0 4.9 24.3 0.0 6.7 0.3 0.0 6.9 0.0 4.3
Cycle Q Clear(g_c), s 0.4 0.0 0.0 4.9 24.3 0.0 6.7 0.3 0.0 6.9 0.0 4.3
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.34
Lane Grp Cap(c), veh/h 28 2860 891 261 3638 1133 212 87 74 266 0 107
V/C Ratio(X) 0.25 0.84 0.07 0.31 0.58 0.00 0.49 0.06 0.00 0.41 0.00 0.60
Avail Cap(c_a), veh/h 200 2860 891 261 3638 1133 212 155 132 314 0 220
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.52 0.52 0.52 1.00 1.00 0.00 1.00 1.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 57.5 0.0 0.0 45.7 8.3 0.0 50.2 54.7 0.0 48.0 0.0 55.1
Incr Delay (d2), s/veh 2.4 1.7 0.1 0.7 0.2 0.0 1.8 0.3 0.0 1.0 0.0 5.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.5 0.0 2.5 11.2 0.0 3.4 0.2 0.0 3.4 0.0 2.2
LnGrp Delay(d),s/veh 59.9 1.7 0.1 46.4 8.6 0.0 51.9 54.9 0.0 49.0 0.0 60.3
LnGrp LOS E A A D A D D D E
Approach Vol, veh/h 2487 2193 110 174
Approach Delay, s/veh 1.9 9.9 52.1 53.2
Approach LOS A A D D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 12.3 23.7 73.0 12.7 10.6 4.8 91.8
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 7.0 14.0 9.0 66.5 12.0 9.0 12.0 66.0
Max Q Clear Time (g_c+I1), s 8.7 6.3 6.9 2.0 8.9 2.3 2.4 26.3
Green Ext Time (p_c), s 0.0 0.1 0.1 19.8 0.1 0.1 0.0 13.5
Intersection Summary
HCM 2010 Ctrl Delay 8.3
HCM 2010 LOS A
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Bkgrd PM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 11 20 16 73 16 15 16 73
Maximum Split (%) 9.2% 16.7% 13.3% 60.8% 13.3% 12.5% 13.3% 60.8%
Minimum Split (s) 11 42 11 25.5 11 42.5 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 29 12 29 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 17.5 28.5 1.5 48.5 17.5 33.5 48.5 64.5
End Time (s) 28.5 48.5 17.5 1.5 33.5 48.5 64.5 17.5
Yield/Force Off (s) 24.5 42.5 10.5 115 29.5 42.5 60.5 10.5
Yield/Force Off 170(s) 24.5 13.5 10.5 103 29.5 13.5 60.5 118.5
Local Start Time (s) 22.5 33.5 6.5 53.5 22.5 38.5 53.5 69.5
Local Yield (s) 29.5 47.5 15.5 0 34.5 47.5 65.5 15.5
Local Yield 170(s) 29.5 18.5 15.5 108 34.5 18.5 65.5 3.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 135
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 1: Lady Moon & Harmony
HCM 2010 TWSC Short Bkgrd AM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 0.6
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 24 204 10 0 157
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 28 240 12 0 185
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 431 246 0 0 252 0
Stage 1 246 - - - - -
Stage 2 185 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 581 793 - - 1313 -
Stage 1 795 - - - - -
Stage 2 847 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 581 793 - - 1313 -
Mov Cap-2 Maneuver 581 - - - - -
Stage 1 795 - - - - -
Stage 2 847 - - - - -
Approach WB NB SB
HCM Control Delay, s 9.7 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 793 1313 -
HCM Lane V/C Ratio - - 0.036 - -
HCM Control Delay (s) - - 9.7 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.1 0 -
Lanes and Geometrics Short Bkgrd AM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.994
Flt Protected
Satd. Flow (prot) 0 1611 1852 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1852 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 297 270 461
Travel Time (s) 6.8 6.1 10.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 1
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 46 130 6 0 242
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 54 153 7 0 285
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 441 156 0 0 160 0
Stage 1 156 - - - - -
Stage 2 285 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 574 890 - - 1419 -
Stage 1 872 - - - - -
Stage 2 763 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 574 890 - - 1419 -
Mov Cap-2 Maneuver 574 - - - - -
Stage 1 872 - - - - -
Stage 2 763 - - - - -
Approach WB NB SB
HCM Control Delay, s 9.3 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 890 1419 -
HCM Lane V/C Ratio - - 0.061 - -
HCM Control Delay (s) - - 9.3 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.2 0 -
Lanes and Geometrics Short Bkgrd PM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.994
Flt Protected
Satd. Flow (prot) 0 1611 1852 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1852 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 297 270 461
Travel Time (s) 6.8 6.1 10.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd AM
3: Lady Moon & Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 2.3
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 28 6 208 42 71 86
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 33 7 245 49 84 101
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 537 269 0 0 294 0
Stage 1 269 - - - - -
Stage 2 268 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 505 770 - - 1268 -
Stage 1 776 - - - - -
Stage 2 777 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 472 770 - - 1268 -
Mov Cap-2 Maneuver 472 - - - - -
Stage 1 776 - - - - -
Stage 2 726 - - - - -
Approach WB NB SB
HCM Control Delay, s 12.7 0 3.6
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 507 1268 -
HCM Lane V/C Ratio - - 0.079 0.066 -
HCM Control Delay (s) - - 12.7 8 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.3 0.2 -
Lanes and Geometrics Short Bkgrd AM
3: Lady Moon & Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.976 0.977
Flt Protected 0.960 0.950
Satd. Flow (prot) 1745 0 1820 0 1770 1863
Flt Permitted 0.960 0.950
Satd. Flow (perm) 1745 0 1820 0 1770 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 322 394 270
Travel Time (s) 7.3 9.0 6.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
3: Lady Moon & Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 2.4
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 52 12 124 24 40 202
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 61 14 146 28 47 238
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 492 160 0 0 174 0
Stage 1 160 - - - - -
Stage 2 332 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 536 885 - - 1403 -
Stage 1 869 - - - - -
Stage 2 727 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 518 885 - - 1403 -
Mov Cap-2 Maneuver 518 - - - - -
Stage 1 869 - - - - -
Stage 2 703 - - - - -
Approach WB NB SB
HCM Control Delay, s 12.4 0 1.3
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 562 1403 -
HCM Lane V/C Ratio - - 0.134 0.034 -
HCM Control Delay (s) - - 12.4 7.7 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.5 0.1 -
Lanes and Geometrics Short Bkgrd PM
3: Lady Moon & Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates sb pm.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.975 0.978
Flt Protected 0.961 0.950
Satd. Flow (prot) 1745 0 1822 0 1770 1863
Flt Permitted 0.961 0.950
Satd. Flow (perm) 1745 0 1822 0 1770 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 322 394 270
Travel Time (s) 7.3 9.0 6.1
Intersection Summary
Area Type: Other
APPENDIX F
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 175 1935 245 130 1370 440 25 485 85 625 370 85
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 184 2037 138 137 1442 0 26 511 0 658 389 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 231 2119 648 163 1822 590 537 604 270 488 494 221
Arrive On Green 0.13 0.42 0.42 0.09 0.36 0.00 0.16 0.17 0.00 0.14 0.14 0.00
Sat Flow, veh/h 1845 5085 1555 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 184 2037 138 137 1442 0 26 511 0 658 389 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1555 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 11.6 46.8 6.8 9.1 30.5 0.0 0.8 16.8 0.0 17.0 12.8 0.0
Cycle Q Clear(g_c), s 11.6 46.8 6.8 9.1 30.5 0.0 0.8 16.8 0.0 17.0 12.8 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 231 2119 648 163 1822 590 537 604 270 488 494 221
V/C Ratio(X) 0.80 0.96 0.21 0.84 0.79 0.00 0.05 0.85 0.00 1.35 0.79 0.00
Avail Cap(c_a), veh/h 231 2119 648 163 1822 590 537 678 303 488 737 330
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.68 0.68 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.0 34.1 22.4 53.6 34.5 0.0 43.1 48.2 0.0 51.5 49.9 0.0
Incr Delay (d2), s/veh 17.6 12.4 0.7 22.8 2.5 0.0 0.0 8.9 0.0 170.5 3.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.1 24.3 3.0 5.5 14.7 0.0 0.4 9.0 0.0 19.6 6.4 0.0
LnGrp Delay(d),s/veh 68.6 46.4 23.2 76.5 37.0 0.0 43.1 57.2 0.0 222.0 53.3 0.0
LnGrp LOS E D C E D D E F D
Approach Vol, veh/h 2359 1579 537 1047
Approach Delay, s/veh 46.8 40.4 56.5 159.3
Approach LOS D D E F
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 24.7 22.7 14.0 56.0 21.0 26.5 21.0 49.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 12.0 24.0 10.0 49.0 16.0 22.0 14.0 42.0
Max Q Clear Time (g_c+I1), s 2.8 14.8 11.1 48.8 19.0 18.8 13.6 32.5
Green Ext Time (p_c), s 1.4 1.0 0.0 0.2 0.0 0.7 0.3 4.3
Intersection Summary
HCM 2010 Ctrl Delay 67.2
HCM 2010 LOS E
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Bkgrd AM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 19 31 14 56 21 29 21 49
Maximum Split (%) 15.8% 25.8% 11.7% 46.7% 17.5% 24.2% 17.5% 40.8%
Minimum Split (s) 11 24 11 34 11 24 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 100 69 119 13 69 90 48 119
End Time (s) 119 100 13 69 90 119 69 48
Yield/Force Off (s) 112 93 9 62 85 112 62 41
Yield/Force Off 170(s) 112 93 9 43 85 112 62 25
Local Start Time (s) 59 28 78 92 28 49 7 78
Local Yield (s) 71 52 88 21 44 71 21 0
Local Yield 170(s) 71 52 88 2 44 71 21 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 145 1735 285 160 2160 860 335 455 115 570 575 180
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 148 1770 141 163 2204 0 342 464 0 582 587 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 169 2257 690 203 2246 727 344 413 185 574 590 264
Arrive On Green 0.09 0.44 0.44 0.11 0.44 0.00 0.10 0.12 0.00 0.17 0.17 0.00
Sat Flow, veh/h 1845 5085 1556 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 148 1770 141 163 2204 0 342 464 0 582 587 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1556 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 9.5 35.6 6.7 10.8 51.3 0.0 11.9 14.0 0.0 20.0 19.9 0.0
Cycle Q Clear(g_c), s 9.5 35.6 6.7 10.8 51.3 0.0 11.9 14.0 0.0 20.0 19.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 169 2257 690 203 2246 727 344 413 185 574 590 264
V/C Ratio(X) 0.88 0.78 0.20 0.80 0.98 0.00 0.99 1.12 0.00 1.01 1.00 0.00
Avail Cap(c_a), veh/h 169 2257 690 222 2246 727 344 413 185 574 590 264
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.33 0.33 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 53.8 28.5 20.4 51.8 33.0 0.0 54.0 53.0 0.0 50.0 50.0 0.0
Incr Delay (d2), s/veh 36.4 2.8 0.7 6.4 7.4 0.0 46.7 82.4 0.0 41.3 35.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.6 17.1 3.0 5.6 25.4 0.0 7.9 11.6 0.0 12.8 12.6 0.0
LnGrp Delay(d),s/veh 90.2 31.3 21.1 58.2 40.4 0.0 100.7 135.4 0.0 91.3 85.7 0.0
LnGrp LOS F C C E D F F F F
Approach Vol, veh/h 2059 2367 806 1169
Approach Delay, s/veh 34.8 41.6 120.7 88.5
Approach LOS C D F F
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 18.0 26.0 16.7 59.3 24.0 20.0 17.0 59.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 19.0 14.0 51.0 19.0 13.0 10.0 52.0
Max Q Clear Time (g_c+I1), s 13.9 21.9 12.8 37.6 22.0 16.0 11.5 53.3
Green Ext Time (p_c), s 0.0 0.0 0.1 7.4 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 57.9
HCM 2010 LOS E
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Bkgrd PM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 26 18 58 24 20 17 59
Maximum Split (%) 15.0% 21.7% 15.0% 48.3% 20.0% 16.7% 14.2% 49.2%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 91 65 109 7 65 89 48 109
End Time (s) 109 91 7 65 89 109 65 48
Yield/Force Off (s) 102 84 3 58 84 102 58 41
Yield/Force Off 170(s) 102 84 3 39 84 102 58 25
Local Start Time (s) 50 24 68 86 24 48 7 68
Local Yield (s) 61 43 82 17 43 61 17 0
Local Yield 170(s) 61 43 82 118 43 61 17 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
120: Ziegler Rd & Harmony EB & WB Dual LT Lanes
Harmony Tech Park Filing 5 8/28/2015 Synchro 9 Light Report
Delich Associates lb north am eb-wb dual lt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 175 1935 245 130 1370 440 25 485 85 625 370 85
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 184 2037 138 137 1442 0 26 511 0 658 389 0
Adj No. of Lanes 231231221221
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 268 2093 640 218 1907 618 722 560 251 717 496 222
Arrive On Green 0.07 0.41 0.41 0.06 0.38 0.00 0.21 0.16 0.00 0.21 0.14 0.00
Sat Flow, veh/h 3579 5085 1555 3442 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 184 2037 138 137 1442 0 26 511 0 658 389 0
Grp Sat Flow(s),veh/h/ln 1790 1695 1555 1721 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 6.0 47.2 6.9 4.7 29.7 0.0 0.7 17.0 0.0 22.5 12.7 0.0
Cycle Q Clear(g_c), s 6.0 47.2 6.9 4.7 29.7 0.0 0.7 17.0 0.0 22.5 12.7 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 268 2093 640 218 1907 618 722 560 251 717 496 222
V/C Ratio(X) 0.69 0.97 0.22 0.63 0.76 0.00 0.04 0.91 0.00 0.92 0.78 0.00
Avail Cap(c_a), veh/h 268 2093 640 229 1907 618 722 560 251 717 796 356
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.68 0.68 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 54.1 34.7 22.8 54.8 32.7 0.0 37.8 49.7 0.0 46.5 49.8 0.0
Incr Delay (d2), s/veh 7.1 14.3 0.8 3.4 1.9 0.0 0.0 19.3 0.0 16.8 2.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.3 24.8 3.1 2.3 14.2 0.0 0.3 9.8 0.0 12.4 6.4 0.0
LnGrp Delay(d),s/veh 61.2 48.9 23.6 58.2 34.7 0.0 37.8 69.0 0.0 63.3 52.6 0.0
LnGrp LOS E D C E C D E E D
Approach Vol, veh/h 2359 1579 537 1047
Approach Delay, s/veh 48.4 36.7 67.4 59.3
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 31.2 22.8 10.6 55.4 29.0 25.0 15.0 51.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 14.0 26.0 7.0 48.0 24.0 18.0 8.0 44.0
Max Q Clear Time (g_c+I1), s 2.7 14.7 6.7 49.2 24.5 19.0 8.0 31.7
Green Ext Time (p_c), s 1.6 1.1 0.0 0.0 0.0 0.0 0.0 5.0
Intersection Summary
HCM 2010 Ctrl Delay 49.0
HCM 2010 LOS D
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Bkgrd AM
120: Ziegler Rd & Harmony EB & WB Dual LT Lanes
Harmony Tech Park Filing 5 8/28/2015 Synchro 9 Light Report
Delich Associates lb north am eb-wb dual lt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 21 33 11 55 29 25 15 51
Maximum Split (%) 17.5% 27.5% 9.2% 45.8% 24.2% 20.8% 12.5% 42.5%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 96 63 117 8 63 92 48 117
End Time (s) 117 96 8 63 92 117 63 48
Yield/Force Off (s) 110 89 4 56 87 110 56 41
Yield/Force Off 170(s) 110 89 4 37 87 110 56 25
Local Start Time (s) 55 22 76 87 22 51 7 76
Local Yield (s) 69 48 83 15 46 69 15 0
Local Yield 170(s) 69 48 83 116 46 69 15 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
120: Ziegler Rd & Harmony EB & WB Dual LT Lanes
Harmony Tech Park Filing 5 8/28/2015 Synchro 9 Light Report
Delich Associates lb north pm eb-wb dual lt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 145 1735 285 160 2160 860 335 455 115 570 575 180
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 148 1770 140 163 2204 0 342 464 0 582 587 0
Adj No. of Lanes 231231221221
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 179 2266 693 245 2246 727 414 501 224 631 665 298
Arrive On Green 0.05 0.45 0.45 0.07 0.44 0.00 0.12 0.14 0.00 0.18 0.19 0.00
Sat Flow, veh/h 3579 5085 1556 3442 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 148 1770 140 163 2204 0 342 464 0 582 587 0
