HomeMy WebLinkAboutREPLAT OF EAST RIDGE - MAJOR AMENDMENT - MJA150005 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT
East Ridge Second Filing
Fort Collins, Colorado
Prepared for:
Hartford Homes
4801 Goodman Road
Timnath, Colorado 80547
Phone: (970) 674-1109
Prepared by:
Galloway & Company, Inc.
3760 East 15th Street, Suite 202
Loveland, Colorado 80538
Phone: (970) 800-3300
Contact: James Prelog, P.E.
Original Preparation: September 9, 2015
Revised: November 12, 2105
1
TABLE OF CONTENTS
TABLE OF CONTENTS.......................................................................................................................... 1
I. CERTIFICATIONS .......................................................................................................................... 2
II. GENERAL LOCATION AND DESCRIPTION .................................................................................. 3
V. DRAINAGE BASINS AND SUB-BASINS ........................................................................................ 4
III. DRAINAGE DESIGN CRITERIA ..................................................................................................... 6
IV. DRAINAGE FACILITY DESIGN .................................................................................................... 12
V. EROSION AND SEDIMENT CONTROL MEASURES ................................................................... 14
VI. CONCLUSIONS ............................................................................................................................ 15
VII. REFERENCES .............................................................................................................................. 15
APPENDIX A - REFERENCE MATERIALS
VICINITY MAP
NRCS SOILS MAP
FEMA FIRMETTE
APPENDIX B - HYDROLOGY CALCULATIONS
PROPOSED COMPOSITE RUNOFF CALCULATIONS
PROPOSED STANDARD FORM SF-2 TIME OF CONCENTRATION CALCULATIONS
PROPOSED STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN 2-YEAR
PROPOSED STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN 100-YEAR
APPENDIX C - HYDRAULIC CALCULATIONS
UDFCD INLET CALCULATIONS
STREET CAPACITY CALCULATIONS
SWALE CAPACITY CALCULATIONS
STORM DRAIN SIZING CALCULATIONS
PRELMINARY DETENTION POND SIZING (EPA SWMM 5.0)
PRELIMINARY EDB AND LID SIZING CALCULATIONS
APPENDIX D – SUPPORTING DOCUMENTION
LAKE CANAL AGREEMENT
BARKER AGREEMENT
APPENDIX D – DRAINAGE MAPS
PROPOSED DRAINAGE | DR01
PROPOSED DRAINAGE | DR02
2
I. CERTIFICATIONS
CERTIFICATION OF ENGINEER
“I hereby certify that this report for the preliminary drainage design of East Ridge Second Filing
was prepared by me (or under my direct supervision) in accordance with the provisions of the
Fort Collins Stormwater Criteria Manual for the owners thereof.”
______________________________________
James Prelog, P.E.
Registered Professional Engineer
State Of Colorado No.39373
For and on behalf of Galloway & Company, Inc.
CERTIFICATION OF OWNER
“Hartford Homes hereby certifies that the drainage facilities for the East Ridge Second Filing
shall be constructed according to the design presented in this report. We understand that the
City of Fort Collins does not and will not assume liability for drainage facilities designed and/or
certified by our engineer. We also understand that the City of Fort Collins relies on the
representation of others to establish that drainage facilities are designed and constructed in
compliance with City of Fort Collins guidelines, standards, or specifications. Review by the City
of Fort Collins can therefore in no way limit or diminish any liability, which we or any other party
may have with respect to the design or construction of such facilities.”
____________________________________
Hartford Homes
Attest:
___________________________________
(Name of Responsible Party)
__________________________________
Notary Public
__________________________________
Authorized Signature
3
II. GENERAL LOCATION AND DESCRIPTION
LOCATION
East Ridge Second Filing (referred to herein as “the site” or “project site”) will be located
southeast of the intersection of East Vine Drive and Timberline Road. The project site is
bounded on north by the Burlington Northern Railroad and East Vine Drive; on the south by an
existing gravel mining operation (i.e., Barker Property), on the east by undeveloped agricultural
land; and on the west by Timberline Road and Collins Aire Park – a mobile home park. The
Larimer-Weld Canal is located north of the sitem, and the Lake Canal is located to the south.
