Preliminary Drainage Report
for
Maverik
City of Fort Collins, Colorado
Developer:
Maverik Inc
880 West Center Street
Salt Lake City, UT 84054
801.335.3851
Contact: Don Lilyquist
Engineer:
Atwell, LLC
143 Union Blvd, Suite 700
Lakewood, CO 80228
303.462.1100
Project Number 15001770
November, 2015
I hereby certify that this Preliminary Drainage Report for the design of Maverik
was prepared by me or under my direct supervision in accordance with the
provisions of the Urban Drainage and Flood Control District Manual and the Fort
Collins Amendments for the owners thereof. I understand that the City of Fort
Collins does not and will not assume liability for drainage facilities designed by
others.
______________________________
Registered Professional Engineer
State of Colorado No. ________
I hereby certify that the drainage facilities for Maverik shall be constructed
according to the design presented in this report. I understand that the City of
Fort Collins does not and will not assume liability for the drainage facilities
designed and/or certified by my engineer. I understand that the City of Fort
Collins review drainage plans but cannot, on behalf of Maverik, guarantee that
final drainage design review will absolve The Maverik, LLC and/or their
successors and/or assigns of future liability for improper design. I further
understand that approval of the Final Development Plan does not imply approval
of my engineer’s drainage design.
_________________________________
Name of Developer
_________________________________
Authorized Signature Date
Table of Contents
Introduction 1
Drainage System Description 1
Drainage Analysis and Design Criteria 3
Grading and Erosion and Sediment Control Plan 3
Stormwater Management Plan 3
Conclusions 3
References 4
Appendix A – Reference
Hydrologic Soil Group Report
Appendix B – Hydrologic Calculations
Historic Composite Run-off Coefficients
Historic Time of Concentration
Historic Minor Storm Runoff Calculations
Historic Major Storm Runoff Calculations
Composite Run-off Coefficients
Time of Concentration
Minor Storm Runoff Calculations
Major Storm Runoff Calculations
Appendix C – Stormwater Quality Calculations
Detention Volume by the Full Spectrum Method
Historic Drainage Plan Back Pocket
Preliminary Drainage Plan Back Pocket
I. Introduction
The purpose of this report is to provide a guide for the City of Fort Collins and the developer to
use for the planning and final design of drainage facilities for the Maverik development site.
The Maverik development site occupies 1.77 acres that includes Lot 2 of Maverik Subdivision
Filing No. 1 and Lot 17 of Interchange Business Park. The site is located within the Northwest
one-quarter of Section 15, Township 7 North, Range 68 West of the 6th Principal Meridian. The
parcel’s street frontage is along I-25 Frontage Road with an address of 4333 E. Mulberry
Street. The site is bounded by Lot 1 of Maverik Subdivision Filing No. 1 to the south and west;
the Frontage Road to the south and east; and CDOT ROW for Intersate-25 to the north. A vicinity
map is included within Appendix A of this report.
The proposed development site currently has a round brick building that formerly served as a
restaurant. The east side of the site generally slopes from north to south at about a 1percent
grade, while the west side generally slopes from east to west. Both sides of the site drain to
grated inlets within the existing parking lot that discharge flow into an existing detention pond
on the north side of the site. This detention pond has a controlled outlet that discharges to a
roadside drainage swale along the I-25 off-ramp to E. Mulberry Street.
Soils on the site are identified as Fort Collins loam, which is a Hydrologic Group B soil. Refer
to the soils map in Appendix A of this report for additional soils information.
The proposed use for the redeveloped property is a convenience store & fueling station.
The development parcel lies within the limits of the Boxelder Creek Regional Master Plan. The
development site is identified as outside of the 100-yr floodplain (Zone X) as shown on the
flood insurance rate map number 08069C1003G, dated May 2, 2012.
II. Drainage System Description
As stated in section I, the east side of the site generally slopes from north to south at about
1percent, while the west side generally slopes from east to west. There is an existing detention
pond in the northwest corner of the property. The outfall drainage way is identified as a
tributary of Boxelder Creek in the aforementioned Regional Master Plan. Under existing
conditions, runoff from the site reaches the outfall drainage way via area drains in the parking
lot on the south side of the site and west of the pond.
