Loading...
HomeMy WebLinkAboutWINDSONG AT ROCK CREEK - PDP - PDP150024 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORT (3)Geotechnical Engineering Report Fort Collins Memory Care Northeast of Ziegler Road and Rock Creek Drive Fort Collins, Colorado September 21, 2015 Terracon Project No. 20155034 Prepared for: Vista Pointe Development Co., LLC Portland, Oregon Prepared by: Terracon Consultants, Inc. Fort Collins, Colorado TABLE OF CONTENTS Page EXECUTIVE SUMMARY ............................................................................................................ i 1.0 INTRODUCTION ............................................................................................................ 1 2.0 PROJECT INFORMATION ............................................................................................ 1 2.1 Project Description .............................................................................................. 1 2.2 Site Location and Description ............................................................................. 2 3.0 SUBSURFACE CONDITIONS ....................................................................................... 2 3.1 Typical Subsurface Profile .................................................................................. 2 3.2 Laboratory Testing .............................................................................................. 3 3.3 Water-Soluble Sulfates ....................................................................................... 3 3.4 Groundwater ....................................................................................................... 3 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ..................................... 4 4.1 Geotechnical Considerations .............................................................................. 4 4.1.1 Groundwater ............................................................................................ 5 4.1.2 Expansive Soils ....................................................................................... 5 4.1.3 Foundation Recommendations ................................................................ 5 4.2 Earthwork ........................................................................................................... 5 4.2.1 Site Preparation........................................................................................ 6 4.2.2 Excavation ............................................................................................... 6 4.2.3 Subgrade Preparation .............................................................................. 7 4.2.4 Fill Materials and Placement ..................................................................... 7 4.2.5 Compaction Requirements ....................................................................... 8 4.2.6 Utility Trench Backfill ............................................................................... 9 4.2.7 Grading and Drainage .............................................................................. 9 4.2.8 Exterior Slab Design and Construction ...................................................10 4.3 Foundations .......................................................................................................10 4.3.1 Spread Footings - Design Recommendations .........................................10 4.3.2 Spread Footings - Construction Considerations ......................................12 4.4 Seismic Considerations......................................................................................12 4.5 Floor Systems ....................................................................................................12 4.5.1 Floor System - Design Recommendations ..............................................13 4.5.2 Floor Systems - Construction Considerations .........................................14 4.6 Lateral Earth Pressures .....................................................................................14 4.7 Pavements .........................................................................................................15 4.7.1 Pavements – Subgrade Preparation .......................................................15 4.7.2 Pavements – Design Recommendations ................................................16 4.7.3 Pavements – Construction Considerations .............................................18 4.7.4 Pavements – Maintenance .....................................................................18 5.0 GENERAL COMMENTS ...............................................................................................19 TABLE OF CONTENTS (continued) Appendix A – FIELD EXPLORATION Exhibit A-1 Site Location Map Exhibit A-2 Exploration Plan Exhibit A-3 Field Exploration Description Exhibits A-4 to A-12 Boring Logs Appendix B – LABORATORY TESTING Exhibit B-1 Laboratory Testing Description Exhibit B-2 Atterberg Limits Test Results Exhibits B-3 Grain-size Distribution Test Results Exhibit B-4 to B-8 Swell-consolidation Test Results Appendix C – SUPPORTING DOCUMENTS Exhibit C-1 General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 Description of Rock Properties Exhibit C-4 Laboratory Test Significance and Purpose Exhibits C-5 and C-6 Report Terminology Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable i EXECUTIVE SUMMARY A geotechnical investigation has been performed for the proposed Fort Collins Memory Care to be constructed northeast of Ziegler Road and Rock Creek Drive in Fort Collins, Colorado. Nine (9) borings, presented as Exhibits A-4 through A-12 and designated as Boring No. 1 through Boring P- 3, were performed to depths of approximately 5 to 30 feet below existing site grades. This report specifically addresses the recommendations for the proposed building and associated pavements. Detailed recommendations for the design of storm water retention feature is outside our scope of work. Borings performed in these areas are for informational purposes and will be utilized by others. Based on the information obtained from our subsurface exploration, the site can be developed for the proposed project. However, the following geotechnical considerations were identified and will need to be considered:  The proposed building may be supported on shallow foundations bearing on 12 inches of scarified and properly prepared on-site soil or on newly placed engineered fill.  A slab-on-grade floor system is recommended for the proposed building provided at least 12 inches of properly compacted, imported granular fill is placed below the floor slabs.  The amount of movement of foundations, floor slabs, pavements, etc. will be related to the wetting of underlying supporting soils. Therefore, it is imperative the recommendations discussed in the 4.2.7 Grading and Drainage section of this report be followed to reduce potential movement.  The 2012 International Building Code, Table 1613.5.2 IBC seismic site classification for this site is D.  Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We therefore recommend that Terracon be retained to monitor this portion of the work. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of the report limitations. Responsive ■ Resourceful ■ Reliable 1 GEOTECHNICAL ENGINEERING REPORT Fort Collins Memory Care Northeast of Ziegler Road and Rock Creek Drive Fort Collins, Colorado Terracon Project No. 20155034 September 21, 2015 1.0 INTRODUCTION This report presents the results of our geotechnical engineering services performed for the proposed Fort Collins Memory Care to be located northeast of Ziegler Road and Rock Creek Drive in Fort Collins, Colorado. The purpose of these services is to provide information and geotechnical engineering recommendations relative to:  subsurface soil and bedrock conditions  foundation design and construction  groundwater conditions  floor slab design and construction  grading and drainage  pavement construction  lateral earth pressures  earthwork  seismic considerations Our geotechnical engineering scope of work for this project included the initial site visit, the advancement of nine test borings to depths ranging from approximately 5 to 30 feet below existing site grades, laboratory testing for soil engineering properties and engineering analyses to provide foundation, floor system and pavement design and construction recommendations. Logs of the borings along with an Exploration Plan (Exhibit A-2) are included in Appendix A. The results of the laboratory testing performed on soil and bedrock samples obtained from the site during the field exploration are included in Appendix B. 2.0 PROJECT INFORMATION 2.1 Project Description Item Description Site layout Refer to the Exploration Plan (Exhibit A-2 in Appendix A) Proposed development Memory care facility with associated paved parking and drives. Building construction We understand a one-story, wood framed building with an approximate footprint area of 37,000 square feet. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 2 Item Description Maximum structural loads Columns: 10 kips (given) Walls: 1.2 kips/foot (given) Floors: 150 psf (assumed) Grading A grading plan for the proposed project has not been provided to us at this time. For the purposes of this proposal, we assume maximum cut and fill depths of approximately 2 feet, relative to the existing grades, will be required to develop the final building and pavement subgrade elevations. Below-grade areas No below-grade areas are planned for this site. Traffic loading NAPA Traffic Class: Automobile Parking Areas: Class I Truck traffic and main drives Class II 2.2 Site Location and Description Item Description Location The site is located northeast of the intersection of Ziegler Road and Rock Creek Drive in Fort Collins, Colorado. Site is approximately 2.92 acres occupying the southwest corner of Parcel No. 86040-00- 003. Existing improvements The site is currently vacant land with Rock Creek Drive to the south, Ziegler Road to the west with residential neighborhoods beyond, with vacant land to the north and east. Current ground cover The ground is covered with tilled agricultural crops. Existing topography The site is relatively flat. 3.0 SUBSURFACE CONDITIONS 3.1 Typical Subsurface Profile Specific conditions encountered at each boring location are indicated on the individual boring logs included in Appendix A. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Based on the results of the borings, subsurface conditions on the project site can be generalized as follows: Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 3 Material Description Approximate Depth to Bottom of Stratum (feet) Consistency/Density/Hardness Lean clay with sand About 14 to 18 feet below existing site grades. Very soft to stiff Clayey sand About 17 to 21 feet below existing site grades in Boring Nos. 1, 3 and 4 only. Loose to medium dense Weathered bedrock varying from claystone, sandstone, and siltstone About 26 feet below existing grades. Weathered Interbedded siltstone/claystone To the maximum depth of exploration of about 30 feet in Boring No. 1 only. Very hard 3.2 Laboratory Testing Representative soil samples were selected for swell-consolidation testing and exhibited 1.4 percent compression to 1.8 percent swell when wetted. Samples of site soils and bedrock selected for plasticity testing exhibited medium plasticity with liquid limits ranging from 28 to 37 and plasticity indices ranging from 15 to 22. Laboratory test results are presented in Appendix B. 3.3 Water-Soluble Sulfates At the time this report was prepared, the laboratory testing for water-soluble sulfates had not been completed. We will submit a supplemental letter with the testing results and recommendations once the testing has been completed. 3.4 Groundwater The boreholes were observed while drilling and after completion for the presence and level of groundwater. In addition, delayed water levels were also obtained in some borings. The water levels observed in the boreholes are noted on the attached boring logs, and are summarized below: Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 4 Boring Number Depth to groundwater while drilling, ft. Depth to groundwater 8 days after drilling, ft. Elevation of groundwater 8 days after drilling, ft. 1 21 16.7 4905.58 2 17 15.6 4906.03 3 17.5 15.5 4905.47 4 17 16.7 4906.02 5 16.5 14.2 4907.24 6 Not encountered -- -- P1 Not encountered -- -- P2 Not encountered -- -- P3 Not encountered -- -- These observations represent groundwater conditions at the time of the field exploration, and may not be indicative of other times or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions, and other factors. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. However, we do not believe groundwater will significantly impact the proposed construction. 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations Based on subsurface conditions encountered in the borings, the site appears suitable for the proposed construction from a geotechnical point of view provided certain precautions and design and construction recommendations described in this report are followed. We have identified geotechnical conditions that could impact design and construction of the proposed structure, pavements, and other site improvements. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 5 4.1.1 Groundwater As previously stated, groundwater was measured at depths ranging from about 14 to 16 feet below existing site grades. We understand no below-grade areas are planned at this site. We do not believe groundwater will significantly affect the proposed construction at this site. 4.1.2 Expansive Soils Laboratory testing indicates the native clay soils exhibited 1.8 percent expansive potential at the samples in-situ moisture content. However, it is our opinion these materials will exhibit a higher expansive potential if the clays undergo a significant loss of moisture. This report provides recommendations to help mitigate the effects of soil shrinkage and expansion. However, even if these procedures are followed, some movement and cracking in the structures, pavements, and flatwork should be anticipated. The severity of cracking and other damage such as uneven floor slabs will probably increase if any modification of the site results in excessive wetting or drying of the expansive clays. Eliminating the risk of movement and distress is generally not feasible, but it may be possible to further reduce the risk of movement if significantly more expensive measures are used during construction. It is imperative the recommendations described in section 4.2.7 Grading and Drainage of this report be followed to reduce movement. 4.1.3 Foundation Recommendations The proposed building may be supported on a spread footing foundation system bearing on 1 foot of scarified and properly prepared on-site soils or properly placed imported fill. A slab-on-grade floor system is recommended for the proposed building provided at least 12 inches of properly compacted, imported granular fill is placed below the floor slabs. The subgrade below the imported granular fill should be scarified a minimum depth of 1 foot and prepared as presented in the 4.2 Earthwork section of this report. Even when bearing on properly prepared soils, movement of the slab-on-grade floor system is possible should the subgrade soils undergo an increase in moisture content. We estimate movement of about 1 inch is possible. If the owner cannot accept the risk of slab movement, a structural floor should be used. 4.2 Earthwork The following presents recommendations for site preparation, excavation, subgrade preparation and placement of engineered fills on the project. All earthwork on the project should be observed and evaluated by Terracon on a full-time basis. The evaluation of earthwork should include observation of over-excavation operations, testing of engineered fills, subgrade preparation, subgrade stabilization, and other geotechnical conditions exposed during the construction of the project. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 6 4.2.1 Site Preparation Prior to placing any fill, strip and remove existing vegetation and any other deleterious materials from the proposed construction areas. Stripped organic materials should be wasted from the site or used to re-vegetate landscaped areas after completion of grading operations. Prior to the placement of fills, the site should be graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed structures. 4.2.2 Excavation It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. The soils to be excavated can vary significantly across the site as their classifications are based solely on the materials encountered in widely-spaced exploratory test borings. The contractor should verify that similar conditions exist throughout the proposed area of excavation. If different subsurface conditions are encountered at the time of construction, the actual conditions should be evaluated to determine any excavation modifications necessary to maintain safe conditions. Although evidence of fills or underground facilities such as septic tanks, vaults, basements, and utilities was not observed during the site reconnaissance, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed and the excavation thoroughly cleaned prior to backfill placement and/or construction. Any over-excavation that extends below the bottom of foundation elevation should extend laterally beyond all edges of the foundations at least 8 inches per foot of over-excavation depth below the foundation base elevation. The over-excavation should be backfilled to the foundation base elevation in accordance with the recommendations presented in this report. Depending upon depth of excavation and seasonal conditions, surface water infiltration and/or groundwater may be encountered in excavations on the site. It is anticipated that pumping from sumps may be utilized to control water within excavations. The subgrade soil conditions should be evaluated during the excavation process and the stability of the soils determined at that time by the contractors’ Competent Person. Slope inclinations flatter than the OSHA maximum values may have to be used. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 7 As a safety measure, it is recommended that all vehicles and soil piles be kept a minimum lateral distance from the crest of the slope equal to the slope height. The exposed slope face should be protected against the elements 4.2.3 Subgrade Preparation After the deleterious materials have been removed from the construction areas, the top 12 inches (8 inches below pavements) of the exposed ground surface should be scarified, moisture conditioned, and recompacted to at least 95 percent of the maximum dry unit weight as determined by ASTM D698 before any new fill, foundation, or pavement is placed. If pockets of soft, loose, or otherwise unsuitable materials are encountered at the bottom of the foundation excavations and it is inconvenient to lower the foundations, the proposed foundation elevations may be reestablished by over-excavating the unsuitable soils and backfilling with compacted engineered fill or lean concrete. After the bottom of the excavation has been compacted, engineered fill can be placed to bring the building pad and pavement subgrade to the desired grade. Engineered fill should be placed in accordance with the recommendations presented in subsequent sections of this report. The stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unstable conditions develop, workability may be improved by scarifying and drying. Alternatively, over-excavation of wet zones and replacement with granular materials may be used, or crushed gravel and/or rock can be tracked or “crowded” into the unstable surface soil until a stable working surface is attained. Use of lime, fly ash, or geotextiles could also be considered as a stabilization technique. Laboratory evaluation is recommended to determine the effect of chemical stabilization on subgrade soils prior to construction. Lightweight excavation equipment may also be used to reduce subgrade pumping. 4.2.4 Fill Materials and Placement The on-site soils or approved granular and low plasticity cohesive imported materials may be used as fill material. The soil removed from this site that is free of organic or objectionable materials, as defined by a field technician who is qualified in soil material identification and compaction procedures, can be re-used as fill for the building pad and pavement subgrade. It should be noted that on-site soils will require reworking to adjust the moisture content to meet the compaction criteria. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 8 Imported granular soils to be placed below floor slabs should meet the following material property requirements: Gradation Percent finer by weight (ASTM C136) 4” 100 3” 70-100 No. 4 Sieve 50-100 No. 200 Sieve 15-50 Soil Properties Value Liquid Limit 30 (max.) Plastic Limit 15 (max.) Maximum Expansive Potential (%) Non-expansive1 1. Measured on a sample compacted to approximately 95 percent of the maximum dry unit weight as determined by ASTM D698 at optimum moisture content. The sample is confined under a 100 psf surcharge and submerged. 4.2.5 Compaction Requirements Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. Item Description Fill lift thickness 9 inches or less in loose thickness when heavy, self- propelled compaction equipment is used 4 to 6 inches in loose thickness when hand-guided equipment (i.e. jumping jack or plate compactor) is used Minimum compaction requirements 95 percent of the maximum dry unit weight as determined by ASTM D698 Moisture content cohesive soil (clay) -1 to +3 % of the optimum moisture content Moisture content cohesionless soil (sand) -3 to +2 % of the optimum moisture content 1. We recommend engineered fill be tested for moisture content and compaction during placement. Should the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. 2. Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction to be achieved without the fill material pumping when proofrolled. 3. Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these materials could result in an increase in the material’s expansive potential. Subsequent wetting of these materials could result in undesirable movement. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 9 4.2.6 Utility Trench Backfill All trench excavations should be made with sufficient working space to permit construction including backfill placement and compaction. All underground piping within or near the proposed structure should be designed with flexible couplings, so minor deviations in alignment do not result in breakage or distress. Utility knockouts in foundation walls should be oversized to accommodate differential movements. It is imperative that utility trenches be properly backfilled with relatively clean materials. If utility trenches are backfilled with relatively clean granular material, they should be capped with at least 18 inches of cohesive fill in non-pavement areas to reduce the infiltration and conveyance of surface water through the trench backfill. Utility trenches are a common source of water infiltration and migration. All utility trenches that penetrate beneath the building should be effectively sealed to restrict water intrusion and flow through the trenches that could migrate below the building. We recommend constructing an effective clay “trench plug” that extends at least 5 feet out from the face of the building exterior. The plug material should consist of clay compacted at a water content at or above the soil’s optimum water content. The clay fill should be placed to completely surround the utility line and be compacted in accordance with recommendations in this report. It is strongly recommended that a representative of Terracon provide full-time observation and compaction testing of trench backfill within building and pavement areas. 4.2.7 Grading and Drainage All grades must be adjusted to provide effective drainage away from the proposed building during construction and maintained throughout the life of the proposed project. Infiltration of water into foundation excavations must be prevented during construction. Landscape irrigation adjacent to foundations should be minimized or eliminated. Water permitted to pond near or adjacent to the perimeter of the structure (either during or post-construction) can result in significantly higher soil movements than those discussed in this report. As a result, any estimations of potential movement described in this report cannot be relied upon if positive drainage is not obtained and maintained, and water is allowed to infiltrate the fill and/or subgrade. Exposed ground (if any) should be sloped at a minimum of 10 percent grade for at least 10 feet beyond the perimeter of the proposed building, where possible. The use of swales, chases and/or area drains may be required to facilitate drainage in unpaved areas around the perimeter of the building. Backfill against foundations and exterior walls should be properly compacted and free of all construction debris to reduce the possibility of moisture infiltration. After construction of the proposed building and prior to project completion, we recommend verification of final grading be performed to document positive drainage, as described above, has been achieved. Flatwork and pavements will be subject to post-construction movement. Maximum grades practical should be used for paving and flatwork to prevent areas where water can pond. In Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 10 addition, allowances in final grades should take into consideration post-construction movement of flatwork, particularly if such movement would be critical. Where paving or flatwork abuts the structure, care should be taken that joints are properly sealed and maintained to prevent the infiltration of surface water. Planters located adjacent to the structure should preferably be self-contained. Sprinkler mains and spray heads should be located a minimum of 5 feet away from the building line(s). Low- volume, drip style landscaped irrigation should not be used near the building. Roof drains should discharge on to pavements or be extended away from the structure a minimum of 10 feet through the use of splash blocks or downspout extensions. A preferred alternative is to have the roof drains discharge by solid pipe to storm sewers or to a detention pond or other appropriate outfall. 4.2.8 Exterior Slab Design and Construction Exterior slabs on-grade, exterior architectural features, and utilities founded on, or in backfill or the site soils will likely experience some movement due to the volume change of the material. Potential movement could be reduced by:  Minimizing moisture increases in the backfill;  Controlling moisture-density during placement of the backfill;  Using designs which allow vertical movement between the exterior features and adjoining structural elements; and  Placing control joints on relatively close centers. 4.3 Foundations The proposed building can be supported by a shallow, spread footing foundation system. Design recommendations for foundations for the proposed structure and related structural elements are presented in the following paragraphs. 