More specifically, the site is located in the Northeast Quarter of Section 8, Township 7 North,
Range 68 West in the City of Fort Collins, County of Larimer and State of Colorado. Refer to
Appendix A for a Vicinity Map.
DESCRIPTION OF PROPERTY
The project site consists of approximately 153.29 acres. It is currently a vacant and
undeveloped tract of land. The existing grades in the north half of the site average one
percent, and existing grades in the south half are steeper, averaging three percent. The
existing runoff generally flows to an existing low lying wetland area in the south central region
of the site. This sump area has no natural outfall.
There are no major drainage ways passing through the project site.
According to the USDA NRCS Web Soil Survey, ‘Fort Collins loam, 0 to 3 percent slopes’
covers roughly two-thirds of the project site. This soil is associated with Hydrologic Soil Group
(HSG) ‘C’. HSG ‘C’ soils have a slow infiltration rate when thoroughly wet, and consist chiefly
of soils having a layer that impedes the downward movement of water or soils of moderately
fine texture or fine texture. These soils have a slow rate of water transmission. The remainder
of the site consists of a mix of HSG ‘B’ and ‘C’ soils. Refer to Appendix A for additional soils
information.
The site is situated south of the Larimer-Weld Canal and north of the Lake Canal. In the
interim, the on-site detention pond will release to the Lake Canal at a rate of 5 cfs until the
ultimate outfall to Dry Creek is complete. Refer to Appendix D for a copy of the previous
4
agreement with the Lake Canal Ditch Company. This agreement is in the process of being
updated, and a revised copy will be provided at Final Design.
The Barker Property, which is situated to the south of the site, currently receives irrigation
water through the No. 10 Ditch (Ditch). The existing connection runs south from the
intersection of Vine Drive and Timberline Road across the project site just east of Timberline
Road to the Barker Property. The Ditch will be relocated with this project. In addition to
providing irrigation water to the Barker Property, the relocated irrigation infrastructure will
service an on-site irrigation pond, which will be used to irrigate the proposed City of Fort
Collins neighborhood park. Refer to Appendix D for a copy of an Agreement dated 12/06/2002.
This agreement is in the process of being updated, and a revised copy will be provided at Final
Design.
East Ridge Second Filing Subdivision will be developed in several phases. During the initial
phase, approximately 114.73 acres (~75%) of the total project area will be developed.
Subsequent phases will develop Tract A, Tract B and Tract C as multi-family, single-family
attached and single-family attached, respectively. The current phase will include a mix of
single-family attached, single-family alley loaded and duplex construction. The development
will surround a proposed City of Fort Collins neighborhood park and wetland/natural area.
During the water quality storm event, runoff will flow into one of several stormwater quality
features that surround the on-site detention pond. The stormwater quality features include: an
Extended Detention Basin (EDB), Grass Buffer (GB), Grass Swale (GS) and Sand Filter (SF).
During the minor (2-year) and major (100-year) storm events, runoff volume in excess of the
water quality event will drain into the on-site detention pond.
V. DRAINAGE BASINS AND SUB-BASINS
MAJOR BASIN DESCRIPTION
The project site is located within the Cooper Slough/Boxelder Basin along the west edge
where East Vine Drive and Timberline Road intersect. According to the City of Fort Collins
website (http://www.fcgov.com/utilities/what-we-do/stormwater/drainage-basins/boxelder-creek-cooper-slough),
the basins “encompass 265 square miles, beginning north of the Colorado/Wyoming border
and extend southward into east Fort Collins, where they end at the Cache la Poudre River.
5
The basins are primarily characterized by farmland with isolated areas of mixed-use residential
development and limited commercial development.”
The basin hydrology was studied as part of the Boxelder Creek/Cooper Slough watershed by
the City of Fort Collins and Larimer County in 1981 and 2002. In addition, a drainage master
plan was prepared for the portion of the basin owned by Anheuser-Busch, Inc. in 1984 in
conjunction with development of the brewery site. The 2003 update to the City of Fort Collins
stormwater master plans adopted improvements for the Lower Cooper Slough Basin and
identified the need for the Upper Cooper Slough as an area to be further studied.