Grp Sat Flow(s),veh/h/ln 1790 1695 1556 1721 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 4.9 35.5 6.6 5.5 51.3 0.0 11.6 15.5 0.0 19.9 19.4 0.0
Cycle Q Clear(g_c), s 4.9 35.5 6.6 5.5 51.3 0.0 11.6 15.5 0.0 19.9 19.4 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 179 2266 693 245 2246 727 414 501 224 631 665 298
V/C Ratio(X) 0.83 0.78 0.20 0.67 0.98 0.00 0.83 0.93 0.00 0.92 0.88 0.00
Avail Cap(c_a), veh/h 179 2266 693 258 2246 727 414 501 224 631 678 303
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.33 0.33 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 56.5 28.3 20.3 54.3 33.0 0.0 51.5 50.9 0.0 48.2 47.4 0.0
Incr Delay (d2), s/veh 26.2 2.8 0.7 2.0 7.4 0.0 12.8 23.2 0.0 19.2 12.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.1 17.1 2.9 2.7 25.4 0.0 6.3 9.2 0.0 11.1 10.6 0.0
LnGrp Delay(d),s/veh 82.7 31.0 20.9 56.4 40.4 0.0 64.4 74.1 0.0 67.4 60.3 0.0
LnGrp LOS F C C E D E E E E
Approach Vol, veh/h 2058 2367 806 1169
Approach Delay, s/veh 34.1 41.5 70.0 63.8
Approach LOS C D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 20.4 28.6 11.5 59.5 26.0 23.0 12.0 59.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 13.0 22.0 8.0 52.0 21.0 16.0 5.0 52.0
Max Q Clear Time (g_c+I1), s 13.6 21.4 7.5 37.5 21.9 17.5 6.9 53.3
Green Ext Time (p_c), s 0.0 0.2 0.0 7.8 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 46.8
HCM 2010 LOS D
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Bkgrd PM
120: Ziegler Rd & Harmony EB & WB Dual LT Lanes
Harmony Tech Park Filing 5 8/28/2015 Synchro 9 Light Report
Delich Associates lb north pm eb-wb dual lt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 20 29 12 59 26 23 12 59
Maximum Split (%) 16.7% 24.2% 10.0% 49.2% 21.7% 19.2% 10.0% 49.2%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 60 109 1 60 86 48 109
End Time (s) 109 89 1 60 86 109 60 48
Yield/Force Off (s) 102 82 117 53 81 102 53 41
Yield/Force Off 170(s) 102 82 117 34 81 102 53 25
Local Start Time (s) 48 19 68 80 19 45 7 68
Local Yield (s) 61 41 76 12 40 61 12 0
Local Yield 170(s) 61 41 76 113 40 61 12 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 175 2125 345 225 1875 55 50 0 30 10 0 15
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 184 2237 209 237 1974 55 53 0 0 11 0 0
Adj No. of Lanes 131130210110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 224 3604 1122 276 3753 104 124 2 0 33 2 0
Arrive On Green 0.13 0.71 0.71 0.16 0.74 0.74 0.04 0.00 0.00 0.02 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5086 142 3442 1863 0 1774 1863 0
Grp Volume(v), veh/h 184 2237 209 237 1315 714 53 0 0 11 0 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1838 1721 1863 0 1774 1863 0
Q Serve(g_s), s 12.1 27.5 5.3 15.6 19.9 20.0 1.8 0.0 0.0 0.7 0.0 0.0
Cycle Q Clear(g_c), s 12.1 27.5 5.3 15.6 19.9 20.0 1.8 0.0 0.0 0.7 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.08 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 224 3604 1122 276 2501 1356 124 2 0 33 2 0
V/C Ratio(X) 0.82 0.62 0.19 0.86 0.53 0.53 0.43 0.00 0.00 0.33 0.00 0.00
Avail Cap(c_a), veh/h 237 3604 1122 281 2501 1356 229 171 0 118 171 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.09 0.09 0.09 0.74 0.74 0.74 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 51.1 9.1 5.9 49.4 6.7 6.7 56.6 0.0 0.0 58.2 0.0 0.0
Incr Delay (d2), s/veh 2.1 0.1 0.0 17.4 0.2 0.3 2.3 0.0 0.0 5.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.1 12.7 2.3 9.0 9.2 10.0 0.9 0.0 0.0 0.4 0.0 0.0
LnGrp Delay(d),s/veh 53.2 9.2 5.9 66.8 6.9 7.0 59.0 0.0 0.0 64.0 0.0 0.0
LnGrp LOS D AAEAAE E
Approach Vol, veh/h 2630 2266 53 11
Approach Delay, s/veh 12.0 13.2 59.0 64.0
Approach LOS BBEE
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.3 0.0 22.6 89.0 6.2 2.1 19.1 92.5
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s 7.0 10.0 18.0 65.0 7.0 10.0 15.0 68.0
Max Q Clear Time (g_c+I1), s 3.8 0.0 17.6 29.5 2.7 0.0 14.1 22.0
Green Ext Time (p_c), s 0.0 0.0 0.0 33.9 0.0 0.0 0.0 43.4
Intersection Summary
HCM 2010 Ctrl Delay 13.2
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Bkgrd AM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None Max None C-Max None Max None None
Maximum Split (s) 12 15 23 70 12 15 20 73
Maximum Split (%) 10.0% 12.5% 19.2% 58.3% 10.0% 12.5% 16.7% 60.8%
Minimum Split (s) 11 15 11 15 11 15 11 15
Yellow Time (s) 33333333
All-Red Time (s) 22222222
Minimum Initial (s) 44444444
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s)
Flash Dont Walk (s)
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 0 12 27 50 0 12 27 47
End Time (s) 12 27 50 0 12 27 47 0
Yield/Force Off (s) 7 22 45 115 7 22 42 115
Yield/Force Off 170(s) 7 22 45 115 7 22 42 115
Local Start Time (s) 5 17 32 55 5 17 32 52
Local Yield (s) 12 27 50 0 12 27 47 0
Local Yield 170(s) 12 27 50 0 12 27 47 0
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 3: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 25 2315 80 50 2680 10 365 0 210 75 0 135
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 26 2362 14 51 2735 10 372 0 117 77 0 0
Adj No. of Lanes 131130210110
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 49 2788 868 80 2959 11 458 0 333 112 262 0
Arrive On Green 0.03 0.55 0.55 0.05 0.57 0.57 0.13 0.00 0.21 0.06 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5230 19 3442 0 1583 1774 1863 0
Grp Volume(v), veh/h 26 2362 14 51 1772 973 372 0 117 77 0 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1859 1721 0 1583 1774 1863 0
Q Serve(g_s), s 1.7 47.0 0.5 3.4 57.1 57.2 12.6 0.0 7.6 5.1 0.0 0.0
Cycle Q Clear(g_c), s 1.7 47.0 0.5 3.4 57.1 57.2 12.6 0.0 7.6 5.1 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.01 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 49 2788 868 80 1918 1052 458 0 333 112 262 0
V/C Ratio(X) 0.53 0.85 0.02 0.64 0.92 0.93 0.81 0.00 0.35 0.69 0.00 0.00
Avail Cap(c_a), veh/h 118 2839 884 118 1918 1052 516 0 333 118 262 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.46 0.46 0.46 0.63 0.63 0.63 1.00 0.00 1.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 57.6 22.9 12.4 56.3 23.7 23.7 50.6 0.0 40.4 55.1 0.0 0.0
Incr Delay (d2), s/veh 4.0 1.2 0.0 5.2 5.5 9.3 8.7 0.0 2.9 14.7 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 22.2 0.2 1.8 28.0 31.9 6.5 0.0 3.6 3.0 0.0 0.0
LnGrp Delay(d),s/veh 61.6 24.1 12.4 61.5 29.2 33.0 59.3 0.0 43.3 69.7 0.0 0.0
LnGrp LOS E C B E C C E D E
Approach Vol, veh/h 2402 2796 489 77
Approach Delay, s/veh 24.4 31.1 55.5 69.7
Approach LOS C C E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 20.0 20.8 9.4 69.8 11.6 29.2 7.3 71.9
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s 17.0 10.0 7.0 66.0 7.0 20.0 7.0 66.0
Max Q Clear Time (g_c+I1), s 14.6 0.0 5.4 49.0 7.1 9.6 3.7 59.2
Green Ext Time (p_c), s 0.3 0.0 0.0 15.8 0.0 0.4 0.0 6.7
Intersection Summary
HCM 2010 Ctrl Delay 30.9
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Bkgrd PM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 22 15 12 71 12 25 12 71
Maximum Split (%) 18.3% 12.5% 10.0% 59.2% 10.0% 20.8% 10.0% 59.2%
Minimum Split (s) 11 15 11 15 11 15 11 15
Yellow Time (s) 33333333
All-Red Time (s) 22222222
Minimum Initial (s) 44444444
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s)
Flash Dont Walk (s)
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 83 105 0 12 83 95 0 12
End Time (s) 105 0 12 83 95 0 12 83
Yield/Force Off (s) 100 115 7 78 90 115 7 78
Yield/Force Off 170(s) 100 115 7 78 90 115 7 78
Local Start Time (s) 83 105 0 12 83 95 0 12
Local Yield (s) 100 115 7 78 90 115 7 78
Local Yield 170(s) 100 115 7 78 90 115 7 78
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Red
Splits and Phases: 3: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 120 1695 350 325 1920 180 230 50 70 5 5 5
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 126 1784 229 342 2021 113 242 53 30 5 5 0
Adj No. of Lanes 131231210111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 162 2733 850 561 3202 996 334 138 78 24 75 64
Arrive On Green 0.18 1.00 1.00 0.16 0.63 0.63 0.10 0.12 0.12 0.01 0.04 0.00
Sat Flow, veh/h 1774 5085 1582 3442 5085 1582 3442 1118 633 1774 1863 1583
Grp Volume(v), veh/h 126 1784 229 342 2021 113 242 0 83 5 5 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1582 1721 1695 1582 1721 0 1751 1774 1863 1583
Q Serve(g_s), s 8.1 0.0 0.0 11.1 29.3 3.4 8.2 0.0 5.2 0.3 0.3 0.0
Cycle Q Clear(g_c), s 8.1 0.0 0.0 11.1 29.3 3.4 8.2 0.0 5.2 0.3 0.3 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.36 1.00 1.00
Lane Grp Cap(c), veh/h 162 2733 850 561 3202 996 334 0 217 24 75 64
V/C Ratio(X) 0.78 0.65 0.27 0.61 0.63 0.11 0.73 0.00 0.38 0.21 0.07 0.00
Avail Cap(c_a), veh/h 177 2733 850 561 3202 996 488 0 233 163 155 132
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.51 0.51 0.51 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 47.8 0.0 0.0 46.7 13.7 8.9 52.6 0.0 48.4 58.6 55.4 0.0
Incr Delay (d2), s/veh 9.8 0.6 0.4 1.9 0.4 0.0 3.0 0.0 1.1 4.3 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.4 0.2 0.1 5.4 13.8 1.5 4.0 0.0 2.6 0.2 0.2 0.0
LnGrp Delay(d),s/veh 57.7 0.6 0.4 48.6 14.1 8.9 55.6 0.0 49.5 62.8 55.8 0.0
LnGrp LOS E A A D B A E D E E
Approach Vol, veh/h 2139 2476 325 10
Approach Delay, s/veh 4.0 18.6 54.1 59.3
Approach LOS A B D E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.6 9.8 25.5 70.0 4.6 19.8 14.0 81.6
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 16.0 9.0 8.0 63.5 10.0 15.0 11.0 63.0
Max Q Clear Time (g_c+I1), s 10.2 2.3 13.1 2.0 2.3 7.2 10.1 31.3
Green Ext Time (p_c), s 0.4 0.1 0.0 11.8 0.0 0.1 0.0 14.4
Intersection Summary
HCM 2010 Ctrl Delay 14.7
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Bkgrd AM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 20 15 15 70 14 21 15 70
Maximum Split (%) 16.7% 12.5% 12.5% 58.3% 11.7% 17.5% 12.5% 58.3%
Minimum Split (s) 11 15 11 25.5 11 15 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 10
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 35 55 20 70 35 49 70 85
End Time (s) 55 70 35 20 49 70 85 35
Yield/Force Off (s) 51 64 28 13.5 45 64 81 28
Yield/Force Off 170(s) 51 64 28 1.5 45 64 81 18
Local Start Time (s) 21.5 41.5 6.5 56.5 21.5 35.5 56.5 71.5
Local Yield (s) 37.5 50.5 14.5 0 31.5 50.5 67.5 14.5
Local Yield 170(s) 37.5 50.5 14.5 108 31.5 50.5 67.5 4.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 13.5 (11%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 174: Lady Moon/HP East & Harmony
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 10 2390 200 225 2120 15 520 5 225 160 45 100
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 10 2439 122 230 2163 0 531 5 85 163 46 0
Adj No. of Lanes 131231210111
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 32 2521 784 401 3129 974 602 10 167 203 93 79
Arrive On Green 0.02 0.50 0.50 0.12 0.62 0.00 0.17 0.11 0.11 0.11 0.05 0.00
Sat Flow, veh/h 1774 5085 1582 3442 5085 1583 3442 89 1508 1774 1863 1583
Grp Volume(v), veh/h 10 2439 122 230 2163 0 531 0 90 163 46 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1582 1721 1695 1583 1721 0 1597 1774 1863 1583
Q Serve(g_s), s 0.7 55.8 3.0 7.6 34.2 0.0 18.1 0.0 6.4 10.7 2.9 0.0
Cycle Q Clear(g_c), s 0.7 55.8 3.0 7.6 34.2 0.0 18.1 0.0 6.4 10.7 2.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.94 1.00 1.00
Lane Grp Cap(c), veh/h 32 2521 784 401 3129 974 602 0 177 203 93 79
V/C Ratio(X) 0.32 0.97 0.16 0.57 0.69 0.00 0.88 0.00 0.51 0.80 0.49 0.00
Avail Cap(c_a), veh/h 118 2521 784 401 3129 974 602 0 213 222 155 132
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.49 0.49 0.49 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 58.2 29.3 5.9 50.2 15.4 0.0 48.3 0.0 50.3 51.8 55.5 0.0
Incr Delay (d2), s/veh 2.8 7.0 0.2 2.0 0.7 0.0 14.3 0.0 2.3 17.5 4.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 27.6 1.3 3.7 16.0 0.0 9.8 0.0 2.9 6.2 1.6 0.0
LnGrp Delay(d),s/veh 61.0 36.3 6.1 52.2 16.1 0.0 62.6 0.0 52.6 69.3 59.5 0.0
LnGrp LOS E D A D B E D E E
Approach Vol, veh/h 2571 2393 621 209
Approach Delay, s/veh 35.0 19.6 61.1 67.1
Approach LOS C B E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 24.0 11.0 20.0 65.0 16.8 18.3 5.1 79.8
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 20.0 9.0 9.0 58.5 14.0 15.0 7.0 63.0
Max Q Clear Time (g_c+I1), s 20.1 4.9 9.6 57.8 12.7 8.4 2.7 36.2
Green Ext Time (p_c), s 0.0 0.1 0.0 0.7 0.1 0.2 0.0 13.2
Intersection Summary
HCM 2010 Ctrl Delay 32.6
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Bkgrd PM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 24 15 16 65 18 21 11 70
Maximum Split (%) 20.0% 12.5% 13.3% 54.2% 15.0% 17.5% 9.2% 58.3%
Minimum Split (s) 11 15 11 25.5 11 15 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 10
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 17.5 41.5 1.5 56.5 17.5 35.5 56.5 67.5
End Time (s) 41.5 56.5 17.5 1.5 35.5 56.5 67.5 17.5
Yield/Force Off (s) 37.5 50.5 10.5 115 31.5 50.5 63.5 10.5
Yield/Force Off 170(s) 37.5 50.5 10.5 103 31.5 50.5 63.5 0.5
Local Start Time (s) 22.5 46.5 6.5 61.5 22.5 40.5 61.5 72.5
Local Yield (s) 42.5 55.5 15.5 0 36.5 55.5 68.5 15.5
Local Yield 170(s) 42.5 55.5 15.5 108 36.5 55.5 68.5 5.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 174: Lady Moon/HP East & Harmony
HCM 2010 TWSC Long Bkgrd AM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Intersection
Int Delay, s/veh 0.5
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 55 295 20 0 680
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 58 311 21 0 716
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1037 321 0 0 332 0
Stage 1 321 - - - - -
Stage 2 716 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 256 720 - - 1227 -
Stage 1 735 - - - - -
Stage 2 484 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 256 720 - - 1227 -
Mov Cap-2 Maneuver 375 - - - - -
Stage 1 735 - - - - -
Stage 2 484 - - - - -
Approach WB NB SB
HCM Control Delay, s 10.4 0 0
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 720 1227 -
HCM Lane V/C Ratio - - 0.08 - -
HCM Control Delay (s) - - 10.4 0 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.3 0 -
Lanes and Geometrics Long Bkgrd AM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.991
Flt Protected
Satd. Flow (prot) 0 1611 1846 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1846 0 0 1863
Link Speed (mph) 30 25 25
Link Distance (ft) 169 260 464
Travel Time (s) 3.8 7.1 12.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Intersection
Int Delay, s/veh 1.5
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 120 630 15 0 470
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 126 663 16 0 495
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1166 671 0 0 679 0
Stage 1 671 - - - - -
Stage 2 495 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 214 456 - - 913 -
Stage 1 508 - - - - -
Stage 2 613 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 214 456 - - 913 -
Mov Cap-2 Maneuver 214 - - - - -
Stage 1 508 - - - - -
Stage 2 613 - - - - -
Approach WB NB SB
HCM Control Delay, s 15.9 0 0
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 456 913 -
HCM Lane V/C Ratio - - 0.277 - -
HCM Control Delay (s) - - 15.9 0 -
HCM Lane LOS - - C A -
HCM 95th %tile Q(veh) - - 1.1 0 -
Lanes and Geometrics Long Bkgrd PM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.997
Flt Protected
Satd. Flow (prot) 0 1611 1857 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1857 0 0 1863
Link Speed (mph) 30 25 25
Link Distance (ft) 169 333 391
