Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutHARMONY COMMONS - PDP - PDP150027 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSFirst Floor Plan
100' - 0"
High Parapet
122' - 0"
Building Parapet
118' - 0"
South Parapet
119' - 0"
W1 W2 W1 W4
color 2
W1 W2
W1 W4
color 1
W1
W4
color 1
6
beyond
7
16 16
3 7 7 3
16 16 12
11
7 3
First Floor Plan
100' - 0"
High Parapet
122' - 0"
Building Parapet
118' - 0"
South Parapet
119' - 0"
6
11
55
8 12
3 3
beyond beyond beyond
12 12 12 12 12
2 6 3 3
1
W4 7 3 3
color 1
W1
W2 W4
color 2
W2 W2 W2
W4
color 2
W5
First Floor Plan
100' - 0"
High Parapet
122' - 0"
Building Parapet
118' - 0"
South Parapet
119' - 0"
W4
color 2
First Floor Plan
100' - 0"
High Roof Parapet
124' - 0"
Low Roof Parapet
118' - 6"
W4
color 1
W2 W2 W1
W4
color 1
W4
color 1
W1
7 7 7
11
6
W2
W1
W1
W4
color 2
1
111
12 16 16 16
1
11 11
12
12
beyond
beyond
beyond
3
33 3
3
beyond
11
12 12 A
12
3 3 3
16
W4
color 2
12
7
12
W4
color 1
W5
First Floor Plan
100' - 0"
High Roof Parapet
124' - 0"
Low Roof Parapet
118' - 6"
W2
W4
W4 color 1
color 1
W1 W1
First Floor Plan
100' - 0"
First Floor Plan
100' - 0"
Second Floor Plan
114' - 0"
110
11
W4
W4
W1
Field
W2 W2
W3
W4
W3
W1
Field
12
12
12
12
13
12
11 11 1
T.O. High Parapet
135' - 8"
T.O. Low Parapet
130' - 2"
17
17
14 17
Max. Height = 35' - 8"
First Floor Plan
100' - 0"
Second Floor Plan
W5 114' - 0"
M M I M
I I
W3
W2
W3
W2
W3
W2
W1 W5
W1
Field
W1
Accent
W1
Accent
W1
Accent
W4
W2
W3
W2 W2 W2 W2
W3
9
First Floor Plan
100' - 0"
First Floor Plan
100' - 0"
Second Floor Plan
114' - 0"
112b
5 5 5
W1
Field
W1
Field
W1
Field
W1
Field
W6
W2
W3
W2
W3
6
W2
W5
W4
9 10
12 12
12 12
T.O. High Parapet
135' - 8"
T.O. Low Parapet
130' - 2"
17
17
12
12
17
First Floor Plan
100' - 0"
First Floor Plan
100' - 0"
Second Floor Plan
114' - 0"
W4
W3
W2
W3
W2 W2 W2 W2
W1
Accent
W3
W2
W3
W2 W2
W1
Accent
W1
Field
W1
W1
Field
1
1 1 1
12
12
12
12
12
12 12
13
12 12 12 12 12 12 12 12
12 12 12 12 12 12 12
T.O. High Parapet
135' - 8"
T.O. Low Parapet
130' - 2"
101
Max Height = 35' - 8"
W4
W5
1
12
W1
Field
17
17
14 14
5
W4
Metal Panel
Manuf: Metal Sales
Product: T2630 - wall panel (horiz)
Color: Slate Grey
*(provide sample for approval)
Mechanical Screen
Manuf: Metal Sales
Product: T13-A wall panel (horiz)
Color: Slate Grey
*(provide sample for approval)
Cementitious Lap Siding
Manuf: James Hardie
Product: HardiePlank Lap Siding, Smooth, 8"
exposure
Color: Tuscan Gold
*(provide sample for approval)
Hard Coat Stucco
Manuf: Sto
Product: PowerWall NExT
Colors: Field - White Linen (fine texture)
Accent - Bronze (fine texture)
*(provide sample for approval)
Concrete Masonry Unit Veneer
Manuf: TBD
Product: 8x16x4 ground face, running bond
Color: Tan Color TBD
*(provide sample for approval)
W1
W2
Brick Veneer
Manuf: TBD
Product: Modular brick, running bond
Color: Tan Color TBD
*(provide sample for approval)
W3
W4
W5
W6
6
W7
Issued
Drawing Number
Scale Accordingly if Reduced
Project No.: Drawn by:
Reviewed by:
In Association with:
ARCHITECTS
r4 architects.com
226 Remington
Unit #3
