Loading...
HomeMy WebLinkAboutSAINT JOHN XXIII CATHOLIC CHURCH AND LOMBARDY STUDENT HOUSING - PDP190001 - DOCUMENT MARKUPS - ROUND 2 - ELEVATIONSKEYNOTE MATERIALS LIST SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 1 SOUTH ELEVATION (UNIVERSITY AVENUE) 01 07 09 05 11 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_ST1 Exterior Stucco assembly Color: Grey (-4" projection, typ.) Preferred Alternative (Budget Permitting) - Gray Metal Panel 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-ST1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 2 EAST ELEVATION 04 06 01 02 10 07 05 07 02 10 01 04 01 03 TOP OF STAIR 178'-8" 03 06 13 13 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 1 NORTH ELEVATION 01 04 09 07 05 04 03 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 2 WEST ELEVATION TOP OF STAIR 178'-8" TOP OF STAIR 178'-8" 10 07 04 01 02 01 04 10 11 10 10 04 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_ST1 Exterior Stucco assembly Color: Grey (-4" projection, typ.) Preferred Alternative (Budget Permitting) - Gray Metal Panel 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-ST1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING 2 VIEW LOOKING NORTHEAST 1 VIEW LOOKING NORTHWEST 3 VIEW LOOKING SOUTHEAST 4 VIEW LOOKING SOUTHWEST BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 05.01.2019 AW. © 2019 DAVIS PARTNERSHIP, P.C. PRELIMINARY DEVELOPMENT PLAN (PDP) N.T.S. BUILDING A - PERSPECTIVES 3 KEYNOTE MATERIALS LIST SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 1 SOUTH ELEVATION (UNIVERSITY AVENUE) 04 01 04 02 05 09 06 07 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 2 EAST ELEVATION 04 07 06 05 04 01 03 10 03 08 02 10 TOP OF STAIR 178'-8" 02 05 02 10 13 13 05 04 05 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_ST1 Exterior Stucco assembly Color: Grey (-4" projection, typ.) Preferred Alternative (Budget Permitting) - Gray Metal Panel 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 1 NORTH ELEVATION 04 09 07 07 04 03 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" 2 WEST ELEVATION TOP OF STAIR 178'-8" TOP OF STAIR 178'-8" 10 05 09 10 04 04 07 01 11 04 04 04 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_ST1 Exterior Stucco assembly Color: Grey (-4" projection, typ.) Preferred Alternative (Budget Permitting) - Gray Metal Panel 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-ST1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 2 VIEW LOOKING NORTHEAST 1 VIEW LOOKING NORTHWEST 3 PERSPECTIVE LOOKING NORTHWEST 4 PERSPECTIVE LOOKING NORTH BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 05.01.2019 PRELIMINARY DEVELOPMENT PLAN (PDP) N.T.S. BUILDING B - PERSPECTIVES 6 KEYNOTE MATERIALS LIST 1 SOUTH ELEVATION (UNIVERSITY AVENUE) 10 04 01 02 05 09 2 EAST ELEVATION 06 07 01 06 04 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" 01 04 05 02 09 05 10 04 04 07 01 03 10 10 12 02 13 05 11 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_ST1 Exterior Stucco assembly Color: Grey (-4" projection, typ.) Preferred Alternative (Budget Permitting) - Gray Metal Panel 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-ST1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 1 NORTH ELEVATION 01 01 04 05 07 09 06 02 2 WEST ELEVATION 01 09 10 04 04 07 SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" SECOND LEVEL 112'-0" THIRD LEVEL 124'-0" FOURTH LEVEL 136'-0" FIFTH LEVEL 148'-0" MAIN LEVEL 100'-0" TOP OF ROOF 167'-8" TOP OF ROOF 171'-8" TOP OF STAIR 183'-2" 04 02 03 05 09 10 04 10 02 01 10 12 05 04 13 11 01 - WS_MAS1 Exterior brick assembly Norman size, 1/3rd bond. Color: ACME Ebony DTP153 (2'-0" projection, typ.) 02 - WS_MAS2 Exterior masonry assembly Color: To match church: ACME Ridgemar PEP031 03 - WS_MAS3 Exterior stone base 04 - WS_ST1 Exterior Stucco assembly Color: Grey (-4" projection, typ.) Preferred Alternative (Budget Permitting) - Gray Metal Panel 05 - WS_WD1 Exterior wood or composite wood assembly (Alt. wood look high pressure laminate, e.g., Trespa Pura) (-2" projection, typ.) 06 - Storefront glazing assembly w/ 1" insulated glass 07 - *Composite window assembly w/ high performance glass, typ. Color: Black 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-ST1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. 2 VIEW LOOKING SOUTHWEST 1 VIEW LOOKING SOUTHEAST 3 VIEW LOOKING NORTHWEST 4 VIEW LOOKING NORTHEAST BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 05.01.2019 PRELIMINARY DEVELOPMENT PLAN (PDP) N.T.S. BUILDING C - PERSPECTIVES 9 ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING SOLAR STUDY 18923.00.000 05/01/19 AW.10 2019 PRELIMINARY DEVELOPMENT PROPOSAL (PDP) SOLAR SHADOW STUDY ON 6.21 AT 8AM, 12PM, & 5PM SOLAR SHADOW STUDY ON 3.21 AT 8AM, 12PM, & 5PM SOLAR SHADOW STUDY ON 9.21 AT 8AM, 12PM, & 5PM SOLAR SHADOW STUDY ON 12.21 AT 6AM, 12PM, & 4PM UNIVERSITY AVENUE S. SHIELDS STREET CITY PARK AVENUE WEST ELIZABETH STREET UNIVERSITY AVENUE S. SHIELDS STREET CITY PARK AVENUE WEST ELIZABETH STREET UNIVERSITY AVENUE S. SHIELDS STREET CITY PARK AVENUE WEST ELIZABETH STREET UNIVERSITY AVENUE S. SHIELDS STREET CITY PARK AVENUE WEST ELIZABETH STREET BUILDING A BUILDING B BUILDING C CHURCH BUILDING A BUILDING B BUILDING C CHURCH BUILDING A BUILDING B BUILDING C CHURCH BUILDING A BUILDING B BUILDING C CHURCH N.T.S N N N N T R 6' - 3 1/2" 18' - 3" 5' - 7 1/4" 2" 6' - 10 3/4" 17' - 7 1/4" 5' - 0" ø 2' - 0" ø 2' - 6" TRASH RECYCLE ADD. RECYCLE ADD. TRASH OUTFALL OUTFALL 10' - 0" CONCRETE CURB ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1/4" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING TRASH DETAILS 18923.00 05/01/19 AW.11 PRELIMINARY DEVELOPMENT PROPOSAL (PDP) 2 BUILDING 1/4" = 1'-0" A - TRASH ROOMS - LEVELS 2-5 1 BUILDING 1/4" = 1'-0" A TRASH ROOM - LEVEL 1 RECYCLE TRASH OUTFALL ADD. TRASH 24' - 3 1/2" 3' - 0" ADD. RECYCLE OUTFALL 10' - 0" CURB TRASH R T 5' - 7 1/8" 10' - 0 1/4" 3' - 0" ø 2' - 6" ø 2' - 0" ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1/4" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING BUILDING B - TRASH DETAILS 18923.00 05/01/19 EX. 7 1 BUILDING 1/4" = 1'-0" B - TRASH ROOM 2 BUILDING 1/4" = 1'-0" B - TRASH CHUTES - LEVELS 2-5 RECYCLE TRASH UP UP UP UP UP UP UP GARAGE PARKING SPACES LEVEL 1: 83 12 9 11 17 8 15 11 98'-6" 105'-4" 112'-0" 118'-0" GARAGE PARKING SPACES LEVEL 2: 74 7 18 11 8 11 123'-7 3/4" 4 15 130'-0" 124'-0" GARAGE PARKING SPACES LEVEL 3: 74 7 18 11 8 11 15 142'-0" 136'-0" 7 18 11 8 11 15 148'-0" GARAGE PARKING SPACES LEVEL 4: 74 ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1" = 20'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING BUILDING C - GARAGE 18923.00 05/01/19 AW.12 PRELIMINARY DEVELOPMENT PLAN 1 1" = 20'-0" 2 1" = 20'-0" LEVEL 1 - GARAGE DIAGRAM LEVEL 2 - GARAGE DIAGRAM 3 1" = 20'-0" 4 1" = 20'-0" LEVEL 3 - GARAGE DIAGRAM LEVEL 4 - GARAGE DIAGRAM UP UP 154'-0" 148'-0" 7 18 11 8 10 15 GARAGE PARKING SPACES LEVEL 5: 74 164'-6" 18 11 10 GARAGE PARKING SPACES ROOF: 46 160'-0" 7 ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1" = 20'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING BUILDING C - GARAGE 18923.00 05/01/19 AW.13 PRELIMINARY DEVELOPMENT PLAN 2 1" = 20'-0" GARAGE DIAGRAM - LEVEL 5 1 1" = 20'-0" GARAGE DIAGRAM - LEVEL 6 STAIR TO ROOF ROOF ACCESS HATCH 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 3/32" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING ROOF ACCESS PLANS 18923.00 05/01/19 AW.14 1 3/32" = 1'-0" BUILDING A - ROOF ACCESS UP UP STAIR TO ROOF STAIR TO ROOF PRESSURIZED STAIR SHAFT, TYP. 6'-0" PARAPET 6'-0" PARAPET 6'-0" PARAPET 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. 