Travel Time (s) 3.8 9.1 10.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd AM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 10 30 15 35 10 30 40 275 45 180 410 90
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 160 - - - 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 32 16 37 11 32 42 289 47 189 432 95
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1276 1279 479 1271 1302 313 526 0 0 337 0 0
Stage 1 858 858 - 397 397 - - - - - - -
Stage 2 418 421 - 874 905 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 144 166 587 145 161 727 1041 - - 1222 - -
Stage 1 352 374 - 629 603 - - - - - - -
Stage 2 612 589 - 344 355 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 111 135 587 100 131 727 1041 - - 1222 - -
Mov Cap-2 Maneuver 111 135 - 100 131 - - - - - - -
Stage 1 338 316 - 604 579 - - - - - - -
Stage 2 552 565 - 255 300 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 36.8 47.6 1 2.2
HCM LOS E E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1041 - - 128 587 160 1222 - -
HCM Lane V/C Ratio 0.04 - - 0.329 0.027 0.493 0.155 - -
HCM Control Delay (s) 8.6 - - 46.3 11.3 47.6 8.5 - -
HCM Lane LOS A - - EBEA--
HCM 95th %tile Q(veh) 0.1 - - 1.3 0.1 2.4 0.5 - -
Lanes and Geometrics Long Bkgrd AM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 160 0 0 100 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.946 0.979 0.973
Flt Protected 0.987 0.977 0.950 0.950
Satd. Flow (prot) 0 1839 1583 0 1722 0 1770 1824 0 1770 1812 0
Flt Permitted 0.987 0.977 0.950 0.950
Satd. Flow (perm) 0 1839 1583 0 1722 0 1770 1824 0 1770 1812 0
Link Speed (mph) 30 30 25 25
Link Distance (ft) 338 220 457 260
Travel Time (s) 7.7 5.0 12.5 7.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Intersection
Int Delay, s/veh 18.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 90 15 45 55 35 80 5 475 25 100 350 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 160 - - - 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 95 16 47 58 37 84 5 500 26 105 368 21
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1173 1126 379 1121 1124 513 389 0 0 526 0 0
Stage 1 589 589 - 524 524 - - - - - - -
Stage 2 584 537 - 597 600 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 169 205 668 183 205 561 1170 - - 1041 - -
Stage 1 494 495 - 537 530 - - - - - - -
Stage 2 498 523 - 490 490 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 112 184 668 146 184 561 1170 - - 1041 - -
Mov Cap-2 Maneuver 112 184 - 146 184 - - - - - - -
Stage 1 492 445 - 535 528 - - - - - - -
Stage 2 392 521 - 395 441 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 96.2 53.9 0.1 1.9
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1170 - - 119 668 240 1041 - -
HCM Lane V/C Ratio 0.004 - - 0.929 0.071 0.746 0.101 - -
HCM Control Delay (s) 8.1 - - 132.8 10.8 53.9 8.8 - -
HCM Lane LOS A - - F B F A - -
HCM 95th %tile Q(veh) 0 - - 5.9 0.2 5.2 0.3 - -
Lanes and Geometrics Long Bkgrd PM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 160 0 0 100 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.937 0.993 0.992
Flt Protected 0.959 0.984 0.950 0.950
Satd. Flow (prot) 0 1786 1583 0 1717 0 1770 1850 0 1770 1848 0
Flt Permitted 0.959 0.984 0.950 0.950
Satd. Flow (perm) 0 1786 1583 0 1717 0 1770 1850 0 1770 1848 0
Link Speed (mph) 30 30 25 25
Link Distance (ft) 335 220 457 333
Travel Time (s) 7.6 5.0 12.5 9.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd AM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Intersection
Int Delay, s/veh 3.4
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 45 65 100 40 5 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 47 68 105 42 5 11
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 116 0 335 82
Stage 1 - - - - 82 -
Stage 2 - - - - 253 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1473 - 660 978
Stage 1 - - - - 941 -
Stage 2 - - - - 789 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1473 - 612 978
Mov Cap-2 Maneuver - - - - 612 -
Stage 1 - - - - 941 -
Stage 2 - - - - 731 -
Approach EB WB NB
HCM Control Delay, s 0 5.5 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 815 - - 1473 -
HCM Lane V/C Ratio 0.019 - - 0.071 -
HCM Control Delay (s) 9.5 - - 7.6 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.1 - - 0.2 -
Lanes and Geometrics Long Bkgrd AM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.920 0.907
Flt Protected 0.966 0.985
Satd. Flow (prot) 1714 0 0 1799 1664 0
Flt Permitted 0.966 0.985
Satd. Flow (perm) 1714 0 0 1799 1664 0
Link Speed (mph) 30 30 30
Link Distance (ft) 415 338 219
Travel Time (s) 9.4 7.7 5.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Intersection
Int Delay, s/veh 6.2
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 50 15 20 40 70 100
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 53 16 21 42 74 105
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 68 0 145 61
Stage 1 - - - - 61 -
Stage 2 - - - - 84 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1533 - 847 1004
Stage 1 - - - - 962 -
Stage 2 - - - - 939 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1533 - 835 1004
Mov Cap-2 Maneuver - - - - 835 -
Stage 1 - - - - 962 -
Stage 2 - - - - 926 -
Approach EB WB NB
HCM Control Delay, s 0 2.5 9.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 927 - - 1533 -
HCM Lane V/C Ratio 0.193 - - 0.014 -
HCM Control Delay (s) 9.8 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.7 - - 0 -
Lanes and Geometrics Long Bkgrd PM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.969 0.921
Flt Protected 0.984 0.980
Satd. Flow (prot) 1805 0 0 1833 1681 0
Flt Permitted 0.984 0.980
Satd. Flow (perm) 1805 0 0 1833 1681 0
Link Speed (mph) 30 30 30
Link Distance (ft) 457 335 198
Travel Time (s) 10.4 7.6 4.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd AM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 95 105 20 25 15 5 5 0 5 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 100 111 21 26 16 5 5 0 5 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 21 0 0 132 0 0 395 395 121 395 403 18
Stage 1 - - - - - - 321 321 - 71 71 -
Stage 2 - - - - - - 74 74 - 324 332 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1595 - - 1453 - - 565 542 930 565 536 1061
Stage 1 - - - - - - 691 652 - 939 836 -
Stage 2 - - - - - - 935 833 - 688 644 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1595 - - 1453 - - 526 496 930 525 491 1061
Mov Cap-2 Maneuver - - - - - - 526 496 - 525 491 -
Stage 1 - - - - - - 644 608 - 875 821 -
Stage 2 - - - - - - 914 818 - 638 600 -
Approach EB WB NB SB
HCM Control Delay, s 3.2 4.2 10.4 8.4
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 672 1595 - - 1453 - - 1061
HCM Lane V/C Ratio 0.016 0.063 - - 0.018 - - 0.005
HCM Control Delay (s) 10.4 7.4 0 - 7.5 0 - 8.4
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0 0.2 - - 0.1 - - 0
Lanes and Geometrics Long Bkgrd AM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.988 0.986 0.932 0.865
Flt Protected 0.979 0.973 0.976
Satd. Flow (prot) 0 1802 0 0 1787 0 0 1694 0 0 1611 0
Flt Permitted 0.979 0.973 0.976
Satd. Flow (perm) 0 1802 0 0 1787 0 0 1694 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 579 415 198 209
Travel Time (s) 13.2 9.4 4.5 4.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 20 35 5 5 105 0 20 0 25 5 0 40
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 21 37 5 5 111 0 21 0 26 5 0 42
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 111 0 0 42 0 0 224 203 39 216 205 111
Stage 1 - - - - - - 82 82 - 121 121 -
Stage 2 - - - - - - 142 121 - 95 84 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1479 - - 1567 - - 732 693 1033 740 691 942
Stage 1 - - - - - - 926 827 - 883 796 -
Stage 2 - - - - - - 861 796 - 912 825 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1479 - - 1567 - - 690 681 1033 711 679 942
Mov Cap-2 Maneuver - - - - - - 690 681 - 711 679 -
Stage 1 - - - - - - 912 815 - 870 794 -
Stage 2 - - - - - - 820 794 - 875 813 -
Approach EB WB NB SB
HCM Control Delay, s 2.5 0.3 9.5 9.2
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 846 1479 - - 1567 - - 909
HCM Lane V/C Ratio 0.056 0.014 - - 0.003 - - 0.052
HCM Control Delay (s) 9.5 7.5 0 - 7.3 0 - 9.2
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0.2
Lanes and Geometrics Long Bkgrd PM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.989 0.925 0.879
Flt Protected 0.984 0.998 0.978 0.995
Satd. Flow (prot) 0 1813 0 0 1859 0 0 1685 0 0 1629 0
Flt Permitted 0.984 0.998 0.978 0.995
Satd. Flow (perm) 0 1813 0 0 1859 0 0 1685 0 0 1629 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 540 457 204 209
Travel Time (s) 12.3 10.4 4.6 4.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd AM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/27/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Intersection
Int Delay, s/veh 2.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 15 0 5 15 0 10 20 45 85 135 385 50
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - 160 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 16 0 5 16 0 11 21 47 89 142 405 53
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 850 895 432 852 876 92 458 0 0 137 0 0
Stage 1 716 716 - 134 134 - - - - - - -
Stage 2 134 179 - 718 742 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 280 280 624 280 287 965 1103 - - 1447 - -
Stage 1 421 434 - 869 785 - - - - - - -
Stage 2 869 751 - 420 422 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 252 248 624 253 254 965 1103 - - 1447 - -
Mov Cap-2 Maneuver 252 248 - 253 254 - - - - - - -
Stage 1 413 391 - 852 770 - - - - - - -
Stage 2 843 737 - 376 381 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 18.1 15.6 1.1 1.8
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1103 - - 296 253 965 1447 - -
HCM Lane V/C Ratio 0.019 - - 0.071 0.062 0.011 0.098 - -
HCM Control Delay (s) 8.3 - - 18.1 20.2 8.8 7.8 - -
HCM Lane LOS A - - C C A A - -
HCM 95th %tile Q(veh) 0.1 - - 0.2 0.2 0 0.3 - -
Lanes and Geometrics Long Bkgrd AM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/27/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 160 100 0 100 100
Storage Lanes 0 0 0 1 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.968 0.850 0.902 0.983
Flt Protected 0.963 0.950 0.950 0.950
Satd. Flow (prot) 0 1736 0 0 1770 1583 1770 1680 0 1770 1831 0
Flt Permitted 0.963 0.950 0.950 0.950
Satd. Flow (perm) 0 1736 0 0 1770 1583 1770 1680 0 1770 1831 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 169 579 1380 297
Travel Time (s) 3.8 13.2 31.4 6.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 60 0 20 95 0 70 5 395 35 25 90 15
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - 160 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 63 0 21 100 0 74 5 416 37 26 95 16
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 600 618 103 611 608 434 111 0 0 453 0 0
Stage 1 155 155 - 445 445 - - - - - - -
Stage 2 445 463 - 166 163 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 413 405 952 406 410 622 1479 - - 1108 - -
Stage 1 847 769 - 592 575 - - - - - - -
Stage 2 592 564 - 836 763 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 357 394 952 389 399 622 1479 - - 1108 - -
Mov Cap-2 Maneuver 357 394 - 389 399 - - - - - - -
Stage 1 844 751 - 590 573 - - - - - - -
Stage 2 520 562 - 798 745 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.6 14.9 0.1 1.6
HCM LOS C B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1479 - - 423 389 622 1108 - -
HCM Lane V/C Ratio 0.004 - - 0.199 0.257 0.118 0.024 - -
HCM Control Delay (s) 7.4 - - 15.6 17.4 11.6 8.3 - -
HCM Lane LOS A - - C C B A - -
HCM 95th %tile Q(veh) 0 - - 0.7 1 0.4 0.1 - -
Lanes and Geometrics Long Bkgrd PM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 160 100 0 100 100
Storage Lanes 0 0 0 1 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.966 0.850 0.988 0.978
Flt Protected 0.964 0.950 0.950 0.950
Satd. Flow (prot) 0 1735 0 0 1770 1583 1770 1840 0 1770 1822 0
Flt Permitted 0.964 0.950 0.950 0.950
Satd. Flow (perm) 0 1735 0 0 1770 1583 1770 1840 0 1770 1822 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 169 540 1380 297
Travel Time (s) 3.8 12.3 31.4 6.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd AM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 15 65 5 0 570
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 16 68 5 0 600
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 671 71 0 0 74 0
Stage 1 71 - - - - -
Stage 2 600 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 422 991 - - 1526 -
Stage 1 952 - - - - -
Stage 2 548 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 422 991 - - 1526 -
Mov Cap-2 Maneuver 422 - - - - -
Stage 1 952 - - - - -
Stage 2 548 - - - - -
Approach WB NB SB
HCM Control Delay, s 8.7 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 991 1526 -
HCM Lane V/C Ratio - - 0.016 - -
HCM Control Delay (s) - - 8.7 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0 0 -
Lanes and Geometrics Long Bkgrd AM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north am.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.991
Flt Protected
Satd. Flow (prot) 0 1611 1846 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1846 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 239 297 357
Travel Time (s) 5.4 6.8 8.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Intersection
Int Delay, s/veh 0.9
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 50 525 0 0 120
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 53 553 0 0 126
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 679 553 0 0 553 0
Stage 1 553 - - - - -
Stage 2 126 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 417 533 - - 1017 -
Stage 1 576 - - - - -
Stage 2 900 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 417 533 - - 1017 -
Mov Cap-2 Maneuver 417 - - - - -
Stage 1 576 - - - - -
Stage 2 900 - - - - -
Approach WB NB SB
HCM Control Delay, s 12.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 533 1017 -
HCM Lane V/C Ratio - - 0.099 - -
HCM Control Delay (s) - - 12.5 0 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.3 0 -
Lanes and Geometrics Long Bkgrd PM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lb north pm.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865
Flt Protected
Satd. Flow (prot) 0 1611 1863 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1863 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 239 297 357
Travel Time (s) 5.4 6.8 8.1
Intersection Summary
Area Type: Other
APPENDIX G
HCM 2010 Signalized Intersection Summary Short Total AM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 164 1198 170 120 1478 531 254 392 83 617 242 74
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 182 1331 170 133 1642 0 282 436 82 686 269 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 215 1751 224 163 1695 549 841 496 93 688 374 167
Arrive On Green 0.12 0.38 0.38 0.09 0.33 0.00 0.24 0.17 0.16 0.20 0.11 0.00
Sat Flow, veh/h 1845 4567 583 1774 5085 1647 3442 2978 556 3442 3539 1583
Grp Volume(v), veh/h 182 988 513 133 1642 0 282 258 260 686 269 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1760 1774 1695 1647 1721 1770 1765 1721 1770 1583
Q Serve(g_s), s 11.6 30.4 30.5 8.8 38.1 0.0 8.1 17.1 17.3 23.9 8.8 0.0
Cycle Q Clear(g_c), s 11.6 30.4 30.5 8.8 38.1 0.0 8.1 17.1 17.3 23.9 8.8 0.0
Prop In Lane 1.00 0.33 1.00 1.00 1.00 0.32 1.00 1.00
Lane Grp Cap(c), veh/h 215 1300 675 163 1695 549 841 295 294 688 374 167