Fort Collins, CO 80524
phone 970/224-0630
www.r4architects.com
TB Group Planning / LA
444 Mountain Avenue
Berthoud, CO 80531
(970) 532-5891
Contact: Cathy Mathis
Email: cathy@tbgroup.us
AE Associates Mechanical & Plumbing
5587 West 19th Street
Greeley, CO 80634
(970) 330-5587
Contact: Alicia Thorpe
Email: alicia.thorpe@aeassociates.net
Engineer
APS, Inc. Electrical Engineer
9249 S. Broadway, #200-836
Highlands Ranch, CO 80129
(970) 381-7462
Contact: Chuck Polson
Email: chuck@apsinc.biz
Interwest Consulting Group Civil Engineer
1218 Ash Street
Windsor, CO 80550
(970) 674-3300
Contact: Mike Oberlander
Email: moberlander@Interwestgrp.com
Brinkman Construction General Contractor
Client Name Developer
Larsen Structural Design Structural Engineer
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
19 Old Town Square, Suite 238
Fort Collins, CO 80524
(970) 568-3355
Contact: Blake Larsen
Email: blake@larsensd.com
Brinkman Partners
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
Submittal No.1
Harmony
Commons
ARCH
1 Submittal No.1 11/30/2015
SA
MR
Office Building 'E'
Elevations
Lot 5
Harmony Tchnology Park Sixth Filing
2015-13
Office
Building 'E'
4 of 4
1/8" = 1'-0"
1
South Building Elevation
1/8" = 1'-0"
2
West Building Elevation
Exterior Material Legend
0 Keynote Legend
Key Value Keynote Text
1 Painted steel column
5 Electrical gear and meters painted to match adjacent
building material
6 Mechanical screen, see detail x/Ax.x
9 Roof drain
10 Overflow roof drain
12 Storefront system, refer to A7.1 and A7.2 for
elevations, details, and dimensions
13 Curtainwall system, refer to A7.1 and A7.2 for
elevations, details, and dimensions
14 Mechanical roof top unit (dashed)
17 Prefinished break metal cap flashing, refer to detail
X/AS.?
No. Description Date
W1
Field
W1
Field
W1
12 13
12 12
12 12 12 12
13
12 12 12 12 12 12 12 12 12
12 12 12 12 12 12 12 12 12 12 12
W1
Accent
W1
Accent
W1
Accent
6
6 T.O. High Parapet
135' - 8"
T.O. Low Parapet
130' - 2"
14 17 14 17
17
17
W1
Field
5
19 19 19
18
W7
7' - 6"
5' - 4" 13' - 4" 2' - 8"
17
18
12' - 8"
7' - 6"
W7
18
17
Metal Panel
Manuf: Metal Sales
Product: T2630 - wall panel (horiz)
Color: Slate Grey
*(provide sample for approval)
Mechanical Screen
Manuf: Metal Sales
Product: T13-A wall panel (horiz)
Color: Slate Grey
*(provide sample for approval)
Cementitious Lap Siding
Manuf: James Hardie
Product: HardiePlank Lap Siding, Smooth, 8"
exposure
Color: Tuscan Gold
*(provide sample for approval)
Hard Coat Stucco
Manuf: Sto
Product: PowerWall NExT
Colors: Field - White Linen (fine texture)
Accent - Bronze (fine texture)
*(provide sample for approval)
Concrete Masonry Unit Veneer
Manuf: TBD
Product: 8x16x4 ground face, running bond
Color: Tan Color TBD
*(provide sample for approval)
W1
W2
Brick Veneer
Manuf: TBD
Product: Modular brick, running bond
Color: Tan Color TBD
*(provide sample for approval)
W3
W4
W5
W6
6
W7
Issued
Drawing Number
Scale Accordingly if Reduced
Project No.: Drawn by:
Reviewed by:
In Association with:
ARCHITECTS
r4 architects.com
226 Remington