From recent conversations with City of Fort Collins Stormwater Utility staff, we understand the
off-site flows that would have spilled from the Larimer-Weld Canal and were reported in the
previous Final Drainage Report for East Ridge Second Filing Subdivision (TST, Inc. Consulting
Engineers | Dated: May 6, 2008) are out of date. Specifically, the availability of new information
and the changes that will be made to the Upper Cooper Slough Master Plan, City of Fort
Collins Stormwater Utility staff determined that the spill from the Larimer-Weld Canal will be
reduced to 0 cfs. Therefore, the off-site flow accounted for in the TST does not affect the
project site.
The project site is shown on FEMA Map Numbers 08069C0982F and 080690982H (refer to
Appendix A for FEMA Firmettes). Neither map shows the project impacted by an existing
floodplain/floodway. Refer to Appendix A for a copy of each Firmette.
SUB- BASIN DESCRIPTION
There are no major off-site flows affecting the proposed site design (see above). Minor flows
from the area between the site’s north property boundary and the existing railroad tracks,
approximately one and a half acres, drains south and onto the site. This runoff should have a
negligible impact on the proposed drainage design and will be studied and accounted for in our
Final Design.
6
III. DRAINAGE DESIGN CRITERIA
REGULATIONS
This preliminary drainage design presented herein was prepared in accordance with the Fort
Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual (i.e.,
Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manuals Volumes 1,
2 and 3 [Manual]). Together, the requirements are referred to as the Fort Collins Stormwater
Criteria Manual [FCSCM].
DIRECTLY CONNECTED IMPERVIOUS AREA (DCIA)
At this preliminary stage of the design process, we’ve developed a strategy for implementing
‘The Four-Step Process’ for stormwater quality management. Each step is listed below and
includes a brief narrative describing the implementation strategy.
Step 1 - Employ runoff reduction practices
Current and future developed runoff from the A series of basins (including Fut-A) will drain
through a Grass Swale (GS) prior to entering the on-site detention facility. The proposed
grass swale has low longitudinal and side slopes and a wide flat bottom (e.g., 0.25%, 7:1
and 30’, respectively). They are designed to convey 2-year storm event runoff in a slow
(i.e., <1 ft/sec) and shallow manner (i.e., normal depth <1 foot). This design encourages
settling and infiltration. The UDFCD defines a Grass Swale as “Densely vegetated
drainageway with low-pitched side slopes that collects and slowly conveys runoff. The
design of the longitudinal slope and cross-section size forces the flow to be slow and
shallow, thereby facilitating sedimentation while limiting erosion.”
Current and future developed runoff from the B, E and F series of basins (including Fut-B)
will drain into a Sand Filter (SF). The UDFCD defines a Sand Filter as “A stormwater quality
BMP consisting of a sand bed and underdrain system. Above the vegetated sand bed is an
extended detention basin sized to capture the WQCV. A Sand Filter extended detention
basin provides pollutant removal through settling and filtering and is generally suited to off-
line, on-site configurations where there is no base flow and the sediment load is relatively
low.”
The current and future developed runoff from the I, J and future Timberline Road right-of-
way series of basins (including Fut-I and Fut-TL4) will also drain into a Sand Filter (SF).
7
The developed runoff from the lots (B-lot grading configuration) situated in the Wtlnd basin
is designed to flow through a Grass Buffer (GB). These lots flank the east and west sides
of the basin. The UDFCD defines a Grass Buffer as a “Uniformly graded and densely
vegetated area, typically turf grass. This BMP requires sheet flow to promote filtration,
infiltration and settling to reduce pollutants.”
We anticipate the future development within the Neighborhood Park will include a paved
parking area. Parking lots are ideally suited for Grass Buffer strips because runoff typically
sheet flows to a down gradient edge of the area. From here, the runoff will be uniformly
distributed along the Grass Buffer. This future impervious area is not specifically accounted
for in the Wtlnd basin. A unique basin for the neighborhood park will be delineated at Final
Design. Any additional impervious area in the neighborhood park should not have a
material effect on the design presented herein.
The following table is a preliminary estimate of the newly added impervious area and a
breakdown of the total area treated by an EDB or an LID feature.
