HomeMy WebLinkAboutEYE CENTER OF NORTHERN COLORADO - PDP - PDP150029 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pederstrian Facilities ....................................................................................................... 5
Bicycle Facilities .............................................................................................................. 9
Transit Facilities .............................................................................................................. 9
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 10
Background Traffic Projections ..................................................................................... 13
Trip Assignment ............................................................................................................ 13
Signal Warrants ............................................................................................................. 13
Operation Analysis ........................................................................................................ 13
Geometry ...................................................................................................................... 17
Trip Generation Comparison with Harmony Technology Park ODP .............................. 17
Pedestrian Level of Service ........................................................................................... 17
Bicycle Level of Service ................................................................................................ 21
Transit Level of Service ................................................................................................. 21
IV. CONCLUSIONS .................................................................................................... 22
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 10
3. Short Range (2020) Background Peak Hour Operation .......................................... 18
4. Short Range (2020) Total Peak Hour Operation ..................................................... 19
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Geometry ..................................................................................................... 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Balanced/Adjusted Recent Peak Hour Traffic ........................................................... 7
5. Site Plan .................................................................................................................. 11
6. Trip Distribution ....................................................................................................... 12
7. Short Range (2020) Background Peak Hour Traffic ................................................ 14
8. Site Generated Peak Hour Traffic ........................................................................... 15
9. Short Range (2020) Total Peak Hour Traffic ........................................................... 16
10. Short Range (2020) Geometry ................................................................................ 20
APPENDICES
A. Base Assumptions Form
B. Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor
Vehicle LOS Standards (Intersections)
D. Short Range (2020) Background Peak Hour Operation
E. Short Range (2020) Total Peak Hour Operation
F. Pedestrian/Bicycle Level of Service Worksheets
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Eye Center of Northern Colorado
development. The proposed Eye Center of Northern Colorado site is located in the
southeast quadrant of the Ziegler/Precision intersection in Fort Collins, Colorado. Eye
Center of Northern Colorado is a medical office/surgery development.
During the course of the analysis, numerous contacts were made with the owner
(Eye Center of Northern Colorado), the project development manager (JPL Development),
the project planning consultant (TBGroup), the project engineer (Interwest Consulting
Group), and Fort Collins Traffic Engineering. The Transportation Impact Study Base
Assumptions form and related documents are provided in Appendix A. This study
generally conforms to the format set forth in the Fort Collins TIS Guidelines in the “Larimer
County Urban Area Street Standards” (LCUASS). As discussed with City staff, this is an
intermediate level transportation impact study. The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Eye Center of Northern Colorado development is shown in
Figure 1. It is important that a thorough understanding of the existing conditions be
presented.
Land Use
Land uses in the area are primarily residential, industrial, office, and institutional.
There are residential uses to the west of the site. There are industrial/office uses to the
north and east of the site. There is an institutional use (Fossil Ridge High School) to the
south of the site. The proposed Eye Center of Northern Colorado site is currently
vacant. The center of Fort Collins lies to the northwest of the proposed Eye Center of
Northern Colorado site.
Streets
The primary streets near the Eye Center of Northern Colorado site are Zeigler
Road, Rock Creek Drive, and Precision Drive. Figure 2 shows a schematic of the
existing geometry at the Zeigler/Rock Creek intersection.
Ziegler Road is to the west of (adjacent to) the proposed Eye Center of Northern
Colorado site. It is a north-south street classified as a four-lane arterial street, north of
Rock Creek Drive, and a two-lane arterial street, south of Rock Creek Drive, according
to the Fort Collins Master Street Plan. Currently, Ziegler Road has a four-lane cross
section, north of Rock Creek Drive, and a two-lane cross section, south of Rock Creek
Drive. At the Ziegler/Rock Creek intersection, Ziegler Road has a northbound and
southbound left-turn lane, a through lane in each direction, and a northbound and
southbound right-turn lane. At the Ziegler/Precision intersection, Ziegler Road has a
two-way left-turn lane, and two through lanes in each direction. The Ziegler/Rock Creek
intersection has signal control. The Ziegler/Precision intersection has stop sign on
Precision Drive. The posted speed limit in this area of Ziegler Road is 40 mph.
Rock Creek Drive is to the south of the proposed Eye Center of Northern
Colorado site. It is an east-west street classified as a collector street according to the
Fort Collins Master Street Plan. Currently, Rock Creek Drive has a two-lane cross
section in this area. At the Ziegler/Rock Creek intersection, Rock Creek Drive has a
westbound left-turn lane, a westbound through lane, a westbound right-turn lane, and
an eastbound left-turn/through/right-turn lane. The posted speed limit on Rock Creek
Drive is 30 mph, east of Ziegler Road, and 25 mph, west of Ziegler Road.
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
Page 3
Eye Center of
Northern Colorado
Timberwood Drive
Rock Creek Drive
Ziegler Road
Technology Pkwy
FRHS Access
Precision Drive
CURRENT GEOMETRY Figure 2
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 4
Ziegler Road
Rock Creek Drive
AM/PM
Precision Drive
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 5
Precision Drive is to the north of (adjacent to) the proposed Eye Center of
Northern Colorado site. It is an east-west street classified as an industrial local street
according to the Fort Collins Master Street Plan. Precision Drive only has an east leg at
the Ziegler/Precision intersection. Precision Drive was recently built between Ziegler
Road and Technology Parkway.
Existing Traffic
Recent morning and afternoon peak hour traffic volumes are shown in Figure 3.
The traffic counts at the Ziegler/Rock Creek intersection were obtained in May 2015 by
the City of Fort Collins. The traffic counts at the Ziegler/Precision intersection were
obtained in November 2015. Raw traffic count data are provided in Appendix B. Since
the counts were done on different days, the counts were adjusted/balanced. The
adjusted/balanced recent peak hour traffic is shown in Figure 4.
Existing Operation
The Ziegler/Rock Creek and Ziegler/Precision intersections were evaluated using
techniques provided in the 2010 Highway Capacity Manual. Using the morning and
afternoon peak hour traffic shown in Figure 4, the peak hour operation is shown in Table
1. Calculation forms are provided in Appendix C. The key intersections are currently
operating acceptably with existing control and geometry in the morning and afternoon
peak hours. A description of level of service for signalized and unsignalized intersection
from the 2010 Highway Capacity Manual is provided in Appendix C. Table 4-3 (revised
per staff comments regarding type of intersection) showing the Fort Collins Motor
Vehicle LOS Standards (Intersections) is also provided in Appendix C. The Eye Center
of Northern Colorado site is in an area termed “other.” In areas termed “other,”
acceptable overall operation at signalized intersections during the peak hours is defined
as level of service D or better. At signalized intersections, acceptable operation of any
leg and any movement is level of service E. At unsignalized intersections, acceptable
operation is considered to be at level of service E for any approach leg for an
arterial/arterial, arterial/collector and arterial/local intersections. In such areas, it is
expected that there would be substantial delays to the minor street movements at
unsignalized intersections during the peak hours. This is considered to be normal in
urban areas. At unsignalized collector/local intersections, acceptable operation is
considered to be at level of service C for any approach leg.
Pedestrian Facilities
There are sidewalks along both sides of Ziegler Road, except on the east side
between Precision Drive and Rock Creek Drive. There are sidewalks along the north
side of Precision Drive. There are sidewalks along both sides of Rock Creek Drive,
west of Ziegler Road, and a sidewalk along the south side of Rock Creek Drive, east of
Ziegler Road. It is expected that as properties in this area are developed or
redeveloped, sidewalks will be installed as part of the street/property infrastructure.
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 6
Ziegler Road
Rock Creek Drive
AM/PM
81/41
534/343
13/5
21/78
258/612
69/140
64/33
30/25
72/51
100/125
9/25
6/15
Precision Drive
348/773
41/17
831/457
5/0
10/50
0/0
ADJUSTED/BALANCED RECENT
PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 7
Ziegler Road
Rock Creek Drive
AM/PM
81/41
587/328
13/5
21/76
258/591
69/135
71/32
30/25
72/51
110/119
9/25
6/15
Precision Drive
348/802
41/17
763/479
5/0
10/50
0/0
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Ziegler/Rock Creek
(signal)
EB LT/T/RT D D
WB LT D C
WB T D C
WB RT D C
WB APPROACH D C
NB LT A A
NB T A A
NB RT A A
NB APPROACH A A
SB LT A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL B A
Ziegler/Precision
(stop sign)
WB LT A A
WB RT B B
WB APPROACH B B
SB LT B A
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 9
Bicycle Facilities
Bicycle lanes exist along Ziegler Road and Rock Creek Drive within the study
area.
