Loading...
HomeMy WebLinkAboutHARMONY COMMONS - PDP - PDP150027 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSFirst Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" W1 W2 W1 W4 color 2 W1 W2 W1 W4 color 1 W1 W4 color 1 6 beyond 7 16 16 3 7 7 3 16 16 12 11 7 3 First Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" 6 11 55 8 12 3 3 beyond beyond beyond 12 12 12 12 12 2 6 3 3 1 W4 7 3 3 color 1 W1 W2 W4 color 2 W2 W2 W2 W4 color 2 W5 First Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" W4 color 2 First Floor Plan 100' - 0" High Roof Parapet 124' - 0" Low Roof Parapet 118' - 6" W4 color 1 W2 W2 W1 W4 color 1 W4 color 1 W1 7 7 7 11 6 W2 W1 W1 W4 color 2 1 111 12 16 16 16 1 11 11 12 12 beyond beyond beyond 3 33 3 3 beyond 11 12 12 A 12 3 3 3 16 W4 color 2 12 7 12 W4 color 1 W5 First Floor Plan 100' - 0" High Roof Parapet 124' - 0" Low Roof Parapet 118' - 6" W2 W4 W4 color 1 color 1 W1 W1 First Floor Plan 100' - 0" First Floor Plan 100' - 0" Second Floor Plan 114' - 0" 110 11 W4 W4 W1 Field W2 W2 W3 W4 W3 W1 Field 12 12 12 12 13 12 11 11 1 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 17 17 14 17 Max. Height = 35' - 8" First Floor Plan 100' - 0" Second Floor Plan W5 114' - 0" M M I M I I W3 W2 W3 W2 W3 W2 W1 W5 W1 Field W1 Accent W1 Accent W1 Accent W4 W2 W3 W2 W2 W2 W2 W3 9 First Floor Plan 100' - 0" First Floor Plan 100' - 0" Second Floor Plan 114' - 0" 112b 5 5 5 W1 Field W1 Field W1 Field W1 Field W6 W2 W3 W2 W3 6 W2 W5 W4 9 10 12 12 12 12 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 17 17 12 12 17 First Floor Plan 100' - 0" First Floor Plan 100' - 0" Second Floor Plan 114' - 0" W4 W3 W2 W3 W2 W2 W2 W2 W1 Accent W3 W2 W3 W2 W2 W1 Accent W1 Field W1 W1 Field 1 1 1 1 12 12 12 12 12 12 12 13 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 101 Max Height = 35' - 8" W4 W5 1 12 W1 Field 17 17 14 14 5 W4 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey *(provide sample for approval) Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Slate Grey *(provide sample for approval) Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold *(provide sample for approval) Hard Coat Stucco Manuf: Sto Product: PowerWall NExT Colors: Field - White Linen (fine texture) Accent - Bronze (fine texture) *(provide sample for approval) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16x4 ground face, running bond Color: Tan Color TBD *(provide sample for approval) W1 W2 Brick Veneer Manuf: TBD Product: Modular brick, running bond Color: Tan Color TBD *(provide sample for approval) W3 W4 W5 W6 6 W7 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Client Name Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com Submittal No.1 Harmony Commons ARCH 1 Submittal No.1 11/30/2015 SA MR Office Building 'E' Elevations Lot 5 Harmony Tchnology Park Sixth Filing 2015-13 Office Building 'E' 4 of 4 1/8" = 1'-0" 1 South Building Elevation 1/8" = 1'-0" 2 West Building Elevation Exterior Material Legend 0 Keynote Legend Key Value Keynote Text 1 Painted steel column 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen, see detail x/Ax.x 9 Roof drain 10 Overflow roof drain 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 13 Curtainwall system, refer to A7.1 and A7.2 for elevations, details, and dimensions 14 Mechanical roof top unit (dashed) 17 Prefinished break metal cap flashing, refer to detail X/AS.? No. Description Date W1 Field W1 Field W1 12 13 12 12 12 12 12 12 13 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 W1 Accent W1 Accent W1 Accent 6 6 T.O. High Parapet 135' - 8" T.O. Low Parapet 130' - 2" 14 17 14 17 17 17 W1 Field 5 19 19 19 18 W7 7' - 6" 5' - 4" 13' - 4" 2' - 8" 17 18 12' - 8" 7' - 6" W7 18 17 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color: Slate Grey *(provide sample for approval) Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Slate Grey *(provide sample for approval) Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold *(provide sample for approval) Hard Coat Stucco Manuf: Sto Product: PowerWall NExT Colors: Field - White