4.3.1 Spread Footings - Design Recommendations Description Value Bearing material Properly prepared on-site soil or new, properly placed engineered fill. Maximum allowable bearing pressure 1 2,000 psf Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 11 Description Value Lateral earth pressure coefficients 2 Lean clay: Active, Ka = 0.41 Passive, Kp = 2.46 At-rest, Ko = 0.58 Imported granular soil: Active, Ka = 0.27 Passive, Kp = 3.69 At-rest, Ko = 0.43 Sliding coefficient 2 Lean clay: µ = 0.37 Imported granular soil: µ = 0.56 Moist soil unit weight Lean clay: ɣ = 120 pcf Imported granular soil: ɣ = 130 pcf Minimum embedment depth below finished grade 3 30 inches Estimated total movement 4 About 1 inch Estimated differential movement 4 About ½ to ¾ of total movement 1. The recommended maximum allowable bearing pressure assumes any unsuitable fill or soft soils, if encountered, will be over-excavated and replaced with properly compacted engineered fill. The design bearing pressure applies to a dead load plus design live load condition. The design bearing pressure may be increased by one-third when considering total loads that include wind or seismic conditions. 2. The lateral earth pressure coefficients and sliding coefficients are ultimate values and do not include a factor of safety. The foundation designer should include the appropriate factors of safety. 3. For frost protection and to reduce the effects of seasonal moisture variations in the subgrade soils. The minimum embedment depth is for perimeter footings beneath unheated areas and is relative to lowest adjacent finished grade, typically exterior grade. 4. The estimated movements presented above are based on the assumption that the maximum footing size is 4 feet for column footings and 2 feet for continuous footings. Footings should be proportioned to reduce differential foundation movement. As discussed, total movement resulting from the assumed structural loads is estimated to be on the order of about 1 inch. Additional foundation movements could occur if water from any source infiltrates the foundation soils; therefore, proper drainage should be provided in the final design and during construction and throughout the life of the structure. Failure to maintain the proper drainage as Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 12 recommended in the 4.2.7 Grading and Drainage section of this report will nullify the movement estimates provided above. 4.3.2 Spread Footings - Construction Considerations Spread footing construction should only be considered if the estimated foundation movement can be tolerated. Subgrade soils beneath footings should be moisture conditioned and compacted as described in the 4.2 Earthwork section of this report. The moisture content and compaction of subgrade soils should be maintained until foundation construction. Footings and foundation walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. Unstable surfaces will need to be stabilized prior to backfilling excavations and/or constructing the building foundation, floor slab and/or project pavements. The use of angular rock, recycled concrete and/or gravel pushed or “crowded” into the yielding subgrade is considered suitable means of stabilizing the subgrade. The use of geogrid materials in conjunction with gravel could also be considered and could be more cost effective. Unstable subgrade conditions should be observed by Terracon to assess the subgrade and provide suitable alternatives for stabilization. Stabilized areas should be proof-rolled prior to continuing construction to assess the stability of the subgrade. Foundation excavations should be observed by Terracon. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required. 4.4 Seismic Considerations Code Used Site Classification 2012 International Building Code (IBC) 1 D 2 1. In general accordance with the 2012 International Building Code, Table 1613.5.2. 2. The 2012 International Building Code (IBC) requires a site soil profile determination extending a depth of 100 feet for seismic site classification. The current scope requested does not include the required 100 foot soil profile determination. The borings completed for this project extended to a maximum depth of about 30 feet and this seismic site class definition considers that similar soil and bedrock conditions exist below the maximum depth of the subsurface exploration. Additional exploration to deeper depths could be performed to confirm the conditions below the current depth of exploration. Alternatively, a geophysical exploration could be utilized in order to attempt to justify a more favorable seismic site class. 4.5 Floor Systems A slab-on-grade floor system is recommended for the proposed building provided at least 12 inches of properly compacted, imported granular fill is placed below the floor slabs. The subgrade below Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 13 the imported granular fill should be scarified a minimum depth of 1 foot and prepared as presented in the 4.2 Earthwork section of this report. The moisture content and compaction of subgrade soils should be maintained until slab construction. If the estimated movement cannot be tolerated, a structurally-supported floor system, supported independent of the subgrade materials, is recommended. 4.5.1 Floor System - Design Recommendations Even when bearing on properly prepared soils, movement of the slab-on-grade floor system is possible should the subgrade soils undergo an increase in moisture content. We estimate movement of about 1 inch is possible. If the owner cannot accept the risk of slab movement, a structural floor should be used. For structural design of concrete slabs-on-grade subjected to point loadings, a modulus of subgrade reaction of 200 pounds per cubic inch (pci) may be used. Additional floor slab design and construction recommendations are as follows:  Positive separations and/or isolation joints should be provided between slabs and all foundations, columns, or utility lines to allow independent movement.  Control joints should be saw-cut in slabs in accordance with ACI Design Manual, Section 302.1R-37 8.3.12 (tooled control joints are not recommended) to control the location and extent of cracking.  Interior utility trench backfill placed beneath slabs should be compacted in accordance with the recommendations presented in the 4.2 Earthwork section of this report.  Floor slabs should not be constructed on frozen subgrade.  A minimum 1½-inch void space should be constructed above or below non-bearing partition walls placed on the floor slab. Special framing details should be provided at doorjambs and frames within partition walls to avoid potential distortion. Partition walls should be isolated from suspended ceilings.  The use of a vapor retarder should be considered beneath concrete slabs that will be covered with wood, tile, carpet or other moisture sensitive or impervious floor coverings, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer and slab contractor should refer to ACI 302 for procedures and cautions regarding the use and placement of a vapor retarder.  Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1R are recommended. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 14 4.5.2 Floor Systems - Construction Considerations Movements of slabs-on-grade using the recommendations discussed in previous sections of this report will likely be reduced and tend to be more uniform. The estimates discussed above assume that the other recommendations in this report are followed. Additional movement could occur should the subsurface soils become wetted to significant depths, which could result in potential excessive movement causing uneven floor slabs and severe cracking. This could be due to over watering of landscaping, poor drainage, improperly functioning drain systems, and/or broken utility lines. Therefore, it is imperative that the recommendations presented in this report be followed. 4.6 Lateral Earth Pressures Reinforced concrete walls with unbalanced backfill levels on opposite sides should be designed for earth pressures at least equal to those indicated in the following table. Earth pressures will be influenced by structural design of the walls, conditions of wall restraint, methods of construction and/or compaction and the strength of the materials being restrained. Two wall restraint conditions are shown. Active earth pressure is commonly used for design of free-standing cantilever retaining walls and assumes wall movement. The "at-rest" condition assumes no wall movement. The recommended design lateral earth pressures do not include a factor of safety and do not provide for possible hydrostatic pressure on the walls. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 15 EARTH PRESSURE COEFFICIENTS Earth Pressure Conditions Coefficient for Backfill Type Equivalent Fluid Density (pcf) Surcharge Pressure, p1 (psf) Earth Pressure, p2 (psf) Active (Ka) Imported Fill - 0.27 Lean Clay - 0.41 35 49 (0.27)S (0.41)S (35)H (49)H At-Rest (Ko) Imported Fill - 0.43 Lean Clay - 0.58 56 70 (0.43)S (0.58)S (56)H (70)H Passive (Kp) Imported Fill - 3.69 Lean Clay - 2.46 480 295 --- --- --- --- Applicable conditions to the above include:  For active earth pressure, wall must rotate about base, with top lateral movements of about 0.002 H to 0.004 H, where H is wall height;  For passive earth pressure to develop, wall must move horizontally to mobilize resistance;  Uniform surcharge, where S is surcharge pressure;  In-situ soil backfill weight a maximum of 120 pcf;  Horizontal backfill, compacted between 95 and 98 percent of maximum dry unit weight as determined by ASTM D698;  Loading from heavy compaction equipment not included;  No hydrostatic pressures acting on wall;  No dynamic loading;  No safety factor included in soil parameters; and  Ignore passive pressure in frost zone. To control hydrostatic pressure behind the wall we recommend that a drain be installed at the foundation wall with a collection pipe leading to a reliable discharge. If this is not possible, then combined hydrostatic and lateral earth pressures should be calculated for lean clay backfill using Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 16 pavement subgrade be thoroughly proofrolled with a loaded tandem-axle dump truck prior to final grading and paving. All pavement areas should be moisture conditioned and properly compacted to the recommendations in this report immediately prior to paving. 4.7.2 Pavements – Design Recommendations Design of new privately-maintained pavements for the project has been based on the procedures described by the National Asphalt Pavement Associations (NAPA) and the American Concrete Institute (ACI). We assumed the following design parameters for NAPA flexible pavement thickness design:  Automobile Parking Areas  Class I - Parking stalls and parking lots for cars and pick-up trucks, with Equivalent Single Axle Load (ESAL) up to 7,000 over 20 years  Main Traffic Corridors  Class II – Parking lots with a maximum of 10 trucks per day with Equivalent Single Axle Load (ESAL) up to 27,000 over 20 years (Including trash trucks)  Subgrade Soil Characteristics  USCS Classification – CL, classified by NAPA as poor We assumed the following design parameters for ACI rigid pavement thickness design based upon the average daily truck traffic (ADTT):  Automobile Parking Areas  ACI Category A: Automobile parking with an ADTT of 1 over 20 years  Main Traffic Corridors  ACI Category A: Automobile parking area and service lanes with an ADTT of up to 10 over 20 years  Subgrade Soil Characteristics  USCS Classification – CL  Concrete modulus of rupture value of 600 psi We should be contacted to confirm and/or modify the recommendations contained herein if actual traffic volumes differ from the assumed values shown above. Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 17 Recommended alternatives for flexible and rigid pavements are summarized for each traffic area as follows: Traffic Area Alternative Recommended Pavement Thickness (Inches) Asphaltic Concrete Surface Aggregate Base Course Portland Cement Concrete Total Automobile Parking (NAPA Class I and ACI Category A) A 3½ 6 -- 9½ B -- -- 5½ 5½ Service Lanes (NAPA Class II and ACI Category A) A 4½ 6 -- 10½ B -- -- 6 6 Aggregate base course (if used on the site) should consist of a blend of sand and gravel which meets strict specifications for quality and gradation. Use of materials meeting Colorado Department of Transportation (CDOT) Class 5 or 6 specifications is recommended for aggregate base course. Aggregate base course should be placed in lifts not exceeding 6 inches and compacted to a minimum of 95 percent of the maximum dry unit weight as determined by ASTM D698. Asphaltic concrete should be composed of a mixture of aggregate, filler and additives (if required) and approved bituminous material. The asphalt concrete should conform to approved mix designs stating the Superpave properties, optimum asphalt content, job mix formula and recommended mixing and placing temperatures. Aggregate used in asphalt concrete should meet particular gradations. Material meeting CDOT Grading S specifications or equivalent is recommended for asphalt concrete. Mix designs should be submitted prior to construction to verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and compacted within a range of 92 to 96 percent of the theoretical maximum (Rice) density (ASTM D2041). Where rigid pavements are used, the concrete should be produced from an approved mix design with the following minimum properties: Properties Value Compressive strength 4,000 psi Cement type Type I or II portland cement Entrained air content (%) 5 to 8 Concrete aggregate ASTM C33 and CDOT Section 703 Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes from the time the water is added to the mix. Longitudinal and transverse joints should be provided Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 18 as needed in concrete pavements for expansion/contraction and isolation per ACI 325. The location and extent of joints should be based upon the final pavement geometry. Although not required for structural support, a minimum 4-inch thick aggregate base course layer is recommended for the PCC pavements to help reduce the potential for slab curl, shrinkage cracking, and subgrade “pumping” through joints. Proper joint spacing will also be required for PCC pavements to prevent excessive slab curling and shrinkage cracking. All joints should be sealed to prevent entry of foreign material and dowelled where necessary for load transfer. For areas subject to concentrated and repetitive loading conditions (if any) such as dumpster pads, truck delivery docks and ingress/egress aprons, we recommend using a portland cement concrete pavement with a thickness of at least 6 inches underlain by at least 4 inches of granular base. Prior to placement of the granular base, the areas should be thoroughly proofrolled. For dumpster pads, the concrete pavement area should be large enough to support the container and tipping axle of the refuse truck. Pavement performance is affected by its surroundings. In addition to providing preventive maintenance, the civil engineer should consider the following recommendations in the design and layout of pavements:  Site grades should slope a minimum of 2 percent away from the pavements;  The subgrade and the pavement surface have a minimum 2 percent slope to promote proper surface drainage;  Consider appropriate edge drainage and pavement under drain systems;  Install pavement drainage surrounding areas anticipated for frequent wetting;  Install joint sealant and seal cracks immediately;  Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to subgrade soils; and  Placing compacted, low permeability backfill against the exterior side of curb and gutter. 4.7.3 Pavements – Construction Considerations Openings in pavement, such as landscape islands, are sources for water infiltration into surrounding pavements. Water collects in the islands and migrates into the surrounding subgrade soils thereby degrading support of the pavement. This is especially applicable for islands with raised concrete curbs, irrigated foliage, and low permeability near-surface soils. The civil design for the pavements with these conditions should include features to restrict or to collect and discharge excess water from the islands. Examples of features are edge drains connected to the storm water collection system or other suitable outlet and impermeable barriers preventing lateral migration of water such as a cutoff wall installed to a depth below the pavement structure. 4.7.4 Pavements – Maintenance Preventative maintenance should be planned and provided for an ongoing pavement management program in order to enhance future pavement performance. Preventive Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable 19 maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. 5.0 GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, and bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as described in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. APPENDIX A FIELD EXPLORATION TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY QUADRANGLES INCLUDE: FORT COLLINS, CO (1/1/1984), TIMNATH, CO (1/1/1971), LOVELAND, CO (1/1/1984) and WINDSOR, CO (1/1/1969). SITE LOCATION MAP Fort Collins Memory Care Facility Northeast Corner of Zeigler Road and Rock Creek Drive Fort Collins, CO 1901 Sharp Point Dr Suite C Ft. Collins, CO 80525 20155034 DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: BCR EDB EDB EDB 9/17/2015 Project No. File Name: Date: A-1 Exhibit Scale: 1”=24,000 SF 0’ 30’ 60’ APPROXIMATE SCALE Scale: EDB BCR EDB EDB Project Manager: Drawn by: Checked by: Approved by: EXPLORATION PLAN Fort Collins Memory Care Northeast Corner of Ziegler Road and Rock Creek Drive Fort Collins, Colorado A-2 20155034Exhibit 9/17/2015 1=60’ Project No. File Name: Date: DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES 1 APPROXIMATE BORING LOCATION LEGEND 3 4 5 6 1 2 APPROXIMATE LOCATION OF FORT COLLINS VERTICAL CONTROL BENCHMARK (ELEVATION=4922.66’) P-2 P-1 1901 Sharp Point Drive, Suite C Fort Collins, Colorado 80525 PH. (970) 484-0359 FAX. (970) 484-0454 P-3 P-1 APPROXIMATE PAVEMENT BORING LOCATION Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable Exhibit A-3 Field Exploration Description The locations of borings were based upon the proposed development shown on the provided site plan. The borings were located in the field by measuring from existing