V/C Ratio(X) 0.85 0.76 0.76 0.82 0.97 0.00 0.34 0.87 0.88 1.00 0.72 0.00
Avail Cap(c_a), veh/h 215 1300 675 163 1695 549 841 295 294 688 885 396
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.43 0.43 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.9 32.2 32.4 53.5 39.4 0.0 37.3 48.8 49.0 48.0 51.9 0.0
Incr Delay (d2), s/veh 25.4 4.2 7.9 13.1 8.7 0.0 0.2 23.9 25.7 33.4 2.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.4 15.0 16.3 4.9 19.2 0.0 3.9 10.3 10.6 14.5 4.5 0.0
LnGrp Delay(d),s/veh 77.3 36.4 40.2 66.6 48.1 0.0 37.5 72.7 74.7 81.4 54.6 0.0
LnGrp LOS E D D E D D E E F D
Approach Vol, veh/h 1683 1775 800 955
Approach Delay, s/veh 42.0 49.5 61.0 73.8
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 35.3 18.7 14.0 52.0 28.0 26.0 20.0 46.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 29.0 10.0 45.0 23.0 19.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 10.1 10.8 10.8 32.5 25.9 19.3 13.6 40.1
Green Ext Time (p_c), s 0.3 0.8 0.0 5.3 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 53.3
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Total AM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 36 14 52 28 26 20 46
Maximum Split (%) 15.0% 30.0% 11.7% 43.3% 23.3% 21.7% 16.7% 38.3%
Minimum Split (s) 11 39 11 34 11 39 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 12 96 30 44 96 4 76 30
End Time (s) 30 12 44 96 4 30 96 76
Yield/Force Off (s) 23 5 40 89 119 23 89 69
Yield/Force Off 170(s) 23 5 40 70 119 23 89 53
Local Start Time (s) 63 27 81 95 27 55 7 81
Local Yield (s) 74 56 91 20 50 74 20 0
Local Yield 170(s) 74 56 91 1 50 74 20 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 135
Offset: 69 (58%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Total PM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 133 1677 255 137 1465 853 264 307 105 698 466 165
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1900 1863 1863 1937 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 141 1784 253 146 1559 0 281 327 82 743 496 0
Adj No. of Lanes 130131220221
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 169 1840 259 148 1907 618 551 395 98 717 608 272
Arrive On Green 0.09 0.41 0.40 0.08 0.38 0.00 0.16 0.14 0.13 0.21 0.17 0.00
Sat Flow, veh/h 1845 4506 635 1774 5085 1647 3442 2814 696 3442 3539 1583
Grp Volume(v), veh/h 141 1339 698 146 1559 0 281 204 205 743 496 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1751 1774 1695 1647 1721 1770 1740 1721 1770 1583
Q Serve(g_s), s 9.0 46.3 47.1 9.9 33.2 0.0 9.0 13.4 13.8 25.0 16.2 0.0
Cycle Q Clear(g_c), s 9.0 46.3 47.1 9.9 33.2 0.0 9.0 13.4 13.8 25.0 16.2 0.0
Prop In Lane 1.00 0.36 1.00 1.00 1.00 0.40 1.00 1.00
Lane Grp Cap(c), veh/h 169 1384 715 148 1907 618 551 248 244 717 608 272
V/C Ratio(X) 0.83 0.97 0.98 0.99 0.82 0.00 0.51 0.82 0.84 1.04 0.82 0.00
Avail Cap(c_a), veh/h 169 1384 715 148 1907 618 551 251 246 717 885 396
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.61 0.61 0.00 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 53.6 34.7 35.1 54.9 33.8 0.0 46.1 50.1 50.5 47.5 47.9 0.0
Incr Delay (d2), s/veh 28.6 17.5 28.4 54.1 2.5 0.0 0.8 19.1 21.9 43.3 3.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.9 24.9 28.3 7.0 15.9 0.0 4.3 7.9 8.1 16.2 8.3 0.0
LnGrp Delay(d),s/veh 82.2 52.2 63.5 109.0 36.3 0.0 46.9 69.2 72.4 90.8 51.7 0.0
LnGrp LOS F D E F D D E E F D
Approach Vol, veh/h 2178 1705 690 1239
Approach Delay, s/veh 57.8 42.5 61.0 75.2
Approach LOS E D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 25.2 26.6 13.0 55.0 29.0 22.8 17.0 51.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 9.0 29.0 9.0 48.0 24.0 16.0 10.0 44.0
Max Q Clear Time (g_c+I1), s 11.0 18.2 11.9 49.1 27.0 15.8 11.0 35.2
Green Ext Time (p_c), s 0.0 1.4 0.0 0.0 0.0 0.0 0.0 4.4
Intersection Summary
HCM 2010 Ctrl Delay 57.4
HCM 2010 LOS E
Timing Report, Sorted By Phase Short Total PM
12: Harmony & Ziegler
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 16 36 13 55 29 23 17 51
Maximum Split (%) 13.3% 30.0% 10.8% 45.8% 24.2% 19.2% 14.2% 42.5%
Minimum Split (s) 11 39 11 34 11 39 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 101 65 117 10 65 94 48 117
End Time (s) 117 101 10 65 94 117 65 48
Yield/Force Off (s) 110 94 6 58 89 110 58 41
Yield/Force Off 170(s) 110 94 6 39 89 110 58 25
Local Start Time (s) 60 24 76 89 24 53 7 76
Local Yield (s) 69 53 85 17 48 69 17 0
Local Yield 170(s) 69 53 85 118 48 69 17 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 145
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Total AM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates st am nb rt & eb rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 164 1198 170 120 1478 531 254 392 83 617 242 74
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 182 1331 73 133 1642 0 282 436 0 686 269 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 215 1949 594 163 1695 549 804 522 220 717 374 167
Arrive On Green 0.12 0.38 0.38 0.09 0.33 0.00 0.23 0.15 0.00 0.21 0.11 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 182 1331 73 133 1642 0 282 436 0 686 269 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 11.6 26.2 3.6 8.8 38.1 0.0 8.2 14.4 0.0 23.6 8.8 0.0
Cycle Q Clear(g_c), s 11.6 26.2 3.6 8.8 38.1 0.0 8.2 14.4 0.0 23.6 8.8 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 215 1949 594 163 1695 549 804 522 220 717 374 167
V/C Ratio(X) 0.85 0.68 0.12 0.82 0.97 0.00 0.35 0.84 0.00 0.96 0.72 0.00
Avail Cap(c_a), veh/h 215 1949 594 163 1695 549 804 560 237 717 885 396
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.43 0.43 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.9 30.9 24.6 53.5 39.4 0.0 38.4 49.7 0.0 47.0 51.9 0.0
Incr Delay (d2), s/veh 25.4 2.0 0.4 13.1 8.7 0.0 0.3 10.0 0.0 23.5 2.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.4 12.6 1.7 4.9 19.2 0.0 3.9 7.8 0.0 13.6 4.5 0.0
LnGrp Delay(d),s/veh 77.3 32.9 25.0 66.6 48.1 0.0 38.7 59.8 0.0 70.4 54.6 0.0
LnGrp LOS E C C E D D E E D
Approach Vol, veh/h 1586 1775 718 955
Approach Delay, s/veh 37.6 49.5 51.5 66.0
Approach LOS D D D E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 34.0 18.7 14.0 52.0 29.0 23.7 20.0 46.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 29.0 10.0 45.0 24.0 18.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 10.2 10.8 10.8 28.2 25.6 16.4 13.6 40.1
Green Ext Time (p_c), s 0.3 0.8 0.0 6.0 0.0 0.3 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 49.1
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Total AM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates st am nb rt & eb rt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 36 14 52 29 25 20 46
Maximum Split (%) 15.0% 30.0% 11.7% 43.3% 24.2% 20.8% 16.7% 38.3%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 12 96 30 44 96 5 76 30
End Time (s) 30 12 44 96 5 30 96 76
Yield/Force Off (s) 23 5 40 89 0 23 89 69
Yield/Force Off 170(s) 23 5 40 70 0 23 89 53
Local Start Time (s) 63 27 81 95 27 56 7 81
Local Yield (s) 74 56 91 20 51 74 20 0
Local Yield 170(s) 74 56 91 1 51 74 20 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 69 (58%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Total PM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates st pm nb rt & eb rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 133 1677 255 137 1465 853 264 307 105 698 466 165
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 141 1784 154 146 1559 0 281 327 0 743 496 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 222222222222
Cap, veh/h 200 2034 620 177 1865 604 499 412 171 746 607 271
Arrive On Green 0.11 0.40 0.39 0.10 0.37 0.00 0.15 0.12 0.00 0.22 0.17 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 141 1784 154 146 1559 0 281 327 0 743 496 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 8.9 38.9 7.9 9.7 33.6 0.0 9.1 10.8 0.0 25.9 16.2 0.0
Cycle Q Clear(g_c), s 8.9 38.9 7.9 9.7 33.6 0.0 9.1 10.8 0.0 25.9 16.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 200 2034 620 177 1865 604 499 412 171 746 607 271
V/C Ratio(X) 0.71 0.88 0.25 0.82 0.84 0.00 0.56 0.79 0.00 1.00 0.82 0.00
Avail Cap(c_a), veh/h 200 2034 620 177 1865 604 499 442 185 746 855 383
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.61 0.61 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.7 33.3 24.6 53.0 34.7 0.0 47.7 51.6 0.0 47.0 47.9 0.0
Incr Delay (d2), s/veh 10.7 5.7 1.0 17.1 2.9 0.0 1.4 9.0 0.0 32.0 4.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.1 19.2 3.6 5.6 16.2 0.0 4.4 5.8 0.0 15.6 8.3 0.0
LnGrp Delay(d),s/veh 62.4 39.0 25.6 70.0 37.6 0.0 49.2 60.6 0.0 79.0 52.2 0.0
LnGrp LOS E D C E D D E E D
Approach Vol, veh/h 2079 1705 608 1239
Approach Delay, s/veh 39.6 40.4 55.3 68.3
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 23.4 26.6 15.0 54.0 30.0 20.0 19.0 50.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 9.0 28.0 11.0 47.0 25.0 14.0 12.0 43.0
Max Q Clear Time (g_c+I1), s 11.1 18.2 11.7 40.9 27.9 12.8 10.9 35.6
Green Ext Time (p_c), s 0.0 1.4 0.0 4.2 0.0 0.2 0.9 3.9
Intersection Summary
HCM 2010 Ctrl Delay 47.8
HCM 2010 LOS D
Timing Report, Sorted By Phase Short Total PM
12: Harmony & Ziegler EB & NB RT Lanes
8/27/2015 Synchro 9 Light Report
Delich Associates st pm nb rt & eb rt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 16 35 15 54 30 21 19 50
Maximum Split (%) 13.3% 29.2% 12.5% 45.0% 25.0% 17.5% 15.8% 41.7%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 102 67 118 13 67 97 48 118
End Time (s) 118 102 13 67 97 118 67 48
Yield/Force Off (s) 111 95 9 60 92 111 60 41
Yield/Force Off 170(s) 111 95 9 41 92 111 60 25
Local Start Time (s) 61 26 77 92 26 56 7 77
Local Yield (s) 70 54 88 19 51 70 19 0
Local Yield 170(s) 70 54 88 0 51 70 19 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 12: Harmony & Ziegler
HCM 2010 Signalized Intersection Summary Short Total AM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 173 1593 132 11 2042 52 75 034012
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 192 1770 90 12 2269 56 83 00400
Adj No. of Lanes 131130110110
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 234 3199 996 103 2942 72 307 326 0 307 326 0
Arrive On Green 0.13 0.63 0.63 0.06 0.58 0.57 0.17 0.00 0.00 0.17 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5105 126 1412 1863 0 1412 1863 0
Grp Volume(v), veh/h 192 1770 90 12 1505 820 83 00400
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1841 1412 1863 0 1412 1863 0
Q Serve(g_s), s 12.6 23.8 2.7 0.8 40.6 40.9 6.2 0.0 0.0 0.3 0.0 0.0
Cycle Q Clear(g_c), s 12.6 23.8 2.7 0.8 40.6 40.9 6.2 0.0 0.0 0.3 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.07 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 234 3199 996 103 1954 1061 307 326 0 307 326 0
V/C Ratio(X) 0.82 0.55 0.09 0.12 0.77 0.77 0.27 0.00 0.00 0.01 0.00 0.00
Avail Cap(c_a), veh/h 310 3199 996 103 1954 1061 307 326 0 307 326 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.40 0.40 0.40 0.75 0.75 0.75 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 50.7 12.7 8.7 53.6 19.4 19.5 43.4 0.0 0.0 41.0 0.0 0.0
Incr Delay (d2), s/veh 5.3 0.3 0.1 0.4 1.5 2.7 2.2 0.0 0.0 0.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.5 11.1 1.2 0.4 19.2 21.5 2.6 0.0 0.0 0.1 0.0 0.0
LnGrp Delay(d),s/veh 56.0 12.9 8.8 53.9 20.8 22.2 45.5 0.0 0.0 41.0 0.0 0.0
LnGrp LOS E B A DCCD D
Approach Vol, veh/h 2052 2337 83 4
Approach Delay, s/veh 16.8 21.5 45.5 41.0
Approach LOS B C D D
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 26.0 13.0 81.0 26.0 18.8 75.2
Change Period (Y+Rc), s 6.0 7.0 6.5 6.0 4.0 7.0
Max Green Setting (Gmax), s 20.0 6.0 74.5 20.0 20.0 63.0
Max Q Clear Time (g_c+I1), s 2.3 2.8 25.8 8.2 14.6 42.9
Green Ext Time (p_c), s 0.2 1.7 10.4 0.1 0.2 10.4
Intersection Summary
HCM 2010 Ctrl Delay 19.8
HCM 2010 LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Total AM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Phase Number 234678
Movement SBTL WBL EBT NBTL EBL WBT
Lead/Lag Lag Lead Lead Lag
Lead-Lag Optimize
Recall Mode Max None C-Max Max None None
Maximum Split (s) 26 13 81 26 24 70
Maximum Split (%) 21.7% 10.8% 67.5% 21.7% 20.0% 58.3%
Minimum Split (s) 15 11 25.5 15 8 26
Yellow Time (s) 3 5.5 5.5 3 3 5.5
All-Red Time (s) 3 1.5 1 3 1 1.5
Minimum Initial (s) 444444
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 29 12 29 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 61 48 87 61 87 111
End Time (s) 87 61 48 87 111 61
Yield/Force Off (s) 81 54 41.5 81 107 54
Yield/Force Off 170(s) 52 54 29.5 52 107 42
Local Start Time (s) 19.5 6.5 45.5 19.5 45.5 69.5
Local Yield (s) 39.5 12.5 0 39.5 65.5 12.5
Local Yield 170(s) 10.5 12.5 108 10.5 65.5 0.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 41.5 (35%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 8: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Short Total PM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 21 2364 95 4 2197 7 124 0 11 58 0 134
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 21 2412 58 4 2242 7 127 0 0 59 0 34
Adj No. of Lanes 131130110110
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 45 3030 943 103 3401 11 321 388 0 354 0 330
Arrive On Green 0.03 0.60 0.60 0.06 0.65 0.64 0.21 0.00 0.00 0.21 0.00 0.20
Sat Flow, veh/h 1774 5085 1583 1774 5234 16 1369 1863 0 1412 0 1583
Grp Volume(v), veh/h 21 2412 58 4 1452 797 127 0 0 59 0 34
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1860 1369 1863 0 1412 0 1583
Q Serve(g_s), s 1.4 43.8 1.8 0.3 31.5 31.5 9.9 0.0 0.0 4.1 0.0 2.1
Cycle Q Clear(g_c), s 1.4 43.8 1.8 0.3 31.5 31.5 12.0 0.0 0.0 4.1 0.0 2.1
Prop In Lane 1.00 1.00 1.00 0.01 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 45 3030 943 103 2203 1209 321 388 0 354 0 330
V/C Ratio(X) 0.47 0.80 0.06 0.04 0.66 0.66 0.40 0.00 0.00 0.17 0.00 0.10
Avail Cap(c_a), veh/h 148 3030 943 103 2203 1209 321 388 0 354 0 330
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.09 0.09 0.09 0.79 0.79 0.79 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 57.7 18.6 10.2 53.3 12.9 12.9 43.3 0.0 0.0 39.2 0.0 38.8
Incr Delay (d2), s/veh 0.7 0.2 0.0 0.1 0.6 1.1 3.6 0.0 0.0 1.0 0.0 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 20.4 0.8 0.1 14.7 16.3 4.1 0.0 0.0 1.7 0.0 1.0
LnGrp Delay(d),s/veh 58.4 18.9 10.2 53.4 13.4 13.9 46.9 0.0 0.0 40.3 0.0 39.5
LnGrp LOS E B B D B B D D D
Approach Vol, veh/h 2491 2253 127 93
Approach Delay, s/veh 19.0 13.7 46.9 40.0
Approach LOS B B D D
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 30.0 13.0 77.0 30.0 6.0 84.0
Change Period (Y+Rc), s 6.0 7.0 6.5 6.0 4.0 7.0
Max Green Setting (Gmax), s 24.0 6.0 70.5 24.0 9.0 70.0
Max Q Clear Time (g_c+I1), s 6.1 2.3 45.8 14.0 3.4 33.5
Green Ext Time (p_c), s 0.6 1.3 13.8 0.5 0.0 12.5
Intersection Summary
HCM 2010 Ctrl Delay 17.7
HCM 2010 LOS B
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Total PM
8: Technology/HP West & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Phase Number 234678
Movement SBTL WBL EBT NBTL EBL WBT
Lead/Lag Lag Lead Lead Lag
Lead-Lag Optimize
Recall Mode Max None C-Max Max None None
Maximum Split (s) 30 13 77 30 13 77
Maximum Split (%) 25.0% 10.8% 64.2% 25.0% 10.8% 64.2%
Minimum Split (s) 15 11 25.5 15 8 26
Yellow Time (s) 3 5.5 5.5 3 3 5.5
All-Red Time (s) 3 1.5 1 3 1 1.5
Minimum Initial (s) 444444
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 29 12 29 12
Dual Entry Yes No Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 14.5 1.5 44.5 14.5 44.5 57.5
End Time (s) 44.5 14.5 1.5 44.5 57.5 14.5
