August 07, 2015
Jerod Huwa
BHA Design, Inc.
1603 Oakridge Dr.
Fort Collins, CO 80525
RE: Warren Federal Credit Union, PDP150011, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual commenter or
direct your questions through the Project Planner, Rebecca Everette, at 970-416-2625 or reverette@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 08/05/2015
08/05/2015: Much of the previous conversation on this project centered around activating the
corner at Illinois Drive and Limon Drive. However, the current development plan does not activate
that corner, and defers public improvements and development there to a later project. I am
concerned that development at that corner is not predictable with this plan and may not fully
integrate (in the future) with the project that is currently proposed. Let's discuss options for ensuring
that the ultimate development of the western lot is consistent with the plans shown here. If the
western parcel is ultimately included in the development plan, as discussed at the staff review
meeting, that would help to address my concerns.
Response – Pedestrian improvements have been included in the first phase construction of the
project. The corner of Illinois and Limon are proposed to be activated through the use of enhanced
pedestrian plaza areas that lead to the larger plaza areas associated with the building.
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 08/04/2015
08/04/2015: Section 3.2.1(D)(1)(c) of the LUC requires "full tree stocking"
along all high use or high visibility sides of a building. This standard appears to
be met on the south and east sides of the building, but there are not enough
2
trees to meet the spacing requirements on the north side of the building. If you
are not able to add another tree to meet this requirement, we can discuss other
options for enhanced landscaping along this side of the building.
Response – Additional ornamental trees as well as planters have been added to the north side of
the building to provide for the tree stocking requirements.
Comment Number: 4 Comment Originated: 08/04/2015
08/04/2015: Do you anticipate using any planters, seating, etc. on the south
side of the building? Please note locations on the landscape plan if applicable.
Response – Planters and benches have been added to the south plaza.
Comment Number: 5 Comment Originated: 08/04/2015
08/04/2015: Section 3.2.1(E)(4)(b) describes the requirements for parking lot
screening from the street. Such screening should have a minimum height of 30
inches and consist of a wall, fence, planter, earthen berm, plant material, or
some combination. This should cover a minimum of 70 percent of the length of
the street frontage of the parking lot. Please demonstrate how the proposal
meets this requirement, including a graphic depiction of parking lot screening
(as seen from the street).
Response – The parking lot is proposed to be thoroughly screened with plant material. A graphic depiction
has been provided on the landscape plan.
Comment Number: 6 Comment Originated: 08/04/2015
08/04/2015: Once final numbers and locations of plants have been determined,
please update the landscape plan with details regarding the locations, numbers,
and species diversity.
Response – Plant counts will be provided with the final landscape plan.
Topic: Plat
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: All references to "MMU" zoning on the plat should be corrected to
"MMN."
Response – Revised
Topic: Site Plan
Comment Number: 2 Comment Originated: 08/04/2015
08/04/2015: If the building changes from 2 stories to 1 story as noted in the
planning objectives, please note that the parking minimums/maximums and
other requirements may need to be adjusted. This could affect the layout of the
site plan as presented here.
Response – Acknowledged.
Comment Number: 7 Comment Originated: 08/05/2015
08/05/2015: The trash and recycling enclosure should be designed to allow
walk-in access (separate from the main service gates). Please show this on the
site plan.
3
Response – The trash enclosure has been revised to allow walk-in access.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/05/2015
08/05/2015: Please label the type of concrete treatment at the corners of Iowa
Drive and Limon Drive as well as Illinois Drive and Limon Drive
Response – Hardscape enhancement language has been added to the site plan.
Comment Number: 3 Comment Originated: 08/05/2015
08/05/2015: It appears that the stairs along Limon Drive at the edge of the
ROW line. Please verify that the handrails in these locations will not protrude
into the ROW.
Response – Stair geometry has been revised to prevent the handrails from protruding into the ROW.
Comment Number: 4 Comment Originated: 08/05/2015
08/05/2015: The proposed street cross section for Limon Drive does not meet
City standards. A minimum 6' parkway and a 5' sidewalk with a 9' Utility
Easement are required for a commercial local street. If an attached sidewalk is
desired, the Illinois Drive Cross Section depicted on the Utility Plans for Rigden
Farm 8th Filing, The Shops at Rigden Farm can be used. This calls for a 6'-6"
walk, 4' tree grate and a 1' additional walk between the tree grate and 6" curb.
Response – The cross section for Limon has been revised to meet City standards.
Comment Number: 5 Comment Originated: 08/05/2015
08/05/2015: Type III Barricades will be needed on the north end of the sidewalk
corner on Illinois and Limon Drive. See redlines.