site features. The ground surface elevation was surveyed at each boring location referencing the temporary benchmark shown on Exhibit A-2 using an engineer’s level. The borings were drilled with a CME-55 truck-mounted rotary drill rig with solid-stem augers. During the drilling operations, lithologic logs of the borings were recorded by the field engineer. Disturbed samples were obtained at selected intervals utilizing a 2-inch outside diameter split- spoon sampler and a 3-inch outside diameter ring-barrel sampler. Penetration resistance values were recorded in a manner similar to the standard penetration test (SPT). This test consists of driving the sampler into the ground with a 140-pound hammer free-falling through a distance of 30 inches. The number of blows required to advance the ring-barrel sampler 12 inches (18 inches for standard split-spoon samplers, final 12 inches are recorded) or the interval indicated, is recorded as a standard penetration resistance value (N-value). The blow count values are indicated on the boring logs at the respective sample depths. Ring-barrel sample blow counts are not considered N-values. A CME automatic SPT hammer was used to advance the samplers in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count value by increasing the penetration per hammer blow over what would be obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. The standard penetration test provides a reasonable indication of the in-place density of sandy type materials, but only provides an indication of the relative stiffness of cohesive materials since the blow count in these soils may be affected by the moisture content of the soil. In addition, considerable care should be exercised in interpreting the N-values in gravelly soils, particularly where the size of the gravel particle exceeds the inside diameter of the sampler. Groundwater measurements were obtained in the borings at the time of site exploration and several days after drilling. After subsequent groundwater measurements were obtained, the borings were backfilled with auger cuttings and sand (if needed). Some settlement of the backfill may occur and should be repaired as soon as possible. 55 10 17 18 22 21 19 110 103 4921.5 4904.5 4901.5 4897.5 4892.5 7-7 1-1-2 N=3 5-8 1-2-2 N=4 3-4-6 N=10 20-50/6" N=70 0.7 18.0 21.0 25.0 30.0 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND, brown to reddish-brown and buff, soft to stiff CLAYEY SAND, brown, medium dense POORLY GRADED GRAVEL WITH SAND, brown INTERBEDDED SEDIMENTARY BEDROCK - CLAYSTONE/SILTSTONE, gray rust to olive, very hard Boring Terminated at 30 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. 1 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-4 17 15 22 16 12 22 107 109 37-17-20 4921 4903.5 4897.5 4896 0.8 3-2-2 N=4 5-6 2-4-4 N=8 4-4 11-13-15 N=28 6-6-7 N=13 0.7 18.0 24.0 25.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND (CL), brown to reddish-brown and buff, medium stiff to stiff POORLY GRADED GRAVEL WITH SAND, brown black to reddish-brown, medium dense INTERBEDDED SEDIMENTARY BEDROCK - SANDSTONE/SILTSTONE, gray rust to olive, weathered Boring Terminated at 25.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. 2 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-5 See Exhibit A-3 for description of field 13 20 19 21 7 25 109 96 4920.5 4907 4903 4897.5 4895.5 6-7 2-1-1 N=2 3-5 1-2-2 N=4 11-12 4-6-7 N=13 0.7 14.0 18.0 23.5 25.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND, trace calcareous nodules, brown, soft to stiff CLAYEY SAND, fine grained, brown, loose POORLY GRADED GRAVEL WITH SAND, brown, medium dense INTERBEDDED SEDIMENTARY BEDROCK - SANDSTONE/SILTSTONE, gray rust to olive, weathered Boring Terminated at 25.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. 3 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-6 See Exhibit A-3 for description of field 49 15 13 21 16 14 22 112 108 28-13-15 4922 4908.5 4905.5 4899 4897 -1.0 3-2-2 N=4 3-5 2-1-1 N=2 4-5 10-11-10 N=21 5-4-2 N=6 0.7 14.0 17.0 23.5 25.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND, brown to dark brown, soft to medium stiff CLAYEY SAND (SC), fine grained, brown, loose POORLY GRADED GRAVEL WITH SAND, brown, medium dense INTERBEDDED SEDIMENTARY BEDROCK - CLAYSTONE/SILTSTONE, gray rust to olive, weathered Boring Terminated at 25.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. 4 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. 78 19 10 18 19 20 102 36-16-20 4920.5 4905 4898.5 4896 6-7 -1.4 2-1-2 N=3 3-3 0-1-2 N=3 5-6-7 N=13 7-12-15 N=27 0.7 16.5 23.0 25.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND (CL), brown to reddish-brown, soft to stiff POORLY GRADED GRAVEL WITH SAND, brown, medium dense SEDIMENTARY BEDROCK - CLAYSTONE, gray and rust, firm Boring Terminated at 25.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. 5 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-8 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory 16 14 15 13 103 107 4922 4907.5 2-4-4 N=8 3-6 2-1-1 N=2 4-3 0.7 15.0 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND, brown to reddish-brown, soft to stiff Boring Terminated at 15 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. 6 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-9 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4922.6 (Ft.) ELEVATION (Ft.) 79 19 37-15-22 4921 4916.5 6-7 1.2 1-1-1 N=2 0.7 5.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND (CL), brown to dark brown, soft to stiff Boring Terminated at 5.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. P1 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-10 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4921.79 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 SWELL (%) 12 19 4921.5 4916.5 2-3 0-1-0 N=1 0.7 5.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND, brown to dark brown, very soft to medium stiff Boring Terminated at 5.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. P2 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-11 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4921.96 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 SWELL (%) FIELD TEST 13 77 19 92 37-15-22 4920 4915 6-8 1.8 2-1-2 N=3 0.7 5.5 VEGETATIVE LAYER - 8 inches LEAN CLAY WITH SAND (CL), dark brown, soft to stiff Boring Terminated at 5.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic GRAPHIC LOG THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155034.GPJ TERRACON2015.GDT 9/17/15 NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155034 Drill Rig: CME-55 Boring Started: 8/14/2015 BORING LOG NO. P3 CLIENT: Vista Pointe Development Co., LLC Portland, Oregon Driller: Drilling Engineers, Inc. Boring Completed: 8/14/2015 Exhibit: A-12 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4920.6 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 SWELL (%) FIELD TEST APPENDIX B LABORATORY TESTING Geotechnical Engineering Report Fort Collins Memory Care ■ Fort Collins, Colorado September 21, 2015 ■ Terracon Project No. 20155034 Responsive ■ Resourceful ■ Reliable Exhibit B-1 Laboratory Testing Description The soil and bedrock samples retrieved during the field exploration were returned to the laboratory for observation by the project geotechnical engineer. At that time, the field descriptions were reviewed and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Laboratory tests were conducted on selected soil and bedrock samples. The results of these tests are presented on the boring logs and in this appendix. The test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. The laboratory tests were performed in general accordance with applicable locally accepted standards. Soil samples were classified in general accordance with the Unified Soil Classification System described in Appendix C. Rock samples were visually classified in general accordance with the description of rock properties presented in Appendix C. Procedural standards noted in this report are for reference to methodology in general. In some cases variations to methods are applied as a result of local practice or professional judgment.  