Yield/Force Off (s) 38.5 7.5 115 38.5 53.5 7.5
Yield/Force Off 170(s) 9.5 7.5 103 9.5 53.5 115.5
Local Start Time (s) 19.5 6.5 49.5 19.5 49.5 62.5
Local Yield (s) 43.5 12.5 0 43.5 58.5 12.5
Local Yield 170(s) 14.5 12.5 108 14.5 58.5 0.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 8: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Short Total AM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 30 1469 101 120 1989 150 111 46 113 5 3 5
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 34 1669 65 136 2260 118 126 52 0630
Adj No. of Lanes 131131111110
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 59 2733 851 348 3674 1144 229 167 142 136 69 0
Arrive On Green 0.06 1.00 1.00 0.20 0.72 0.72 0.07 0.09 0.00 0.01 0.04 0.00
Sat Flow, veh/h 1845 5085 1583 1774 5085 1583 1774 1863 1583 1774 1863 0
Grp Volume(v), veh/h 34 1669 65 136 2260 118 126 52 0630
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1583 1774 1863 1583 1774 1863 0
Q Serve(g_s), s 2.1 0.0 0.0 8.0 26.6 2.7 8.0 3.1 0.0 0.4 0.2 0.0
Cycle Q Clear(g_c), s 2.1 0.0 0.0 8.0 26.6 2.7 8.0 3.1 0.0 0.4 0.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 59 2733 851 348 3674 1144 229 167 142 136 69 0
V/C Ratio(X) 0.58 0.61 0.08 0.39 0.62 0.10 0.55 0.31 0.00 0.04 0.04 0.00
Avail Cap(c_a), veh/h 231 2733 851 348 3674 1144 229 248 211 229 248 0
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.84 0.84 0.84 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 55.4 0.0 0.0 42.0 8.3 5.0 50.0 51.2 0.0 54.1 55.7 0.0
Incr Delay (d2), s/veh 7.3 0.9 0.1 0.7 0.3 0.0 2.8 1.1 0.0 0.1 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 0.2 0.0 4.0 12.5 1.2 4.1 1.7 0.0 0.2 0.1 0.0
LnGrp Delay(d),s/veh 62.7 0.9 0.1 42.7 8.6 5.0 52.8 52.2 0.0 54.3 55.9 0.0
LnGrp LOS E A A D A A D D D E
Approach Vol, veh/h 1768 2514 178 9
Approach Delay, s/veh 2.0 10.3 52.6 54.8
Approach LOS A B D D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 9.5 29.5 70.0 4.7 15.8 6.8 92.7
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 7.0 15.0 11.0 63.5 7.0 15.0 14.0 63.0
Max Q Clear Time (g_c+I1), s 10.0 2.2 10.0 2.0 2.4 5.1 4.1 28.6
Green Ext Time (p_c), s 0.0 0.1 0.0 9.3 0.0 0.1 0.0 15.8
Intersection Summary
HCM 2010 Ctrl Delay 8.8
HCM 2010 LOS A
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Total AM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 11 21 18 70 11 21 18 70
Maximum Split (%) 9.2% 17.5% 15.0% 58.3% 9.2% 17.5% 15.0% 58.3%
Minimum Split (s) 11 42 11 25.5 11 42.5 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 29 12 29 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 66.5 77.5 48.5 98.5 66.5 77.5 98.5 116.5
End Time (s) 77.5 98.5 66.5 48.5 77.5 98.5 116.5 66.5
Yield/Force Off (s) 73.5 92.5 59.5 42 73.5 92.5 112.5 59.5
Yield/Force Off 170(s) 73.5 63.5 59.5 30 73.5 63.5 112.5 47.5
Local Start Time (s) 24.5 35.5 6.5 56.5 24.5 35.5 56.5 74.5
Local Yield (s) 31.5 50.5 17.5 0 31.5 50.5 70.5 17.5
Local Yield 170(s) 31.5 21.5 17.5 108 31.5 21.5 70.5 5.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 125
Offset: 42 (35%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 1: Lady Moon & Harmony
HCM 2010 Signalized Intersection Summary Short Total PM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 7 2293 133 128 2003 12 109 5 120 106 40 96
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 7 2389 69 133 2086 0 114 5 0 110 42 22
Adj No. of Lanes 131131111110
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 222222222222
Cap, veh/h 28 2860 891 261 3638 1133 212 87 74 266 70 37
Arrive On Green 0.03 1.00 1.00 0.15 0.72 0.00 0.07 0.05 0.00 0.08 0.06 0.05
Sat Flow, veh/h 1845 5085 1583 1774 5085 1583 1774 1863 1583 1774 1153 604
Grp Volume(v), veh/h 7 2389 69 133 2086 0 114 5 0 110 0 64
Grp Sat Flow(s),veh/h/ln 1845 1695 1583 1774 1695 1583 1774 1863 1583 1774 0 1756
Q Serve(g_s), s 0.4 0.0 0.0 8.3 23.8 0.0 7.3 0.3 0.0 6.9 0.0 4.3
Cycle Q Clear(g_c), s 0.4 0.0 0.0 8.3 23.8 0.0 7.3 0.3 0.0 6.9 0.0 4.3
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.34
Lane Grp Cap(c), veh/h 28 2860 891 261 3638 1133 212 87 74 266 0 107
V/C Ratio(X) 0.25 0.84 0.08 0.51 0.57 0.00 0.54 0.06 0.00 0.41 0.00 0.60
Avail Cap(c_a), veh/h 200 2860 891 261 3638 1133 212 155 132 314 0 220
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.57 0.57 0.57 1.00 1.00 0.00 1.00 1.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 57.5 0.0 0.0 47.2 8.2 0.0 50.4 54.7 0.0 48.0 0.0 55.1
Incr Delay (d2), s/veh 2.6 1.8 0.1 1.6 0.2 0.0 2.7 0.3 0.0 1.0 0.0 5.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.5 0.0 4.2 11.1 0.0 3.7 0.2 0.0 3.4 0.0 2.2
LnGrp Delay(d),s/veh 60.1 1.8 0.1 48.8 8.5 0.0 53.1 54.9 0.0 49.0 0.0 60.3
LnGrp LOS E A A D A D D D E
Approach Vol, veh/h 2465 2219 119 174
Approach Delay, s/veh 1.9 10.9 53.2 53.2
Approach LOS A B D D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 12.3 23.7 73.0 12.7 10.6 4.8 91.8
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 7.0 14.0 9.0 66.5 12.0 9.0 12.0 66.0
Max Q Clear Time (g_c+I1), s 9.3 6.3 10.3 2.0 8.9 2.3 2.4 25.8
Green Ext Time (p_c), s 0.0 0.1 0.0 19.3 0.1 0.1 0.0 13.7
Intersection Summary
HCM 2010 Ctrl Delay 8.9
HCM 2010 LOS A
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Short Total PM
1: Lady Moon & Harmony
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Phase Number 12345678
Movement NBL SBTL WBL EBT SBL NBTL EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 11 20 16 73 16 15 16 73
Maximum Split (%) 9.2% 16.7% 13.3% 60.8% 13.3% 12.5% 13.3% 60.8%
Minimum Split (s) 11 42 11 25.5 11 42.5 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7777
Flash Dont Walk (s) 29 12 29 12
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 17.5 28.5 1.5 48.5 17.5 33.5 48.5 64.5
End Time (s) 28.5 48.5 17.5 1.5 33.5 48.5 64.5 17.5
Yield/Force Off (s) 24.5 42.5 10.5 115 29.5 42.5 60.5 10.5
Yield/Force Off 170(s) 24.5 13.5 10.5 103 29.5 13.5 60.5 118.5
Local Start Time (s) 22.5 33.5 6.5 53.5 22.5 38.5 53.5 69.5
Local Yield (s) 29.5 47.5 15.5 0 34.5 47.5 65.5 15.5
Local Yield 170(s) 29.5 18.5 15.5 108 34.5 18.5 65.5 3.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 145
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 1: Lady Moon & Harmony
HCM 2010 TWSC Short Total AM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 11 0 0 24 0 246 10 0 186 38
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - 0 - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 13 0 0 28 0 289 12 0 219 45
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 536 542 241 536 559 295 264 0 0 301 0 0
Stage 1 241 241 - 295 295 - - - - - - -
Stage 2 295 301 - 241 264 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 455 447 798 455 438 744 1300 - - 1260 - -
Stage 1 762 706 - 713 669 - - - - - - -
Stage 2 713 665 - 762 690 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 438 447 798 448 438 744 1300 - - 1260 - -
Mov Cap-2 Maneuver 438 447 - 448 438 - - - - - - -
Stage 1 762 706 - 713 669 - - - - - - -
Stage 2 686 665 - 750 690 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.6 10 0 0
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1300 - - 798 744 1260 - -
HCM Lane V/C Ratio - - - 0.016 0.038 - - -
HCM Control Delay (s) 0 - - 9.6 10 0 - -
HCM Lane LOS A - - A B A - -
HCM 95th %tile Q(veh) 0 - - 0 0.1 0 - -
Lanes and Geometrics Short Total AM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 1 0 1 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.865 0.995 0.977
Flt Protected
Satd. Flow (prot) 0 0 1611 0 0 1611 0 1853 0 0 1820 0
Flt Permitted
Satd. Flow (perm) 0 0 1611 0 0 1611 0 1853 0 0 1820 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 248 297 270 461
Travel Time (s) 5.6 6.8 6.1 10.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 10 0 0 46 0 188 6 0 268 33
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - 0 - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 12 0 0 54 0 221 7 0 315 39
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 560 563 335 560 579 225 354 0 0 228 0 0
Stage 1 335 335 - 225 225 - - - - - - -
Stage 2 225 228 - 335 354 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 439 435 707 439 426 814 1205 - - 1340 - -
Stage 1 679 643 - 778 718 - - - - - - -
Stage 2 778 715 - 679 630 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 410 435 707 432 426 814 1205 - - 1340 - -
Mov Cap-2 Maneuver 410 435 - 432 426 - - - - - - -
Stage 1 679 643 - 778 718 - - - - - - -
Stage 2 726 715 - 668 630 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.2 9.7 0 0
HCM LOS B A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1205 - - 707 814 1340 - -
HCM Lane V/C Ratio - - - 0.017 0.066 - - -
HCM Control Delay (s) 0 - - 10.2 9.7 0 - -
HCM Lane LOS A - - B A A - -
HCM 95th %tile Q(veh) 0 - - 0.1 0.2 0 - -
Lanes and Geometrics Short Total PM
2: Lady Moon & RT Access
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 1 0 1 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.865 0.996 0.985
Flt Protected
Satd. Flow (prot) 0 0 1611 0 0 1611 0 1855 0 0 1835 0
Flt Permitted
Satd. Flow (perm) 0 0 1611 0 0 1611 0 1855 0 0 1835 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 248 297 270 461
Travel Time (s) 5.6 6.8 6.1 10.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
3: Lady Moon & Timberwood/Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 42 0 17 28 0 6 44 208 42 71 97 29
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 160 - - - 200 - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 49 0 20 33 0 7 52 245 49 84 114 34
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 674 696 131 671 688 269 148 0 0 294 0 0
Stage 1 298 298 - 373 373 - - - - - - -
Stage 2 376 398 - 298 315 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 368 365 919 370 369 770 1434 - - 1268 - -
Stage 1 711 667 - 648 618 - - - - - - -
Stage 2 645 603 - 711 656 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 337 328 919 334 332 770 1434 - - 1268 - -
Mov Cap-2 Maneuver 337 328 - 334 332 - - - - - - -
Stage 1 685 623 - 625 596 - - - - - - -
Stage 2 616 581 - 649 613 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.1 15.9 1.1 2.9
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1434 - - 337 919 371 1268 - -
HCM Lane V/C Ratio 0.036 - - 0.147 0.022 0.108 0.066 - -
HCM Control Delay (s) 7.6 - - 17.5 9 15.9 8 - -
HCM Lane LOS A - - C A C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.5 0.1 0.4 0.2 - -
Lanes and Geometrics Short Total AM
3: Lady Moon & Timberwood/Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 160 0 0 200 0 200 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.976 0.975 0.966
Flt Protected 0.950 0.960 0.950 0.950
Satd. Flow (prot) 0 1770 1583 0 1745 0 1770 1816 0 1770 1799 0
Flt Permitted 0.950 0.960 0.950 0.950
Satd. Flow (perm) 0 1770 1583 0 1745 0 1770 1816 0 1770 1799 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 343 322 1304 270
Travel Time (s) 7.8 7.3 29.6 6.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
3: Lady Moon & Timberwood/Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 4.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 58 0 20 52 0 12 35 124 24 40 212 26
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 160 - - - 200 - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 68 0 24 61 0 14 41 146 28 47 249 31
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 608 615 265 601 616 160 280 0 0 174 0 0
Stage 1 359 359 - 242 242 - - - - - - -
Stage 2 249 256 - 359 374 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 408 407 774 412 406 885 1283 - - 1403 - -
Stage 1 659 627 - 762 705 - - - - - - -
Stage 2 755 696 - 659 618 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 382 381 774 380 380 885 1283 - - 1403 - -
Mov Cap-2 Maneuver 382 381 - 380 380 - - - - - - -
Stage 1 638 606 - 738 682 - - - - - - -
Stage 2 719 674 - 618 597 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.8 15.3 1.5 1.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1283 - - 382 774 426 1403 - -
HCM Lane V/C Ratio 0.032 - - 0.179 0.03 0.177 0.034 - -
HCM Control Delay (s) 7.9 - - 16.5 9.8 15.3 7.7 - -
HCM Lane LOS A - - C A C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.6 0.1 0.6 0.1 - -
Lanes and Geometrics Short Total PM
3: Lady Moon & Timberwood/Banner Access
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 160 0 0 200 0 200 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.975 0.976 0.983
Flt Protected 0.950 0.961 0.950 0.950
Satd. Flow (prot) 0 1770 1583 0 1745 0 1770 1818 0 1770 1831 0
Flt Permitted 0.950 0.961 0.950 0.950
Satd. Flow (perm) 0 1770 1583 0 1745 0 1770 1818 0 1770 1831 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 343 322 394 270
Travel Time (s) 7.8 7.3 9.0 6.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
22: Timberwood & Access A
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 4.4
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 44 28 39 34 31 28
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 52 33 46 40 36 33
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 86 0 - 0 202 66
Stage 1 - - - - 66 -
Stage 2 - - - - 136 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1510 - - - 787 998
Stage 1 - - - - 957 -
Stage 2 - - - - 890 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1510 - - - 759 998
Mov Cap-2 Maneuver - - - - 759 -
Stage 1 - - - - 957 -
Stage 2 - - - - 859 -
Approach EB WB SB
HCM Control Delay, s 4.6 0 9.6
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1510 - - - 856
HCM Lane V/C Ratio 0.034 - - - 0.081
HCM Control Delay (s) 7.5 0 - - 9.6
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.1 - - - 0.3
Lanes and Geometrics Short Total AM
22: Timberwood & Access A
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.937 0.935
Flt Protected 0.970 0.975
Satd. Flow (prot) 0 1807 1745 0 1698 0
Flt Permitted 0.970 0.975
Satd. Flow (perm) 0 1807 1745 0 1698 0
Link Speed (mph) 30 30 30
Link Distance (ft) 454 343 187
Travel Time (s) 10.3 7.8 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
22: Timberwood & Access A
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 5.1
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 33 32 38 23 46 40
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 39 38 45 27 54 47
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 72 0 - 0 173 58
Stage 1 - - - - 58 -
Stage 2 - - - - 115 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1528 - - - 817 1008
Stage 1 - - - - 965 -
Stage 2 - - - - 910 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1528 - - - 796 1008
Mov Cap-2 Maneuver - - - - 796 -
Stage 1 - - - - 965 -
Stage 2 - - - - 886 -
Approach EB WB SB
HCM Control Delay, s 3.8 0 9.6
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1528 - - - 882
HCM Lane V/C Ratio 0.025 - - - 0.115
HCM Control Delay (s) 7.4 0 - - 9.6
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.1 - - - 0.4
Lanes and Geometrics Short Total PM
22: Timberwood & Access A
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.949 0.937
Flt Protected 0.975 0.974
Satd. Flow (prot) 0 1816 1768 0 1700 0
Flt Permitted 0.975 0.974
Satd. Flow (perm) 0 1816 1768 0 1700 0
Link Speed (mph) 30 30 30
Link Distance (ft) 454 343 187
Travel Time (s) 10.3 7.8 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
27: Timberwood & Access B
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 60 44 28 39 28 47
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 71 52 33 46 33 55
