HomeMy WebLinkAboutSAINT JOHN XXIII CATHOLIC CHURCH AND LOMBARDY STUDENT HOUSING - PDP190001 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORTErosion Control Review : Comments & Redlines
Project Information
Project Name: ______________________________ Project Number: ____________________
Prior Name(s): ______________________________ Prior Number(s): ______________________
Round _____ Date Submitted: _____________ Comment Due Date: _____________
Total Disturbance __________ SF GPS Lat _______________ GPS Long _______________
Sensitive Area _____ Steep Slopes (3H:1V) _____
Project Comments:
Information Only:
The site disturbs more than 10,000 sq. ft. and therefore Erosion and
Sediment Control Materials need to be submitted. The erosion control
requirements are located in the Stormwater Design Criteria in Chapter 2
Section 6.0 a copy of the requirements can be found at
www.fcgov.com/erosion
For Final:
Please submit an Erosion Control Plans to meet City Criteria.
For Final:
Please resubmit an Erosion Control Report to meet City Criteria.
Development Agreement:
Please submit an Erosion Control Escrow / Security Calculation based upon
the accepted Erosion Control Plans to meet City Criteria.
Information only:
Based upon the area of disturbance, State permits for stormwater will be
required since the site is over an acre and should be pulled before
Construction Activities begin.
Other Comments:
____
Staff
Dev Review Coordinator ______________
Zoning ______________
Planner ______________
Engineer______________
Water Utilities Reviewer ______________
Developing Party
Owner ______________
Owner’s Company ____________
Developer ______________
Developer’s Company ____________
EC Design Engineer ______________
EC Design Firm ______________
Review Information
Reviewer: _____________________
Received: _____________
Completed Review: __________
Cursory Review Time (hr.): __________
Full Review (hr.): __________
Phone Correspondence (hr.): __________
Email Correspondence (hr.): __________
Internal Staff Coordination (hr.): __________
Applicant Meeting (hr.): __________
Enter all hours round to the nearest 0.25 (15 min)
B M
VAULT
F.O.
VAULT
ELEC
TELE
VAULT
ELEC
VAULT
ELEC
C
VAULT
ELEC
VAULT
ELEC
ELEC
C
VAULT
ELEC
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC VAULT
VAULT ELEC
ELEC
VAULT
TELE
VAULT
ELEC
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
T T
T
ELEC
VAULT
ELEC
T
ELEC ELEC
CONTROL
IRR
M
CONTROL
IRR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
T
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC
BRKR
ELEC T
ELEC
X X X
ST
ST
ST
ST ST
ST
UD
UD
UD
UD
UD UD UD
UD
UD UD UD UD UD UD
UD
UD UD
UD
D
N UP
UP
X X X
X
X
X X
X
X
X X X
X
X
X X
X
DN UP
DN UP
DN
UP
DN
X
TF
TF
TF
TF
X
UNIVERSITY AVENUE
UNIVERSITY AVENUE
SOUTH SHIELDS STREET
CITY PARK AVENUE
WEST ELIZABETH STREET
WEST ELIZABETH STREET
NICOL CAMPUS WEST
1205 W. ELIZABETH ST. A
NICOL CAMPUS
WEST LIMITED
1213 W.
ELIZABETH ST.
GLEASON/WESTSIDE
INVESTMENTS
LLC
1301 W.
ELIZABETH ST.
JDH2 INVESTMENTS LLC
1305 W. ELIZABETH ST.
PHILLIPS DAVID J LIVING
TRUST (.615)
1335 W. ELIZABETH ST. 160
1221 W.
ELIZABETH ST.