Transit Facilities
Currently, this area of Fort Collins is served by Transfort route 16. The nearest
bus stop is at the Ziegler/Rock Creek intersection.
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The Eye Center of Northern Colorado is a 32,900 square foot medical/surgical
office. It is expected to have 105 employees at this site. Figure 5 shows a site plan of
the Eye Center of Northern Colorado development. The short range analysis (Year
2020) includes the full development of the site and an appropriate increase in
background traffic due to normal growth and other potential developments in the area.
Primary access to the site will be via a driveway to Precision Drive. There will be
secondary access to Rock Creek Drive, through the proposed Windsong at Rock Creek
development to the south.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. Medical office (Code 720), using
employees and floor area as the trip generation variables, in Trip Generation, 9th Edition,
ITE was used to estimate the trips that would be generated by the proposed uses at a site.
A trip is defined as a one-way vehicle movement from origin to destination. Table 2 shows
the expected trip generation on a daily and peak hour basis. The average of the
calculated trip generation was used in this TIS. The trip generation of Eye Center of
Northern Colorado development resulted in 1062 daily trip ends; 67 morning peak hour trip
ends; and 115 afternoon peak hour trip ends.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
720 Medical Office 105 Employees 8.91 936 0.42 44 0.11 12 0.36 38 0.70 74
720 Medical Office 32.9 KSF 36.13 1188 1.89 62 0.50 16 1.00 33 2.57 84
Average 1062 53 14 36 79
Trip Distribution
Trip distribution for the Eye Center of Northern Colorado was based on
existing/future travel patterns, land uses in the area, consideration of trip
attractions/productions in the area, and engineering judgment. Figure 6 shows the trip
distribution for the short range (2020) analysis future. The trip distribution was agreed
to by City of Fort Collins staff in the scoping email exchange.
SITE PLAN Figure 5
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 11
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 12
Ziegler Road
Rock Creek Drive
AM/PM
5% 5%
20%
70%
Precision Drive
SITE
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 13
Background Traffic Projections
Figure 7 shows the short range (2020) background peak hour traffic projections.
These forecasts assume that the current street network exists in this area. Background
traffic projections for the short range were obtained by reviewing the North Front Range
Regional Transportation Plan, engineering judgment, and various traffic studies
prepared for this area of Fort Collins. Based upon these sources, it was determined
that the traffic volumes would increase by approximately 2.0 percent per year. The
Mainstreet and Windsong at Rock Creek developments were added to the background
traffic. Precision Drive was recently extended to Ziegler Road. Traffic from various
developments within the Harmony Teck Park were reassigned to Precision Drive.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figure 8 shows the site generated peak hour traffic assignment. Figure 9 shows
the short range (2020) total (site plus background) peak hour traffic assignment.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. For the streets in the
vicinity of the Eye Center of Northern Colorado development, four hour and/or eight hour
signal warrants are applicable. These warrants require much data and are applied when
the traffic is actually on the area street system. It is acknowledged that peak hour signal
warrants should not be applied, but since the peak hour forecasts are readily available in a
traffic impact study, it is reasonable to use them to get an idea whether other signal
warrants may be met. If peak hour signal warrants will not be met at a given intersection,
it is reasonable to conclude that it is not likely that other signal warrants would be met. If
peak hour signal warrants are met, it merely indicates that further evaluation should occur
in the future as the development occurs. However, a judgment can be made that some
intersections will likely meet other signal warrants.
The Ziegler/Rock Creek intersection is currently signalized. Using the short range
(2020) total peak hour traffic (Figure 9), none of the key unsignalized intersections will
meet the lower threshold volume for the minor street approach (100 vehicles) or signal
spacing requirements.
Operation Analysis
In the short range (2020), capacity analyses were performed at the Ziegler/Rock
Creek, Ziegler/Precision, Precision/Site Access, and Rock Creek/Site Access
intersections.
SHORT RANGE (2020) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 14
Ziegler Road
Rock Creek Drive
AM/PM
89/45
650/364
15/7
23/84
286/655
80/151
78/35
34/28
79/56
122/137
10/29
8/18
Precision Drive
388/885
94/44
840/533
10/3
34/107
1/5
Site Access
1/2
0/0
0/0
0/2
0/0
0/0
0/0
34/108
0/0
2/2
100/44
2/1
1/5
0/0
0/0
138/176
6/3
123/183
SITE GENERATED
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 15
Ziegler Road
Rock Creek Drive
AM/PM
7/5
3/2
0/1
1/6
1/0
2/2
1/3
2/10
Precision Drive
37/25
8/5
10/55
1/7
Site Access
11/62
0/1
1/0
45/30
3/13
0/3
2/2
5/4
SHORT RANGE (2020) TOTAL
PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 16
Ziegler Road
Rock Creek Drive
AM/PM
89/45
657/369
18/9
23/85
287/661
80/151
79/35
36/30
79/56
122/137
11/32
10/28
Precision Drive
388/885
131/69
840/533
18/8
44/162
2/12
Site Access
12/64
0/0
0/1
0/2
0/0
0/0
0/0
34/108
1/0
2/2
100/44
47/31
4/18
0/3
2/2
138/176
11/7
123/183
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 17
Using the traffic volumes shown in Figure 7, the Ziegler/Rock Creek,
Ziegler/Precision, Precision/Site Access, and Rock Creek/Site Access intersections
operate in the short range (2020) background traffic future as indicated in Table 3.
Calculation forms for these analyses are provided in Appendix D. The key intersections
will meet the City of Fort Collins Motor Vehicle LOS standards during the morning and
afternoon peak hours with the existing control and geometry.
Using the traffic volumes shown in Figure 9, the Ziegler/Rock Creek,
Ziegler/Precision, Precision/Site Access, and Rock Creek/Site Access intersections
operate in the short range (2020) total traffic future as indicated in Table 4. Calculation
forms for these analyses are provided in Appendix E. The key intersections will meet the
City of Fort Collins Motor Vehicle LOS standards during the morning and afternoon peak
hours with the existing control and geometry.
Geometry
Figure 10 shows a schematic of the short range (2020) geometry. This is existing
geometry at the existing key intersections. According to Figure 8-1 in LCUASS, an
eastbound left-turn lane is not required at Rock Creek/Site Access intersection.
However, as mentioned in a recent TIS, The Windsong at Rock Creek development will
restripe this section of Rock Creek Drive to provide an eastbound left-turn lane at the
Rock Creek/Site Access intersection.
Trip Generation Comparison to the Harmony Technology Park ODP
In the “Harmony Technology Park Filing 5 (ODP) Transportation Impact Study,”
dated July 2015, the Windsong at Rock Creek and Eye Center of Northern Colorado
sites were assumed to have 6.3 acres of office park. From that ODP TIS, the trip
generation for these parcels is as follows: 1228 daily trip ends, 161 morning peak hour
trip ends, and 178 afternoon peak hour trip ends. The Windsong at Rock Creek and
Eye Center of Northern Colorado trip generation resulted in: 1196 daily trip ends, 78
morning peak hour trip ends, and 129 afternoon peak hour trip ends. This is a decrease
of: 32 daily trip ends, 83 morning peak hour trip ends, and 49 afternoon peak hour trip
ends. From the foregoing analyses, it is concluded that the trip generation for the
proposed parcels on this portion of the Harmony Technology Park will be less on a daily
basis and on a morning and afternoon peak hour basis as compared to that used in the
cited ODP TIS.