The proposed development contains a gas station configuration replacing the existing
restaurant building along with expanding to the northeast with parking, a rest with tot lot area,
and a dog park. Sub-Basin A, comprising of 1.21 acres, contains the new building, the new
canopy, most of the parking lot, and the recreation area & dog park. Sub-Basin A drains to an
existing grated inlet near the south driveway entrance which then conveys the flows via an 18”
reinforced concrete pipe to the pond. Sub-Basin B, comprising of 0.32 acres, contains the
northern driveway, the new outdoor dining area, and the back side of the new building. Sub-
Basin B drains west off property, then to the northwest to an existing grated inlet, just west of
the existing detention pond, on the adjacent property that then conveys the flows via an 18”
reinforced concrete storm sewer pipe. Both storm sewers combine into the detention and water
quality pond in the northwest corner of the property.
Sub-Basin C consists of a slim strip of land encompassing 0.02 acres on the southeast side of
the new building. Sub-Basin C drains to 2 grated slot drains inside of the sub-basin, which
convey the flows northeast to the 18” reinforced concrete storm drain sewer pipe in Sub-Basin
A. Sub-Basin D, comprising of 0.16 acres, is the area of land that contains the existing
detention pond. Sub-Basin D will not be altered by site development. Rational Method
Calculations of site-generated runoff for the 2-year and 100-year storm events are included in
the appendix.
The existing on-site detention pond will be reused in its’ existing condition. Detention volumes
and release rates are as follows:
Stage Volume
(acre-feet)
Release Rate
(cfs)
100-yr detention 0.26 1.45
Excess Urban Runoff
Volume (EURV)
0.14 72-hour drain time
Detained storm water from the site will be discharged toward the northwest through the existing
outlet structure located at the northwest end of the pond. The outlet will discharge to the
existing swale just beyond the northwest property line, which is identified as the outfall from
storm water flows in this area. No changes are proposed to the existing outlet structure or
pond at this time.
III. Drainage Analysis and Design Criteria
Drainage analysis and facility design has been prepared in accordance with UDFCD standards
and the Fort Collins Amendments. Essentially all the flow from Basins A, B, & C are collected
by the slot drains.
IV. Grading and Erosion and Sediment Control Plan
A Grading Plan has been prepared and is included in the Preliminary Development Plans. An
Erosion & Sediment Control Plan will be included in the Final Development Plan.
V. Storm Water Management Plan
All phases of construction will provide temporary erosion control measures in accordance with
Urban Storm Drainage Criteria Manual and as required by the Colorado Department of Health.
These measures will remain in place until the permanent erosion control facilities are in place.
Storm water management and erosion control measures will be included in the Storm Water
Management Plan (SWMP). Standard best management practices (BMP’s) will be employed as
required by References 1 and 2.
VI. Conclusions
This study is in compliance with the Urban Storm Drainage Criteria Manual and the Fort Collins
Amendments. This study is also consistent with the overall drainage concept in previously
prepared regional drainage study (References 3). The proposed development and proposed
drainage facilities will result in no adverse impacts created by the quantity or quality of storm water
generated by this project.
VII. References
1. Urban Storm Drainage Criteria Manual; Denver Regional Council of Governments; August
2011.
2. Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual;
City of Fort Collins; December 12, 2012
3. Final Boxelder Creek Regional Stormwater Master Plan; Larimer County & Boxelder Creek
Regional Alliance; October 2006
4. Floor Insurance Rate Map, Larimer County, Map Number 08069C1003G; Federal Emergency
Management Agency; May 2, 2012
Appendix A
Reference
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/16/2015
Page 1 of 4
4491990 4492030 4492070 4492110 4492150 4492190 4492230 4492270
4491990 4492030 4492070 4492110 4492150 4492190 4492230 4492270
499960 500000 500040 500080 500120 500160 500200 500240 500280 500320 500360
499960 500000 500040 500080 500120 500160 500200 500240 500280 500320 500360
40° 34' 52'' N
105° 0' 2'' W
40° 34' 52'' N
104° 59' 43'' W
40° 34' 43'' N
105° 0' 2'' W
40° 34' 43'' N
104° 59' 43'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 30 60 120 180
Meters
Map Scale: 1:2,030 if printed on A landscape (11" x 8.5") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
34 Fort Collins loam, 0 to 1
percent slopes
B 10.9 63.6%
73 Nunn clay loam, 0 to 1
percent slopes
C 5.5 32.3%
76 Nunn clay loam, wet, 1 to
3 percent slopes
C 0.7 4.1%
Totals for Area of Interest 17.1 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/16/2015
Page 3 of 4
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/16/2015
Page 4 of 4
Appendix B
Hydrologic Calculations
COMPOSITE C-FACTOR & WEIGHTED PERCENT IMPERVIOUSNESS ANALYSIS
Maverik
Atwell, LLC
CBS
Date: Nov 2015
Historic Runoff Coefficients
C2 C100 I (%)
Landscaping 0.08 0.52 5.0%
Paved Area 0.89 0.96 100.0% (Table 1, Ref. 1)
Roof Area 0.73 0.83 90.0% (Table 1, Ref. 1)
Total Area Landscaping Paved Area Roof Area
BASIN (AC) (AC) (AC) (AC) Comp. C2 Comp. C100 Comp. I (%)
OS1 0.01 0.01 0.0001 0.00 0.09 0.53 6.1%
OS2 0.08 0.08 0.00 0.00 0.08 0.52 5.0%
A 1.25 0.49 0.52 0.24 0.55 0.76 61.3%
B 0.25 0.01 0.25 0.00 0.87 0.95 97.6%
C 0.01 0.01 0.00 0.00 0.27 0.62 27.1%
D 0.16 0.16 0.00 0.00 0.08 0.52 5.0%
Composite On-Site
Basins 1.68 0.66 0.77 0.24 0.55 0.77 61.0%
STANDARD FORM SF-2
HISTORIC TIME OF CONCENTRATION
PROJECT: Maverik
CALCULATED BY: CBS DATE: Nov 2015
SUB-BASIN DATA INITIAL/OVERLAND TRAVEL TIME Tc CHECK FINAL REMARKS
TIME (Tc) (Tt) (Urbanized Basins) Tc
DESIGN: AREA C5 LENGTH AVG. SLOPE Ti LENGTH AVG. SLOPE VEL Tt COMP TOTAL Tc=(L/180)+10
(acres) (ft) (%) (min) (ft) (%) (fps) (min) Tc LENGTH (ft) (min) (min)
OS1 0.01 0.53 13 2.4 2.8 0.0 2.8 13 10.1 5.0
OS2 0.08 0.52 40 11.8 2.9 0.0 2.9 40 10.2 5.0
A 1.25 0.76 233 1.3 8.5 271 0.5 1.4 3.2 11.7 504 12.8 11.7
B 0.25 0.95 205 0.9 4.0 176 0.8 1.7 1.7 5.7 381 12.1 5.7
C 0.01 0.62 27 5.5 2.6 317 0.5 0.5 10.7 13.2 344 11.9 11.9
D 0.16 0.52 40 2.0 5.3 0 5.0 1.6 5.3 40 10.2 5.3
CBS JOB NO: 15001770
DATE: Nov 2015 PROJECT: Maverik
CHECKED BY: DESIGN STORM: 2-year
DESCRIPTION
DESIGN POINT
AREA DESIG.
AREA (Acres)
RUNOFF COEFF
Tc (min)
C A (Acres)
I (in/hour)
Q (cfs)
Tc (min)
(C A) (Acres)
I (in/hour)
Q (cfs)
OS1 1 OS1 0.01 0.09 5.0 0.00 2.88 0.003
OS2 2 OS2 0.08 0.08 5.0 0.01 2.88 0.02
A 4 A 1.25 0.55 11.7 0.68 2.16 1.5
B 5 B 0.25 0.87 5.7 0.22 2.78 0.6
C 6 C 0.01 0.27 11.9 0.00 2.14 0.01
D 7 D 0.16 0.08 5.3 0.01 2.84 0.04
.
.
2-year P1 = 0.85 inches (UDFCD, Fig. RA-1) I = 28.5(P1)/(10+Tc)
0.786
(Ref. 2, Eq RA-3)
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
HISTORIC
CALCULATED BY:
DIRECT RUNOFF TOTAL RUNOFF
CBS JOB NO: 15001770
DATE: Nov 2015 PROJECT: Maverik
CHECKED BY: DESIGN STORM: 100-year
DESCRIPTION
DESIGN POINT
AREA DESIG.