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 79 0 - 0 249 56
Stage 1 - - - - 56 -
Stage 2 - - - - 193 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1519 - - - 739 1011
Stage 1 - - - - 967 -
Stage 2 - - - - 840 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1519 - - - 704 1011
Mov Cap-2 Maneuver - - - - 704 -
Stage 1 - - - - 967 -
Stage 2 - - - - 800 -
Approach EB WB SB
HCM Control Delay, s 4.3 0 9.6
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1519 - - - 869
HCM Lane V/C Ratio 0.046 - - - 0.102
HCM Control Delay (s) 7.5 0 - - 9.6
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.1 - - - 0.3
Lanes and Geometrics Short Total AM
27: Timberwood & Access B
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.921 0.916
Flt Protected 0.972 0.982
Satd. Flow (prot) 0 1811 1716 0 1676 0
Flt Permitted 0.972 0.982
Satd. Flow (perm) 0 1811 1716 0 1676 0
Link Speed (mph) 30 30 30
Link Distance (ft) 494 454 177
Travel Time (s) 11.2 10.3 4.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
27: Timberwood & Access B
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 57 33 40 38 32 49
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 67 39 47 45 38 58
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 92 0 - 0 242 69
Stage 1 - - - - 69 -
Stage 2 - - - - 173 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1503 - - - 746 994
Stage 1 - - - - 954 -
Stage 2 - - - - 857 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1503 - - - 712 994
Mov Cap-2 Maneuver - - - - 712 -
Stage 1 - - - - 954 -
Stage 2 - - - - 818 -
Approach EB WB SB
HCM Control Delay, s 4.8 0 9.7
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1503 - - - 860
HCM Lane V/C Ratio 0.045 - - - 0.111
HCM Control Delay (s) 7.5 0 - - 9.7
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0.1 - - - 0.4
Lanes and Geometrics Short Total PM
27: Timberwood & Access B
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.934 0.918
Flt Protected 0.969 0.981
Satd. Flow (prot) 0 1805 1740 0 1678 0
Flt Permitted 0.969 0.981
Satd. Flow (perm) 0 1805 1740 0 1678 0
Link Speed (mph) 30 30 30
Link Distance (ft) 494 454 177
Travel Time (s) 11.2 10.3 4.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
24: Intel Access/Timberwood & Technology
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 0
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 3 0 0 75 104 39
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Free Free
RT Channelized - None - None - None
Storage Length - - - 0 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 0 0 88 122 46
Major/Minor Minor2 Minor1 Major2
Conflicting Flow All 0 245 245 0 0 -
Stage 1 0 245 0 - - -
Stage 2 0 0 245 - - -
Critical Hdwy - - - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - -
Pot Cap-1 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Platoon blocked, % -
Mov Cap-1 Maneuver - 0 0 - - -
Mov Cap-2 Maneuver - 0 0 - - -
Stage 1 - 0 0 - - -
Stage 2 - 0 0 - - -
Approach EB WB SB
HCM Control Delay, s
HCM LOS - -
Minor Lane/Major Mvmt EBLn1WBLn1WBLn2 SBL SBR
Capacity (veh/h) -----
HCM Lane V/C Ratio -----
HCM Control Delay (s) - 0 - - -
HCM Lane LOS - A - - -
HCM 95th %tile Q(veh) -----
Lanes and Geometrics Short Total AM
24: Intel Access/Timberwood & Technology
8/20/2015 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 0 1770 1863 1583 1770 1583
Flt Permitted 0.950 0.950
Satd. Flow (perm) 0 1770 1863 1583 1770 1583
Link Speed (mph) 30 30 30
Link Distance (ft) 266 494 659
Travel Time (s) 6.0 11.2 15.0
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
24: Intel Access/Timberwood & Technology
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 0
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 46 0 0 89 90 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Free Free
RT Channelized - None - None - None
Storage Length - - - 0 0 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 54 0 0 105 106 11
Major/Minor Minor2 Minor1 Major2
Conflicting Flow All 0 212 212 0 0 -
Stage 1 0 212 0 - - -
Stage 2 0 0 212 - - -
Critical Hdwy - - - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - -
Pot Cap-1 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Platoon blocked, % -
Mov Cap-1 Maneuver - 0 0 - - -
Mov Cap-2 Maneuver - 0 0 - - -
Stage 1 - 0 0 - - -
Stage 2 - 0 0 - - -
Approach EB WB SB
HCM Control Delay, s
HCM LOS - -
Minor Lane/Major Mvmt EBLn1WBLn1WBLn2 SBL SBR
Capacity (veh/h) -----
HCM Lane V/C Ratio -----
HCM Control Delay (s) - 0 - - -
HCM Lane LOS - A - - -
HCM 95th %tile Q(veh) -----
Lanes and Geometrics Short Total PM
24: Intel Access/Timberwood & Technology
8/20/2015 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 0 1770 1863 1583 1770 1583
Flt Permitted 0.950 0.950
Satd. Flow (perm) 0 1770 1863 1583 1770 1583
Link Speed (mph) 30 30 30
Link Distance (ft) 266 494 659
Travel Time (s) 6.0 11.2 15.0
Intersection Summary
Area Type: Other
APPENDIX H
HCM 2010 Signalized Intersection Summary Long Total AM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 175 1980 245 135 1400 460 255 485 95 650 370 85
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 184 2084 141 142 1474 0 268 511 0 684 389 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 231 2119 648 163 1822 590 538 604 270 488 494 221
Arrive On Green 0.13 0.42 0.42 0.09 0.36 0.00 0.16 0.17 0.00 0.14 0.14 0.00
Sat Flow, veh/h 1845 5085 1555 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 184 2084 141 142 1474 0 268 511 0 684 389 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1555 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 11.6 48.6 7.0 9.5 31.4 0.0 8.5 16.8 0.0 17.0 12.8 0.0
Cycle Q Clear(g_c), s 11.6 48.6 7.0 9.5 31.4 0.0 8.5 16.8 0.0 17.0 12.8 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 231 2119 648 163 1822 590 538 604 270 488 494 221
V/C Ratio(X) 0.80 0.98 0.22 0.87 0.81 0.00 0.50 0.85 0.00 1.40 0.79 0.00
Avail Cap(c_a), veh/h 231 2119 648 163 1822 590 538 678 303 488 737 330
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.68 0.68 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 51.0 34.6 22.5 53.8 34.8 0.0 46.3 48.2 0.0 51.5 49.9 0.0
Incr Delay (d2), s/veh 17.6 16.0 0.8 27.8 2.7 0.0 0.7 8.9 0.0 193.4 3.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.1 25.7 3.1 5.9 15.2 0.0 4.1 9.0 0.0 21.2 6.4 0.0
LnGrp Delay(d),s/veh 68.6 50.6 23.2 81.6 37.5 0.0 47.0 57.1 0.0 244.9 53.3 0.0
LnGrp LOS E D C F D D E F D
Approach Vol, veh/h 2409 1616 779 1073
Approach Delay, s/veh 50.4 41.4 53.6 175.4
Approach LOS D D D F
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 24.8 22.7 14.0 56.0 21.0 26.5 21.0 49.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 12.0 24.0 10.0 49.0 16.0 22.0 14.0 42.0
Max Q Clear Time (g_c+I1), s 10.5 14.8 11.5 50.6 19.0 18.8 13.6 33.4
Green Ext Time (p_c), s 0.5 1.0 0.0 0.0 0.0 0.7 0.3 4.1
Intersection Summary
HCM 2010 Ctrl Delay 71.2
HCM 2010 LOS E
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Total AM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 19 31 14 56 21 29 21 49
Maximum Split (%) 15.8% 25.8% 11.7% 46.7% 17.5% 24.2% 17.5% 40.8%
Minimum Split (s) 11 24 11 34 11 24 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 100 69 119 13 69 90 48 119
End Time (s) 119 100 13 69 90 119 69 48
Yield/Force Off (s) 112 93 9 62 85 112 62 41
Yield/Force Off 170(s) 112 93 9 43 85 112 62 25
Local Start Time (s) 59 28 78 92 28 49 7 78
Local Yield (s) 71 52 88 21 44 71 21 0
Local Yield 170(s) 71 52 88 2 44 71 21 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 120
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Total PM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 145 1770 285 165 2195 880 335 455 120 590 575 180
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 148 1806 145 168 2240 0 342 464 0 602 587 0
Adj No. of Lanes 131131221221
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 169 2243 686 208 2246 727 344 413 185 574 590 264
Arrive On Green 0.09 0.44 0.44 0.12 0.44 0.00 0.10 0.12 0.00 0.17 0.17 0.00
Sat Flow, veh/h 1845 5085 1556 1774 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 148 1806 145 168 2240 0 342 464 0 602 587 0
Grp Sat Flow(s),veh/h/ln 1845 1695 1556 1774 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 9.5 36.9 6.9 11.1 52.7 0.0 11.9 14.0 0.0 20.0 19.9 0.0
Cycle Q Clear(g_c), s 9.5 36.9 6.9 11.1 52.7 0.0 11.9 14.0 0.0 20.0 19.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 169 2243 686 208 2246 727 344 413 185 574 590 264
V/C Ratio(X) 0.88 0.81 0.21 0.81 1.00 0.00 0.99 1.12 0.00 1.05 1.00 0.00
Avail Cap(c_a), veh/h 169 2243 686 222 2246 727 344 413 185 574 590 264
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.30 0.30 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 53.8 29.1 20.7 51.6 33.4 0.0 54.0 53.0 0.0 50.0 50.0 0.0
Incr Delay (d2), s/veh 36.4 3.2 0.7 6.4 9.9 0.0 46.7 82.4 0.0 51.2 35.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.6 17.9 3.1 5.8 26.5 0.0 7.9 11.6 0.0 13.6 12.6 0.0
LnGrp Delay(d),s/veh 90.2 32.3 21.4 58.0 43.3 0.0 100.7 135.4 0.0 101.2 85.7 0.0
LnGrp LOS F C C E D F F F F
Approach Vol, veh/h 2099 2408 806 1189
Approach Delay, s/veh 35.6 44.3 120.7 93.6
Approach LOS D D F F
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 18.0 26.0 17.1 58.9 24.0 20.0 17.0 59.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 11.0 19.0 14.0 51.0 19.0 13.0 10.0 52.0
Max Q Clear Time (g_c+I1), s 13.9 21.9 13.1 38.9 22.0 16.0 11.5 54.7
Green Ext Time (p_c), s 0.0 0.0 0.0 7.1 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 60.0
HCM 2010 LOS E
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Total PM
120: Ziegler Rd & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 18 26 18 58 24 20 17 59
Maximum Split (%) 15.0% 21.7% 15.0% 48.3% 20.0% 16.7% 14.2% 49.2%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 91 65 109 7 65 89 48 109
End Time (s) 109 91 7 65 89 109 65 48
Yield/Force Off (s) 102 84 3 58 84 102 58 41
Yield/Force Off 170(s) 102 84 3 39 84 102 58 25
Local Start Time (s) 50 24 68 86 24 48 7 68
Local Yield (s) 61 43 82 17 43 61 17 0
Local Yield 170(s) 61 43 82 118 43 61 17 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 120
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Total AM
120: Ziegler Rd & Harmony Dual EB-WB LT Lanes
Harmony Tech Park Filing 5 8/26/2015 Synchro 9 Light Report
Delich Associates lt north am eb-wb dual lt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 175 1980 245 135 1400 460 255 485 95 650 370 85
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 184 2084 140 142 1474 0 268 511 0 684 389 0
Adj No. of Lanes 231231221221
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 268 2086 638 223 1907 618 722 560 251 717 496 222
Arrive On Green 0.07 0.41 0.41 0.06 0.38 0.00 0.21 0.16 0.00 0.21 0.14 0.00
Sat Flow, veh/h 3579 5085 1555 3442 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 184 2084 140 142 1474 0 268 511 0 684 389 0
Grp Sat Flow(s),veh/h/ln 1790 1695 1555 1721 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 6.0 49.1 7.0 4.8 30.6 0.0 8.0 17.0 0.0 23.6 12.7 0.0
Cycle Q Clear(g_c), s 6.0 49.1 7.0 4.8 30.6 0.0 8.0 17.0 0.0 23.6 12.7 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 268 2086 638 223 1907 618 722 560 251 717 496 222
V/C Ratio(X) 0.69 1.00 0.22 0.64 0.77 0.00 0.37 0.91 0.00 0.95 0.78 0.00
Avail Cap(c_a), veh/h 268 2086 638 229 1907 618 722 560 251 717 796 356
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.61 0.61 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 54.1 35.4 22.9 54.7 33.0 0.0 40.6 49.7 0.0 46.9 49.8 0.0
Incr Delay (d2), s/veh 7.1 19.5 0.8 3.4 1.9 0.0 0.3 19.3 0.0 22.9 2.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.3 26.7 3.1 2.4 14.7 0.0 3.8 9.8 0.0 13.5 6.4 0.0
LnGrp Delay(d),s/veh 61.2 54.9 23.7 58.1 34.9 0.0 40.9 69.0 0.0 69.8 52.6 0.0
LnGrp LOS E D C E C D E E D
Approach Vol, veh/h 2408 1616 779 1073
Approach Delay, s/veh 53.5 37.0 59.3 63.6
Approach LOS D D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 31.2 22.8 10.8 55.2 29.0 25.0 15.0 51.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 14.0 26.0 7.0 48.0 24.0 18.0 8.0 44.0
Max Q Clear Time (g_c+I1), s 10.0 14.7 6.8 51.1 25.6 19.0 8.0 32.6
Green Ext Time (p_c), s 1.3 1.1 0.0 0.0 0.0 0.0 0.0 4.9
Intersection Summary
HCM 2010 Ctrl Delay 51.6
HCM 2010 LOS D
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Total AM
120: Ziegler Rd & Harmony Dual EB-WB LT Lanes
Harmony Tech Park Filing 5 8/26/2015 Synchro 9 Light Report
Delich Associates lt north am eb-wb dual lt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 21 33 11 55 29 25 15 51
Maximum Split (%) 17.5% 27.5% 9.2% 45.8% 24.2% 20.8% 12.5% 42.5%
Minimum Split (s) 11 24 11 34 11 24 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 96 63 117 8 63 92 48 117
End Time (s) 117 96 8 63 92 117 63 48
Yield/Force Off (s) 110 89 4 56 87 110 56 41
Yield/Force Off 170(s) 110 89 4 37 87 110 56 25
Local Start Time (s) 55 22 76 87 22 51 7 76
Local Yield (s) 69 48 83 15 46 69 15 0
Local Yield 170(s) 69 48 83 116 46 69 15 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 110
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Total PM
120: Ziegler Rd & Harmony Dual EB-WB LT Lanes
Harmony Tech Park Filing 5 8/26/2015 Synchro 9 Light Report
Delich Associates lt north pm eb-wb dual lt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 145 1770 285 165 2195 880 335 455 120 590 575 180
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1937 1863 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 148 1806 142 168 2240 0 342 464 0 602 587 0
Adj No. of Lanes 231231221221
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 179 2259 691 249 2246 727 414 501 224 631 665 298
Arrive On Green 0.05 0.44 0.44 0.07 0.44 0.00 0.12 0.14 0.00 0.18 0.19 0.00
Sat Flow, veh/h 3579 5085 1556 3442 5085 1647 3442 3539 1583 3442 3539 1583
Grp Volume(v), veh/h 148 1806 142 168 2240 0 342 464 0 602 587 0
Grp Sat Flow(s),veh/h/ln 1790 1695 1556 1721 1695 1647 1721 1770 1583 1721 1770 1583
Q Serve(g_s), s 4.9 36.7 6.7 5.7 52.7 0.0 11.6 15.5 0.0 20.8 19.4 0.0
Cycle Q Clear(g_c), s 4.9 36.7 6.7 5.7 52.7 0.0 11.6 15.5 0.0 20.8 19.4 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 179 2259 691 249 2246 727 414 501 224 631 665 298
V/C Ratio(X) 0.83 0.80 0.21 0.67 1.00 0.00 0.83 0.93 0.00 0.95 0.88 0.00
Avail Cap(c_a), veh/h 179 2259 691 258 2246 727 414 501 224 631 678 303
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 0.24 0.24 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 56.5 28.7 20.4 54.3 33.4 0.0 51.5 50.9 0.0 48.5 47.4 0.0
Incr Delay (d2), s/veh 26.2 3.1 0.7 1.6 8.7 0.0 12.8 23.2 0.0 24.9 12.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.1 17.7 3.0 2.8 26.3 0.0 6.3 9.2 0.0 12.1 10.6 0.0
LnGrp Delay(d),s/veh 82.7 31.8 21.1 55.8 42.1 0.0 64.4 74.1 0.0 73.4 60.3 0.0
LnGrp LOS F C C E D E E E E
Approach Vol, veh/h 2096 2408 806 1189
Approach Delay, s/veh 34.7 43.0 70.0 67.0
Approach LOS C D E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 20.4 28.6 11.7 59.3 26.0 23.0 12.0 59.0
Change Period (Y+Rc), s 7.0 7.0 4.0 7.0 5.0 7.0 7.0 7.0
Max Green Setting (Gmax), s 13.0 22.0 8.0 52.0 21.0 16.0 5.0 52.0
Max Q Clear Time (g_c+I1), s 13.6 21.4 7.7 38.7 22.8 17.5 6.9 54.7
Green Ext Time (p_c), s 0.0 0.2 0.0 7.6 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 48.1
HCM 2010 LOS D
Notes
User approved pedestrian interval to be less than phase max green.
