Loading...
HomeMy WebLinkAboutCENTERPOINT PLAZA (RE-APPLICATION) - PDP - PDP150014 - REPORTS - EROSION CONTROL LETTER/REPORT (3)1 EROSIONCONTROLREPORT FOR CENTERPOINT PLAZA FIRST REPLAT Job Number 1028 September 30, 2015 2 EROSION CONTROL REPORT FOR CENTERPOINT PLAZA PREPARED FOR: NEXGEN PROPERTIES, LLC One Denver Tech Center 5251 DTC Parkway, Suite 8000 Greenwood Village, CO 80111 (303) 923-2442 PREPARED BY: RICK ENGINEERING COMPANY, INC. 4 Inverness Court East #300 Englewood, CO 80112 (303) 565-8080 JN 1028 September 30, 2015 3 Table of Contents 1.0 Introduction 1.1 Site Description………………………………………………………………………5 1.2 Stormwater Management Controls: …………………………………………………6 1.3Vehicle Tracking Control……………………………………………………………6 1.4 Location of Contaminated Soils ……………………………………………………6 1.5 Vehicular Traffic……………………………………………………………………6 1.6 Location of Material Stockpile……………………………………………………..6 1.7 Batching Plant………………………………………………………………………6 1.8 Dewatering………………………………………………………......………………7 1.9 Soil Characteristics………………………………………………….………………7 1.10 Seeding and Mulching……………………………………………………………7 2.0 Construction Sequence………………………………………………………………………8 2.1 Erosion Control Plan…………………………………………………………………….…10 2.2 Erosion Control Security Calculations…………………………………………….…….…11 4 List of Figures Figure, 1 Project Site Location…………………………………………………………………1 List of Tables: Table 1 Construction Sequence…………………………………………………………………… Table 2 Estimate of Probable Cost for Erosion Control Escrow Security……………………… 5 1.0 Introduction 1.1 Site Description Centerpoint Plaza (project site) is located in the northwest quarter of Section 20, Township 7 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins, Colorado. More specifically, the project site is bounded by Timberline Road on the west, Midpoint Drive on the north, Railroad Right of Way on the north and industrial development to the east as shown on the location map (Figure 1) below. The project site is a total of approximately 2.34 acres. Phase 1 development was completed in May of 2006. The Phase 2 area is approximately 1.57 acres. Soil is in undisturbed state on the site and consists of native weeds and grasses. There are no impervious areas on the site other than a walkway running North South. The project is going to be a 2.5 story commercial building with other site infrastructure consisting of paved parking areas with curb, gutter and sidewalk, utility service line and storm utilities. The site is not near any major waterbody and not within any regulatory floodplains Figure 1: Project Location 6 designated by the City of Fort Collins or FEMA. Silt fence will be installed before any site disturbance to check erosion. After the site is graded, it will be protected using Wattles laid on contours and the site will be hydroseeded to prevent any erosion post grading. Inlets shall be protected using Rock socks and wattles. Silt fences will be removed after the site has stabilized and there is required amount of vegetation. In addition to stormwater discharge there are no other sources of non stormwater discharge through the site. 1.2 Stormwater Management Controls: Description of all SWMC: The project has no SWMP administrator as of now, a SWMP Administrator will be designated to the project when the project will be awarded to a contractor. During the performance of the work required by the plans, the contractor shall carry out proper measures wherever necessary to reduce dust nuisance. The contractor will be held liable for any damage resulting from dust originating from his operations under these plans, on right-of-way or elsewhere. 1.3 Vehicle Tracking Control: Wherever construction vehicles access routes intersect paved roads, provisions shall be made to minimize the transport of sediments by runoff or vehicles tracking on the paved surface. A stabilized construction is required as per shown on the map. The contractor shall be responsible for clearing tracked mud on a daily basis. 1.4 Location of Contaminated Soils There are no contaminated soils located on the project site. 1.5 Vehicular Traffic All the vehicular traffic on site will pass through North East side of the site and over the Vehicle Tracking pad so that tracking of mud on streets can be minimized. 1.6 Location of Material Stockpile Location of Water Material Stockpile (Should be minimum 50 feet away from any inlet structure or watercourse). Please see attached plan 1.7 Batching Plant There shall not be any asphalt or concrete batch plant on the site. Portable toilets shall be provided by the contractor (Provide location, 50 feet away from any inlet or water source) Please see attached plan 7 1.8 Dewatering It is anticipated that the project site will not involve groundwater and stormwater dewatering practice and hence any scope of spills is minimal 1.9 Soil Characteristics According to Natural Resources Conservation Services (NRCS) Hydrologic Soil Group of site is C and the vegetation consists of native weed and grasses. 1.10 Seeding and Mulching For evergreen trees, 6 feet diameter mulch shall be provided with a 6” planting rim for trees in dryland planting beds and in irrigated native seeds areas where irrigation zones are to be shut down after establishment. For deciduous trees, 4” depth of mulch is suggested with a 6’ diameter mulch ring. Mulch has to be kept away from woody trunk. For shrubs 4” mulch depth is suggested 2.0 Construction Sequence: A construction timeline has not yet been completed due to the project being in the “entitlement:” stage. A construction schedule and the below sequence will be completed. 8 Table 1: Construction Sequence Mobiliz ation Demoli tion Grad ing Utilities Installati on Flat work Installa tion Vertica l Installa tion Landsc ape Demobili zation Best Management Practices (BMPs) Structural “Installation” Silt Fence Barriers* Contour Furrows (Ripping / Disking) Sediment Trap / Filter Vehicle Tracking Pad* Flow Barriers (Wattles)* Inlet Filter Bags* Any prior inlets that could use protecti ng Rock Bags* Any prior inlets that could use protecti ng Terracing 9 Stream Flow Diversion* Rip Rap Collecting Asphalt / Concrete Saw Cutting Waste *All BMPs to be Removed once Construction is Complete. Vegetative Temporary Seeding Planting Any time the site will sit dorman t longer than 30 Days. Mulching/Seal ant Any time the site will sit dorman t longer than 30 Days. Permanent Seeding Planting Sod Installation Rolled Products : Netting/Blanke ts/Mats Any time the site will sit dorman t longer than 30 Days. Other: 10 2.1 Erosion Control Plan: Please see next page. 11 2.2 Erosion Control Security Calculations: Table 2 Estimate of Probable Cost for Erosion Control Escrow Security Engineer’s Estimate of Probable Cost for Erosion Control Escrow Security Project: Center Point Plaza First Replat Project No: 1028 Calculations By: Rick Engineering Company Date: Itemized Costs: Item Unit Quantity Unit Cost Total Silt Fence LF 880 $ 2.00 $ 1,760.00 Sandbags LF 35 $ 4.00 $ 140.00 Sed. Bas. EA 1 $ 1,600.00 $ 1,600.00 Subtotal $ 3,500.00 Multiplier 1.5 Total $ 5,250.00 Formula Based: Unit Quantity Unit Cost Total Revegetation AC 1.57 $ 775.00 $ 1,216.75 Multiplier 1.5 Total $ 1,825.13 Escrow Security (greater of two estimates, $ 3000.00 min.) $ 5,250.00