Unit #3
Fort Collins, CO 80524
phone 970/224-0630
www.r4architects.com
TB Group Planning / LA
444 Mountain Avenue
Berthoud, CO 80531
(970) 532-5891
Contact: Cathy Mathis
Email: cathy@tbgroup.us
AE Associates Mechanical & Plumbing
5587 West 19th Street
Greeley, CO 80634
(970) 330-5587
Contact: Alicia Thorpe
Email: alicia.thorpe@aeassociates.net
Engineer
APS, Inc. Electrical Engineer
9249 S. Broadway, #200-836
Highlands Ranch, CO 80129
(970) 381-7462
Contact: Chuck Polson
Email: chuck@apsinc.biz
Interwest Consulting Group Civil Engineer
1218 Ash Street
Windsor, CO 80550
(970) 674-3300
Contact: Mike Oberlander
Email: moberlander@Interwestgrp.com
Brinkman Construction General Contractor
Client Name Developer
Larsen Structural Design Structural Engineer
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
19 Old Town Square, Suite 238
Fort Collins, CO 80524
(970) 568-3355
Contact: Blake Larsen
Email: blake@larsensd.com
Brinkman Partners
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
Submittal No.1
Harmony
Commons
ARCH
1 Submittal No.1 11/30/2015
SA
MR
Office Building 'E'
Elevations
Lot 5
Harmony Tchnology Park Sixth Filing
2015-13
Office
Building 'E'
3 of 4
1/8" = 1'-0"
1
North Building Elevation
1/8" = 1'-0"
2
East Building Elevation
1/4" = 1'-0"
3
Trash Enclosure - Front Elevation
1/4" = 1'-0"
4
Trash Enclosure - Typical Side Elevation
Exterior Material Legend
0 Keynote Legend
Key Value Keynote Text
1 Painted steel column
5 Electrical gear and meters painted to match adjacent
building material
6 Mechanical screen, see detail x/Ax.x
8 Fire Department Connection
9 Roof drain
11 Knox box
12 Storefront system, refer to A7.1 and A7.2 for
elevations, details, and dimensions
13 Curtainwall system, refer to A7.1 and A7.2 for
elevations, details, and dimensions
14 Mechanical roof top unit (dashed)
17 Prefinished break metal cap flashing, refer to detail
X/AS.?
18 Steel pipe bollard, typ. see detail on sheet -AS.?
19 Steel trash enclosure gate with metal panel to match
building mechancial screen. See details on sheet
-AS.?
No. Description Date
W2
W4
color 1
Beyond
6
7
12
W4
color 2
W4
W1
1
7 7 6
1
1 1 11
12 12 2 12 12 12 12 12 12 12
3 3 3 3 3 3
Beyond
3 6 6 3 W1
W5
W1 W2
7
W4
color 2
1 1 1 1 1 1 1 12 W4 1 16 8
color 1
W1 W5
5
11
First Floor Plan
100' - 0"
High Roof Parapet
124' - 0"
Low Roof Parapet
118' - 6"
W4
color 1
W4
color 1
W4
W5 W1 W2 color 1 W2
12 2
12 12 12 12
12 12
12 12
3
16
1111 W4
color 1
6
beyond beyond
11 1
11
W4
color 2
W1 W4
color 1
beyond beyond beyond
3
1 12 12 12 1
3
First Floor Plan
100' - 0"
High Roof Parapet
124' - 0"
Low Roof Parapet
118' - 6"
W1 W4
W1 color 1
7 7 7 11
11 7
12 12
6 W2 7 12
W2
1
16 7 8 12 12 12
W1
A
W4 12
color 1
W2
W1
W2
W3
W4
W5
W6
6
W8
Metal Panel
Manuf: Metal Sales
Product: T2630 - wall panel (horiz)
Color #1: Dark Bronze
Color #2: Weathered Copper
*(provide sample for approval)
Mechanical Screen
Manuf: Metal Sales
Product: T13-A wall panel (horiz)
Color: Sandstone
*(provide sample for approval)
Cementitious Lap Siding
Manuf: James Hardie
