Loading...
HomeMy WebLinkAbout320 MAPLE STREET - PDP - PDP150025 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTNovember 18, 2015 PRELIMINARY DRAINAGE REPORT MELDRUM MIXED USE Fort Collins, Colorado Prepared for: Alex Schuman Schuman Companies, Inc. 605 S. College Avenue, Suite 100 Fort Collins, Colorado 80524 Prepared by: 301 N. Howes Street Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 574-007 PThis Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. November 18, 2015 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage Report for Meldrum Mixed Use Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage Report for your review. This report accompanies the Preliminary Plan submittal for the proposed Meldrum Mixed Use development. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed Meldrum Mixed Use housing project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Andrew Reese Project Engineer Meldrum Mixed Use TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ......................................................... 1 II. DRAINAGE BASINS AND SUB-BASINS ............................................................. 4 III. DRAINAGE DESIGN CRITERIA ......................................................................... 5 IV. DRAINAGE FACILITY DESIGN .......................................................................... 7 V. CONCLUSIONS............................................................................................... 9 References ............................................................................................................. 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Hydraulic Computations (Reserved for Final) B.2 – Detention Facilities APPENDIX C – Water Quality Design Computations (Reserved for Final) APPENDIX D – Erosion Control Report APPENDIX E – Standard Operating Procedures (SOP’s) References (Reserved for Final) MAP POCKET: DR1 – Drainage Exhibit DR2 – Existing Drainage Exhibit Meldrum Mixed Use Page|1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 – Vicinity Map 2. The Meldrum Mixed Use project site is located in the southwest quarter of Section 11, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site (refer to Figure 1) is bordered to the north by a single family residence; to the south by Maple Street (100’ ROW); to the east by an existing public alley (20' Right-of-Way); and to the west by Meldrum Street (100’ ROW). 4. There are no major drainageways within or adjacent to the site. Meldrum Mixed Use Page|2 B. Description of Property 1. Meldrum Mixed Use is comprised of ±0.65 acres. 2. The site is currently occupied by two commercial buildings, an single family residence and several small outbuildings. Figure 2 – Aerial Photograph 3. The existing groundcover consists of grasses, asphalt and gravel. The existing on-site runoff generally drains from the southwest-to-northeast east across flat grades (e.g., <2.00%) into the existing alley. From there it is directed to Maple Street via the alley, and then to an existing inlet via curb and gutter on Maple. The existing inlet is located at the interseciton of Maple and Howes, at the northwest corner. From there, the drainage continues through an existing storm system down Maple Street to a large regional drainage culvert near Mason Street, and on to the Cache La Poudre River. 4. There are no major drainageways within or adjacent to the project site. 5. The proposed Meldrum Mixed Use development will consist of a single mixed-use building. Other proposed improvements include: a new concrete parking area located under the building, new sidewalks and new landscaping. 6. The proposed land use is mixed-use. This is a permitted use in the Downtown District (D). Project Site Meldrum Mixed Use Page|3 C. Floodplain 1. The subject property is not located in a FEMA regulatory floodplain. In particular, the project site is not located within a FEMA designated 100-year floodplain per Map Number 08069C0979H (Effective date: May 2, 2012). The project site is located adjacent to a City of Fort Collins regulated Old Town floodplain. As such, the project will comply with all regulations set forth in Chapter 10 of the City Municipal Code. Figure 4 – FEMA Firmette (Map Number 08069C0979H) Project Site Meldrum Mixed Use Page|4 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. Meldrum Mixed Use is located within the City of Fort Collins Old Town major drainage basin. Specifically, the project site is situated in the north-central portion of this major drainage basin. This basin is located in north-central Fort Collins and has a drainage area of approximately 2,120 acres, including approximately 400 acres of the Colorado State University campus. The Old Town major drainage basin generally drains from west to east. It receives some runoff from the Canal Importation Basin directly west of Old Town. Most of the runoff from the Old Town major drainage basin drains into the Poudre River. B. Sub-Basin Description 1. The outfall for the project site is the existing curb and gutter along Maple Street which then flows to an existing curb inlet located at the intersection of Howes Street and Maple Street, in the northwest corner. 