AREA (Acres)
RUNOFF COEFF
Tc (min)
C A (Acres)
I (in/hour)
Q (cfs)
Tc (min)
(C A) (Acres)
I (in/hour)
Q (cfs)
OS1 1 OS1 0.01 0.53 5.0 0.01 9.06 0.1
OS2 2 OS2 0.08 0.52 5.0 0.04 9.06 0.4
A 4 A 1.25 0.76 11.7 0.96 6.78 6.5
B 5 B 0.25 0.95 5.7 0.24 8.72 2.1
C 6 C 0.01 0.62 11.9 0.01 6.72 0.05
D 7 D 0.16 0.52 5.3 0.09 8.93 0.8
100-year P1 = 2.67 inches (UDFCD, Fig. RA-6) I = 28.5(P1)/(10+Tc)
0.786
(Ref. 2, Eq RA-3)
HISTORIC
(RATIONAL METHOD PROCEDURE)
STORM DRAINAGE SYSTEM DESIGN
STANDARD FORM SF-3
CALCULATED BY:
DIRECT RUNOFF TOTAL RUNOFF
COMPOSITE C-FACTOR & WEIGHTED PERCENT IMPERVIOUSNESS ANALYSIS
Maverik
Atwell, LLC
CBS
Date: Nov 2015
Runoff Coefficients
C2 C100 I (%)
Landscaping 0.08 0.52 5.0%
Paved Area 0.89 0.96 100.0% (Table 1, Ref. 1)
Roof Area 0.73 0.83 90.0% (Table 1, Ref. 1)
Total Area Landscaping Paved Area Roof Area
BASIN (AC) (AC) (AC) (AC) Comp. C2 Comp. C100 Comp. I (%)
OS1 0.01 0.01 0.00 0.00 0.08 0.47 5.5%
OS2 0.05 0.05 0.00 0.00 0.08 0.52 5.0%
A 1.21 0.23 0.69 0.29 0.70 0.85 79.5%
B 0.32 0.05 0.27 0.00 0.76 0.89 85.1%
C 0.02 0.02 0.00 0.00 0.08 0.51 4.9%
D 0.16 0.16 0.00 0.00 0.08 0.52 5.0%
Composite On-Site
Basins 1.71 0.46 0.96 0.29 0.64 0.82 72.6%
PROJECT: Maverik
CALCULATED BY: CBS DATE: Nov 2015
SUB-BASIN DATA INITIAL/OVERLAND TRAVEL TIME Tc CHECK FINAL REMARKS
TIME (Tc) (Tt) (Urbanized Basins) Tc
DESIGN: AREA C5 LENGTH AVG. SLOPE Ti LENGTH AVG. SLOPE VEL Tt COMP TOTAL Tc=(L/180)+10
(acres) (ft) (%) (min) (ft) (%) (fps) (min) Tc LENGTH (ft) (min) (min)
OS1 0.01 0.53 13 2.4 2.8 0.0 2.8 13 10.1 5.0
OS2 0.05 0.52 40 11.8 2.9 0.0 2.9 40 10.2 5.0
A 1.21 0.85 358 1.5 7.6 271 0.5 1.4 3.2 10.8 629 13.5 10.8
B 0.32 0.89 254 0.5 7.6 175 0.5 1.4 2.1 9.6 429 12.4 9.6
C 0.02 0.51 25 1.1 5.2 317 0.5 0.5 10.7 15.9 342 11.9 11.9
D 0.16 0.52 40 2.0 5.3 0 5.0 0.0 5.3 40 10.2 5.3
TIME OF CONCENTRATION
STANDARD FORM SF-2
CBS JOB NO: 15001770
DATE: Nov 2015 PROJECT: Maverik
CHECKED BY: DESIGN STORM: 2-year
DESCRIPTION
DESIGN POINT
AREA DESIG.
AREA (Acres)
RUNOFF COEFF
Tc (min)
C A (Acres)
I (in/hour)
Q (cfs)
Tc (min)
(C A) (Acres)
I (in/hour)
Q (cfs)
OS1 1 OS1 0.01 0.081 5.0 0.001 2.88 0.003
OS2 2 OS2 0.05 0.519 5.0 0.03 2.88 0.1
A 4 A 1.21 0.70 10.8 0.85 2.23 1.9
B 5 B 0.32 0.76 9.6 0.24 2.33 0.6
C 6 C 0.02 0.08 11.9 0.00 2.14 0.003
D 7 D 0.16 0.08 5.3 0.01 2.84 0.04
.