Description Area, acres Preliminary Proposed
Imperviousness, %
Newly added Impervious
Area, acres
Total Site Area: 153.29
Neighborhood
Park/Detention Area: 22.49 ~13% 2.92
Current Developed Area: 92.24 ~67% 61.53
Future Developed Area: 38.56 ~77% 29.62
Total: 153.29 Total: 94.07
43% to EDB 40.79
57% to LID 53.28
Step 2 - Implement BMPs that provide a Water Quality Capture Volume (WQCV)
The developed runoff from the C and D basins will drain into an Extended Detention Basin
(EDB). The UDFCD defines an Extended Detention Basin as “An engineered basin with an
outlet structure designed to slowly release urban runoff over an extended time period to
provide water quality benefits and control peak flows for frequently occurring storm events.
The basins are sometimes called "dry ponds" because they are designed not to have a
significant permanent pool of water remaining between storm runoff events. Outlet
8
structures for extended detention basins are sized to control more frequently occurring
storm events.”
Current and future developed runoff from the G, H and future Timberline Road right-of-way
(including Fut-G, Fut-H and Fut-Tl1 through Fut-TL3) will drain into an Extended Detention
Basins (EDB).
Step 3 - Stabilize drainageways
Steps will be taken at final design to stabilize the proposed Grass Swale and prevent
erosion during storm events exceeding the 2-year recurrence level. Additionally, measures
will be implemented to protect the Lake Canal receiving outflow from the on-site detention
pond.
Step 4 - Implement site specific and other source control BMPS
Site specific considerations such as material storage and other site operations are
addressed in the Stormwater Management Plan (SWMP).
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
The project site has no natural outfall. In the interim, we propose to pump water from the on-
site detention pond, at a maximum rate of 5 cfs, into the Lake Canal. In the future, we
anticipate an outfall will be built to receive outflow from the on-site detention pond. We expect,
at that time, to replace the pump with a more traditional passive outfall structure. Our design
includes an outfall structure that can be converted from one use to another with minimal
construction.
HYDROLOGICAL CRITERIA
For urban catchments that are not complex and are generally 160 acres or less in size, it is
acceptable that the design storm runoff be analyzed using the Rational Method. The Rational
Method is often used when only the peak flow rate or total volume of runoff is needed (e.g.,
storm sewer sizing or simple detention basin sizing). The Rational Method was used to
estimate the peak flow at each design point. For preliminary design, no routing (i.e., time
attenuation) calculations were completed; this work will occur at Final Design. When a total
9
flow is reported within this preliminary drainage report, assume it is simply a summation of all
upstream flows.
The Rational Method is based on the Rational Formula:
Q = CiA
Where:
Q = the maximum rate of runoff, cfs
C = a runoff coefficient that is the ratio between the runoff volume from an area and the
average rate of rainfall depth over a given duration for that area
i = average intensity of rainfall in inches per hour for a duration equal to the Time of
Concentration (Tc)
A = area, acres
The one-hour rainfall Intensity-Duration-Frequency tables for use with the Rational Method of
runoff analysis are provided in Table RA-7 and Table RA-8 (refer to Appendix B).
The 2-year and 100-year storm events are the basis for the preliminary drainage system
design. The 2-year storm is considered the minor storm event. It has a fifty percent probability
of exceedance during any given year. The 100-year storm is considered the major storm
event. It has a one percent probability of exceedance during any given year.
The 2-year drainage system, at a minimum, must be designed to transport runoff from the 2-
year recurrence interval storm event with minimal disruption to the urban environment. The
100-year drainage system, as a minimum, must be designed to convey runoff from the 100-
year recurrence interval flood to minimize life hazards and health, damage to structures, and
interruption to traffic and services.
The preliminary detention storage was estimated with EPA SWMM 5.0. Various input
parameters were provided by Table RO-13 and Table RO-14. The interim detention discharge
is 5 cfs.
10
HYDRAULIC CRITERIA
On-site excess developed runoff will travel overland from the residential lot areas to the
adjacent street section. Drive-over or vertical curb and gutter will capture the runoff and convey
it to sump Type ‘R’ curb inlets. The inlets discharge to one of the on-site storm drain systems.