2. The existing subject site can be defined with one (1) sub-basin. Refer to the Existing Drainage Exhibit for additional information. · Sub-basin EX1 delineates the proposed project site, which was used to approximate the 2- and 100-year existing runoff. The existing site runoff generally drains from northwest-to-southeast into the existing alley along the eastern boundary of the site. 3. The project site does not receive notable runoff from contiguous off-site properties. Meldrum Mixed Use Page|5 III. DRAINAGE DESIGN CRITERIA A. There are no optional provisions outside of the FCSCM proposed with Meldrum Mixed Use. B. The overall stormwater management strategy employed with Meldrum Mixed Use utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By choosing an already developed site with public storm sewer currently in place, the burden is significantly less than developing a vacant parcel absent of any infrastructure. Meldrum Mixed Use aims to reduce runoff peaks, volumes and pollutant loads from frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and 2-year storm events) by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be routed across landscaped areas or Bio-retention planters. These LID practices reduce the overall amount of impervious area, while at the same time Minimizing Directly Connected Impervious Areas (MDCIA). The combined LID/MDCIA techniques will be implemented, where practical, throughout the development, thereby slowing runoff and increasing opportunities for infiltration. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release. The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, urban development of this intensity will still have stormwater runoff leaving the site. The primary water quality treatment will occur in the Bio-retention planters located in the second level courtyard. Step 3 – Stabilize Drainageways. As stated in Section I.B.5, above, there are no major drainageways in or near the subject site. While this step may not seem applicable to Meldrum Mixed Use, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Once again, site selection has a positive effect on stream stabilization. By developing an infill site with existing stormwater infrastructure, combined with LID and MDCIA strategies, the likelihood of bed and bank erosion is reduced. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments. C. Development Criteria Reference and Constraints 1. The subject property is not part of any Overall Development Plan (ODP) drainage study or similar “development/project” drainage master plan. 2. The site plan is constrained on two sides by public streets, as well as by existing developments along the remaining two sides. As previously mentioned, the drainage outfall for sub-basin A is the existing curb and gutter along Maple Street which then flows to an existing curb inlet located at the intersection of Howes Street and Maple Street, in the northwest corner. Meldrum Mixed Use Page|6 3. Peak runoff from the project site during the 2-year event will remain unchanged and will decrease during the 100-year storm event. During the 2-year storm event, runoff will remain at ±0.96 cfs; and during the 100-year storm event runoff will decrease from ±4.28 cfs to ±0.96 cfs. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the Meldrum Mixed Use development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. E. Hydraulic Criteria 1. The drainage facilities proposed with the Meldrum Mixed Use project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 2. As stated in Section I.C.1, above, the subject property is located in a City of Fort Collins designated floodplain. F. Floodplain Regulations Compliance 1. As previously mentioned, this project is adjacent to a City of Fort Collins regulated floodplain. Discussions with City staff have indicated that more accurate mapping information will likely remove all or part of the property from the floodplain fringe. With this in mind, it is the intent of the project to provide the additional data to modify the floodplain in this location. 2. Should additional data not have the anticipated effect on the floodplain mapping, the building will be elevated or flood-proofed above the regulatory floodplain as required by City Code. Additionally, all requirements set forth in Chapter 10 of the City Municipal Code shall be met. G. Modifications of Criteria 1. No modifications are requested at this time. H. Conformance with Low Impact Development (LID) Meldrum Mixed Use Page|7 1. The project site will conform with the requirement to provide a minimum of 25% of new paving as permeable pavement. Since all parking for the project is located under the structure, no permeable paving is required. 