Linen (fine texture) Accent - Bronze (fine texture) *(provide sample for approval) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16x4 ground face, running bond Color: Tan Color TBD *(provide sample for approval) W1 W2 Brick Veneer Manuf: TBD Product: Modular brick, running bond Color: Tan Color TBD *(provide sample for approval) W3 W4 W5 W6 6 W7 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Client Name Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com Submittal No.1 Harmony Commons ARCH 1 Submittal No.1 11/30/2015 SA MR Office Building 'E' Elevations Lot 5 Harmony Tchnology Park Sixth Filing 2015-13 Office Building 'E' 3 of 4 1/8" = 1'-0" 1 North Building Elevation 1/8" = 1'-0" 2 East Building Elevation 1/4" = 1'-0" 3 Trash Enclosure - Front Elevation 1/4" = 1'-0" 4 Trash Enclosure - Typical Side Elevation Exterior Material Legend 0 Keynote Legend Key Value Keynote Text 1 Painted steel column 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen, see detail x/Ax.x 8 Fire Department Connection 9 Roof drain 11 Knox box 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 13 Curtainwall system, refer to A7.1 and A7.2 for elevations, details, and dimensions 14 Mechanical roof top unit (dashed) 17 Prefinished break metal cap flashing, refer to detail X/AS.? 18 Steel pipe bollard, typ. see detail on sheet -AS.? 19 Steel trash enclosure gate with metal panel to match building mechancial screen. See details on sheet -AS.? No. Description Date W2 W4 color 1 Beyond 6 7 12 W4 color 2 W4 W1 1 7 7 6 1 1 1 11 12 12 2 12 12 12 12 12 12 12 3 3 3 3 3 3 Beyond 3 6 6 3 W1 W5 W1 W2 7 W4 color 2 1 1 1 1 1 1 1 12 W4 1 16 8 color 1 W1 W5 5 11 First Floor Plan 100' - 0" High Roof Parapet 124' - 0" Low Roof Parapet 118' - 6" W4 color 1 W4 color 1 W4 W5 W1 W2 color 1 W2 12 2 12 12 12 12 12 12 12 12 3 16 1111 W4 color 1 6 beyond beyond 11 1 11 W4 color 2 W1 W4 color 1 beyond beyond beyond 3 1 12 12 12 1 3 First Floor Plan 100' - 0" High Roof Parapet 124' - 0" Low Roof Parapet 118' - 6" W1 W4 W1 color 1 7 7 7 11 11 7 12 12 6 W2 7 12 W2 1 16 7 8 12 12 12 W1 A W4 12 color 1 W2 W1 W2 W3 W4 W5 W6 6 W8 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color #1: Dark Bronze Color #2: Weathered Copper *(provide sample for approval) Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Sandstone *(provide sample for approval) Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold *(provide sample for approval) Hard Coat Stucco Manuf: Sto Product: PowerWall NExT Color: Field - White Linen (fine texture) *(provide sample for approval) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16x4 ground face, running bond Colors: Field - Tan Color TBD Accent - Grey Color TBD *(provide sample for approval) Brick Veneer Not Used 21' - 4" 5' - 4" 14' - 0" 2' - 0" W8 18 18 17 19 19 7' - 4" 12' - 8" W8 18 18 17 7' - 4" W8 18 17 21' - 4" 7' - 4" W8 17 18 12' - 8" 7' - 4" First Floor Plan 100' - 0" Low Roof Parapet 118' - 6" 12 12 12 12 12 12 6 1 1 1 1 W5 3 33 W4 3 color 2 W2 W5 W1 W4 color 1 3 First Floor Plan 100' - 0" High Roof Parapet 124' - 0" Low Roof Parapet 118' - 6" W4 color 1 W4 color 1 W1 12 12 12 W2 12 W1 12 12 11 11 12 11 12 2 1 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Client Name Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com Submittal No.1 Harmony Commons ARCH 1 Submittal No.1 11/30/2015 JDO SA Retail Building 'D' Elevations Lot 4 Harmony Technology Park Sixth Filing 2015-13 Retail Building 'D' 2 OF 4 3/32" = 1'-0" 1 North Building Elevation 3/32" = 1'-0" 2 South Building Elevation 3/32" = 1'-0" 4 West Building Elevation 3/32" = 1'-0" 3 East Building Elevation Exterior Material Legend Keynote Legend Key Value Keynote Text 1 Painted steel column 2 Painted steel canopy 3 Building Signage, by others. 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen, see detail x/Ax.x 7 Prefinished collector head and downspout 8 Fire Department Connection 11 Knox box 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 16 Exterior insulated hollow metal door & frame w/ thermal threshold, painted. 