Loading...
HomeMy WebLinkAboutCHABAD JEWISH CENTER OF NORTHERN COLORADO - BDR - BDR140003 - REPORTS - DRAINAGE REPORT301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com Drainage Letter Report Date: May 5, 2015 Project: Chabad Jewish Center Project No. 574-003 Project Development Plan Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the Chabad Jewish Center project. There are two existing buildings is situated on the site, a single story housing-style structure in the center of the lot and a single story garage towards the northwest corner. The site currently consists of rooftop, concrete walks and patios, a concrete parking area, turf, trees, and other vegetation. It presently functions similar to an ‘A’ corner lot, with historic drainage being split towards Westward Drive to the south and towards Shields Street to the east. The total impervious area of the existing site is approximately 3,056 square-feet. The existing percent impervious for the entire site is 13.5%. The existing total runoff from the site is 1.1 cfs in the 100-yr event. The proposed redevelopment will require demolition of the existing garage along with the parking area to the northeast. The new facility is planned as 4 phases of construction. For the purpose of this letter, only Phases 1 and 2 will be considered and permitted. Phases 3 and 4 will require a future application and a re-evaluation of the conditions and requirements at that time. Minor grading will occur to host the new facility, including the addition of two bio-swales along the south and east portions of the site to capture runoff from the proposed facility and parking area. The total impervious area of the proposed redevelopment (Phases 1 and 2) is roughly 7,774 square-feet. This is an increase of 4,718 SF from the existing condition. The proposed percent impervious for the entire site also increases slightly to 34.1%. The proposed total runoff from the site is 3.1 cfs in the 100-yr event. The site is located in the Old Town Drainage Basin. On-site detention is not required if the increase in impermeable area is less than 5,000 SF. Calculations using the rational method to determine the existing and proposed runoff are attached to this letter, as is a drainage exhibit. There are no regulatory floodplains associated with the project. Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since the approximately 22,713 sf area of disturbance for the project is less than one acre, a State Stormwater Discharge Permit is not required for this project. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. There are no existing stormwater BMP’s currently on-site. In order to bring the site into compliance with the Low-Impact Development Standards adopted by the City, water quality mitigation will be provided on- site. Water quality treatment will occur along the south and east sides of the site, where bio-swales will collect runoff from both the proposed parking lot and the proposed building. This bio-swale will have an engineered section designed to remove particulates and contaminants from the runoff. While most minor events are expected to infiltrate into the ground, the bio-swale will convey major events above ground to an existing storm inlet near the S Shields St Right-Of-Way. The City LID requirements specify that a minimum 25% of all new paving shall be treated using permeable paving technique and a minimum of 50% of new impervious surface area bust be treated by a LID-type device or technology. In the case of this project, nearly 100% of the runoff passes through either one of the proposed bio-swales. For this reason, we propose an alternative to minimum 25% permeable paver concept as all stormwater will result in an equal to or greater than level of LID attainment overall. To summarize, the proposed grading concept closely matches existing elevations and drainage patterns. On-site detention is proven to be unnecessary. Stormwater quality has been provided, and meets or exceeds the city requirements for Low-Impact Development. Therefore, it is my professional opinion that the Chabad Jewish Center satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Danny Weber Nicholas W. Haws, PE Project Engineer Project Manager enc. CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Chabad Jewish Center Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: D. Weber Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0.. 95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. E-Hist 13,164 0.30 0.00 0.03 0.03 0.00 0.00 0.24 0.38 0.38 0.48 17.1 S-Hist 9,549 0.22 0.00 0.00 0.01 0.00 0.00 0.21 0.29 0.29 0.36 4.9 Total 22,713 0.52 0.00 0.03 0.04 0.00 0.00 0.45 0.34 0.34 0.43 12.0 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Chabad Jewish Center Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: D. Weber Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0.. 95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. E-Hist 13,164 0.30 0.00 0.03 0.03 0.00 0.00 0.24 0.38 0.38 0.48 17.1 S-Hist 9,549 0.22 0.00 0.00 0.01 0.00 0.00 0.21 0.29 0.29 0.36 4.9 Total 22,713 0.52 0.00 0.03 0.04 0.00 0.00 0.45 0.34 0.34 0.43 12.0 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: Chabad Jewish Center Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, Rational Method Equation: Project: Chabad Jewish Center Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: E E-Hist 0.30 25.1 25.1 24.1 0.38 0.38 0.48 1.43 2.44 5.09 0.2 0.3 0.7 S S-Hist 0.22 22.4 22.4 21.5 0.29 0.29 0.36 1.53 2.61 5.46 0.1 0.2 0.4 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D. Weber May 5, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Existing.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) E E-Hist 0.30 0.38 0.38 0.48 25.1 25.1 24.1 0.2 0.3 0.7 S S-Hist 0.22 0.29 0.29 0.36 22.4 22.4 21.5 0.1 0.2 0.4 EXISTING RUNOFF SUMMARY TABLE D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Existing.xlsx\Summary Table CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Chabad Jewish Center Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: D. Weber Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0.. 95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. E 11,419 0.26 0.00 0.00 0.05 0.00 0.00 0.22 0.37 0.37 0.47 16.0 S 11,295 0.26 0.04 0.04 0.05 0.00 0.00 0.13 0.60 0.60 0.76 47.2 Total 22,714 0.52 0.04 0.04 0.09 0.00 0.00 0.34 0.49 0.49 0.61 31.5 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: Chabad Jewish Center Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, Rational Method Equation: Project: Chabad Jewish Center Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: E E 0.26 5.0 5.0 5.0 0.37 0.37 0.47 2.85 4.87 9.95 0.3 0.5 1.2 S S 0.26 5.0 5.0 5.0 0.60 0.60 0.76 2.85 4.87 9.95 0.4 0.8 1.9 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D. Weber May 5, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Proposed.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) E E 0.26 0.37 0.37 0.47 5.0 5.0 5.0 0.3 0.5 1.2 S S 0.26 0.60 0.60 0.76 5.0 5.0 5.0 0.4 0.8 1.9 DEVELOPED RUNOFF SUMMARY TABLE D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Proposed.xlsx\Summary Table V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) E E No 0.95 0.95 1.00 40 5.0 1.0 1.0 0.7 0 0.0 0.00 N/A 314 1.0 1.50 3.5 5.0 5.0 5.0 S S No 0.95 0.95 1.00 50 2.3 1.5 1.5 1.0 0 0.0 0.00 N/A 152 1.0 1.50 1.7 5.0 5.0 5.0 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow D. Weber May 5, 2015 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti − = D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Proposed.xlsx\Tc-2-yr_&_100-yr 10-year Cf = 1.00 May 5, 2015 D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Proposed.xlsx\C-Values V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) E E-Hist No 0.15 0.15 0.19 200 1.0 25.1 25.1 24.1 0 0.0 0.00 N/A 0 0.0 0.00 N/A 25.1 25.1 24.1 S S-Hist No 0.15 0.15 0.19 100 0.5 22.4 22.4 21.5 0 0.0 0.00 N/A 0 0.0 0.00 N/A 22.4 22.4 21.5 EXISTING TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow D. Weber May 5, 2015 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti − = D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Existing.xlsx\Tc-2-yr_&_100-yr 10-year Cf = 1.00 May 5, 2015 D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Existing.xlsx\C-Values 10-year Cf = 1.00 May 5, 2015 D:\Projects\574-003\Drainage\Hydrology\574-003_Rational-Calcs_Existing.xlsx\C-Values