2. The project site will conform with the requirement to treat a minimum of 50% of the project site using an LID technique. The total project area is 28,498 sf. Of that area, 24,384 sf will be treated by LID techniques, primarily bio- retention basins located in the second level courtyard. This means that ± 85% of the site will be treated by LID-type technology, exceeding the minimum requirement of 50%. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objective of the Meldrum Mixed Use drainage design is to maintain existing drainage patterns, while not adversely impacting adjacent properties. 2. No notable off-site runoff passes directly through the project site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. Drainage for the project site has been analyzed using two (2) drainage sub-basins, designated as sub-basins A & B. The drainage patterns anticipated for the basins are further described below. Sub-Basin A Sub-basin A encompasses approximately 85%the total site area. This sub-basin is comprised primarily of roof area and the on-site parking area. The majority of the parking area will be located below the building and will not be exposed to precipitation. Detention will be provided within an underground vault located under the parking area. This basin will release at an adjusted 2-year rate of 0.46 cfs through an orifice plate. An outlet orifice cap located on the east wall of the proposed drain basin will be used to control the flow rate. See Section IV.B.1 for discussion on how the adjusted release rate was determined. Sub-Basin B Sub-basin B encompasses approximately 15%the total site area. This sub-basin is comprised primarily of landscaped area surrounding the building. Sub-basin B will leave the site undetained. This basin will release at 0.12 cfs in the 2-yr event and at 0.50 cfs in the 100-year event. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. The release rate for the undeveloped land (pre-development) was established Meldrum Mixed Use Page|8 by calculating the 2-year peak runoff rate for the entire project area. The total establishes the overall maximum allowable release rate, 0.96 cfs, from the project site. The allowable release rate of 0.46 cfs utilized in the FAA procedure detention storage computations (Refer to Appendix B for these calculations) and was established by subtracting the total undetained release from Basin B of 0.50 cfs from the overall maximum allowable release rate. 2. The FAA method was used to size the on-site detention vault for quantity detention. Calculations for this area, based on the characteristics of sub-basin A and adjusted release rate, indicate a detention volume of 4,557 cu. ft. This does not include any volume for Water Quality Capture Volume (WQCV) as WQ treatment is being provided in the bio-retention planters. There is no- infiltration accounted for with this design. 3. All roof drain downspouts will discharge into the bio-retention planters section. The exception to this are the small awning located over entrances, which will release into landscaped areas. 4. The emergency spill path will be from the vault into the existing alley, where flows will proceed along the historic path south along the alley and east to the existing curb inlet. Meldrum Mixed Use Page|9 V. CONCLUSIONS A. Compliance with Standards 1. The design elements comply without variation, and meet all LID requirements. 2. The drainage design proposed with Meldrum Mixed Use complies with the City of Fort Collins Master Drainage Plan for the Old Town Basin. 3. There are no FEMA regulatory floodplains associated with the Meldrum Mixed Use development. However the project is impacted by the Old Town Floodplain, which is a City Regulated floodplain. All provisions within Chapter 10 of the City Municipal Code shall be adhered to. 4. The drainage plan and stormwater management measures proposed with the Meldrum Mixed Use project are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. Meldrum Mixed Use will detain for the pervious area converted to impervious areas to release at the 2-year existing rate during the 100-year storm. 2. The proposed Meldrum Mixed Use development will not impact the Master Drainage Plan recommendations for the Old Town major drainage basin. Meldrum Mixed Use Page|10 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Maple Mixed Use Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. EX1 28,498 0.65 0.05 0.04 0.27 0.04 0.00 0.25 0.61 0.61 0.76 52.6 TOTAL ONSITE 28,498 0.65 0.05 0.04 0.27 0.04 0.00 0.25 0.61 0.61 0.76 52.6 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 November 18, 2015 Overland Flow, Time of Concentration: Project: Maple Mixed Use Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = T i + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Rational Method Equation: Project: Maple Mixed Use Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: EX1 EX1 0.65 8.4 8.4 8.0 0.61 0.61 0.76 2.40 4.10 8.59 0.96 1.63 4.28 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) A. Reese November 18, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) D:\Projects\574-007\Drainage\Hydrology\574-007_Rational Calcs_Existing.