Water content  Plasticity index  Grain-size distribution  Consolidation/swell  Dry density  Water-soluble sulfate content 0 10 20 30 40 50 60 0 20 40 60 80 100 LL USCS 2 4 5 P1 P3 ATTERBERG LIMITS RESULTS ASTM D4318 4 - 5 14 - 15 2 - 3 2 - 3 2 - 3 CL or OL CH or OH ML or OL MH or OH Boring ID Depth PL PI Description CLAYEY SAND LEAN CLAY with SAND LEAN CLAY with SAND LEAN CLAY with SAND SC CL CL CL Fines P L A S T I C I T Y I N D E X LIQUID LIMIT "U" Line "A" Line 37 28 36 37 37 17 13 16 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 100 10 1 0.1 0.01 0.001 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 13 15 D100 Cc Cu SILT OR CLAY 4 D30 D10 %Gravel %Sand 4 CLAYEY SAND(SC) 28 4.75 0.116 6 16 20 30 40 50 1.5 6 200 810 0.0 14 48.6 %Fines LL PL PI 1 4 3/4 1/2 60 fine 4 GRAIN SIZE IN MILLIMETERS PERCENT FINER BY WEIGHT coarse fine 14 - 15 3/8 3 100 3 2 140 COBBLES GRAVEL SAND USCS Classification 51.4 D60 coarse medium Boring ID Depth Boring ID Depth -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 0.8 percent swell upon wetting under an applied pressure of 1,000 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-4 Specimen Identification Classification , pcf 2 107 15 WC, % 4 - 5 ft LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155034.GPJ TERRACON2012.GDT 9/17/15 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 1.0 percent compression upon wetting under an applied pressure of 1,000 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-5 Specimen Identification Classification , pcf 4 WC, % 14 - 15 ft CLAYEY SAND(SC) LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155034.GPJ TERRACON2012.GDT 9/17/15 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 1.4 percent compression upon wetting under an applied pressure of 500 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-6 Specimen Identification Classification , pcf 5 WC, % 2 - 3 ft LEAN CLAY with SAND(CL) LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155034.GPJ TERRACON2012.GDT 9/17/15 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 1.2 percent swell upon wetting under an applied pressure of 150 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-7 Specimen Identification Classification , pcf P1 WC, % 2 - 3 ft LEAN CLAY with SAND(CL) LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155034.GPJ TERRACON2012.GDT 9/17/15 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 1.8 percent swell upon wetting under an applied pressure of 150 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-8 Specimen Identification Classification , pcf P3 WC, % 2 - 3 ft LEAN CLAY with SAND(CL) LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155034.GPJ TERRACON2012.GDT 9/17/15 APPENDIX C SUPPORTING DOCUMENTS Exhibit: C-1 Unconfined Compressive Strength Qu, (psf) 500 to 1,000 2,000 to 4,000 > 8,000 less than 500 1,000 to 2,000 4,000 to 8,000 Non-plastic Low Medium High DESCRIPTION OF SYMBOLS AND ABBREVIATIONS SAMPLING WATER LEVEL FIELD TESTS GENERAL NOTES Over 12 in. (300 mm) 12 in. to 3 in. (300mm to 75mm) 3 in. to #4 sieve (75mm to 4.75 mm) #4 to #200 sieve (4.75mm to 0.075mm Passing #200 sieve (0.075mm) Particle Size < 5 5 - 12 > 12 Percent of Dry Weight Descriptive Term(s) of other constituents RELATIVE PROPORTIONS OF FINES 0 1 - 10 11 - 30 > 30 Plasticity Index Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. LOCATION AND ELEVATION NOTES Percent of Dry Weight Major Component of Sample Trace With Modifier RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Trace With Modifier DESCRIPTIVE SOIL CLASSIFICATION Boulders Cobbles UNIFIED SOIL CLASSIFICATION SYSTEM Exhibit C-2 Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu  4 and 1  Cc  3 E GW Well-graded gravel F Cu  4 and/or 1  Cc  3 E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F,G,H Fines classify as CL or CH GC Clayey gravel F,G,H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu  6 and 1  Cc  3 E SW Well-graded sand I Cu  6 and/or 1  Cc  3 E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G,H,I Fines classify as CL or CH SC Clayey sand G,H,I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic: PI  7 and plots on or above “A” line J CL Lean clay K,L,M PI  4 or plots below “A” line J ML Silt K,L,M Organic: Liquid limit - oven dried  0.75 OL Organic clay K,L,M,N Liquid limit - not dried Organic silt K,L,M,O Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above “A” line CH Fat clay K,L,M PI plots below “A” line MH Elastic Silt K,L,M Organic: Liquid limit - oven dried  0.75 OH Organic clay K,L,M,P Liquid limit - not dried Organic silt K,L,M,Q Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. DESCRIPTION OF ROCK PROPERTIES Exhibit C-3 WEATHERING Fresh Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline. Very slight Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show bright. Rock rings under hammer if crystalline. Slight Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer. Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength as compared with fresh rock. Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority show kaolinization. Rock shows severe loss of strength and can be excavated with geologist’s pick. Severe All rock except quartz discolored or stained. Rock “fabric” clear and evident, but reduced in strength to strong soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left. Very severe All rock except quartz discolored or stained. Rock “fabric” discernible, but mass effectively reduced to “soil” with only fragments of strong rock remaining. Complete Rock reduced to ”soil”. Rock “fabric” not discernible or discernible only in small, scattered locations. Quartz may be present as dikes or stringers. HARDNESS (for engineering description of rock – not to be confused with Moh’s scale for minerals) Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of geologist’s pick. Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen. Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of a geologist’s pick. Hand specimens can be detached by moderate blow. Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small chips to pieces about 1-in. maximum size by hard blows of the point of a geologist’s pick. Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure. Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be broken with finger pressure. Can be scratched readily by fingernail. Joint, Bedding, and Foliation Spacing in Rock a Spacing Joints Bedding/Foliation Less than 2 in. Very close Very thin 2 in. – 1 ft. Close Thin 1 ft. – 3 ft. Moderately close Medium 3 ft. – 10 ft. Wide Thick More than 10 ft. Very wide Very thick a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so. Rock Quality Designator (RQD) a Joint Openness Descriptors RQD, as a percentage Diagnostic description Openness Descriptor Exceeding 90 Excellent No Visible Separation Tight 90 – 75 Good Less than 1/32 in. Slightly Open 75 – 50 Fair 1/32 to 1/8 in. Moderately Open 50 – 25 Poor 1/8 to 3/8 in. Open Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide a. RQD (given as a percentage) = length of core in pieces Greater than 0.1 ft. Wide 4 in. and longer/length of run. References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, 1976. U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual. Exhibit C-4 LABORATORY TEST SIGNIFICANCE AND PURPOSE Test Significance Purpose California Bearing Ratio Used to evaluate the potential strength of subgrade soil, subbase, and base course material, including recycled materials for use in road and airfield pavements. Pavement Thickness Design Consolidation Used to develop an estimate of both the rate and amount of both differential and total settlement of a structure. Foundation Design Direct Shear Used to determine the consolidated drained shear strength of soil or rock. Bearing Capacity, Foundation Design, and Slope Stability Dry Density Used to determine the in-place density of natural, inorganic, fine-grained soils. Index Property Soil Behavior Expansion Used to measure the expansive potential of fine-grained soil and to provide a basis for swell potential classification. Foundation and Slab Design Gradation Used for the quantitative determination of the distribution of particle sizes in soil. Soil Classification Liquid & Plastic Limit, Plasticity Index Used as an integral part of engineering classification systems to characterize the fine-grained fraction of soils, and to specify the fine-grained fraction of construction materials. Soil Classification Permeability Used to determine the capacity of soil or rock to conduct a liquid or gas. Groundwater Flow Analysis pH Used to determine the degree of acidity or alkalinity of a soil. Corrosion Potential Resistivity Used to indicate the relative ability of a soil medium to carry electrical currents. Corrosion Potential R-Value Used to evaluate the potential strength of subgrade soil, subbase, and base course material, including recycled materials for use in road and airfield pavements. Pavement Thickness Design Soluble Sulfate Used to determine the quantitative amount of soluble sulfates within a soil mass. Exhibit C-5 REPORT TERMINOLOGY (Based on ASTM D653) Allowable Soil Bearing Capacity The recommended maximum contact stress developed at the interface of the foundation element and the supporting material. Alluvium Soil, the constituents of which have been transported in suspension by flowing water and subsequently deposited by sedimentation. Aggregate Base Course A layer of specified material placed on a subgrade or subbase usually beneath slabs or pavements. Backfill A specified material placed and compacted in a confined area. Bedrock A natural aggregate of mineral grains connected by strong and permanent cohesive forces. Usually requires drilling, wedging, blasting or other methods of extraordinary force for excavation. Bench A horizontal surface in a sloped deposit. Caisson (Drilled Pier or Shaft) A concrete foundation element cast in a circular excavation which may have an enlarged base. Sometimes referred to as a cast-in-place pier or drilled shaft. Coefficient of Friction A constant proportionality factor relating normal stress and the corresponding shear stress at which sliding starts between the two surfaces. Colluvium Soil, the