The storm drain systems discharge into a Grass Swale (LID), Sand Filter (SF) or Extended
Detention Basins (EDBs) and ultimately the on-site detention pond.
Street Capacity Analysis
The maximum encroachment of gutter flow within the street for the minor storm event was
used to estimate the capacity of the local and collector street sections. These maximum
encroachments do not exceed the criteria given in Table ST-2 (see below). For example, minor
storm flows within local streets cannot overtop the curb (dmax=0.395’) or the crown of the street.
For the major storm event, street capacities were estimated based on the maximum street
encroachment given in Table ST-3 (see below). For example, the depth of water at the street
crown shall not exceed six (6) inches for local streets. Generic street capacity calculations for
four (4) different proposed street sections and a range of longitudinal grades are presented in
Appendix B.
· Alley (Local)
· Drive-Over 15’ CL to FL (Local)
· Vertical C&G 15’ CL to FL (Local)
· Vertical C&G 25’ CL to FL (Collector)
Table ST-2 - Pavement Encroachment Standards for the Minor Storm
Street Classification Maximum Encroachment
Local No curb overtopping. Flow may spread to
crown of street.
Collector No curb overtopping. Flow spread must leave
at least one lane free of water.
Table ST-3 - Street Inundation Standards for the Major (i.e., 100-Year) Storm
Street Classification Maximum Depth and Inundated Area
Local and Collector Residential dwellings and public, commercial
and industrial buildings should be no less than
12 inches above the 100-year flood at the
ground line or lowest water entry of the
11
building. The depth of water of the gutter flow
line should not exceed 18 inches.
Table ST-4 – Allowable Cross-Street Flow
Street Classification Initial Storm Flow Major (100-Year) Storm Flow
Local 6 inches of depth in cross
pan.
18 inches of depth above gutter
flow line.
Collector Where cross pans allowed,
depth of flow should not
exceed 6 inches.
12 inches of depth above gutter
flow line.
The minor storm event street capacity calculations were estimated with the Modified Manning
Equation and Excel. The major storm event street capacity calculations were completed within
Bentley FlowMaster.
Inlet Capacity Analysis
CDOT Type ‘R’ inlets are proposed throughout the project for removing 2- and 100-year
developed runoff from the street sections. In general, the inlet capacities for the minor and
major storm event were estimated using UD-Inlet_v3.14. More specifically, the local and
collector street section geometry and storm event encroachment limits were accounted for in
the estimated capacity calculations. Appendix B includes capacity calculations for proposed
Type ‘R’ curb inlets, which range in length from 5’ to 20’, using the 15’ CL to FL drive-over
section. A 25’ Type ‘R’ curb inlet capacity was estimated for the 25’ CL to FL section. The
preliminary calculations included in Appendix B are based on the more conservative ponding
depths (i.e., encroachment of gutter flow) associated with the drive-over curb and gutter.
Storm Drain Capacity Analysis
The preliminary storm drain system is sized to convey the sum of the 100-year developed
runoff at each design point draining into the system (e.g., Storm Drain System A: ΣQ100=A1Q100
+ A2Q100 + . . . + A13Q100). The pipes are sized to convey this runoff without surcharging (i.e.,
full-flow capacity). This method provides a conservative estimate of total runoff and
corresponding pipe sizes. At Final Design, the developed flows will be routed through the
proposed storm drain system and a hydraulic grade-line analysis will be completed.
12
IV. DRAINAGE FACILITY DESIGN
GENERAL CONCEPT
This preliminary design is the initial step in developing a system for collecting and conveying
developed runoff from current and future development at East Ridge Second Filing to the on-
site detention pond. The existing site runoff drains to an existing wetland area in the south
central region of the project site. The wetland area has no natural outfall. The proposed design
matches this existing drainage pattern and includes the development of an interim outfall and
plans for a permanent outfall.
Typically, the on-site excess developed runoff will travel overland from residential lot areas into
the adjacent street section. Most of the residential lots drain to a 15’ CL to FL section with
either drive-over or vertical curb and gutter. The street section will convey developed runoff to
sump Type ‘R’ curb inlets. These inlets discharge to one of several the on-site storm drain
systems which then discharge into a Grass Swale (LID), Sand Filters (SF) or Extended
Detention Basins (EDBs), and ultimately, the on-site detention pond.