Pedestrian Level of Service
Appendix F shows a map of the area that is within 1320 feet of the Eye Center of
Northern Colorado development. There are four pedestrian destinations within 1320
feet of the Eye Center of Northern Colorado development. These are: 1) the residential
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 18
TABLE 3
Short Range (2020) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Ziegler/Rock Creek
(signal)
EB LT/T/RT D C
WB LT D C
WB T D C
WB RT D C
WB APPROACH D C
NB LT A A
NB T B A
NB RT A A
NB APPROACH B A
SB LT A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL B B
Ziegler/Precision
(stop sign)
WB LT C C
WB RT B B
WB APPROACH B B
SB LT B A
Precision/Site Access
(stop sign)
EB LT/T/RT A A
WB LT/T/RT A A
NB LT/T A A
NB RT A A
NB APPROACH A A
SB LT/T/RT A A
Rock Creek/Site Access
(stop sign)
EB LT A A
SB LT/RT A A
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 19
TABLE 4
Short Range (2020) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Ziegler/Rock Creek
(signal)
EB LT/T/RT D C
WB LT D C
WB T D C
WB RT D C
WB APPROACH D C
NB LT A A
NB T B A
NB RT A A
NB APPROACH B A
SB LT A A
SB T A B
SB RT A A
SB APPROACH A A
OVERALL B B
Ziegler/Precision
(stop sign)
WB LT C C
WB RT B B
WB APPROACH B B
SB LT B A
Precision/Site Access
(stop sign)
EB LT/T/RT A A
WB LT/T/RT A A
NB LT/T A B
NB RT A A
NB APPROACH A B
SB LT/T/RT A A
Rock Creek/Site Access
(stop sign)
EB LT A A
SB LT/RT A A
SHORT RANGE (2020) GEOMETRY Figure 10
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
page 20
Ziegler Road
Rock Creek Drive
- Denotes Lane
Precision Drive
Site Access
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 21
area to the west; 2) the commercial area to the north of this site; 3) the
commercial/office to the east; and 4) Fossil Ridge High School to the south. The Eye
Center of Northern Colorado site is located within an area termed as “transit corridor,”
which sets the level of service threshold at LOS B for directness and security and LOS
C for all other measured categories. The Pedestrian LOS Worksheet is provided in
Appendix F. This development will build sidewalk along the site frontage.
Bicycle Level of Service
Appendix F shows a map of the area that is within 1320 feet of the Eye Center of
Northern Colorado development. There is one bicycle destination within 1320 feet of
the Eye Center of Northern Colorado development, Fossil Ridge High School to the
south. The Bicycle LOS Worksheet is provided in Appendix F. The minimum level of
service for this site is C. This site is connected to bike lanes on Ziegler Road.
Therefore, it is concluded that level of service B can be achieved.
Transit Level of Service
This area of Fort Collins is served by Transfort Routes 16. There are bus stops
near the Ziegler/Rock Creek intersection.
DELICH Eye Center of Northern Colorado TIS, November 2015
ASSOCIATES Page 22
IV. CONCLUSIONS
This study assessed the impacts of the Eye Center of Northern Colorado on the
street system in the vicinity of the proposed development in the short range (2020) future.
As a result of this analysis, the following is concluded:
- The development of the Eye Center of Northern Colorado is feasible from a traffic
engineering standpoint. The Eye Center of Northern Colorado development will
generate approximately 1062 daily trips, 67 morning peak hour trip ends, and 115
afternoon peak hour trip ends.
- Current operation at the Ziegler/Rock Creek and Ziegler/Precision intersections
meet the City of Fort Collins Motor Vehicle LOS standards.
- The Ziegler/Rock Creek intersection is currently unsignalized. None of the key
unsignalized intersections will meet the lower threshold volume for the minor street
approach (100 vehicles) or signal spacing requirements.
- In the short range (2020) future, given development of the Eye Center of Northern
Colorado and an increase in background traffic, the Ziegler/Rock Creek,
Ziegler/Precision, Precision/Site Access, and Rock Creek/Site Access intersections
will meet the City of Fort Collins Motor Vehicle LOS standards.
- The short range (2020) geometry is shown in Figure 10.
- The trip generation for the proposed parcels along Ziegler Road, between Rock
Creek Drive and Precision Drive, are in line with the Harmony Technology Park
ODP.
- Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi-modal transportation guidelines and future
improvements to the street system in the area. The practical limits of pedestrian
improvements would be on the Eye Center of Northern Colorado site itself.
APPENDIX A
1
2
3
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Eye Center of Northern Colorado TIS, November 2015
Ziegler Road
Rock Creek Drive
AM/PM
5% 5%
20%
70%
Precision Drive
SITE
4
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
720 Medical Office 105 Employees 8.91 936 0.42 44 0.11 12 0.36 38 0.70 74
720 Medical Office 30.2 KSF 36.13 1092 1.89 57 0.50 15 1.00 30 2.57 78
5
APPENDIX B
6
7
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 11/12/15 Observer: Andy
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Ziegler/Precision
S = straight
L = left turn
Time Northbound: Ziegler Southbound: Ziegler Total Eastbound: Westbound: Precision Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 214 0 214 10 83 93 307 0 02 2 2 309
7:45 203 1 204 10 107 117 321 0 03 3 3 324
8:00 205 2 207 12 71 83 290 0 03 3 3 293
8:15 209 2 211 987 96 307 0 02 2 2 309
7:30-8:30 0 831 5 836 41 348 0 389 1225 0 0 000 0 101010 1235
PHF n/a 0.97 0.63 0.98 0.85 0.81 n/a 0.83 0.95 n/a n/a n/a n/a n/a n/a 0.83 0.83 0.83 0.95
4:30 91 0 91 2 180 182 273 0 06 6 6 279
4:45 120 0 120 2 171 173 293 0 013 13 13 306
5:00 124 0 124 4 206 210 334 0 014 14 14 348
5:15 122 0 122 9 216 225 347 0 017 17 17 364
4:30-5:30 0 457 0 457 17 773 0 790 1247 0 0 000 0 505050 1297
PHF n/a 0.92 n/a 0.92 0.47 0.89 n/a 0.88 0.9 n/a n/a n/a n/a n/a n/a 0.74 0.74 0.74 0.89
8
APPENDIX C
9
HCM 2010 Signalized Intersection Summary
168: Ziegler & Rock Creek Recent AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 71 30 72 6 9 110 81 587 13 69 258 21
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.98 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 84 35 54 7 11 2 95 691 0 81 304 0
Adj No. of Lanes 010111111111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 150 55 71 230 267 225 816 1288 1095 522 1286 1093
Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.04 0.69 0.00 0.04 0.69 0.00
Sat Flow, veh/h 709 384 496 1350 1863 1567 1774 1863 1583 1774 1863 1583
Grp Volume(v), veh/h 173 0 0 7 11 2 95 691 0 81 304 0
Grp Sat Flow(s),veh/h/ln 1588 0 0 1350 1863 1567 1774 1863 1583 1774 1863 1583
Q Serve(g_s), s 10.3 0.0 0.0 0.0 0.6 0.1 1.7 20.0 0.0 1.4 6.6 0.0
Cycle Q Clear(g_c), s 11.5 0.0 0.0 0.6 0.6 0.1 1.7 20.0 0.0 1.4 6.6 0.0
Prop In Lane 0.49 0.31 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 277 0 0 230 267 225 816 1288 1095 522 1286 1093
V/C Ratio(X) 0.63 0.00 0.00 0.03 0.04 0.01 0.12 0.54 0.00 0.16 0.24 0.00
Avail Cap(c_a), veh/h 422 0 0 355 440 370 917 1288 1095 576 1286 1093
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 45.2 0.0 0.0 40.6 40.6 40.4 4.3 8.3 0.0 6.1 6.3 0.0
Incr Delay (d2), s/veh 2.3 0.0 0.0 0.1 0.1 0.0 0.1 1.6 0.0 0.1 0.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.2 0.0 0.0 0.2 0.3 0.1 0.8 10.7 0.0 0.7 3.5 0.0
LnGrp Delay(d),s/veh 47.5 0.0 0.0 40.7 40.7 40.4 4.4 9.9 0.0 6.3 6.7 0.0
LnGrp LOS D D D D A A A A
Approach Vol, veh/h 173 20 786 385
Approach Delay, s/veh 47.5 40.6 9.3 6.6
Approach LOS D D A A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.8 81.4 20.8 7.7 81.6 20.8
Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0
Max Green Setting (Gmax), s 10.0 58.5 25.0 7.0 61.5 25.0