17 Prefinished break metal cap flashing, refer to detail X/AS.? 18 Steel pipe bollard, typ. see detail on sheet -AS.? 19 Steel trash enclosure gate with metal panel to match building mechancial screen. See details on sheet -AS.? A Tubelite T14000 thermally broken storefront, clear anodized finish 1/4" = 1'-0" 5 West Trash Enclosure Elevation 1/4" = 1'-0" 6 North Trash Enclosure Elevation 1/4" = 1'-0" 8 East Trash Enclosure Elevation 1/4" = 1'-0" 7 South Trash Enclosure Elevation 3/32" = 1'-0" 9 East Retail_West Building Elevation 3/32" = 1'-0" 10 West Retail_West Building Elevation No. Description Date W4 color 1 beyond 6 11 7 W2 W1 7 W1 33 12 12 12 12 12 beyond 6 First Floor Plan 100' - 0" High Parapet 122' - 0" Building Parapet 118' - 0" South Parapet 119' - 0" beyond W4 color 1 W2 W4 color 2 W1 W5 1 12 12 55 11 16 8 12 11 2 3 3 7 17 W8 15' - 4" 18 18 17 17 18 W8 2' - 8" 10' - 0" 2' - 8" 15' - 4" 18 18 19 16' - 8" 17 18 18 W8 W8 W8 18 17 16' - 8" 10' - 8" 4' - 0" 2' - 0" 19 W1 W2 W3 W4 W5 W6 6 W8 Metal Panel Manuf: Metal Sales Product: T2630 - wall panel (horiz) Color #1: Dark Bronze Color #2: Weathered Copper *(provide sample for approval) Mechanical Screen Manuf: Metal Sales Product: T13-A wall panel (horiz) Color: Sandstone *(provide sample for approval) Cementitious Lap Siding Manuf: James Hardie Product: HardiePlank Lap Siding, Smooth, 8" exposure Color: Tuscan Gold *(provide sample for approval) Hard Coat Stucco Manuf: Sto Product: PowerWall NExT Color: Field - White Linen (fine texture) *(provide sample for approval) Concrete Masonry Unit Veneer Manuf: TBD Product: 8x16x4 ground face, running bond Colors: Field - Tan Color TBD Accent - Grey Color TBD *(provide sample for approval) Brick Veneer Not Used Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com TB Group Planning / LA 444 Mountain Avenue Berthoud, CO 80531 (970) 532-5891 Contact: Cathy Mathis Email: cathy@tbgroup.us AE Associates Mechanical & Plumbing 5587 West 19th Street Greeley, CO 80634 (970) 330-5587 Contact: Alicia Thorpe Email: alicia.thorpe@aeassociates.net Engineer APS, Inc. Electrical Engineer 9249 S. Broadway, #200-836 Highlands Ranch, CO 80129 (970) 381-7462 Contact: Chuck Polson Email: chuck@apsinc.biz Interwest Consulting Group Civil Engineer 1218 Ash Street Windsor, CO 80550 (970) 674-3300 Contact: Mike Oberlander Email: moberlander@Interwestgrp.com Brinkman Construction General Contractor Client Name Developer Larsen Structural Design Structural Engineer 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com 19 Old Town Square, Suite 238 Fort Collins, CO 80524 (970) 568-3355 Contact: Blake Larsen Email: blake@larsensd.com Brinkman Partners 3528 Precision Dr Ste. 100 Fort Collins, CO 80528 (970) 267-0954 Contact: Todd Parker Email: Todd.Parker@brinkmanpartners.com Submittal No.1 Harmony Commons ARCH 1 Submittal No.1 11/30/2015 JDO MR Retail Building 'C' Elevations Lot 3 Harmony Technology Park Sixth Filing 2015-13 Retail Building 'C' 1 OF 4 1/8" = 1'-0" 1 North Building Elevation 1/8" = 1'-0" 2 South Building Elevation 1/8" = 1'-0" 3 East Building Elevation 1/8" = 1'-0" 4 West Building Elevation 1/4" = 1'-0" 5 North - Trash Enclosure Elevation 1/4" = 1'-0" 6 South - Trash Enclosure Elevation 1/4" = 1'-0" 7 East - Trash Enclosure Elevation 1/4" = 1'-0" 8 West - Trash Enclosure Elevation Keynote Legend Number Description 1 Painted steel column 2 Painted steel canopy 3 Building Signage, by others. 5 Electrical gear and meters painted to match adjacent building material 6 Mechanical screen, see detail x/Ax.x 7 Prefinished collector head and downspout 8 Fire Department Connection 11 Knox box 12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and dimensions 16 Exterior insulated hollow metal door & frame w/ thermal threshold, painted. 17 Prefinished break metal cap flashing, refer to detail X/AS.? 18 Steel pipe bollard, typ. see detail on sheet -AS.? 19 Steel trash enclosure gate with metal panel to match building mechancial screen. See details on sheet -AS.? 0 Exterior Material Legend No. Description Date