SPECIFIC DETAILS
The proposed detention pond was sized using a simplified SWMM model. At this stage of the
design, the model does not account for the effects of routing flows through any conveyance
from the developed basins to the on-site detention pond - the developed basins connect
directly to the detention pond. We used the width parameter to adjust the runoff from each
basin to a target unit release rate of approximately 7.0 cfs/acre. In the interim, there is no
passive outfall from the detention pond. In the future, an outfall will be constructed that will
receive flows from this pond. In the interim, the on-site detention pond will function as a
retention facility. Since the retention facility is expected to be temporary, the City of Fort Collins
requires that it be sized to capture two times the two hour 100-year storm plus one foot of
freeboard. The interim design releases flows to the south at 5 cfs into the Lake Canal. Refer to
Appendix C for a copy of the release agreement.
A-Basins
These basins comprise approximately 21.32 acres. This area includes the north area (Tract B)
set aside for future single-family attached development. The developed runoff within these
basins drains into Storm Drain System A (SDS A). The system will discharge into a grass
13
swale before entering the detention pond. In particular, the downstream end of the system
discharges into a swale that is graded to keep 2-year flows from the A-basins and the G- and
H-basins separate. The design allows minor storm event flows to drain into separate
stormwater quality features. During the major storm event, flows from these upstream basins
will combine when the depth in the swale exceeds one and a half feet.
B-, E- and F-Basins
These basins comprise approximately 37.40 acres. This area includes the north area set aside
for future single-family attached (Tract B). The developed runoff within these basins drains into
Storm Drain System B (SDS B). The system outfall into a Sand Filter (SF) before entering the
detention pond.
C- and D-Basins
These basins comprise approximately 23.76 acres. The developed runoff within these basins
drains to Storm Drain System C (SDS C). The system will discharge to an EDB before entering
the detention pond.
G- and H-Basins + Fut-Tl1 through Fut-TL3
These basins comprise approximately 34.49 acres. This area includes the area set aside for
future single-family attached (Tract E) and multi-family (Tract A) development. The developed
runoff within these basins drains into Storm Drain System G-H (SDS G-H). This system will
discharge into an EDB before entering the detention pond. In the interim, runoff from the future
developed areas was accounted for in the EDB design. These future areas are planned to be
multi-family and/or commercial and will need to follow LID criteria. In particular, no less than
50% of any newly added impervious area must be treated using one or a combination of LID
techniques, and no less than 25% of any newly added pavement areas must be treated using
a permeable pavement technology.
I- and J-Basins + Fut-TL4
These basins comprise approximately 13.82 acres. The developed runoff within these basins
drains to Storm Drain System I (SDS I). The system will discharge to a Sand Filter (SF) before
entering the detention pond.
14
V. EROSION AND SEDIMENT CONTROL MEASURES
A General Permit for Stormwater Discharge Associated with Construction Activities issued by
the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control
Division (WQCD), will be acquired for the site. A Stormwater Management Plan (SWMP)
should be prepared to identity the Best Management Practices (BMPs) which, when
implemented, will meet the requirements of said General Permit. Below is a summary of
SWMP requirements which may be implemented on-site.
The following temporary BMPs may be installed and maintained to control on-site erosion and
prevent sediment from traveling off-site during construction:
· Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a temporary barrier
that is placed at the base of a disturbed area.
· Vehicle Tracking Control – a stabilized stone pad located at points of ingress and egress
on a construction site. The stone pad is designed to reduce the amount of mud transported
onto public roads by construction traffic.
· Straw Wattles – wattles act as a sediment filter. They are a temporary BMP and require
proper installation and maintenance to ensure their performance.
· Inlet protection – Inlet protection will be used on all existing and proposed storm inlets to
help prevent debris from entering the storm sewer system. Inlet protection generally
consists of straw wattles or block and gravel filters.
CONSTRUCTION MATERIAL & EQUIPMENT
The contractor shall store all construction materials and equipment and shall provide
maintenance and fueling of equipment in confined areas on-site from which runoff will be
contained and filtered.
MAINTENANCE
The temporary BMPs will be inspected by the contractor at a minimum of once every two
weeks and after each significant storm event.