100-YR FLOODWAY
(PER CSU CLOMR)
100-YR FLOODPLAIN
(PER CSU CLOMR)
CONNECT TO
EXISTING
STORM INLET
EXISTING
STORM DRAIN
PROPOSED
STORM DRAIN
PROPOSED
STORM DRAIN PROPOSED
INLET
PROPOSED
INLET
EXISTING
CONCRETE PAN EXISTING
PROPOSED CONCRETE PAN
INLET
PROPOSED
INLET
PROPOSED 2'
SIDEWALK CULVERT
PROPOSED 2'
PROPOSED CONCRETE PAN
STORMTECH CHAMBERS
PROPOSED
INLET
EXISTING
INLET
PROPOSED AREA
DRAIN BASIN
PROPOSED AREA
DRAIN BASIN
PROPOSED
UNDERDRAIN
PROPOSED
UNDERDRAINS
PROPOSED
UNDERDRAIN
CF CF CF CF CF CF CF CF
CF CF CF CF CF CF
CF
CF CF
CF
CF CF
CF
CF
CF CF
CF
CF
CF
CF CF
CF
CF
CF CF
CF CF CF
CF
CF CF CF
CF
CF CF
CF
CF CF CF CF
100-YR FLOODPLAIN
(PER CSU CLOMR)
100-YR FLOODPLAIN
(PER CSU CLOMR)
PROPOSED AREA
DRAIN BASIN
PROPOSED 10'
CONCRETE PAN
VTC
CWA
CF
WD
RS
PP
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
CF CF
CF
CF
IP
RS
RS
RS
RS
RS
BLDG A
BLDG B
BLDG C
CHURCH
BLDG
SAINT JOHN XXIII AND
LOMBARDY STUDENT HOUSING
Sheet
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
E NGINEER ING
N O R T H E RN
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
970.221.4158
northernengineering.com
of 18
C700
EROSION CONTROL PLAN
15
NORTH
( IN FEET )
1 inch = ft.
60 0 60 Feet
60
120 180
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION
Project: Saint John XXIII and Lombardy Student Housing
CONSTRUCTION PHASE MOBILIZATION DEMOLITION GRADING
BEST MANAGEMENT PRACTICES (BMPS)
Structural "Installation"
Flow Barriers (Bales, Wattles, etc.) (RS)
UTILITIES
INSTALLATION
FLAT WORK
INSTALLATION
VERTICAL
INSTALLATION LANDSCAPE DEMOBILIZATION
Concrete Washout Area (CWA)
* All Temporary BMPs to be Removed once Construction is Complete
Vehicle Tracking Pad * (VTC)
Construction Fence (CF)
NORTH
1. IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR
PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY
DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL
AUTHORITIES.
2. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY
NECESSARILY SHOWN IN THEIR EXACT LOCATION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH
GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION
CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED.
4. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION
SEQUENCING AND LEVEL OF SITE STABILIZATION.
5. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS
UNTIL SITE IS FULLY STABILIZED.
6. CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN
SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT.
7. INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
WATTLES FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
8. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO
MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO
ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
9. CONTRACTOR IS RESPONSIBLE FOR PREVENTING SEDIMENT FROM UNSTABILIZED LANDSCAPE AREAS FROM MIGRATING ONTO AND
ENTERING THE PERMEABLE PAVER SYSTEMS UNTIL UPGRADIENT TRIBUTARY AREAS ARE FULLY STABILIZED.
10. ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO ENSURE THAT EACH BUILDING PAD IS STABILIZED
THROUGHOUT CONSTRUCTION. WATTLES SHALL BE PROVIDED AROUND BUILDING PAD SIDES TO ENSURE AT NO TIME SHALL
SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
11. CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER
PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN
SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, GRAVEL SOCKS FOR PAVEMENT, ETC.)
12. FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL
DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT
WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR
DRAINAGE WAY.
13. CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED
AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A
CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF
WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS
SHALL BE STAKED DOWN.
14. THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING
OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS
HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE.
15. WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS,
DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL
STAFF TO PREVENT EROSION.