Product: HardiePlank Lap Siding, Smooth, 8" exposure
Color: Tuscan Gold
*(provide sample for approval)
Hard Coat Stucco
Manuf: Sto
Product: PowerWall NExT
Color: Field - White Linen (fine texture)
*(provide sample for approval)
Concrete Masonry Unit Veneer
Manuf: TBD
Product: 8x16x4 ground face, running bond
Colors: Field - Tan Color TBD
Accent - Grey Color TBD
*(provide sample for approval)
Brick Veneer
Not Used
21' - 4"
5' - 4" 14' - 0" 2' - 0"
W8
18
18
17
19 19
7' - 4"
12' - 8"
W8
18 18
17
7' - 4"
W8
18
17
21' - 4"
7' - 4"
W8
17
18
12' - 8"
7' - 4"
First Floor Plan
100' - 0"
Low Roof Parapet
118' - 6"
12 12 12 12 12 12
6
1 1 1 1
W5 3
33 W4 3
color 2
W2
W5
W1 W4
color 1
3
First Floor Plan
100' - 0"
High Roof Parapet
124' - 0"
Low Roof Parapet
118' - 6"
W4
color 1
W4
color 1
W1
12 12 12 W2 12 W1 12 12
11 11 12 11 12 2 1
Issued
Drawing Number
Scale Accordingly if Reduced
Project No.: Drawn by:
Reviewed by:
In Association with:
ARCHITECTS
r4 architects.com
226 Remington
Unit #3
Fort Collins, CO 80524
phone 970/224-0630
www.r4architects.com
TB Group Planning / LA
444 Mountain Avenue
Berthoud, CO 80531
(970) 532-5891
Contact: Cathy Mathis
Email: cathy@tbgroup.us
AE Associates Mechanical & Plumbing
5587 West 19th Street
Greeley, CO 80634
(970) 330-5587
Contact: Alicia Thorpe
Email: alicia.thorpe@aeassociates.net
Engineer
APS, Inc. Electrical Engineer
9249 S. Broadway, #200-836
Highlands Ranch, CO 80129
(970) 381-7462
Contact: Chuck Polson
Email: chuck@apsinc.biz
Interwest Consulting Group Civil Engineer
1218 Ash Street
Windsor, CO 80550
(970) 674-3300
Contact: Mike Oberlander
Email: moberlander@Interwestgrp.com
Brinkman Construction General Contractor
Client Name Developer
Larsen Structural Design Structural Engineer
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
19 Old Town Square, Suite 238
Fort Collins, CO 80524
(970) 568-3355
Contact: Blake Larsen
Email: blake@larsensd.com
Brinkman Partners
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
Submittal No.1
Harmony
Commons
ARCH
1 Submittal No.1 11/30/2015
JDO
SA
Retail Building 'D'
Elevations
Lot 4
Harmony Technology Park Sixth Filing
2015-13
Retail
Building 'D'
2 OF 4
3/32" = 1'-0"
1
North Building Elevation
3/32" = 1'-0"
2
South Building Elevation
3/32" = 1'-0"
4
West Building Elevation
3/32" = 1'-0"
3
East Building Elevation
Exterior Material Legend
Keynote Legend
Key Value Keynote Text
1 Painted steel column
2 Painted steel canopy
3 Building Signage, by others.
5 Electrical gear and meters painted to match adjacent building material
6 Mechanical screen, see detail x/Ax.x
7 Prefinished collector head and downspout
8 Fire Department Connection
11 Knox box
12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and
dimensions
16 Exterior insulated hollow metal door & frame w/ thermal threshold, painted.
17 Prefinished break metal cap flashing, refer to detail X/AS.?
18 Steel pipe bollard, typ. see detail on sheet -AS.?
19 Steel trash enclosure gate with metal panel to match building mechancial
screen. See details on sheet -AS.?