The property owner will be responsible for routine and non-routine maintenance of the
temporary BMPs. Routine maintenance includes:
· Remove sediment from the bottom of the temporary sediment basin when accumulated
sediment occupies about 20% of the design volume or when sediment accumulation
results in poor drainage.
15
· Lawn mowing-maintain height of grass depending on aesthetic requirements.
· Debris and litter removal-remove debris and litter to minimize outlet clogging and
improve aesthetics as necessary.
· Inspection of the facility-inspect the facility annually to ensure that it functions as initially
intended.
· Cleaning and repair of BMP’s is required when sediment has built up or the BMP is not
working properly.
VI. CONCLUSIONS
COMPLIANCE WITH STANDARDS
The design presented in this preliminary drainage report for East Ridge Second Filing has
been prepared in accordance with the design standards and guidelines presented in the Fort
Collins Stormwater Criteria Manual.
VARIANCES
No variance(s) requested at this time.
DRAINAGE CONCEPT
The proposed East Ridge Second Filing storm drainage improvements should provide
adequate protection for the developed site. The proposed drainage design for the site should
not negatively impact the existing downstream storm drainage system.
VII. REFERENCES
1. Fort Collins Stormwater Criteria Manual (Addendum to the Urban Storm Drainage
Criteria Manuals Volumes 1, 2 and 3), prepared by City of Fort Collins
2. Urban Drainage and Flood Control District, Drainage Criteria Manual Volumes 1 and 2,
prepared by Wright-McLaughlin Engineers, dated June 2001 (revised April 2008), and
the Volume 3, prepared by Wright-McLaughlin Engineers, dated September 1992 and
revised November 2010.
`
APPENDIX A
REFERENCE MATERIAL
`
VICINITY MAP
Vicinity Map - East Ridge
Not to Scale
Larimer-Weld Canal
Lake Canal
East Ridge
Project Site
Barker Property
`
NRCS SOILS MAP
Hydrologic Soil Group—Larimer County Area, Colorado
(East Ridge Subdivision)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/24/2015
Page 1 of 4
4492900 4493000 4493100 4493200 4493300 4493400 4493500 4493600 4493700 4493800 4493900 4494000 4494100
4492900 4493000 4493100 4493200 4493300 4493400 4493500 4493600 4493700 4493800 4493900 4494000 4494100
497500 497600 497700 497800 497900 498000 498100 498200 498300
497500 497600 497700 497800 497900 498000 498100 498200 498300
40° 35' 52'' N
105° 1' 49'' W
40° 35' 52'' N
105° 1' 8'' W
40° 35' 10'' N
105° 1' 49'' W
40° 35' 10'' N
105° 1' 8'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 300 600 1200 1800
Feet
0 50 100 200 300
Meters
Map Scale: 1:6,220 if printed on A portrait (8.5" x 11") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
5 Aquepts, loamy A/D 11.7 6.4%
7 Ascalon sandy loam, 0 to
3 percent slopes
B 5.8 3.2%
34 Fort Collins loam, 0 to 1
percent slopes