177' - 1 1/4" 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. 6'-0" PARAPET 6'-0" PARAPET ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 3/32" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING ROOF ACCESS PLANS 18923.00 05/01/19 AW.15 1 3/32" = 1'-0" ROOF LEVEL UP STAIR ROOF ACCESS ROOF ACCESS HATCH ROOF ACCESS HATCH 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. 6'-0" - PARAPET 6'-0" PARAPET 6'-0" PARAPET 2'-0" PARAPET; TYP. 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. 6'-0" PARAPET 2'-0" PARAPET; TYP. ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 3/32" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING ROOF ACCESS PLANS 18923.00 05/01/19 AW.16 1 3/32" = 1'-0" 02 - 100 - LEVEL 6 ROOF - OVERALL Copy 1 ADD. TRASH 11' - 5 3/4" 31' - 2 1/2" OUTFALL OUTFALL 10' - 0" CURB T R 10' - 10" 4' - 11 1/4" 11' - 0 1/4" 11' - 4 1/4" ø 2' - 6" ø 2' - 0" ISSUE DATE: PROJECT NO: SCALE: © DAVIS PARTNERSHIP, P.C. 1/4" = 1'-0" BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING BUILDING C - TRASH DETAILS 18923.00 05/01/19 EX. 9 PRELIMINARY DEVELOPMENT PLAN (PDP) 1 BUILDING 1/4" = 1'-0" C - TRASH ROOM 2 BUILDING 1/4" = 1'-0" C - TRASH CHUTES - LEVEL 2-5 Trash and Recycling Narrative: Per coordination with Waste Management and comments from Internal Services, the project will utilize 3-yard dumpsters for both trash and recycling. Trash and Recycling service will take place 5 days per week. Dumpsters will be serviced directly from each building. On each level each chute to read “Recycle” or “Landfill” Building A: (2) 3-Yard Dumpsters / (2) 3-Yard Recycling Container Building B: (3) 3-Yard Dumpsters / (1) 3-Yard Recycling Container Building C: (2) 3-Yard Dumpsters / (1) 3-Yard Recycling Container *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 05.01.2019 PRELIMINARY DEVELOPMENT PLAN (PDP) 3/32"=1'-0" BUILDING C - ELEVATIONS 8 KEYNOTE MATERIALS LIST 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 05.01.2019 PRELIMINARY DEVELOPMENT PLAN (PDP) 3/32"=1'-0" BUILDING C - ELEVATIONS 7 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 05.01.2019 PRELIMINARY DEVELOPMENT PLAN (PDP) 3/32"=1'-0" BUILDING B - ELEVATIONS 5 KEYNOTE MATERIALS LIST 11 01 02 08 - Steel entry shroud 09 - Aluminum or steel window shroud at WS-ST1 Color: Black (1'-0" projection, typ.) 10 - Parapet cap 11 - Precast concrete sill 12 - Rated coiling garage door 13 - 4'-0" entry awning with WS_WD1 infill NOTE: Color selections are preliminary and subject to change and may be adjusted per City approval per final compliance requirements. *Typical windows at living rooms are 8'-0"w x 8'-0"h & bedroom windows are 5'-0"w x 8'-0"h with 2'-0" sill BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 AW. © 2019 DAVIS PARTNERSHIP, P.C. 05.01.2019 PRELIMINARY DEVELOPMENT PLAN (PDP) 3/32"=1'-0" BUILDING B - ELEVATIONS 4 PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 05.01.2019 AW. © 2019 DAVIS PARTNERSHIP, P.C. PRELIMINARY DEVELOPMENT PLAN (PDP) 3/32"=1'-0" BUILDING A - ELEVATIONS 2 KEYNOTE MATERIALS LIST 04 3 TYPICAL STONE STILL AT WS_MAS1 BASE 4 TYPICAL WINDOW CONDITIONS 04 05 01 02 09 04 11 01 04 07 07 04 04 BLACKBIRD INVESTMENTS, LOMBARDY STUDENT HOUSING PROJECT NO: ISSUE DATE: SCALE: 18923.00.000 05.01.2019 AW. © 2019 DAVIS PARTNERSHIP, P.C. PRELIMINARY DEVELOPMENT PLAN (PDP) 3/32"=1'-0" BUILDING A - ELEVATIONS 1