Response – All of the perimeter sidewalks are now proposed to be built
Comment Number: 6 Comment Originated: 08/05/2015
08/05/2015: Please clearly define the lot boundaries on the Utility Plans.
Response – Lot lines have been revised and are now more square.
Comment Number: 7 Comment Originated: 08/05/2015
08/05/2015: It is unclear what is being proposed for this PDP. Please only
show details for the Lot 2 improvements on the Utility Plan. Is the storm pipe that
extends into Lot 1 a part of this submittal? Will there be off site improvements
for the grading required on Lot 1? Will the sidewalk along Illinois Drive be
constructed with this proposal?
Response – Lot 1 and Lot 2 are now clearly not included in the PDP. The lots will be graded.
Comment Number: 8 Comment Originated: 08/05/2015
08/05/2015: There seems to be a discrepancy between the elevations and the
Utility/Site Plans. The elevation drawings show a retaining wall for the proposed
ramps to run parallel with the sidewalk on Iowa Drive. There is a minimum 2'
4
setback required for walls that run parallel to sidewalks.
Response – 2’ setback has been provided between the walls and the sidewalk.
Comment Number: 10 Comment Originated: 08/06/2015
08/06/2015: Utility Plans show 4.5' wide sidewalks along Iowa Drive. The
minimum sidewalk width for a commercial local street is 5'.
Response – A 5’ sidewalk has been provided.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 9 Comment Originated: 08/05/2015
08/05/2015: The project owes an additional $197.50 for the PDP TDRF. It
looks like the project did not include the entire area being platted within the
calculations.
Response – Additional fees have been provided with the resubmittal.
Contact: Tom Knostman, tknostman@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
FROM STREETS DEPARTMENT 08/04/2015: Need to see civil drawings for
ROW improvements.
Department: Environmental Planning
Contact: Kelly Kimple, kkimple@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Our city has an established identity as a forward-thinking
community that cares about the quality of life it offers its citizens and has many
sustainability programs and goals that may benefit your project. Of particular
interest may be the:
• ClimateWise program: http://www.fcgov.com/climatewise/
• Zero Waste Plan and the Waste Reduction and Recycling Assistance
Program (WRAP):
http://www.fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOverview.pdf,
contact Caroline Mitchell at 970-221-6288 or cmtichell@fcgov.com
• Green Building and the Climate Action Plan:
http://www.fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-
416-4238 or traeker@fcgov.com
• Nature in the City Strategic Plan:
http://www.fcgov.com/planning/natureinthecity/?key=advanceplanning/natureinthecity/, contact Justin
Scharton at 970-221-6213
5
or jscharton@fcgov.com
Please consider the City’s sustainability goals and ways for your development
to engage with these efforts.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015:
Use the newly developed project and landscape notes on the project plans.
These notes are available from the City Planner.
Response – Revised
Comment Number: 2 Comment Originated: 08/04/2015
08/04/2015:
The final landscape plan will need to identify all trees and landscape plants by
direct labeling them on the plan. Street trees should be selected from the City of
Fort Collins street tree list.
Response – Plant callouts will be provided on the final landscape plan.
Comment Number: 3 Comment Originated: 08/04/2015
08/04/2015:
Skymaster English oak is no longer in nursery production. Due to likely
availability problems use another canopy shade tree in its place.
Response – Acknowledged.
Comment Number: 4 Comment Originated: 08/04/2015
08/04/2015:
If there are existing trees on site schedule an on-site meeting with the City
Forester to obtain tree inventory information that is required on the plans.
Response – There are no existing trees on site.
Comment Number: 5 Comment Originated: 08/04/2015
08/04/2015:
Is it possible to increase the planting area where trees are shown along Limon
Drive by a foot to 5 feet wide to provide a little more room for the trees.
Response – The tree lawn along Limon drive averages 5.5’ with the latest plan.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 07/24/2015
07/24/2015:
Building Permit Pre-Submittal Meeting:
Pre-Submittal meetings are offered to assist the designer/builder by assuring,
6
early on in the design,
that the new commercial or multi-family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid-design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi-family projects are advised to
call 416-2341 to schedule
a pre-submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial
chapter.
City of Fort Collins
Building Services
Plan Review
416-2341
Response – Acknowledged
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Light and Power has electric facilities on the south side of Drake
Rd that could be utilized to provide power to the proposed site.