A Tubelite T14000 thermally broken storefront, clear anodized finish
1/4" = 1'-0"
5
West Trash Enclosure Elevation
1/4" = 1'-0"
6
North Trash Enclosure Elevation
1/4" = 1'-0"
8
East Trash Enclosure Elevation
1/4" = 1'-0"
7
South Trash Enclosure Elevation
3/32" = 1'-0"
9
East Retail_West Building Elevation
3/32" = 1'-0"
10
West Retail_West Building Elevation
No. Description Date
W4
color 1
beyond
6
11
7
W2
W1
7
W1
33
12 12 12 12 12
beyond
6
First Floor Plan
100' - 0"
High Parapet
122' - 0"
Building Parapet
118' - 0"
South Parapet
119' - 0"
beyond
W4
color 1
W2 W4
color 2
W1
W5
1
12 12 55 11 16 8 12
11
2
3
3 7
17
W8
15' - 4"
18 18
17 17
18
W8
2' - 8" 10' - 0" 2' - 8"
15' - 4"
18 18
19
16' - 8"
17
18 18
W8
W8 W8
18
17
16' - 8"
10' - 8" 4' - 0" 2' - 0"
19
W1
W2
W3
W4
W5
W6
6
W8
Metal Panel
Manuf: Metal Sales
Product: T2630 - wall panel (horiz)
Color #1: Dark Bronze
Color #2: Weathered Copper
*(provide sample for approval)
Mechanical Screen
Manuf: Metal Sales
Product: T13-A wall panel (horiz)
Color: Sandstone
*(provide sample for approval)
Cementitious Lap Siding
Manuf: James Hardie
Product: HardiePlank Lap Siding, Smooth, 8" exposure
Color: Tuscan Gold
*(provide sample for approval)
Hard Coat Stucco
Manuf: Sto
Product: PowerWall NExT
Color: Field - White Linen (fine texture)
*(provide sample for approval)
Concrete Masonry Unit Veneer
Manuf: TBD
Product: 8x16x4 ground face, running bond
Colors: Field - Tan Color TBD
Accent - Grey Color TBD
*(provide sample for approval)
Brick Veneer
Not Used
Issued
Drawing Number
Scale Accordingly if Reduced
Project No.: Drawn by:
Reviewed by:
In Association with:
ARCHITECTS
r4 architects.com
226 Remington
Unit #3
Fort Collins, CO 80524
phone 970/224-0630
www.r4architects.com
TB Group Planning / LA
444 Mountain Avenue
Berthoud, CO 80531
(970) 532-5891
Contact: Cathy Mathis
Email: cathy@tbgroup.us
AE Associates Mechanical & Plumbing
5587 West 19th Street
Greeley, CO 80634
(970) 330-5587
Contact: Alicia Thorpe
Email: alicia.thorpe@aeassociates.net
Engineer
APS, Inc. Electrical Engineer
9249 S. Broadway, #200-836
Highlands Ranch, CO 80129
(970) 381-7462
Contact: Chuck Polson
Email: chuck@apsinc.biz
Interwest Consulting Group Civil Engineer
1218 Ash Street
Windsor, CO 80550
(970) 674-3300
Contact: Mike Oberlander
Email: moberlander@Interwestgrp.com
Brinkman Construction General Contractor
Client Name Developer
Larsen Structural Design Structural Engineer
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
19 Old Town Square, Suite 238
Fort Collins, CO 80524
(970) 568-3355
Contact: Blake Larsen
Email: blake@larsensd.com
Brinkman Partners
3528 Precision Dr Ste. 100
Fort Collins, CO 80528
(970) 267-0954
Contact: Todd Parker
Email: Todd.Parker@brinkmanpartners.com
Submittal No.1
Harmony
Commons
ARCH
1 Submittal No.1 11/30/2015
JDO
MR
Retail Building 'C'
Elevations
Lot 3
Harmony Technology Park Sixth Filing
2015-13
Retail
Building 'C'
1 OF 4
1/8" = 1'-0"
1
North Building Elevation
1/8" = 1'-0"
2
South Building Elevation
1/8" = 1'-0"
3
East Building Elevation
1/8" = 1'-0"
4
West Building Elevation
1/4" = 1'-0"
5
North - Trash Enclosure Elevation
1/4" = 1'-0"
6
South - Trash Enclosure Elevation
1/4" = 1'-0"
7
East - Trash Enclosure Elevation
1/4" = 1'-0"
8
West - Trash Enclosure Elevation
Keynote Legend
Number Description
1 Painted steel column
2 Painted steel canopy
3 Building Signage, by others.
5 Electrical gear and meters painted to match adjacent building material
6 Mechanical screen, see detail x/Ax.x
7 Prefinished collector head and downspout
8 Fire Department Connection
11 Knox box
12 Storefront system, refer to A7.1 and A7.2 for elevations, details, and
dimensions
16 Exterior insulated hollow metal door & frame w/ thermal threshold, painted.
17 Prefinished break metal cap flashing, refer to detail X/AS.?
18 Steel pipe bollard, typ. see detail on sheet -AS.?
19 Steel trash enclosure gate with metal panel to match building mechancial
screen. See details on sheet -AS.?
0
Exterior Material Legend
No. Description Date