Timing Report, Sorted By Phase Long Total PM
120: Ziegler Rd & Harmony Dual EB-WB LT Lanes
Harmony Tech Park Filing 5 8/26/2015 Synchro 9 Light Report
Delich Associates lt north pm eb-wb dual lt.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None None None Max None None None C-Max
Maximum Split (s) 20 29 12 59 26 23 12 59
Maximum Split (%) 16.7% 24.2% 10.0% 49.2% 21.7% 19.2% 10.0% 49.2%
Minimum Split (s) 11 15 11 34 11 15 11 30
Yellow Time (s) 4.5 4.5 3 5.5 3 4.5 5.5 5.5
All-Red Time (s) 2.5 2.5 1 1.5 2 2.5 1.5 1.5
Minimum Initial (s) 4 7 4 15 4 7 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 19 16
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 89 60 109 1 60 86 48 109
End Time (s) 109 89 1 60 86 109 60 48
Yield/Force Off (s) 102 82 117 53 81 102 53 41
Yield/Force Off 170(s) 102 82 117 34 81 102 53 25
Local Start Time (s) 48 19 68 80 19 45 7 68
Local Yield (s) 61 41 76 12 40 61 12 0
Local Yield 170(s) 61 41 76 113 40 61 12 104
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 41 (34%), Referenced to phase 8:WBT, Start of Yellow
Splits and Phases: 120: Ziegler Rd & Harmony
HCM 2010 Signalized Intersection Summary Long Total AM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 175 2120 430 225 1865 55 115 0 30 10 0 15
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 184 2232 260 237 1963 55 121 0 0 11 0 0
Adj No. of Lanes 131130210110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 224 3488 1086 276 3637 102 202 13 0 33 2 0
Arrive On Green 0.13 0.69 0.69 0.16 0.72 0.72 0.06 0.00 0.00 0.02 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5086 142 3442 1863 0 1774 1863 0
Grp Volume(v), veh/h 184 2232 260 237 1308 710 121 0 0 11 0 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1838 1721 1863 0 1774 1863 0
Q Serve(g_s), s 12.1 29.5 7.4 15.6 21.5 21.5 4.1 0.0 0.0 0.7 0.0 0.0
Cycle Q Clear(g_c), s 12.1 29.5 7.4 15.6 21.5 21.5 4.1 0.0 0.0 0.7 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.08 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 224 3488 1086 276 2425 1314 202 13 0 33 2 0
V/C Ratio(X) 0.82 0.64 0.24 0.86 0.54 0.54 0.60 0.00 0.00 0.33 0.00 0.00
Avail Cap(c_a), veh/h 237 3488 1086 281 2425 1314 229 171 0 118 171 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.09 0.09 0.09 0.74 0.74 0.74 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 51.1 10.5 7.1 49.4 7.9 7.9 55.1 0.0 0.0 58.2 0.0 0.0
Incr Delay (d2), s/veh 2.1 0.1 0.0 17.5 0.2 0.3 3.4 0.0 0.0 5.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.1 13.7 3.2 9.0 10.0 11.0 2.1 0.0 0.0 0.4 0.0 0.0
LnGrp Delay(d),s/veh 53.2 10.6 7.1 66.9 8.1 8.3 58.5 0.0 0.0 64.0 0.0 0.0
LnGrp LOS D BAEAAE E
Approach Vol, veh/h 2676 2255 121 11
Approach Delay, s/veh 13.2 14.3 58.5 64.0
Approach LOS BBEE
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.0 0.0 22.6 86.3 6.2 4.8 19.1 89.8
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s 7.0 10.0 18.0 65.0 7.0 10.0 15.0 68.0
Max Q Clear Time (g_c+I1), s 6.1 0.0 17.6 31.5 2.7 0.0 14.1 23.5
Green Ext Time (p_c), s 0.0 0.0 0.0 32.1 0.0 0.0 0.0 42.1
Intersection Summary
HCM 2010 Ctrl Delay 14.9
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total AM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None Max None C-Max None Max None None
Maximum Split (s) 12 15 23 70 12 15 20 73
Maximum Split (%) 10.0% 12.5% 19.2% 58.3% 10.0% 12.5% 16.7% 60.8%
Minimum Split (s) 11 15 11 15 11 15 11 15
Yellow Time (s) 33333333
All-Red Time (s) 22222222
Minimum Initial (s) 44444444
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s)
Flash Dont Walk (s)
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 0 12 27 50 0 12 27 47
End Time (s) 12 27 50 0 12 27 47 0
Yield/Force Off (s) 7 22 45 115 7 22 42 115
Yield/Force Off 170(s) 7 22 45 115 7 22 42 115
Local Start Time (s) 5 17 32 55 5 17 32 52
Local Yield (s) 12 27 50 0 12 27 47 0
Local Yield 170(s) 12 27 50 0 12 27 47 0
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 3: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Long Total PM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 25 2300 155 50 2665 10 440 0 210 75 0 135
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1900 1863 1863 1900 1863 1863 1900
Adj Flow Rate, veh/h 26 2347 90 51 2719 10 449 0 117 77 0 0
Adj No. of Lanes 131130210110
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 49 2788 868 80 2959 11 516 0 333 112 230 0
Arrive On Green 0.03 0.55 0.55 0.05 0.57 0.57 0.15 0.00 0.21 0.06 0.00 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5230 19 3442 0 1583 1774 1863 0
Grp Volume(v), veh/h 26 2347 90 51 1762 967 449 0 117 77 0 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1859 1721 0 1583 1774 1863 0
Q Serve(g_s), s 1.7 46.5 3.3 3.4 56.4 56.5 15.3 0.0 7.6 5.1 0.0 0.0
Cycle Q Clear(g_c), s 1.7 46.5 3.3 3.4 56.4 56.5 15.3 0.0 7.6 5.1 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.01 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 49 2788 868 80 1918 1052 516 0 333 112 230 0
V/C Ratio(X) 0.53 0.84 0.10 0.64 0.92 0.92 0.87 0.00 0.35 0.69 0.00 0.00
Avail Cap(c_a), veh/h 118 2839 884 118 1918 1052 516 0 333 118 230 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.42 0.42 0.42 0.63 0.63 0.63 1.00 0.00 1.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 57.6 22.7 13.0 56.3 23.6 23.6 49.9 0.0 40.4 55.1 0.0 0.0
Incr Delay (d2), s/veh 3.7 1.0 0.0 5.2 5.1 8.7 14.8 0.0 2.9 14.7 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 21.8 1.4 1.8 27.5 31.3 8.4 0.0 3.6 3.0 0.0 0.0
LnGrp Delay(d),s/veh 61.2 23.8 13.0 61.6 28.7 32.3 64.6 0.0 43.3 69.7 0.0 0.0
LnGrp LOS E C B E C C E D E
Approach Vol, veh/h 2463 2780 566 77
Approach Delay, s/veh 23.8 30.5 60.2 69.7
Approach LOS C C E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 22.0 18.8 9.4 69.8 11.6 29.2 7.3 71.9
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s 17.0 10.0 7.0 66.0 7.0 20.0 7.0 66.0
Max Q Clear Time (g_c+I1), s 17.3 0.0 5.4 48.5 7.1 9.6 3.7 58.5
Green Ext Time (p_c), s 0.0 0.0 0.0 16.3 0.0 0.4 0.0 7.4
Intersection Summary
HCM 2010 Ctrl Delay 31.1
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Total PM
3: Technology/HP West & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None None C-Max None None
Maximum Split (s) 22 15 12 71 12 25 12 71
Maximum Split (%) 18.3% 12.5% 10.0% 59.2% 10.0% 20.8% 10.0% 59.2%
Minimum Split (s) 11 15 11 15 11 15 11 15
Yellow Time (s) 33333333
All-Red Time (s) 22222222
Minimum Initial (s) 44444444
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s)
Flash Dont Walk (s)
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 83 105 0 12 83 95 0 12
End Time (s) 105 0 12 83 95 0 12 83
Yield/Force Off (s) 100 115 7 78 90 115 7 78
Yield/Force Off 170(s) 100 115 7 78 90 115 7 78
Local Start Time (s) 83 105 0 12 83 95 0 12
Local Yield (s) 100 115 7 78 90 115 7 78
Local Yield 170(s) 100 115 7 78 90 115 7 78
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Red
Splits and Phases: 3: Technology/HP West & Harmony
HCM 2010 Signalized Intersection Summary Long Total AM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 120 1680 360 380 1905 180 235 50 105 5 5 5
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 126 1768 236 400 2005 113 247 53 45 5 5 0
Adj No. of Lanes 131231210111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 162 2733 850 554 3192 993 339 117 99 24 76 65
Arrive On Green 0.18 1.00 1.00 0.16 0.63 0.63 0.10 0.13 0.13 0.01 0.04 0.00
Sat Flow, veh/h 1774 5085 1582 3442 5085 1582 3442 932 791 1774 1863 1583
Grp Volume(v), veh/h 126 1768 236 400 2005 113 247 0 98 5 5 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1582 1721 1695 1582 1721 0 1723 1774 1863 1583
Q Serve(g_s), s 8.1 0.0 0.0 13.2 29.1 3.4 8.4 0.0 6.3 0.3 0.3 0.0
Cycle Q Clear(g_c), s 8.1 0.0 0.0 13.2 29.1 3.4 8.4 0.0 6.3 0.3 0.3 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.46 1.00 1.00
Lane Grp Cap(c), veh/h 162 2733 850 554 3192 993 339 0 217 24 76 65
V/C Ratio(X) 0.78 0.65 0.28 0.72 0.63 0.11 0.73 0.00 0.45 0.21 0.07 0.00
Avail Cap(c_a), veh/h 177 2733 850 554 3192 993 488 0 230 163 155 132
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.52 0.52 0.52 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 47.8 0.0 0.0 47.8 13.7 9.0 52.5 0.0 48.6 58.6 55.4 0.0
Incr Delay (d2), s/veh 9.9 0.6 0.4 4.6 0.4 0.1 3.2 0.0 1.5 4.3 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.4 0.2 0.1 6.6 13.7 1.5 4.1 0.0 3.1 0.2 0.2 0.0
LnGrp Delay(d),s/veh 57.7 0.6 0.4 52.4 14.1 9.0 55.7 0.0 50.1 62.8 55.7 0.0
LnGrp LOS E A A D B A E D E E
Approach Vol, veh/h 2130 2518 345 10
Approach Delay, s/veh 4.0 20.0 54.1 59.3
Approach LOS A B D E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.8 9.9 25.3 70.0 4.6 20.1 14.0 81.3
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 16.0 9.0 8.0 63.5 10.0 15.0 11.0 63.0
Max Q Clear Time (g_c+I1), s 10.4 2.3 15.2 2.0 2.3 8.3 10.1 31.1
Green Ext Time (p_c), s 0.4 0.1 0.0 11.7 0.0 0.1 0.0 14.7
Intersection Summary
HCM 2010 Ctrl Delay 15.6
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total AM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 20 15 15 70 14 21 15 70
Maximum Split (%) 16.7% 12.5% 12.5% 58.3% 11.7% 17.5% 12.5% 58.3%
Minimum Split (s) 11 15 11 25.5 11 15 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 10
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 21.5 41.5 6.5 56.5 21.5 35.5 56.5 71.5
End Time (s) 41.5 56.5 21.5 6.5 35.5 56.5 71.5 21.5
Yield/Force Off (s) 37.5 50.5 14.5 0 31.5 50.5 67.5 14.5
Yield/Force Off 170(s) 37.5 50.5 14.5 108 31.5 50.5 67.5 4.5
Local Start Time (s) 21.5 41.5 6.5 56.5 21.5 35.5 56.5 71.5
Local Yield (s) 37.5 50.5 14.5 0 31.5 50.5 67.5 14.5
Local Yield 170(s) 37.5 50.5 14.5 108 31.5 50.5 67.5 4.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 0 (0%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 174: Lady Moon/HP East & Harmony
HCM 2010 Signalized Intersection Summary Long Total PM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 10 2365 210 275 2095 15 530 5 275 160 45 100
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 10 2413 132 281 2138 0 541 5 136 163 46 0
Adj No. of Lanes 131231210111
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 32 2521 784 394 3120 971 602 6 173 203 97 82
Arrive On Green 0.02 0.50 0.50 0.11 0.61 0.00 0.17 0.11 0.11 0.11 0.05 0.00
Sat Flow, veh/h 1774 5085 1582 3442 5085 1583 3442 56 1535 1774 1863 1583
Grp Volume(v), veh/h 10 2413 132 281 2138 0 541 0 141 163 46 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1582 1721 1695 1583 1721 0 1592 1774 1863 1583
Q Serve(g_s), s 0.7 54.6 3.3 9.4 33.6 0.0 18.5 0.0 10.4 10.7 2.9 0.0
Cycle Q Clear(g_c), s 0.7 54.6 3.3 9.4 33.6 0.0 18.5 0.0 10.4 10.7 2.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.96 1.00 1.00
Lane Grp Cap(c), veh/h 32 2521 784 394 3120 971 602 0 179 203 97 82
V/C Ratio(X) 0.32 0.96 0.17 0.71 0.69 0.00 0.90 0.00 0.79 0.80 0.47 0.00
Avail Cap(c_a), veh/h 118 2521 784 394 3120 971 602 0 212 222 155 132
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.49 0.49 0.49 1.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 58.2 29.0 6.0 51.2 15.5 0.0 48.5 0.0 51.9 51.8 55.3 0.0
Incr Delay (d2), s/veh 2.8 6.0 0.2 5.9 0.6 0.0 16.3 0.0 15.2 17.5 3.6 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 26.9 1.5 4.8 15.8 0.0 10.2 0.0 5.3 6.2 1.6 0.0
LnGrp Delay(d),s/veh 61.0 35.0 6.2 57.2 16.1 0.0 64.8 0.0 67.1 69.3 58.8 0.0
LnGrp LOS E D A E B E E E E
Approach Vol, veh/h 2555 2419 682 209
Approach Delay, s/veh 33.6 20.9 65.3 67.0
Approach LOS C C E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 24.0 11.3 19.7 65.0 16.8 18.5 5.1 79.6
Change Period (Y+Rc), s 4.0 6.0 7.0 6.5 4.0 6.0 4.0 7.0
Max Green Setting (Gmax), s 20.0 9.0 9.0 58.5 14.0 15.0 7.0 63.0
Max Q Clear Time (g_c+I1), s 20.5 4.9 11.4 56.6 12.7 12.4 2.7 35.6
Green Ext Time (p_c), s 0.0 0.2 0.0 1.6 0.1 0.1 0.0 13.5
Intersection Summary
HCM 2010 Ctrl Delay 33.2
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Total PM
174: Lady Moon/HP East & Harmony
Harmony Tech Park Filing 5 8/25/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Phase Number 12345678
Movement NBL SBT WBL EBT SBL NBT EBL WBT
Lead/Lag Lead Lag Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None None None C-Max None None None None
Maximum Split (s) 24 15 16 65 18 21 11 70
Maximum Split (%) 20.0% 12.5% 13.3% 54.2% 15.0% 17.5% 9.2% 58.3%
Minimum Split (s) 11 15 11 25.5 11 15 11 28
Yellow Time (s) 3 3 5.5 5.5 3 3 3 5.5
All-Red Time (s) 1 3 1.5 1131 1.5
Minimum Initial (s) 4 4 4 15 4 4 4 15
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 7 7
Flash Dont Walk (s) 12 10
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 17.5 41.5 1.5 56.5 17.5 35.5 56.5 67.5
End Time (s) 41.5 56.5 17.5 1.5 35.5 56.5 67.5 17.5
Yield/Force Off (s) 37.5 50.5 10.5 115 31.5 50.5 63.5 10.5
Yield/Force Off 170(s) 37.5 50.5 10.5 103 31.5 50.5 63.5 0.5
Local Start Time (s) 22.5 46.5 6.5 61.5 22.5 40.5 61.5 72.5
Local Yield (s) 42.5 55.5 15.5 0 36.5 55.5 68.5 15.5
Local Yield 170(s) 42.5 55.5 15.5 108 36.5 55.5 68.5 5.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 100
Offset: 115 (96%), Referenced to phase 4:EBT, Start of Yellow
Splits and Phases: 174: Lady Moon/HP East & Harmony
HCM 2010 TWSC Long Total AM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Intersection
Int Delay, s/veh 0.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 10 0 0 55 0 335 20 0 705 40
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - 0 - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 11 0 0 58 0 353 21 0 742 42
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1126 1137 763 1126 1147 363 784 0 0 374 0 0
Stage 1 763 763 - 363 363 - - - - - - -
Stage 2 363 374 - 763 784 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 182 202 404 182 199 682 834 - - 1184 - -
Stage 1 397 413 - 656 625 - - - - - - -
Stage 2 656 618 - 397 404 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 167 202 404 177 199 682 834 - - 1184 - -
Mov Cap-2 Maneuver 167 202 - 177 199 - - - - - - -
Stage 1 397 413 - 656 625 - - - - - - -
Stage 2 600 618 - 387 404 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.1 10.8 0 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 834 - - 404 682 1184 - -
HCM Lane V/C Ratio - - - 0.026 0.085 - - -
HCM Control Delay (s) 0 - - 14.1 10.8 0 - -
HCM Lane LOS A - - B B A - -
HCM 95th %tile Q(veh) 0 - - 0.1 0.3 0 - -
Lanes and Geometrics Long Total AM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 1 0 1 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.865 0.992 0.993
Flt Protected
Satd. Flow (prot) 0 0 1611 0 0 1611 0 1848 0 0 1850 0
Flt Permitted
Satd. Flow (perm) 0 0 1611 0 0 1611 0 1848 0 0 1850 0
Link Speed (mph) 30 30 25 25
Link Distance (ft) 186 169 260 464
Travel Time (s) 4.2 3.8 7.1 12.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Intersection
Int Delay, s/veh 1.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 5 0 0 120 0 690 15 0 495 35
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - 0 - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 5 0 0 126 0 726 16 0 521 37
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1273 1281 539 1273 1292 734 558 0 0 742 0 0
Stage 1 539 539 - 734 734 - - - - - - -
Stage 2 734 742 - 539 558 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 144 166 542 144 163 420 1013 - - 865 - -
Stage 1 527 522 - 412 426 - - - - - - -
Stage 2 412 422 - 527 512 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 101 166 542 143 163 420 1013 - - 865 - -
Mov Cap-2 Maneuver 101 166 - 143 163 - - - - - - -
Stage 1 527 522 - 412 426 - - - - - - -
Stage 2 288 422 - 522 512 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.7 17.2 0 0
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1013 - - 542 420 865 - -
HCM Lane V/C Ratio - - - 0.01 0.301 - - -
HCM Control Delay (s) 0 - - 11.7 17.2 0 - -
HCM Lane LOS A - - B C A - -
HCM 95th %tile Q(veh) 0 - - 0 1.2 0 - -
Lanes and Geometrics Long Total PM
7: Lady Moon & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 1 0 1 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.865 0.997 0.991
Flt Protected
Satd. Flow (prot) 0 0 1611 0 0 1611 0 1857 0 0 1846 0
Flt Permitted
Satd. Flow (perm) 0 0 1611 0 0 1611 0 1857 0 0 1846 0
Link Speed (mph) 30 30 25 25
Link Distance (ft) 186 169 333 391
Travel Time (s) 4.2 3.8 9.1 10.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total AM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Intersection
Int Delay, s/veh 13.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 50 30 25 35 10 30 65 275 45 180 415 120
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 160 - - - 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 53 32 26 37 11 32 68 289 47 189 437 126
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1350 1353 500 1345 1392 313 563 0 0 337 0 0
Stage 1 879 879 - 450 450 - - - - - - -
Stage 2 471 474 - 895 942 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 128 150 571 129 142 727 1008 - - 1222 - -