Response – Acknowledged
7
Comment Number: 2 Comment Originated: 08/04/2015
08/04/2015: Please provide a one line diagram and a C-1 form to Light and
Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Response – One line diagram will be provided.
Comment Number: 3 Comment Originated: 08/04/2015
08/04/2015: d.) Contact Light and Power Engineering to coordinate the
transformer and electric meter locations, please show the locations on the utility
plans. Transformer must be within 10’ of an asphalt/concrete surface. Pay close
attention to the transformer clearances in the Electric Construction Policies,
Practices & Procedures.
Response – Transformer has been shown on the site and utility plans.
Comment Number: 4 Comment Originated: 08/04/2015
08/04/2015: e.) Please contact Luke Unruh at Light & Power Engineering if
you have any questions at 970.416-2724. Please reference our policies,
development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Response – Acknowledged
Comment Number: 5 Comment Originated: 08/04/2015
08/04/2015: Development and capacity charges will apply at owner’s expense.
Response – Acknowledged
Department: Outside Agencies
Contact: Bob Rulli, Century Link, ,
Topic: General
Comment Number: 1 Comment Originated: 07/24/2015
07/24/2015: No issues here. Developer/Building to work with Century Link as
needs dictate. I can work with them on specifics (MP at property edge, entrance
conduits, backboard space etc. Century Link has no facilities in the ROW
around this block so we will have a build out to reach property edge. Also, there
are facilities along E Drake (south side) so any relocates necessary to support
this build will be at developers expense.
Short of that looking forward to the project. Developer can reach out to me for
questions as I cover this area. Direct: (970) 490.7503 Cell: (970) 988.2120.
robert.rulli@centurylink.com.
Response – Acknowledged
8
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 07/31/2015
07/31/2015: WATER SUPPLY
Minimum water supply requirements have been met with the existing utility
infrastructure available in the area. Nothing further required.
Response – Acknowledged
Comment Number: 2 Comment Originated: 07/31/2015
07/31/2015: GENERAL FIRE ACCESS
Fire access is required to within 150' of all exterior portions of the ground floor.
This minimum fire access requirement has not been met with the site plan,
however as the building will be equipped with an automatic sprinkler system, the
52' out of access condition is permitted.
Response – Acknowledged
Comment Number: 3 Comment Originated: 07/31/2015
07/31/2015: BUILDINGS EXCEEDING THREE STORIES OR 30 FEET IN
HEIGHT
Minimum aerial access requirements have not been met as per code language
provided below. In circumstances when aerial apparatus access cannot be met
due to site constraints, upgraded building design and systems may allow for
alternative means of compliance. Further discussion would be needed.
AERIAL FIRE APPARATUS ACCESS ROADS - WHERE REQUIRED
> IFC D105.1: Where the vertical distance between the grade plane and the
highest roof surface exceeds 30 feet, approved aerial fire apparatus access
roads shall be provided. For purposes of this section, the highest roof surface
shall be determined by measurement to the eave of a pitched roof, the
intersection of the roof to the exterior wall, or the top of parapet walls, whichever
is greater.
AERIAL FIRE APPARATUS ACCESS ROADS - WIDTH
> IFC D105.2; FCLUC 3.6.2(B)2006; and Local Amendments: Aerial fire
apparatus access roads shall have a minimum unobstructed width of 30 feet,
exclusive of shoulders, in the immediate vicinity of the building or portion
thereof.
AERIAL FIRE APPARATUS ACCESS ROADS - PROXIMITY TO BUILDING
> IFC D105.3: At least one of the required access routes meeting this condition
shall be located within a minimum of 15 feet and a maximum of 30 feet from the
building, and shall be positioned parallel to one entire side of the building. The
side of the building on which the aerial fire apparatus access road is positioned
shall be approved by the fire code official.
Response – Building is only one story now (no second floor) and is 23’ high except for fireplace/sign wall
element that is 36’ high.
9
Comment Number: 4 Comment Originated: 07/31/2015
07/31/2015: PARAPET HEIGHT
From submitted materials, it appears the parapet height above the roof line will
be 5'. In order to allow firefighters access on and off the roof during ladder truck
operations, the parapet height would need to be somewhat reduced in all or
some portions, unless alternative means of gaining roof access have been
approved (See comment no. 4 above).
Response – Most parapets are 4’ high now.
Comment Number: 5 Comment Originated: 07/31/2015
07/31/2015: FDC
> IFC 912.2: Fire Department Connections shall be installed in accordance with
NFPA standards. Fire department connections shall be located on the street
side of buildings, fully visible and recognizable from the street or nearest point
of fire department vehicle access. The location of the FDC shall be approved by
the fire department.