Max Q Clear Time (g_c+I1), s 3.7 8.6 13.5 3.4 22.0 2.6
Green Ext Time (p_c), s 0.1 3.8 0.5 0.0 3.7 0.6
Intersection Summary
HCM 2010 Ctrl Delay 13.8
HCM 2010 LOS B
10
Timing Report, Sorted By Phase
168: Ziegler & Rock Creek Recent AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 6
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None C-Max None
Maximum Split (s) 14 65 31 11 68 31
Maximum Split (%) 12.7% 59.1% 28.2% 10.0% 61.8% 28.2%
Minimum Split (s) 11 32.5 30 11 31.5 31
Yellow Time (s) 3 4.5 3 3 4.5 3
All-Red Time (s) 123123
Minimum Initial (s) 474474
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 19 17 18 18
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 55 10 41 52 10
End Time (s) 55 10 41 52 10 41
Yield/Force Off (s) 51 3.5 35 48 3.5 35
Yield/Force Off 170(s) 51 94.5 18 48 95.5 17
Local Start Time (s) 31 45 0 31 42 0
Local Yield (s) 41 103.5 25 38 103.5 25
Local Yield 170(s) 41 84.5 8 38 85.5 7
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 10 (9%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 168: Ziegler & Rock Creek
11
HCM 2010 Signalized Intersection Summary
168: Ziegler & Rock Creek Recent pm
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 32 25 51 15 25 119 41 328 5 135 591 76
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.98 0.97 0.99 0.97 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 37 29 4 17 29 8 47 377 0 155 679 44
Adj No. of Lanes 010111111111
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87
Percent Heavy Veh, % 222222222222
Cap, veh/h 144 97 10 261 207 171 525 1223 1040 773 1258 1068
Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.04 0.66 0.00 0.06 0.68 0.68
Sat Flow, veh/h 679 874 94 1407 1863 1541 1774 1863 1583 1774 1863 1581
Grp Volume(v), veh/h 70 0 0 17 29 8 47 377 0 155 679 44
Grp Sat Flow(s),veh/h/ln 1647 0 0 1407 1863 1541 1774 1863 1583 1774 1863 1581
Q Serve(g_s), s 1.2 0.0 0.0 0.0 1.1 0.4 0.6 7.0 0.0 2.1 14.9 0.7
Cycle Q Clear(g_c), s 2.9 0.0 0.0 0.7 1.1 0.4 0.6 7.0 0.0 2.1 14.9 0.7
Prop In Lane 0.53 0.06 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 251 0 0 261 207 171 525 1223 1040 773 1258 1068
V/C Ratio(X) 0.28 0.00 0.00 0.07 0.14 0.05 0.09 0.31 0.00 0.20 0.54 0.04
Avail Cap(c_a), veh/h 591 0 0 562 605 501 645 1223 1040 860 1258 1068
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 32.9 0.0 0.0 31.9 32.1 31.8 4.9 5.9 0.0 3.7 6.6 4.3
Incr Delay (d2), s/veh 2.2 0.0 0.0 0.4 1.1 0.4 0.1 0.7 0.0 0.1 1.7 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.6 0.0 0.0 0.4 0.6 0.2 0.3 3.8 0.0 1.0 8.1 0.3
LnGrp Delay(d),s/veh 35.0 0.0 0.0 32.3 33.2 32.2 4.9 6.6 0.0 3.8 8.3 4.4
LnGrp LOS D C C C A A A A A
Approach Vol, veh/h 70 54 424 878
Approach Delay, s/veh 35.0 32.8 6.4 7.3
Approach LOS D C A A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.6 59.5 13.9 8.1 58.0 13.9
Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0
Max Green Setting (Gmax), s 8.0 30.5 25.0 8.0 30.5 25.0
Max Q Clear Time (g_c+I1), s 2.6 16.9 4.9 4.1 9.0 3.1
Green Ext Time (p_c), s 0.0 8.7 1.0 0.1 12.0 1.0
Intersection Summary
HCM 2010 Ctrl Delay 9.4
HCM 2010 LOS A
12
Timing Report, Sorted By Phase
168: Ziegler & Rock Creek Recent pm
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 6
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 12 37 31 12 37 31
Maximum Split (%) 15.0% 46.3% 38.8% 15.0% 46.3% 38.8%
Minimum Split (s) 11 32.5 30 11 31.5 31
Yellow Time (s) 3 4.5 3 3 4.5 3
All-Red Time (s) 123123
Minimum Initial (s) 474474
Vehicle Extension (s) 366366
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 19 17 18 18
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 7 19 56 7 19 56
End Time (s) 19 56 7 19 56 7
Yield/Force Off (s) 15 49.5 1 15 49.5 1
Yield/Force Off 170(s) 15 30.5 64 15 31.5 63
Local Start Time (s) 31 43 0 31 43 0
Local Yield (s) 39 73.5 25 39 73.5 25
Local Yield 170(s) 39 54.5 8 39 55.5 7
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 56 (70%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 168: Ziegler & Rock Creek
13
HCM 2010 TWSC
3: Ziegler & Precision Recent AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Intersection
Int Delay, s/veh 0.5
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 10 763 5 41 348
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 150 0 - - 250 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 12 898 6 48 409
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1202 452 0 0 904 0
Stage 1 901 - - - - -
Stage 2 301 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 177 555 - - 748 -
Stage 1 357 - - - - -
Stage 2 725 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 166 555 - - 748 -
Mov Cap-2 Maneuver 278 - - - - -
Stage 1 357 - - - - -
Stage 2 678 - - - - -
Approach WB NB SB
HCM Control Delay, s 11.6 0 1.1
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - - 555 748 -
HCM Lane V/C Ratio - - - 0.021 0.064 -
HCM Control Delay (s) - - 0 11.6 10.1 -
HCM Lane LOS - - A B B -
HCM 95th %tile Q(veh) - - - 0.1 0.2 -
14
Lanes and Geometrics
3: Ziegler & Precision Recent AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 150 0 0 250
Storage Lanes 1 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95
Ped Bike Factor
Frt 0.850 0.999
Flt Protected 0.950
Satd. Flow (prot) 1863 1583 3536 0 1770 3539
Flt Permitted 0.950
Satd. Flow (perm) 1863 1583 3536 0 1770 3539
Link Speed (mph) 30 40 40
Link Distance (ft) 757 898 349
Travel Time (s) 17.2 15.3 5.9
Intersection Summary
Area Type: Other
15
HCM 2010 TWSC
3: Ziegler & Precision Recent pm
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 2
Intersection
Int Delay, s/veh 0.5
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 0 50 479 0 17 802
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 150 0 - - 250 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 56 532 0 19 891
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1015 266 0 0 532 0
Stage 1 532 - - - - -
Stage 2 483 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 234 732 - - 1032 -
Stage 1 553 - - - - -
Stage 2 586 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 230 732 - - 1032 -
Mov Cap-2 Maneuver 362 - - - - -
Stage 1 553 - - - - -
Stage 2 575 - - - - -
Approach WB NB SB
HCM Control Delay, s 10.3 0 0.2
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - - 732 1032 -
HCM Lane V/C Ratio - - - 0.076 0.018 -
HCM Control Delay (s) - - 0 10.3 8.6 -
HCM Lane LOS - - A B A -
HCM 95th %tile Q(veh) - - - 0.2 0.1 -
16
Lanes and Geometrics
3: Ziegler & Precision Recent pm
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 150 0 0 250
Storage Lanes 1 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 1863 1583 3539 0 1770 3539
Flt Permitted 0.950
Satd. Flow (perm) 1863 1583 3539 0 1770 3539
Link Speed (mph) 30 40 40
Link Distance (ft) 851 909 970
Travel Time (s) 19.3 15.5 16.5
Intersection Summary
Area Type: Other
17
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Intersection type
Land Use (from structure plan)
Commercial
corridors
Other corridors within:
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
D E* D D
Any Leg E E D E
Any Movement E E D E
Stop sign control
(arterial/arterial,
arterial/collector or local-
any approach leg)
N/A F** F** E
Stop sign control
(collector/local--any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
18
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
19
APPENDIX D
20
HCM 2010 Signalized Intersection Summary
168: Ziegler & Rock Creek Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 78 34 79 8 10 122 89 650 15 80 286 23
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.98 1.00 0.99 1.00 1.00 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 92 40 62 9 12 17 105 765 3 94 336 2
Adj No. of Lanes 010111111111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 157 60 79 237 292 246 772 1262 1069 458 1260 1046