Stage 1 342 365 - 589 572 - - - - - - -
Stage 2 573 558 - 335 342 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 95 118 571 82 112 727 1008 - - 1222 - -
Mov Cap-2 Maneuver 95 118 - 82 112 - - - - - - -
Stage 1 319 309 - 549 533 - - - - - - -
Stage 2 501 520 - 243 289 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 95.8 63.7 1.5 2.1
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1008 - - 102 571 135 1222 - -
HCM Lane V/C Ratio 0.068 - - 0.826 0.046 0.585 0.155 - -
HCM Control Delay (s) 8.8 - - 122.1 11.6 63.7 8.5 - -
HCM Lane LOS A - - F B F A - -
HCM 95th %tile Q(veh) 0.2 - - 4.6 0.1 3 0.5 - -
Lanes and Geometrics Long Total AM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 160 0 0 100 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.946 0.979 0.966
Flt Protected 0.970 0.977 0.950 0.950
Satd. Flow (prot) 0 1807 1583 0 1722 0 1770 1824 0 1770 1799 0
Flt Permitted 0.970 0.977 0.950 0.950
Satd. Flow (perm) 0 1807 1583 0 1722 0 1770 1824 0 1770 1799 0
Link Speed (mph) 30 30 25 25
Link Distance (ft) 338 220 457 260
Travel Time (s) 7.7 5.0 12.5 7.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Intersection
Int Delay, s/veh 59.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 150 15 55 55 35 80 25 475 25 100 355 45
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 160 - - - 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 158 16 58 58 37 84 26 500 26 105 374 47
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1234 1187 397 1182 1198 513 421 0 0 526 0 0
Stage 1 608 608 - 566 566 - - - - - - -
Stage 2 626 579 - 616 632 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver ~ 153 188 652 167 186 561 1138 - - 1041 - -
Stage 1 483 486 - 509 507 - - - - - - -
Stage 2 472 501 - 478 474 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 98 165 652 128 163 561 1138 - - 1041 - -
Mov Cap-2 Maneuver ~ 98 165 - 128 163 - - - - - - -
Stage 1 472 437 - 497 495 - - - - - - -
Stage 2 363 490 - 377 426 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s $ 322.7 70.8 0.4 1.8
HCM LOS F F
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1138 - - 102 652 216 1041 - -
HCM Lane V/C Ratio 0.023 - - 1.703 0.089 0.828 0.101 - -
HCM Control Delay (s) 8.2 - -$ 426.6 11.1 70.8 8.8 - -
HCM Lane LOS A - - F B F A - -
HCM 95th %tile Q(veh) 0.1 - - 13.7 0.3 6.2 0.3 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Lanes and Geometrics Long Total PM
14: Lady Moon & Timberwood/Banner
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 160 0 0 100 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.937 0.993 0.983
Flt Protected 0.957 0.984 0.950 0.950
Satd. Flow (prot) 0 1783 1583 0 1717 0 1770 1850 0 1770 1831 0
Flt Permitted 0.957 0.984 0.950 0.950
Satd. Flow (perm) 0 1783 1583 0 1717 0 1770 1850 0 1770 1831 0
Link Speed (mph) 30 30 25 25
Link Distance (ft) 335 220 457 333
Travel Time (s) 7.6 5.0 12.5 9.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total AM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Intersection
Int Delay, s/veh 4.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 45 70 65 100 70 25 5 0 10 25 0 25
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 47 74 68 105 74 26 5 0 11 26 0 26
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 100 0 0 142 0 0 514 514 108 505 534 87
Stage 1 - - - - - - 203 203 - 297 297 -
Stage 2 - - - - - - 311 311 - 208 237 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1493 - - 1441 - - 471 464 946 478 452 971
Stage 1 - - - - - - 799 733 - 712 668 -
Stage 2 - - - - - - 699 658 - 794 709 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1493 - - 1441 - - 420 414 946 433 403 971
Mov Cap-2 Maneuver - - - - - - 420 414 - 433 403 -
Stage 1 - - - - - - 772 708 - 688 617 -
Stage 2 - - - - - - 628 607 - 758 685 -
Approach EB WB NB SB
HCM Control Delay, s 1.9 3.9 10.5 11.6
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 667 1493 - - 1441 - - 599
HCM Lane V/C Ratio 0.024 0.032 - - 0.073 - - 0.088
HCM Control Delay (s) 10.5 7.5 0 - 7.7 0 - 11.6
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.1 0.1 - - 0.2 - - 0.3
Lanes and Geometrics Long Total AM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.951 0.983 0.907 0.932
Flt Protected 0.988 0.975 0.985 0.976
Satd. Flow (prot) 0 1750 0 0 1785 0 0 1664 0 0 1694 0
Flt Permitted 0.988 0.975 0.985 0.976
Satd. Flow (perm) 0 1750 0 0 1785 0 0 1664 0 0 1694 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 415 338 219 198
Travel Time (s) 9.4 7.7 5.0 4.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Intersection
Int Delay, s/veh 6.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 35 80 15 20 75 15 70 0 100 40 0 35
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 37 84 16 21 79 16 74 0 105 42 0 37
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 95 0 0 100 0 0 313 303 92 347 303 87
Stage 1 - - - - - - 166 166 - 129 129 -
Stage 2 - - - - - - 147 137 - 218 174 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1499 - - 1493 - - 640 610 965 607 610 971
Stage 1 - - - - - - 836 761 - 875 789 -
Stage 2 - - - - - - 856 783 - 784 755 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1499 - - 1493 - - 597 585 965 524 585 971
Mov Cap-2 Maneuver - - - - - - 597 585 - 524 585 -
Stage 1 - - - - - - 814 741 - 852 777 -
Stage 2 - - - - - - 811 771 - 680 735 -
Approach EB WB NB SB
HCM Control Delay, s 2 1.4 11.1 11.1
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 770 1499 - - 1493 - - 667
HCM Lane V/C Ratio 0.232 0.025 - - 0.014 - - 0.118
HCM Control Delay (s) 11.1 7.5 0 - 7.4 0 - 11.1
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.9 0.1 - - 0 - - 0.4
Lanes and Geometrics Long Total PM
11: Access A & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.984 0.981 0.921 0.937
Flt Protected 0.987 0.991 0.980 0.974
Satd. Flow (prot) 0 1809 0 0 1811 0 0 1681 0 0 1700 0
Flt Permitted 0.987 0.991 0.980 0.974
Satd. Flow (perm) 0 1809 0 0 1811 0 0 1681 0 0 1700 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 457 335 198 203
Travel Time (s) 10.4 7.6 4.5 4.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total AM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 160 150 20 25 40 35 5 0 5 25 0 55
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 168 158 21 26 42 37 5 0 5 26 0 58
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 79 0 0 179 0 0 647 637 168 621 629 61
Stage 1 - - - - - - 505 505 - 113 113 -
Stage 2 - - - - - - 142 132 - 508 516 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1519 - - 1397 - - 384 395 876 400 399 1004
Stage 1 - - - - - - 549 540 - 892 802 -
Stage 2 - - - - - - 861 787 - 547 534 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1519 - - 1397 - - 323 339 876 355 343 1004
Mov Cap-2 Maneuver - - - - - - 323 339 - 355 343 -
Stage 1 - - - - - - 481 474 - 782 786 -
Stage 2 - - - - - - 795 771 - 477 468 -
Approach EB WB NB SB
HCM Control Delay, s 3.7 1.9 12.8 11.5
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 472 1519 - - 1397 - - 639
HCM Lane V/C Ratio 0.022 0.111 - - 0.019 - - 0.132
HCM Control Delay (s) 12.8 7.7 0 - 7.6 0 - 11.5
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.1 0.4 - - 0.1 - - 0.5
Lanes and Geometrics Long Total AM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.992 0.952 0.932 0.907
Flt Protected 0.976 0.988 0.976 0.985
Satd. Flow (prot) 0 1803 0 0 1752 0 0 1694 0 0 1664 0
Flt Permitted 0.976 0.988 0.976 0.985
Satd. Flow (perm) 0 1803 0 0 1752 0 0 1694 0 0 1664 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 579 415 198 209
Travel Time (s) 13.2 9.4 4.5 4.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Intersection
Int Delay, s/veh 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 80 70 5 5 145 30 20 0 25 35 0 85
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 84 74 5 5 153 32 21 0 26 37 0 89
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 184 0 0 79 0 0 469 440 76 437 426 168
Stage 1 - - - - - - 245 245 - 179 179 -
Stage 2 - - - - - - 224 195 - 258 247 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1391 - - 1519 - - 505 511 985 530 520 876
Stage 1 - - - - - - 759 703 - 823 751 -
Stage 2 - - - - - - 779 739 - 747 702 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1391 - - 1519 - - 430 477 985 490 485 876
Mov Cap-2 Maneuver - - - - - - 430 477 - 490 485 -
Stage 1 - - - - - - 711 659 - 771 748 -
Stage 2 - - - - - - 697 736 - 681 658 -
Approach EB WB NB SB
HCM Control Delay, s 4 0.2 11.2 11.1
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 626 1391 - - 1519 - - 712
HCM Lane V/C Ratio 0.076 0.061 - - 0.003 - - 0.177
HCM Control Delay (s) 11.2 7.8 0 - 7.4 0 - 11.1
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.2 0.2 - - 0 - - 0.6
Lanes and Geometrics Long Total PM
17: Access B & Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.996 0.977 0.925 0.905
Flt Protected 0.975 0.999 0.978 0.986
Satd. Flow (prot) 0 1809 0 0 1818 0 0 1685 0 0 1662 0
Flt Permitted 0.975 0.999 0.978 0.986
Satd. Flow (perm) 0 1809 0 0 1818 0 0 1685 0 0 1662 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 540 457 204 209
Travel Time (s) 12.3 10.4 4.6 4.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total AM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 15 0 5 40 0 60 20 60 110 220 385 50
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 16 0 5 42 0 63 21 63 116 232 405 53
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1090 1116 432 1060 1084 121 458 0 0 179 0 0
Stage 1 895 895 - 163 163 - - - - - - -
Stage 2 195 221 - 897 921 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 193 208 624 202 217 930 1103 - - 1397 - -
Stage 1 335 359 - 839 763 - - - - - - -
Stage 2 807 720 - 334 349 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 155 170 624 172 178 930 1103 - - 1397 - -
Mov Cap-2 Maneuver 155 170 - 172 178 - - - - - - -
Stage 1 329 299 - 823 748 - - - - - - -
Stage 2 738 706 - 276 291 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 26.2 20.5 0.9 2.7
HCM LOS D C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1103 - - 191 337 1397 - -
HCM Lane V/C Ratio 0.019 - - 0.11 0.312 0.166 - -
HCM Control Delay (s) 8.3 - - 26.2 20.5 8.1 - -
HCM Lane LOS A - - D C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.4 1.3 0.6 - -
Lanes and Geometrics Long Total AM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 100 0 100 100
Storage Lanes 0 0 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.968 0.919 0.903 0.983
Flt Protected 0.963 0.980 0.950 0.950
Satd. Flow (prot) 0 1736 0 0 1678 0 1770 1682 0 1770 1831 0
Flt Permitted 0.963 0.980 0.950 0.950
Satd. Flow (perm) 0 1736 0 0 1678 0 1770 1682 0 1770 1831 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 169 579 1380 297
Travel Time (s) 3.8 13.2 31.4 6.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Intersection
Int Delay, s/veh 7.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 60 0 20 120 0 125 5 405 55 100 90 15
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - 160 100 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 63 0 21 126 0 132 5 426 58 105 95 16
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 779 808 103 790 787 455 111 0 0 484 0 0
Stage 1 313 313 - 466 466 - - - - - - -
Stage 2 466 495 - 324 321 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 313 315 952 308 324 605 1479 - - 1079 - -
Stage 1 698 657 - 577 562 - - - - - - -
Stage 2 577 546 - 688 652 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 226 283 952 278 291 605 1479 - - 1079 - -
Mov Cap-2 Maneuver 226 283 - 278 291 - - - - - - -
Stage 1 696 593 - 575 560 - - - - - - -
Stage 2 450 544 - 607 589 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 23.4 20.3 0.1 4.2
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1479 - - 279 278 605 1079 - -
HCM Lane V/C Ratio 0.004 - - 0.302 0.454 0.217 0.098 - -
HCM Control Delay (s) 7.4 - - 23.4 28.3 12.6 8.7 - -
HCM Lane LOS A - - C D B A - -
HCM 95th %tile Q(veh) 0 - - 1.2 2.2 0.8 0.3 - -
Lanes and Geometrics Long Total PM
13: Technology & Intel/Timberwood
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 160 100 0 100 100
Storage Lanes 0 0 0 1 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.966 0.850 0.982 0.978
Flt Protected 0.964 0.950 0.950 0.950
Satd. Flow (prot) 0 1735 0 0 1770 1583 1770 1829 0 1770 1822 0
Flt Permitted 0.964 0.950 0.950 0.950
Satd. Flow (perm) 0 1735 0 0 1770 1583 1770 1829 0 1770 1822 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 169 540 1380 297
Travel Time (s) 3.8 12.3 31.4 6.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total AM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Intersection
Int Delay, s/veh 0.3
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 30 115 20 0 655
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 32 121 21 0 689
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 821 132 0 0 142 0
Stage 1 132 - - - - -
Stage 2 689 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 344 917 - - 1441 -
Stage 1 894 - - - - -
Stage 2 498 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 344 917 - - 1441 -
Mov Cap-2 Maneuver 344 - - - - -
Stage 1 894 - - - - -
Stage 2 498 - - - - -
Approach WB NB SB
HCM Control Delay, s 9.1 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 917 1441 -
HCM Lane V/C Ratio - - 0.034 - -
HCM Control Delay (s) - - 9.1 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.1 0 -
Lanes and Geometrics Long Total AM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/20/2015 Synchro 9 Light Report
Delich Associates lt north am.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.980
Flt Protected
Satd. Flow (prot) 0 1611 1825 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1825 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 239 297 357
Travel Time (s) 5.4 6.8 8.1
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 70 580 10 0 205
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 74 611 11 0 216
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 832 616 0 0 621 0
Stage 1 616 - - - - -
Stage 2 216 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 339 491 - - 960 -
Stage 1 539 - - - - -
Stage 2 820 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 339 491 - - 960 -
Mov Cap-2 Maneuver 339 - - - - -
Stage 1 539 - - - - -
Stage 2 820 - - - - -
Approach WB NB SB
HCM Control Delay, s 13.6 0 0
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 491 960 -
HCM Lane V/C Ratio - - 0.15 - -
HCM Control Delay (s) - - 13.6 0 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.5 0 -
Lanes and Geometrics Long Total PM
1: Technology & RT Access
Harmony Tech Park Filing 5 8/21/2015 Synchro 9 Light Report
Delich Associates lt north pm.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 0 0
Storage Lanes 0 1 0 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865 0.998
Flt Protected
Satd. Flow (prot) 0 1611 1859 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1859 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 239 297 357
Travel Time (s) 5.4 6.8 8.1
Intersection Summary
Area Type: Other
APPENDIX I
Harmony
Kechter
Rock Creek
Ziegler
Timberwood
Lady Moon
Precision
Le Fever
Cinquefoil
Fossil Ridge
High School
Timberwood
Technology
SCALE: 1"=1000'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
HTP Retail TIS, September 2015
Pedestrian LOS Worksheet
Project Location Classification: Other
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Avago Commercial
Minimum C C C C C
1 Actual A D C C C
Proposed A B C C B
Banner Medical
Campus Commercial
Minimum C C C C C
2 Actual A D D C B
Proposed A A C B B
Intel Industrial
Minimum C C C C C
3 Actual A D D C D
Proposed A B C B C
Minimum
4 Actual
Proposed
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
40/35
705/495
10/5
RT
Access
Timberwood
120/45
415/355
180/100
50/150
30/15
25/55
65/25
275/475
45/25
30/80
10/35
35/55
235/530
50/5
105/275
1680/2365
360/210
5/100
5/45
5/160
120/10
180/15
1905/2095
380/275
Intel
Banner
AM/PM
Rounded to Nearest
5 Vehicles
Access A
Access B
5/20
NOM
5/25
55/85
NOM
25/35
Timberwood
NOM
5/70
10/100
25/35
NOM
25/40
160/80
150/70
20/5
25/5
40/145
35/30
45/35
70/80
65/15
100/20
70/75
25/15
Technology
120/128
47/49
28/32
39/38
28/40
60/57
44/33
34/23
39/38
28/40
31/46
44/33
28/32
Access A
Access B
Timberwood
Intel
Banner
AM/PM
39/9
104/90
75/89
NOM
3/46
NOM
Technology
254/264
392/307
83/105
74/165
242/466
617/698
164/133
1198/1677
170/255
531/853
1478/1465
120/137
680/470
Timberwood
90/20
410/350
180/100
10/90
30/15
15/45
40/5
275/475
45/25
30/80
10/35
35/55
230/520
50/5
70/225
1695/2390
350/200
5/100
5/45
5/160
120/10
180/15
1920/2120
325/225
Intel
Banner
AM/PM
Rounded to Nearest
5 Vehicles
Access B
5/40
NOM
0/5
95/20
105/35
20/5
Access A
5/20
NOM
5/25
Timberwood
25/5
15/105
5/0
40/40
100/20
45/50
65/15
5/70
10/100
Technology
86/202
71/40
208/124
42/24
6/12
28/52
87/77
13/9
23/19
52/57
22/25
-15/-25
54/50
-14/-26
12/9
6/8
35/50
26/20
28/26
7/6
41/58
10/12
Technology
7/8
35/50
44/35
29/26
11/10
42/58
17/20