Response – Acknowledged. We are planning on locating FDC on east elevation accessed from Iowa Drive.
Comment Number: 6 Comment Originated: 07/31/2015
07/31/2015: KEY BOXES REQUIRED
2012 IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire
Authority requires at least one key box ("Knox Box") to be mounted in an
approved, exterior location (or locations) on every new or existing building
equipped with a required fire sprinkler or fire alarm system. The box shall be
positioned 3 to 7 feet above finished floor and within 10 feet of the front door, or
closest door to the fire alarm panel. Exception can be made by the PFA if it is
more logical to have the box located somewhere else on the structure
Response – Acknowledged
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 07/21/2015
08/03/2015: Waiting for Material Submittle FDP
07/21/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Response – Acknowledged
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/04/2015
08/04/2015: Please compare the flows for each sub-bsin as well. The flow to
the inlet in Iowa Drive is proposed to increase. Please verify the inlet and storm
10
sewer have capacity.
Response – We have modelled the new total flow to the Iowa inlet with the HGL from the original report to
verify it will not flood the immediate downstream pipe.
Comment Number: 3 Comment Originated: 08/04/2015
08/04/2015: Please provide the LID table to verify the site is meeting the LID
requirements. This detail can be electronically delivered upon request.
Response – Added.
Comment Number: 4 Comment Originated: 08/04/2015
08/04/2015: The porous paver detail is not per City Standards. Please provide
a detail that is consistent with the City's porous paver schematic.
Response – Revised.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: No comments.
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 08/04/2015
08/04/2015: Please change the title to "Lot 2, Warren Federal Credit Union -
East Drake".
Response – Revised – this is now Lot 3 and Tract A for the PDP.
Comment Number: 3 Comment Originated: 08/04/2015
08/04/2015: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX¿.
Response – Revised
Comment Number: 4 Comment Originated: 08/04/2015
11
08/04/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response – Revised
Comment Number: 5 Comment Originated: 08/04/2015
08/04/2015: There are line over text issues. See redlines.
Response – Revised
Comment Number: 6 Comment Originated: 08/04/2015
08/04/2015: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response – Revised.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 08/04/2015
08/04/2015: The lighter background text & linework marked is not acceptable. It
will not scan or reproduce. Please darken it up. See redlines.
Response – Linework screening has been corrected
Topic: Lighting Plan
Comment Number: 8 Comment Originated: 08/04/2015
08/04/2015: No comments.
Topic: Plat
Comment Number: 9 Comment Originated: 08/04/2015
08/04/2015: Please change the titleblock to match the title. See redlines.
Response – Revised.
Topic: Site Plan
Comment Number: 10 Comment Originated: 08/04/2015
08/04/2015: Please change the legal description to "Lot 2, Warren Federal
Credit Union - East Drake".
Response – Revised
Comment Number: 11 Comment Originated: 08/04/2015
08/04/2015: There is text that needs to be rotated 180 degrees. See redlines.
Response – Revised
Comment Number: 12 Comment Originated: 08/04/2015
08/04/2015: The lighter background text & linework marked is not acceptable. It
will not scan or reproduce. Please darken it up. See redlines.
Response – Revised
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
12
08/04/2015: Since access spacing, sidewalk width etc along Illinios is a
concern, it would be helpful on the plans to more clearly indicate that the Lot 1 is
not a part of this submittal (perhaps shaded back more..)
Response – This future drive has been removed from the plan altogether.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Response – Acknowledged
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/04/2015
08/04/2015: Please add all water and sewer details during final compliance.
Response – Acknowledged
Department: Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 07/24/2015
07/24/2015: I believe the build to lines for streetfront buildings (LUC 3.5.3[C][2])
would require the building be moved towards the NE corner of the property near
the intersection.
Response – Revised
Please include the following comment(s) from GIS:
Comment Number: 1
Addresses will be assigned by the GIS Department after the plans have met final
approval through Development Review and are recorded with the City.
Comment Number: 2
Projects with three or more tenant units require the Unit Level Addressing form to be completed and
submitted to the GIS Department once plans have met final approval through Development Review and are
recorded with the City. This can occur anytime during construction, but before any utilities or address signs
are installed. All addressing will be determined by the GIS Department and submitted to Poudre Fire
Authority, USPS, Building Services, and Fort Collins Utilities. Failure to contact GIS and determining
addresses through other means may result in address changes.
The Unit Level Addressing form can be obtained by contacting the GIS office at gis@fcgov.com or (970)
416-2483.