16. CONTRACTOR SHALL EXERCISE CAUTION TO PROTECT RAIN GARDENS AND MODIFIED RAIN GARDEN FROM SEDIMENTATION. THIS
INCLUDES EDUCATING SUBCONTRACTORS ON-SITE.
17. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE
STABILIZATION METHODS.
18. DIRT AND DEBRIS FROM CONSTRUCTION ACTIVITIES TRACKED ON CITY STREETS SHALL BE KEPT TO A MINIMUM AND CLEANED
NIGHTLY OR AT THE SUGGESTION OF THE CITY'S EROSION CONTROL INSPECTOR.
19. CONTRACTOR SHALL KEEP CONSTRUCTION VEHICLES ENTERING AND EXITING SITE TO A MINIMUM.
20. THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM
ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. LOOSE MATERIALS SHALL NOT BE STORED ON THE PERMEABLE
PAVEMENT AREA. MUD AND SEDIMENT-LADEN RUNOFF SHOULD BE KEPT AWAY FROM THE PAVEMENT AREA. TEMPORARILY DIVERT
RUNOFF OR INSTALL SEDIMENT CONTROL MEASURES AS NECESSARY TO REDUCE THE AMOUNT OF SEDIMENT RUN-ON TO THE
PAVEMENT. SURFACE PROTECTION COULD INCLUDE COVERING AREAS OF THE PAVEMENT, PROVIDING ALTERNATIVE
CONSTRUCTION VEHICLE ACCESS, AND PROVIDING EDUCATION TO ALL PARTIES WORKING ONSITE.
EROSION CONTROL NOTES:
BENCHMARK
NOTE:
ALL BMPS SHOWN ON THIS PLAN ARE GRAPHIC
REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE
AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR
AND DOCUMENTED ON THE DYNAMIC SITE PLAN.
1. CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR
SIMILAR METHODS.
2. TOTAL DISTURBED AREA = 5.56 ACRES
3. SWMP ADMINISTRATOR:
Contact ________________________________
Company ________________________________
Address ________________________________
Phone________________________________
4. CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF
ACCESS IS OFF PAVEMENT.
5. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR SAINT JOHN XXIII AND LOMBARDY STUDENT
HOUSING, DATED FEBRUARY 6, 2019, BY NORTHERN ENGINEERING, FOR ADDITIONAL INFORMATION.
6. FOR ADDITIONAL INFORMATION SEE SEPARATE STORMWATER MANAGEMENT PLAN / EROSION
CONTROL REPORT FOR SAINT JOHN XXIII AND LOMBARDY STUDENT HOUSING.
7. CONTRACTOR SHALL INSTALL PAVERS AS LATE AS FEASIBLE IN THE CONSTRUCTION PROCESS AND
SHALL PROTECT IN PLACE ONCE INSTALLED TO PREVENT SEDIMENT LOADING OF THIS DRAINAGE
FACILITY DURING CONSTRUCTION.
GENERAL NOTES:
LEGEND:
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
VEHICLE TRACKING CONTROL PAD
CONSTRUCTION FENCE w/ ROCK SOCK CF
CONCRETE WASHOUT
ROCK SOCK
CWA
RS
VTC
CF
WATTLE DIKE WD
INLET PROTECTION IP
PAVER PROTECTION PP
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK 20-97
AT THE SOUTHWEST CORNER OF WEST ELIZABETH AND CONSTITUTION AVE. ON A CONCRETE TRAFFIC
SIGNAL BASE.
ELEV.= 5050.15
CITY OF FORT COLLINS BENCHMARK 19-97
AT THE SOUTHEAST CORNER OF WEST ELIZABETH AND SHIELDS ST., ON A CONCRETE TRAFFIC SIGNAL
BASE.
ELEV.= 5025.74
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED:
NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.18'
BASIS OF BEARINGS
THE BASIS OF BEARINGS IS THE EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 15-7-69 AS
BEARING SOUTH 00° 29' 45" WEST (ASSUMED BEARING).