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) EX1 EX1 0.65 0.61 0.61 0.76 8.4 8.4 8.0 0.96 1.63 4.28 EXISTING RUNOFF SUMMARY TABLE D:\Projects\574-007\Drainage\Hydrology\574-007_Rational Calcs_Existing.xlsx\Summary Table CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Maple Mixed Use Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0..95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A 24,384 0.56 0.00 0.00 0.56 0.00 0.00 0.00 0.95 0.95 1.00 90.0 B 4,114 0.09 0.00 0.03 0.00 0.00 0.00 0.06 0.43 0.43 0.53 31.3 TOTAL ONSITE 28,498 0.65 0.00 0.00 0.56 0.00 0.00 0.00 0.81 0.81 1.00 77.0 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Maple Mixed Use Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: Maple Mixed Use Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: A A 0.56 5.0 5.0 5.0 0.95 0.95 1.00 2.85 4.87 9.95 1.52 2.59 5.57 B B 0.09 5.0 5.0 5.0 0.43 0.43 0.53 2.85 4.87 9.95 0.12 0.20 0.50 DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) A. Reese November 18, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) D:\Projects\574-007\Drainage\Hydrology\574-007_Rational-Calcs_Proposed.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) A A 0.56 0.95 0.95 1.00 5.0 5.0 5.0 1.52 2.59 5.57 B B 0.09 0.43 0.43 0.53 5.0 5.0 5.0 0.12 0.20 0.50 DEVELOPED RUNOFF SUMMARY TABLE D:\Projects\574-007\Drainage\Hydrology\574-007_Rational-Calcs_Proposed.xlsx\Summary Table APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Detention Facilities APPENDIX B.1 STORM SEWERS APPENDIX B.2 DETENTION FACILITIES Maple Mixed Use Fort Collins, Colorado A. Reese Date: November 18, 2015 Pond No.: A A 100-yr 1.00 WQCV 0 ft 3 Area (A)= 0.59 acres Quantity Detention 4557 ft 3 Max Release Rate = 0.46 cfs Total Volume 4557 ft 3 Total Volume 0.105 ac-ft Time Time Ft.Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 9.95 5.9 1761 138 1623 10 600 7.72 4.6 2733 276 2457 15 900 6.52 3.8 3462 414 3048 20 1200 5.60 3.3 3965 552 3413 25 1500 4.98 2.9 4407 690 3717 30 1800 4.52 2.7 4800 828 3972 35 2100 4.08 2.4 5055 966 4089 40 2400 3.74 2.2 5296 1104 4192 45 2700 3.46 2.0 5512 1242 4270 50 3000 3.23 1.9 5717 1380 4337 55 3300 3.03 1.8 5899 1518 4381 60 3600 2.86 1.7 6075 1656 4419 65 3900 2.72 1.6 6259 1794 4465 70 4200 2.59 1.5 6418 1932 4486 75 4500 2.48 1.5 6584 2070 4514 80 4800 2.38 1.4 6740 2208 4532 85 5100 2.29 1.4 6891 2346 4545 90 5400 2.21 1.3 7041 2484 4557 95 5700 2.13 1.3 7163 2622 4541 100 6000 2.06 1.2 7292 2760 4532 105 6300 2.00 1.2 7434 2898 4536 110 6600 1.94 1.1 7554 3036 4518 115 6900 1.89 1.1 7694 3174 4520 120 7200 1.84 1.1 7816 3312 4504 125 7500 1.79 1.1 7921 3450 4471 130 7800 1.75 1.0 8054 3588 4466 135 8100 1.71 1.0 8172 3726 4446 APPENDIX C WATER QUALITY DESIGN COMPUTATIONS APPENDIX D EROSION CONTROL REPORT Meldrum Mixed Use EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet C001 of the Utility Plans. The Final Utility Plans will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E STANDARD OPERATING PROCEDURES (SOPs) REFERENCES MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT 140 8400 1.67 1.0 8277 3864 4413 145 8700 1.63 1.0 8367 4002 4365 150 9000 1.60 0.9 8496 4140 4356 155 9300 1.57 0.9 8615 4278 4337 160 9600 1.54 0.9 8723 4416 4307 165 9900 1.51 0.9 8820 4554 4266 170 10200 1.48 0.9 8907 4692 4215 175 10500 1.45 0.9 8983 4830 4153 180 10800 1.42 0.8 9048 4968 4080 185 11100 1.40 0.8 9169 5106 4063 190 11400 1.38 0.8 9282 5244 4038 195 11700 1.36 0.8 9388 5382 4006 200 12000 1.34 0.8 9487 5520 3967 205 12300 1.32 0.8 9579 5658 3921 210 12600 1.30 0.8 9664 5796 3868 215 12900 1.28 0.8 9742 5934 3808 220 13200 1.26 0.7 9813 6072 3741 225 13500 1.24 0.7 9877 6210 3667 230 13800 1.22 0.7 9933 6348 3585 235 14100 1.21 0.7 10066 6486 3580 240 14400 1.20 0.7 10195 6624 3571 Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = Detention Pond Calculation | FAA Method Project: Project Location: Calculations By: D:\Projects\574-007\Drainage\Detention\574-007_Detention.xlsm\ (min) 10-yr Tc (min) 100-yr Tc (min) A A No 0.95 0.95 1.00 25 1.0 1.4 1.4 0.9 83 2.1 2.90 0.5 83 2.1 2.18 0.6 5.0 5.0 5.0 B B No 0.95 0.95 1.00 15 1.7 0.9 0.9 0.6 0 0.0 0.00 0.0 0 0.0 0.00 0.0 5.0 5.0 5.0 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Design Point Basin Overland Flow A. Reese November 18, 2015 GutterConcentration Flow Swale Flow Time of (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = D:\Projects\574-007\Drainage\Hydrology\574-007_Rational-Calcs_Proposed.xlsx\Tc-2-yr_&_100-yr November 18, 2015 D:\Projects\574-007\Drainage\Hydrology\574-007_Rational-Calcs_Proposed.xlsx\C-Values Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) EX1 EX1 No 0.25 0.25 0.31 25 2.9 5.6 5.6 5.2 0 0.0 0.00 0.0 117 0.2 0.69 2.8 8.4 8.4 8.0 EXISTING TIME OF CONCENTRATION COMPUTATIONS Design Point Basin Overland Flow A. Reese November 18, 2015 GutterConcentration Flow Swale Flow Time of (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = D:\Projects\574-007\Drainage\Hydrology\574-007_Rational Calcs_Existing.xlsx\Tc-2-yr_&_100-yr D:\Projects\574-007\Drainage\Hydrology\574-007_Rational Calcs_Existing.xlsx\C-Values