.
2-year P1 = 0.85 inches (UDFCD, Fig. RA-1) I = 28.5(P1)/(10+Tc)
0.786
(Ref. 2, Eq RA-3)
CALCULATED BY:
DIRECT RUNOFF
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
REDEVELOPED
TOTAL RUNOFF
CBS JOB NO: 15001770
DATE: Nov 2015 PROJECT: Maverik
CHECKED BY: DESIGN STORM: 100-year
DESCRIPTION
DESIGN POINT
AREA DESIG.
AREA (Acres)
RUNOFF COEFF
Tc (min)
C A (Acres)
I (in/hour)
Q (cfs)
Tc (min)
(C A) (Acres)
I (in/hour)
Q (cfs)
OS1 1 OS1 0.01 0.47 5.0 0.01 9.06 0.1
OS2 2 OS2 0.05 0.52 5.0 0.03 9.06 0.2
A 4 A 1.21 0.85 10.8 1.03 7.00 7.2
B 5 B 0.32 0.89 9.6 0.28 7.33 2.1
C 6 C 0.02 0.51 11.9 0.01 6.73 0.1
D 7 D 0.16 0.52 5.3 0.09 8.93 0.8
100-year P1 = 2.67 inches (UDFCD, Fig. RA-6) I = 28.5(P1)/(10+Tc)
0.786
(Ref. 2, Eq RA-3)
CALCULATED BY:
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
REDEVELOPED
DIRECT RUNOFF TOTAL RUNOFF
Appendix C
Stormwater Quality Calculations
Project:
Basin ID:
1.71
72.6%
0
72.6%
Percentage of Area Area (acres)
0.0
100.0% 1.7
0.0
Initial--f i Final--fo
4.5 0.6 0.0018
(watershed inches) (acre-feet)
0.98 0.14 Design Oulet to Empty
EURV in 72 Hours
100-year Detention Volume plus WQCV
5 1.84 0.26 1.45
Notes:
* User input data
shown in blue.
2) Results shown reflect runoff reduction from Level 1 or 2 MDCIA and are plotted at the watershed's total imperviousness value; the impact
of MDCIA is reflected by the results being below the curves.
3) Maximum allowable release rates for 100-year event are based on Table SO-1. Outlet for the Excess Urban Runoff Volume (EURV) to be
designed to empty out the EURV in 72 hours. Outlet design is similar to one for the WQCV outlet of an extended detention basin (i.e.,
perforated plate with a micro-pool) and extends to top of EURV water surface elevation.
Recommended Horton's Equation Parameters for CUHP
Effective Imperviousness
1
Type C or D
Decay
Coefficient--
4) EURV approximates the difference between developed and pre-developed runoff volume.
5) User has opted to add the WQCV to the 100-year detention volume to satisfy local regulations. This is not required per the USDCM.
Detention Volumes
2,5
DETENTION VOLUME BY THE FULL SPECTRUM METHOD
Maverik
Detention Pond
1) Effective imperviousness is based on Figure ND-1 of the Urban Storm Drainage Criteria Manual (USDCM).
Area of Watershed (acres)
Subwatershed Imperviousness
Level of Minimizing Directly Connected
Impervious Area (MDCIA)
Hydrologic Soil Type
Type A
Type B
Excess Urban Runoff Volume
4
Infiltration (inches per hour)
Maximum Allowable
Release Rate, cfs
3
0.00
0.50
1.00
1.50
2.00
2.50
0 20 40 60 80 100
Runoff Voume - Inches
Percent Total Imperviousness
100-yr Vol Type A Soil
100-yr Vol Type B, C & D Soils
EURV Type A Soil
EURV Type B Soil
EURV Type C/D Soil
100-yr Storage Volume
EURV Storage Volume
15001770-UD-Detention_v2.32.xls 11/20/2015, 10:41 AM
Survey Area Data: Version 10, Sep 22, 2015
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Apr 22, 2011—Apr 28,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
11/16/2015
Page 2 of 4