Arrive On Green 0.16 0.16 0.16 0.16 0.16 0.16 0.04 0.68 0.68 0.04 0.68 0.68
Sat Flow, veh/h 693 382 505 1335 1863 1568 1774 1863 1579 1774 1863 1546
Grp Volume(v), veh/h 194 0 0 9 12 17 105 765 3 94 336 2
Grp Sat Flow(s),veh/h/ln 1580 0 0 1335 1863 1568 1774 1863 1579 1774 1863 1546
Q Serve(g_s), s 11.8 0.0 0.0 0.0 0.6 1.0 1.9 24.7 0.1 1.7 7.8 0.0
Cycle Q Clear(g_c), s 12.9 0.0 0.0 0.8 0.6 1.0 1.9 24.7 0.1 1.7 7.8 0.0
Prop In Lane 0.47 0.32 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 296 0 0 237 292 246 772 1262 1069 458 1260 1046
V/C Ratio(X) 0.66 0.00 0.00 0.04 0.04 0.07 0.14 0.61 0.00 0.21 0.27 0.00
Avail Cap(c_a), veh/h 420 0 0 344 440 371 870 1262 1069 510 1260 1046
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.5 0.0 0.0 39.5 39.4 39.6 4.9 9.7 5.7 7.8 7.0 5.8
Incr Delay (d2), s/veh 2.5 0.0 0.0 0.1 0.1 0.1 0.1 2.2 0.0 0.2 0.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.9 0.0 0.0 0.2 0.3 0.5 1.0 13.3 0.0 0.8 4.2 0.0
LnGrp Delay(d),s/veh 47.0 0.0 0.0 39.5 39.4 39.7 5.0 11.9 5.7 8.0 7.6 5.8
LnGrp LOS D D D D ABAAAA
Approach Vol, veh/h 194 38 873 432
Approach Delay, s/veh 47.0 39.6 11.0 7.6
Approach LOS D D B A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.9 79.9 22.2 7.8 80.0 22.2
Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0
Max Green Setting (Gmax), s 10.0 58.5 25.0 7.0 61.5 25.0
Max Q Clear Time (g_c+I1), s 3.9 9.8 14.9 3.7 26.7 3.0
Green Ext Time (p_c), s 0.1 4.4 0.5 0.1 4.3 0.8
Intersection Summary
HCM 2010 Ctrl Delay 15.3
HCM 2010 LOS B
21
Timing Report, Sorted By Phase
168: Ziegler & Rock Creek Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 10
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None C-Max None
Maximum Split (s) 14 65 31 11 68 31
Maximum Split (%) 12.7% 59.1% 28.2% 10.0% 61.8% 28.2%
Minimum Split (s) 11 32.5 30 11 31.5 31
Yellow Time (s) 3 4.5 3 3 4.5 3
All-Red Time (s) 123123
Minimum Initial (s) 474474
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 19 17 18 18
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 55 10 41 52 10
End Time (s) 55 10 41 52 10 41
Yield/Force Off (s) 51 3.5 35 48 3.5 35
Yield/Force Off 170(s) 51 94.5 18 48 95.5 17
Local Start Time (s) 31 45 0 31 42 0
Local Yield (s) 41 103.5 25 38 103.5 25
Local Yield 170(s) 41 84.5 8 38 85.5 7
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 10 (9%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 168: Ziegler & Rock Creek
22
HCM 2010 Signalized Intersection Summary
168: Ziegler & Rock Creek Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 35 28 56 18 29 137 45 364 7 151 655 84
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.98 0.97 0.99 0.98 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 40 32 9 21 33 28 52 418 2 174 753 54
Adj No. of Lanes 010111111111
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87
Percent Heavy Veh, % 222222222222
Cap, veh/h 143 102 22 279 228 189 464 1192 1012 728 1233 1047
Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.05 0.64 0.64 0.07 0.66 0.66
Sat Flow, veh/h 620 833 182 1399 1863 1545 1774 1863 1581 1774 1863 1581
Grp Volume(v), veh/h 81 0 0 21 33 28 52 418 2 174 753 54
Grp Sat Flow(s),veh/h/ln 1635 0 0 1399 1863 1545 1774 1863 1581 1774 1863 1581
Q Serve(g_s), s 1.4 0.0 0.0 0.0 1.3 1.3 0.8 8.3 0.0 2.5 18.3 1.0
Cycle Q Clear(g_c), s 3.4 0.0 0.0 0.8 1.3 1.3 0.8 8.3 0.0 2.5 18.3 1.0
Prop In Lane 0.49 0.11 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 268 0 0 279 228 189 464 1192 1012 728 1233 1047
V/C Ratio(X) 0.30 0.00 0.00 0.08 0.14 0.15 0.11 0.35 0.00 0.24 0.61 0.05
Avail Cap(c_a), veh/h 586 0 0 563 605 502 580 1192 1012 805 1233 1047
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 32.2 0.0 0.0 31.2 31.4 31.4 5.9 6.7 5.2 4.2 7.7 4.7
Incr Delay (d2), s/veh 2.3 0.0 0.0 0.4 1.0 1.3 0.1 0.8 0.0 0.2 2.3 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 0.0 0.4 0.7 0.6 0.4 4.4 0.0 1.1 10.0 0.4
LnGrp Delay(d),s/veh 34.5 0.0 0.0 31.6 32.4 32.7 6.0 7.5 5.2 4.3 9.9 4.8
LnGrp LOS C C C C AAAAAA
Approach Vol, veh/h 81 82 472 981
Approach Delay, s/veh 34.5 32.3 7.3 8.7
Approach LOS C C A A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.7 58.5 14.8 8.5 56.7 14.8
Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0
Max Green Setting (Gmax), s 8.0 30.5 25.0 8.0 30.5 25.0
Max Q Clear Time (g_c+I1), s 2.8 20.3 5.4 4.5 10.3 3.3
Green Ext Time (p_c), s 0.0 7.5 1.4 0.2 12.9 1.4
Intersection Summary
HCM 2010 Ctrl Delay 10.8
HCM 2010 LOS B
23
Timing Report, Sorted By Phase
168: Ziegler & Rock Creek Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 10
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 12 37 31 12 37 31
Maximum Split (%) 15.0% 46.3% 38.8% 15.0% 46.3% 38.8%
Minimum Split (s) 11 32.5 30 11 31.5 31
Yellow Time (s) 3 4.5 3 3 4.5 3
All-Red Time (s) 123123
Minimum Initial (s) 474474
Vehicle Extension (s) 366366
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 19 17 18 18
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 7 19 56 7 19 56
End Time (s) 19 56 7 19 56 7
Yield/Force Off (s) 15 49.5 1 15 49.5 1
Yield/Force Off 170(s) 15 30.5 64 15 31.5 63
Local Start Time (s) 31 43 0 31 43 0
Local Yield (s) 39 73.5 25 39 73.5 25
Local Yield 170(s) 39 54.5 8 39 55.5 7
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 56 (70%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 168: Ziegler & Rock Creek
24
HCM 2010 TWSC
3: Ziegler & Precision Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 1 34 840 10 94 388
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 150 0 - - 250 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1 40 988 12 111 456
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1443 500 0 0 1000 0
Stage 1 994 - - - - -
Stage 2 449 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 123 516 - - 688 -
Stage 1 319 - - - - -
Stage 2 610 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 103 516 - - 688 -
Mov Cap-2 Maneuver 223 - - - - -
Stage 1 319 - - - - -
Stage 2 512 - - - - -
Approach WB NB SB
HCM Control Delay, s 12.8 0 2.2
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 223 516 688 -
HCM Lane V/C Ratio - - 0.005 0.078 0.161 -
HCM Control Delay (s) - - 21.2 12.6 11.2 -
HCM Lane LOS - - C B B -
HCM 95th %tile Q(veh) - - 0 0.3 0.6 -
25
Lanes and Geometrics
3: Ziegler & Precision Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 150 0 0 250
Storage Lanes 1 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95
Ped Bike Factor
Frt 0.850 0.998
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 3532 0 1770 3539
Flt Permitted 0.950 0.950
Satd. Flow (perm) 1770 1583 3532 0 1770 3539
Link Speed (mph) 30 40 40
Link Distance (ft) 547 898 349
Travel Time (s) 12.4 15.3 5.9
Intersection Summary
Area Type: Other
26
HCM 2010 TWSC
3: Ziegler & Precision Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 2
Intersection
Int Delay, s/veh 1.1
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 5 107 533 3 44 885
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 150 0 - - 250 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 6 119 592 3 49 983
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1183 298 0 0 596 0
Stage 1 594 - - - - -
Stage 2 589 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 182 698 - - 976 -
Stage 1 514 - - - - -
Stage 2 517 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 173 698 - - 976 -
Mov Cap-2 Maneuver 308 - - - - -
Stage 1 514 - - - - -
Stage 2 491 - - - - -
Approach WB NB SB
HCM Control Delay, s 11.5 0 0.4
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 308 698 976 -
HCM Lane V/C Ratio - - 0.018 0.17 0.05 -
HCM Control Delay (s) - - 16.9 11.2 8.9 -
HCM Lane LOS - - C B A -
HCM 95th %tile Q(veh) - - 0.1 0.6 0.2 -
27
Lanes and Geometrics