constituents of which have been deposited chiefly by gravity such as at the foot of a slope or cliff. Compaction The densification of a soil by means of mechanical manipulation Concrete Slab-on- Grade A concrete surface layer cast directly upon a base, subbase or subgrade, and typically used as a floor system. Differential Movement Unequal settlement or heave between, or within foundation elements of structure. Earth Pressure The pressure exerted by soil on any boundary such as a foundation wall. ESAL Equivalent Single Axle Load, a criteria used to convert traffic to a uniform standard, (18,000 pound axle loads). Engineered Fill Specified material placed and compacted to specified density and/or moisture conditions under observations of a representative of a geotechnical engineer. Equivalent Fluid A hypothetical fluid having a unit weight such that it will produce a pressure against a lateral support presumed to be equivalent to that produced by the actual soil. This simplified approach is valid only when deformation conditions are such that the pressure increases linearly with depth and the wall friction is neglected. Existing Fill (or Man-Made Fill) Materials deposited throughout the action of man prior to exploration of the site. Existing Grade The ground surface at the time of field exploration. Exhibit C-6 REPORT TERMINOLOGY (Based on ASTM D653) Expansive Potential The potential of a soil to expand (increase in volume) due to absorption of moisture. Finished Grade The final grade created as a part of the project. Footing A portion of the foundation of a structure that transmits loads directly to the soil. Foundation The lower part of a structure that transmits the loads to the soil or bedrock. Frost Depth The depth at which the ground becomes frozen during the winter season. Grade Beam A foundation element or wall, typically constructed of reinforced concrete, used to span between other foundation elements such as drilled piers. Groundwater Subsurface water found in the zone of saturation of soils or within fractures in bedrock. Heave Upward movement. Lithologic The characteristics which describe the composition and texture of soil and rock by observation. Native Grade The naturally occurring ground surface. Native Soil Naturally occurring on-site soil, sometimes referred to as natural soil. Optimum Moisture Content The water content at which a soil can be compacted to a maximum dry unit weight by a given compactive effort. Perched Water Groundwater, usually of limited area maintained above a normal water elevation by the presence of an intervening relatively impervious continuous stratum. Scarify To mechanically loosen soil or break down existing soil structure. Settlement Downward movement. Skin Friction (Side Shear) The frictional resistance developed between soil and an element of the structure such as a drilled pier. Soil (Earth) Sediments or other unconsolidated accumulations of solid particles produced by the physical and chemical disintegration of rocks, and which may or may not contain organic matter. Strain The change in length per unit of length in a given direction. Stress The force per unit area acting within a soil mass. Strip To remove from present location. Subbase A layer of specified material in a pavement system between the subgrade and base course. Subgrade The soil prepared and compacted to support a structure, slab or pavement system. Corrosion Potential Unconfined Compression To obtain the approximate compressive strength of soils that possess sufficient cohesion to permit testing in the unconfined state. Bearing Capacity Analysis for Foundations Water Content Used to determine the quantitative amount of water in a soil mass. Index Property Soil Behavior C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay E Cu = D60/D10 Cc = 10 60 2 30 D x D (D ) F If soil contains  15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains  15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains  30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains  30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI  4 and plots on or above “A” line. O PI  4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. Gravel Sand Silt or Clay Descriptive Term(s) of other constituents N (HP) (T) (DCP) (PID) (OVA) < 15 15 - 29 > 30 Term PLASTICITY DESCRIPTION Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. Water Level After a Specified Period of Time Water Level After a Specified Period of Time Water Initially Encountered Modified Dames & Moore Ring Sampler Standard Penetration Test Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Photo-Ionization Detector Organic Vapor Analyzer STRENGTH TERMS BEDROCK Loose Medium Dense Dense 0 - 3 4 - 9 10 - 29 30 - 50 7 - 18 19 - 58 Very Soft Soft Medium-Stiff Stiff Very Stiff Standard Penetration or N-Value Blows/Ft. 2 - 4 4 - 8 8 - 15 < 3 5 - 9 19 - 42 > 42 30 - 49 50 - 89 20 - 29 Medium Hard Very Dense RELATIVE DENSITY OF COARSE-GRAINED SOILS Descriptive Term (Density) Very Loose > 50 Ring Sampler Blows/Ft. 0 - 6 59 - 98 > 99 Descriptive Term (Consistency) Hard 0 - 1 Ring Sampler Blows/Ft. 3 - 4 10 - 18 Ring Sampler Blows/Ft. < 30 90 - 119 Standard Penetration or N-Value Blows/Ft. Descriptive Term (Consistency) Weathered Firm Very Hard CONSISTENCY OF FINE-GRAINED SOILS (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance Standard Penetration or N-Value Blows/Ft. _ 15 - 30 > 30 > 119 < 20 30 - 49 50 - 79 >79 Hard GRAIN SIZE DISTRIBUTION ASTM D422 14 - 15 PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-3 1901 Sharp Point Drive, Suite C Fort Collins, Colorado LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS-2 20155034.GPJ TERRACON2012.GDT 9/17/15 15 15 20 15 20 22 22 49 78 79 77 PROJECT NUMBER: 20155034 PROJECT: Fort Collins Memory Care SITE: NE of Ziegler Road and Rock Creek Drive Fort Collins, Colorado CLIENT: Vista Pointe Development Co., LLC Portland, Oregon EXHIBIT: B-2 1901 Sharp Point Drive, Suite C Fort Collins, Colorado LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 20155034.GPJ TERRACON2012.GDT 9/17/15 CL-ML RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516415° Longitude: -105.018204° No free water observed WATER LEVEL OBSERVATIONS RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516508° Longitude: -105.018922° No free water observed WATER LEVEL OBSERVATIONS FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.517106° Longitude: -105.019082° No free water observed WATER LEVEL OBSERVATIONS SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 SWELL (%) FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516459° Longitude: -105.019453° No free water observed WATER LEVEL OBSERVATIONS procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4921.44 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 25 SWELL (%) FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516649° Longitude: -105.018691° While drilling After 24 hours WATER LEVEL OBSERVATIONS Boring Completed: 8/14/2015 Exhibit: A-7 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4922.72 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 25 SWELL (%) FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516648° Longitude: -105.019647° While drilling After 24 hours WATER LEVEL OBSERVATIONS procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4920.97 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 25 SWELL (%) FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516986° Longitude: -105.018709° While drilling After 24 hours WATER LEVEL OBSERVATIONS procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4921.63 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 25 SWELL (%) FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516983° Longitude: -105.019174° While drilling After 24 hours WATER LEVEL OBSERVATIONS See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Fort Collins Memory Care PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4922.28 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 25 30 SWELL (%) FIELD TEST RESULTS DEPTH LOCATION See Exhibit A-2 Latitude: 40.516989° Longitude: -105.019644° While drilling After 24 hours WATER LEVEL OBSERVATIONS an equivalent fluid weighing 90 and 100 pcf for active and at-rest conditions, respectively. For granular backfill, an equivalent fluid weighing 85 and 90 pcf should be used for active and at-rest, respectively. These pressures do not include the influence of surcharge, equipment or floor loading, which should be added. Heavy equipment should not operate within a distance closer than the exposed height of retaining walls to prevent lateral pressures more than those provided. 4.7 Pavements 4.7.1 Pavements – Subgrade Preparation On most project sites, the site grading is accomplished relatively early in the construction phase. Fills are typically placed and compacted in a uniform manner. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, or rainfall/snow melt. As a result, the pavement subgrade may not be suitable for pavement construction and corrective action will be required. The subgrade should be carefully evaluated at the time of pavement construction for signs of disturbance or instability. We recommend the