HomeMy WebLinkAboutCSU HEALTH CENTER / GF WAIRDS REPLAT & UTILITY PLAN - PDP/FDP - FDP150039 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTSUBMITTAL CHECKLIST:
SUBDIVISION PLAT (FINAL)
Community Development & Neighborhood Services – 281 N College Ave – Fort Collins, CO 80522-0580
Development Review Guide – STEP 6 of 8
The following information is required to be submitted with all applications, unless
waived by staff. Any item waived must be dated and initialed by a planner with
the City of Fort Collins Community Development and Neighborhood Services
Application form, APO fees, and filing fee. Application Form.pdf
Transportation Development Review Fee – please contact Engineering at (970) 221-6605
for information. TDR Fees and Application.pdf
Final Subdivision Plat (23 copies 24” X 36” - folded).
Soils Report (2 copies).
Drainage Report (4 copies).
An update of the Transportation Impact Analysis or statement that there has been no change
from the PDP (6 copies).
Final Utility and Drainage Plans (13 copies 24” x 36” - unfolded).
Deeds for all off-site rights-of-way and easements.
Certification of Notice of Mineral Rights Owners (1 copy). Mineral Rights Certificate.pdf
Other information Director may require.
*This document is meant to be used as a checklist only. For a more detailed list and explanation of each
of these items, please see the handout: “Submittal Requirements: Subdivision Plat (Final)”