3: Ziegler & Precision Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 150 0 0 250
Storage Lanes 1 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95
Ped Bike Factor
Frt 0.850 0.999
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 3536 0 1770 3539
Flt Permitted 0.950 0.950
Satd. Flow (perm) 1770 1583 3536 0 1770 3539
Link Speed (mph) 30 40 40
Link Distance (ft) 606 909 970
Travel Time (s) 13.8 15.5 16.5
Intersection Summary
Area Type: Other
28
HCM 2010 TWSC
5: Site Access & Precision Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Intersection
Int Delay, s/veh 0.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 2 100 2 0 34 0 1 0 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 50 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 118 2 0 40 0 1 0 0 0 0 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 40 0 0 120 0 0 164 164 119 164 165 40
Stage 1 - - - - - - 124 124 - 40 40 -
Stage 2 - - - - - - 40 40 - 124 125 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1570 - - 1468 - - 801 729 933 801 728 1031
Stage 1 - - - - - - 880 793 - 975 862 -
Stage 2 - - - - - - 975 862 - 880 792 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1570 - - 1468 - - 800 728 933 800 727 1031
Mov Cap-2 Maneuver - - - - - - 800 728 - 800 727 -
Stage 1 - - - - - - 879 792 - 974 862 -
Stage 2 - - - - - - 975 862 - 879 791 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 0 9.5 0
HCM LOS A A
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 800 - 1570 - - 1468 - - -
HCM Lane V/C Ratio 0.001 - 0.001 ------
HCM Control Delay (s) 9.5 0 7.3 0 - 0 - - 0
HCM Lane LOS AAAA-A--A
HCM 95th %tile Q(veh) 0 - 0 - - 0 - - -
29
Lanes and Geometrics
5: Site Access & Precision Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 50 0 0
Storage Lanes 0 0 0 0 0 1 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998
Flt Protected 0.999 0.950
Satd. Flow (prot) 0 1857 0 0 1863 0 0 1770 1863 0 1863 0
Flt Permitted 0.999 0.950
Satd. Flow (perm) 0 1857 0 0 1863 0 0 1770 1863 0 1863 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 547 210 888 353
Travel Time (s) 12.4 4.8 20.2 8.0
Intersection Summary
Area Type: Other
30
HCM 2010 TWSC
5: Site Access & Precision Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 4
Intersection
Int Delay, s/veh 0.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 2 44 1 0 108 0 2 0 0 0 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 50 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 49 1 0 120 0 2 0 0 0 0 2
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 120 0 0 50 0 0 175 174 49 174 174 120
Stage 1 - - - - - - 54 54 - 120 120 -
Stage 2 - - - - - - 121 120 - 54 54 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1468 - - 1557 - - 788 719 1020 789 719 931
Stage 1 - - - - - - 958 850 - 884 796 -
Stage 2 - - - - - - 883 796 - 958 850 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1468 - - 1557 - - 786 718 1020 788 718 931
Mov Cap-2 Maneuver - - - - - - 786 718 - 788 718 -
Stage 1 - - - - - - 957 849 - 883 796 -
Stage 2 - - - - - - 881 796 - 957 849 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 0 9.6 8.9
HCM LOS A A
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 786 - 1468 - - 1557 - - 931
HCM Lane V/C Ratio 0.003 - 0.002 ----- 0.002
HCM Control Delay (s) 9.6 0 7.5 0 - 0 - - 8.9
HCM Lane LOS AAAA-A--A
HCM 95th %tile Q(veh) 0 - 0 - - 0 - - 0
31
Lanes and Geometrics
5: Site Access & Precision Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 50 0 0
Storage Lanes 0 0 0 0 0 1 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.997 0.865
Flt Protected 0.998 0.950
Satd. Flow (prot) 0 1853 0 0 1863 0 0 1770 1863 0 1611 0
Flt Permitted 0.998 0.950
Satd. Flow (perm) 0 1853 0 0 1863 0 0 1770 1863 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 606 245 929 215
Travel Time (s) 13.8 5.6 21.1 4.9
Intersection Summary
Area Type: Other
32
HCM 2010 TWSC
6: Rock Creek & Site Access Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 6
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 6 123 138 0 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 100 - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 7 145 162 0 0 1
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 162 0 - 0 321 162
Stage 1 - - - - 162 -
Stage 2 - - - - 159 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1417 - - - 673 883
Stage 1 - - - - 867 -
Stage 2 - - - - 870 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1417 - - - 670 883
Mov Cap-2 Maneuver - - - - 670 -
Stage 1 - - - - 867 -
Stage 2 - - - - 866 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 9.1
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1417 - - - 883
HCM Lane V/C Ratio 0.005 - - - 0.001
HCM Control Delay (s) 7.6 - - - 9.1
HCM Lane LOS A - - - A
HCM 95th %tile Q(veh) 0 - - - 0
33
Lanes and Geometrics
6: Rock Creek & Site Access Short Background AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 5
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 1 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865
Flt Protected 0.950
Satd. Flow (prot) 1770 1863 1863 0 1611 0
Flt Permitted 0.950
Satd. Flow (perm) 1770 1863 1863 0 1611 0
Link Speed (mph) 25 25 30
Link Distance (ft) 555 550 888
Travel Time (s) 15.1 15.0 20.2
Intersection Summary
Area Type: Other
34
HCM 2010 TWSC
6: Rock Creek & Site Access Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 6
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 3 183 176 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 100 - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 3 203 196 0 0 6
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 196 0 - 0 406 196
Stage 1 - - - - 196 -
Stage 2 - - - - 210 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1377 - - - 601 845
Stage 1 - - - - 837 -
Stage 2 - - - - 825 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1377 - - - 600 845
Mov Cap-2 Maneuver - - - - 600 -
Stage 1 - - - - 837 -
Stage 2 - - - - 823 -
Approach EB WB SB
HCM Control Delay, s 0.1 0 9.3
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1377 - - - 845
HCM Lane V/C Ratio 0.002 - - - 0.007
HCM Control Delay (s) 7.6 - - - 9.3
HCM Lane LOS A - - - A
HCM 95th %tile Q(veh) 0 - - - 0
35
Lanes and Geometrics
6: Rock Creek & Site Access Short Background PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 5
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 1 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.865
Flt Protected 0.950
Satd. Flow (prot) 1770 1863 1863 0 1611 0
Flt Permitted 0.950
Satd. Flow (perm) 1770 1863 1863 0 1611 0
Link Speed (mph) 25 25 30
Link Distance (ft) 587 518 929
Travel Time (s) 16.0 14.1 21.1
Intersection Summary
Area Type: Other
36
APPENDIX E
37
HCM 2010 Signalized Intersection Summary
168: Ziegler & Rock Creek Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 79 36 79 10 11 122 89 657 18 80 287 23
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.98 1.00 0.99 1.00 1.00 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 93 42 62 12 13 17 105 773 6 94 338 2
Adj No. of Lanes 010111111111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 222222222222
Cap, veh/h 158 62 79 238 295 248 768 1258 1066 450 1256 1043
Arrive On Green 0.16 0.16 0.16 0.16 0.16 0.16 0.04 0.68 0.68 0.04 0.67 0.67
Sat Flow, veh/h 691 393 498 1332 1863 1568 1774 1863 1579 1774 1863 1546
Grp Volume(v), veh/h 197 0 0 12 13 17 105 773 6 94 338 2
Grp Sat Flow(s),veh/h/ln 1581 0 0 1332 1863 1568 1774 1863 1579 1774 1863 1546
Q Serve(g_s), s 12.0 0.0 0.0 0.0 0.7 1.0 1.9 25.3 0.1 1.7 7.9 0.0
Cycle Q Clear(g_c), s 13.1 0.0 0.0 1.1 0.7 1.0 1.9 25.3 0.1 1.7 7.9 0.0
Prop In Lane 0.47 0.31 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 298 0 0 238 295 248 768 1258 1066 450 1256 1043
V/C Ratio(X) 0.66 0.00 0.00 0.05 0.04 0.07 0.14 0.61 0.01 0.21 0.27 0.00
Avail Cap(c_a), veh/h 421 0 0 342 440 371 866 1258 1066 502 1256 1043
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.4 0.0 0.0 39.4 39.2 39.4 4.9 9.9 5.8 8.0 7.1 5.8
Incr Delay (d2), s/veh 2.5 0.0 0.0 0.1 0.1 0.1 0.1 2.2 0.0 0.2 0.5 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.0 0.0 0.0 0.3 0.3 0.4 1.0 13.7 0.1 0.8 4.2 0.0
LnGrp Delay(d),s/veh 46.9 0.0 0.0 39.5 39.3 39.5 5.0 12.1 5.8 8.2 7.6 5.8
LnGrp LOS D D D D ABAAAA
Approach Vol, veh/h 197 42 884 434
Approach Delay, s/veh 46.9 39.4 11.3 7.8
Approach LOS D D B A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.9 79.7 22.4 7.8 79.8 22.4
Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0
Max Green Setting (Gmax), s 10.0 58.5 25.0 7.0 61.5 25.0
Max Q Clear Time (g_c+I1), s 3.9 9.9 15.1 3.7 27.3 3.1
Green Ext Time (p_c), s 0.1 4.5 0.6 0.1 4.4 0.8
Intersection Summary
HCM 2010 Ctrl Delay 15.5
HCM 2010 LOS B
38
Timing Report, Sorted By Phase
168: Ziegler & Rock Creek Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 10
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Max None None C-Max None
Maximum Split (s) 14 65 31 11 68 31
Maximum Split (%) 12.7% 59.1% 28.2% 10.0% 61.8% 28.2%
Minimum Split (s) 11 32.5 30 11 31.5 31
Yellow Time (s) 3 4.5 3 3 4.5 3
All-Red Time (s) 123123
Minimum Initial (s) 474474
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 19 17 18 18
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 41 55 10 41 52 10
End Time (s) 55 10 41 52 10 41
Yield/Force Off (s) 51 3.5 35 48 3.5 35
Yield/Force Off 170(s) 51 94.5 18 48 95.5 17
Local Start Time (s) 31 45 0 31 42 0
Local Yield (s) 41 103.5 25 38 103.5 25
Local Yield 170(s) 41 84.5 8 38 85.5 7
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 10 (9%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 168: Ziegler & Rock Creek
39
HCM 2010 Signalized Intersection Summary
168: Ziegler & Rock Creek Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 35 30 56 28 32 137 45 369 9 151 661 85
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.98 0.97 0.99 0.98 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1824 1937 1824 1937 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 40 34 9 32 37 28 52 424 4 174 760 55
Adj No. of Lanes 010111111111
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87
Percent Heavy Veh, % 222222222222
Cap, veh/h 142 108 22 284 234 194 456 1186 1006 718 1227 1042
Arrive On Green 0.13 0.13 0.13 0.13 0.13 0.13 0.05 0.64 0.64 0.07 0.66 0.66
Sat Flow, veh/h 603 860 178 1396 1863 1546 1774 1863 1581 1774 1863 1581
Grp Volume(v), veh/h 83 0 0 32 37 28 52 424 4 174 760 55
Grp Sat Flow(s),veh/h/ln 1641 0 0 1396 1863 1546 1774 1863 1581 1774 1863 1581
Q Serve(g_s), s 1.4 0.0 0.0 0.0 1.4 1.3 0.8 8.6 0.1 2.5 18.8 1.0
Cycle Q Clear(g_c), s 3.4 0.0 0.0 1.2 1.4 1.3 0.8 8.6 0.1 2.5 18.8 1.0
Prop In Lane 0.48 0.11 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 273 0 0 284 234 194 456 1186 1006 718 1227 1042
V/C Ratio(X) 0.30 0.00 0.00 0.11 0.16 0.14 0.11 0.36 0.00 0.24 0.62 0.05
Avail Cap(c_a), veh/h 587 0 0 562 605 502 572 1186 1006 795 1227 1042
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 32.0 0.0 0.0 31.1 31.2 31.1 6.1 6.8 5.3 4.3 7.9 4.8
Incr Delay (d2), s/veh 2.3 0.0 0.0 0.6 1.1 1.2 0.1 0.8 0.0 0.2 2.4 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.9 0.0 0.0 0.7 0.8 0.6 0.4 4.6 0.0 1.2 10.3 0.5
LnGrp Delay(d),s/veh 34.3 0.0 0.0 31.8 32.3 32.4 6.2 7.7 5.3 4.4 10.2 4.9
LnGrp LOS C C C C AAAABA
Approach Vol, veh/h 83 97 480 989
Approach Delay, s/veh 34.3 32.2 7.5 8.9
Approach LOS C C A A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.7 58.2 15.0 8.5 56.4 15.0
Change Period (Y+Rc), s 4.0 6.5 6.0 4.0 6.5 6.0
Max Green Setting (Gmax), s 8.0 30.5 25.0 8.0 30.5 25.0
Max Q Clear Time (g_c+I1), s 2.8 20.8 5.4 4.5 10.6 3.4
Green Ext Time (p_c), s 0.0 7.3 1.5 0.2 12.9 1.6
Intersection Summary
HCM 2010 Ctrl Delay 11.1
HCM 2010 LOS B
40
Timing Report, Sorted By Phase
168: Ziegler & Rock Creek Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 10
Phase Number 124568
Movement NBL SBTL EBTL SBL NBTL WBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize
Recall Mode None C-Min None None C-Min None
Maximum Split (s) 12 37 31 12 37 31
Maximum Split (%) 15.0% 46.3% 38.8% 15.0% 46.3% 38.8%
Minimum Split (s) 11 32.5 30 11 31.5 31
Yellow Time (s) 3 4.5 3 3 4.5 3
All-Red Time (s) 123123
Minimum Initial (s) 474474
Vehicle Extension (s) 366366
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 7 7 7 7
Flash Dont Walk (s) 19 17 18 18
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 7 19 56 7 19 56
End Time (s) 19 56 7 19 56 7
Yield/Force Off (s) 15 49.5 1 15 49.5 1
Yield/Force Off 170(s) 15 30.5 64 15 31.5 63
Local Start Time (s) 31 43 0 31 43 0
Local Yield (s) 39 73.5 25 39 73.5 25
Local Yield 170(s) 39 54.5 8 39 55.5 7
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 56 (70%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red
Splits and Phases: 168: Ziegler & Rock Creek
41
HCM 2010 TWSC
3: Ziegler & Precision Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 2
Intersection
Int Delay, s/veh 1.5
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 2 44 840 18 131 388
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 150 0 - - 250 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 52 988 21 154 456
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1535 505 0 0 1009 0
Stage 1 999 - - - - -
Stage 2 536 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 107 512 - - 683 -
Stage 1 317 - - - - -
Stage 2 551 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 83 512 - - 683 -
Mov Cap-2 Maneuver 203 - - - - -
Stage 1 317 - - - - -
Stage 2 427 - - - - -
Approach WB NB SB
HCM Control Delay, s 13.2 0 3
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 203 512 683 -
HCM Lane V/C Ratio - - 0.012 0.101 0.226 -
HCM Control Delay (s) - - 22.9 12.8 11.8 -
HCM Lane LOS - - C B B -
HCM 95th %tile Q(veh) - - 0 0.3 0.9 -
42
Lanes and Geometrics
3: Ziegler & Precision Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 150 0 0 250
Storage Lanes 1 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95
Ped Bike Factor
Frt 0.850 0.997
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 3529 0 1770 3539
Flt Permitted 0.950 0.950
Satd. Flow (perm) 1770 1583 3529 0 1770 3539
Link Speed (mph) 30 40 40
Link Distance (ft) 547 898 349
Travel Time (s) 12.4 15.3 5.9
Intersection Summary
Area Type: Other
43
HCM 2010 TWSC
3: Ziegler & Precision Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 2
Intersection
Int Delay, s/veh 1.7
Movement WBL WBR NBT NBR SBL SBT
Vol, veh/h 12 162 533 8 69 885
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 150 0 - - 250 -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 13 180 592 9 77 983
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1242 301 0 0 601 0
Stage 1 597 - - - - -
Stage 2 645 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 167 695 - - 972 -
Stage 1 513 - - - - -
Stage 2 484 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 154 695 - - 972 -
Mov Cap-2 Maneuver 288 - - - - -
Stage 1 513 - - - - -
Stage 2 446 - - - - -
Approach WB NB SB
HCM Control Delay, s 12.4 0 0.7
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT
Capacity (veh/h) - - 288 695 972 -
HCM Lane V/C Ratio - - 0.046 0.259 0.079 -
HCM Control Delay (s) - - 18.1 12 9 -
HCM Lane LOS - - C B A -
HCM 95th %tile Q(veh) - - 0.1 1 0.3 -
44
Lanes and Geometrics
3: Ziegler & Precision Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 150 0 0 250
Storage Lanes 1 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95
Ped Bike Factor
Frt 0.850 0.998
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 3532 0 1770 3539
Flt Permitted 0.950 0.950
Satd. Flow (perm) 1770 1583 3532 0 1770 3539
Link Speed (mph) 30 40 40
Link Distance (ft) 606 909 970
Travel Time (s) 13.8 15.5 16.5
Intersection Summary
Area Type: Other
45
HCM 2010 TWSC
5: Site Access & Precision Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 4
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 2 100 47 1 34 0 12 0 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 50 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 118 55 1 40 0 14 0 0 0 0 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 40 0 0 173 0 0 192 192 145 192 220 40
Stage 1 - - - - - - 150 150 - 42 42 -
Stage 2 - - - - - - 42 42 - 150 178 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1570 - - 1404 - - 768 703 902 768 678 1031
Stage 1 - - - - - - 853 773 - 972 860 -
Stage 2 - - - - - - 972 860 - 853 752 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1570 - - 1404 - - 767 702 902 767 677 1031
Mov Cap-2 Maneuver - - - - - - 767 702 - 767 677 -
Stage 1 - - - - - - 852 772 - 971 859 -
Stage 2 - - - - - - 971 859 - 852 751 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.2 9.8 0
HCM LOS A A
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 767 - 1570 - - 1404 - - -
HCM Lane V/C Ratio 0.018 - 0.001 - - 0.001 - - -
HCM Control Delay (s) 9.8 0 7.3 0 - 7.6 0 - 0
HCM Lane LOS AAAA-AA-A
HCM 95th %tile Q(veh) 0.1 - 0 - - 0 - - -
46
Lanes and Geometrics
5: Site Access & Precision Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 50 0 0
Storage Lanes 0 0 0 0 0 1 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.958
Flt Protected 0.999 0.999 0.950
Satd. Flow (prot) 0 1783 0 0 1861 0 0 1770 1863 0 1863 0
Flt Permitted 0.999 0.999 0.950
Satd. Flow (perm) 0 1783 0 0 1861 0 0 1770 1863 0 1863 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 547 210 888 353
Travel Time (s) 12.4 4.8 20.2 8.0
Intersection Summary
Area Type: Other
47
HCM 2010 TWSC
5: Site Access & Precision Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 4
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 2 44 31 0 108 0 64 0 1 0 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 50 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 49 34 0 120 0 71 0 1 0 0 2
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 120 0 0 83 0 0 192 191 66 191 208 120
Stage 1 - - - - - - 71 71 - 120 120 -
Stage 2 - - - - - - 121 120 - 71 88 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1468 - - 1514 - - 768 704 998 769 689 931
Stage 1 - - - - - - 939 836 - 884 796 -
Stage 2 - - - - - - 883 796 - 939 822 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1468 - - 1514 - - 766 703 998 768 688 931
Mov Cap-2 Maneuver - - - - - - 766 703 - 768 688 -
Stage 1 - - - - - - 938 835 - 883 796 -
Stage 2 - - - - - - 881 796 - 937 821 -
Approach EB WB NB SB
HCM Control Delay, s 0.2 0 10.2 8.9
HCM LOS B A
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 766 998 1468 - - 1514 - - 931
HCM Lane V/C Ratio 0.093 0.001 0.002 ----- 0.002
HCM Control Delay (s) 10.2 8.6 7.5 0 - 0 - - 8.9
HCM Lane LOS BAAA-A--A
HCM 95th %tile Q(veh) 0.3 0 0 - - 0 - - 0
48
Lanes and Geometrics
5: Site Access & Precision Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 50 0 0
Storage Lanes 0 0 0 0 0 1 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.946 0.850 0.865
Flt Protected 0.999 0.950
Satd. Flow (prot) 0 1760 0 0 1863 0 0 1770 1583 0 1611 0
Flt Permitted 0.999 0.950
Satd. Flow (perm) 0 1760 0 0 1863 0 0 1770 1583 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 606 245 929 215
Travel Time (s) 13.8 5.6 21.1 4.9
Intersection Summary
Area Type: Other
49
HCM 2010 TWSC
6: Rock Creek & Site Access Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 6
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 11 123 138 2 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 100 - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 13 145 162 2 0 5
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 165 0 - 0 335 164
Stage 1 - - - - 164 -
Stage 2 - - - - 171 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1413 - - - 660 881
Stage 1 - - - - 865 -
Stage 2 - - - - 859 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1413 - - - 654 881
Mov Cap-2 Maneuver - - - - 654 -
Stage 1 - - - - 865 -
Stage 2 - - - - 851 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 9.1
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1413 - - - 881
HCM Lane V/C Ratio 0.009 - - - 0.005
HCM Control Delay (s) 7.6 - - - 9.1
HCM Lane LOS A - - - A
HCM 95th %tile Q(veh) 0 - - - 0
50
Lanes and Geometrics
6: Rock Creek & Site Access Short Total AM
City of Fort Collins Signal Timing 8:00 am 3/6/2008 Final Timings - 2009 Synchro 9 Light Report
Page 5
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 1 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.865
Flt Protected 0.950
Satd. Flow (prot) 1770 1863 1859 0 1611 0
Flt Permitted 0.950
Satd. Flow (perm) 1770 1863 1859 0 1611 0
Link Speed (mph) 25 25 30
Link Distance (ft) 555 550 888
Travel Time (s) 15.1 15.0 20.2
Intersection Summary
Area Type: Other
51
HCM 2010 TWSC
6: Rock Creek & Site Access Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 6
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT WBT WBR SBL SBR
Vol, veh/h 7 183 176 2 3 18
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 100 - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 203 196 2 3 20
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 198 0 - 0 416 197
Stage 1 - - - - 197 -
Stage 2 - - - - 219 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1375 - - - 593 844
Stage 1 - - - - 836 -
Stage 2 - - - - 817 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1375 - - - 590 844
Mov Cap-2 Maneuver - - - - 590 -
Stage 1 - - - - 836 -
Stage 2 - - - - 812 -
Approach EB WB SB
HCM Control Delay, s 0.3 0 9.7
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1375 - - - 795
HCM Lane V/C Ratio 0.006 - - - 0.029
HCM Control Delay (s) 7.6 - - - 9.7
HCM Lane LOS A - - - A
HCM 95th %tile Q(veh) 0 - - - 0.1
52
Lanes and Geometrics
6: Rock Creek & Site Access Short Total PM
City of Fort Collins Signal Timing 4:30 pm 8/9/2012 Synchro 9 Light Report
Page 5
Lane Group EBL EBT WBT WBR SBL SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 1 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.999 0.883
Flt Protected 0.950 0.994
Satd. Flow (prot) 1770 1863 1861 0 1635 0
Flt Permitted 0.950 0.994
Satd. Flow (perm) 1770 1863 1861 0 1635 0
Link Speed (mph) 25 25 30
Link Distance (ft) 587 518 929
Travel Time (s) 16.0 14.1 21.1
Intersection Summary
Area Type: Other
53
APPENDIX F
54
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Eye Center of
Northern Colorado
Timberwood Drive
Rock Creek Drive
Ziegler Road
Technology Pkwy
FRHS Access
Precision Drive
55
Pedestrian LOS Worksheet
Project Location Classification: Transit Corridor
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Neighborhood to the
west Residential
Minimum B C C C B
1 Actual B B B B B
Proposed B B B B B
Commercial to the north Commercial
Minimum B C C C B
2 Actual A B A B B
Proposed A B A B B
Commercial/Office to
the east
Commercial/
Office
Minimum B C C C B
3 Actual A B A B B
Proposed A B A B B
Fossil Ridge High
School to the southeast Institutional
Minimum B C C C B
4 Actual A B A B B
Proposed A B A B B
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
56
SCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Eye Center of
Northern Colorado
Timberwood Drive
Rock Creek Drive
Ziegler Road
Technology Pkwy
FRHS Access
Precision Drive
57
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C A A
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Fossil Ridge High
1 School Institutional B A A
2
3
4
58