B 6.0 3.3%
35 Fort Collins loam, 0 to 3
percent slopes
C 109.7 60.3%
42 Gravel pits A 10.8 5.9%
53 Kim loam, 1 to 3 percent
slopes
B 17.2 9.5%
73 Nunn clay loam, 0 to 1
percent slopes
C 6.8 3.7%
74 Nunn clay loam, 1 to 3
percent slopes
C 6.4 3.5%
94 Satanta loam, 0 to 1
percent slopes
B 0.1 0.0%
102 Stoneham loam, 3 to 5
percent slopes
B 7.3 4.0%
Totals for Area of Interest 181.8 100.0%
Hydrologic Soil Group—Larimer County Area, Colorado East Ridge Subdivision
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/24/2015
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado East Ridge Subdivision
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/24/2015
Page 4 of 4
`
FEMA FIRMETTE
`
APPENDIX B
HYDROLOGIC CALCULATIONS
Tributary Area tc | 2-Year tc | 100-Year Q2 Q100
Sub-basin (acres) C2 C100 (min) (min) (cfs) (cfs)
A1 0.52 0.77 0.96 7.4 6.3 1.0 4.6
A2 0.83 0.68 0.85 9.2 6.7 1.3 6.4
A3 1.45 0.67 0.83 11.0 8.6 2.1 10.1
A4 2.11 0.66 0.83 12.4 10.0 2.9 13.7
A5 1.96 0.67 0.84 10.3 9.2 2.9 13.3
A6 2.20 0.62 0.77 11.9 9.5 2.9 13.7
A7 0.96 0.65 0.82 10.8 8.3 1.4 6.6
A8 2.18 0.58 0.72 14.1 12.6 2.4 11.2
A9 0.46 0.67 0.84 7.3 5.5 0.8 3.8
A10 1.31 0.68 0.85 8.0 6.1 2.2 10.4
A11 1.08 0.68 0.85 8.7 6.9 1.7 8.3
A12 0.76 0.59 0.74 8.0 6.3 1.1 5.2
A13 0.36 0.58 0.73 6.4 5.3 0.6 2.6
B1 0.61 0.77 0.96 9.7 8.5 1.1 4.9
B2 2.56 0.63 0.78 14.5 12.3 3.1 14.4
B3 2.73 0.63 0.79 14.5 12.4 3.3 15.4
B4 2.16 0.63 0.79 12.6 10.2 2.8 13.3
B5 1.35 0.68 0.85 8.5 6.8 2.2 10.5
B6 2.39 0.62 0.77 12.5 10.1 3.0 14.5
B7 1.06 0.57 0.71 10.1 8.0 1.4 6.5
B8 1.39 0.58 0.73 10.3 8.9 1.8 8.3
B9 1.34 0.64 0.80 10.4 7.9 1.9 9.2
B10 1.81 0.65 0.81 10.7 9.1 2.6 11.9
B11 0.99 0.66 0.82 9.2 7.4 1.5 7.2
B12 1.32 0.65 0.81 8.2 6.2 2.1 10.0
B13 1.43 0.53 0.66 12.6 11.7 1.6 7.0
B14 1.18 0.66 0.83 9.8 7.2 1.8 8.7
B15 0.99 0.68 0.85 8.4 6.5 1.6 7.8
B16 0.98 0.66 0.83 10.0 8.1 1.5 6.9
B17 0.82 0.61 0.76 9.1 7.3 1.2 5.5
B18 0.38 0.67 0.83 7.1 5.9 0.7 3.0
C1 1.39 0.66 0.83 10.8 8.4 2.0 9.7
C2 1.25 0.66 0.82 10.3 7.8 1.8 8.9
C3 1.53 0.67 0.83 11.1 9.4 2.2 10.3
C4 0.53 0.68 0.85 5.9 5.0 1.0 4.5
C5 1.04 0.69 0.86 6.8 5.0 1.9 8.9
C6 0.82 0.70 0.88 7.0 5.0 1.5 7.2
C7 0.77 0.70 0.88 5.3 5.0 1.5 6.7
C8 1.01 0.68 0.85 7.4 5.5 1.7 8.4
C9 1.50 0.65 0.82 7.6 6.3 2.4 11.4
C10 1.02 0.67 0.84 7.6 6.3 1.7 8.0
C11 1.41 0.62 0.78 10.3 7.9 2.0 9.5
C12 1.75 0.64 0.80 9.4 8.1 2.6 12.1
C13 1.42 0.62 0.78 10.6 8.3 1.9 9.4
C14 2.29 0.64 0.80 9.6 8.3 3.4 15.6
C15 1.21 0.65 0.82 8.9 7.0 1.9 8.9
C16 0.87 0.73 0.92 10.0 8.6 1.4 6.7
C17 0.21 0.78 0.97 7.6 5.0 0.4 2.1
BASIN SUMMARY TABLE
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3. Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
C18 2.57 0.41 0.51 12.0 12.0 2.2 9.6
D1 0.95 0.69 0.86 9.2 6.6 1.5 7.5
D2 0.19 0.77 0.97 5.0 5.0 0.4 1.8
E1 1.09 0.66 0.82 10.1 7.6 1.6 7.8
E2 2.15 0.61 0.76 12.7 10.4 2.7 12.7
E3 0.24 0.77 0.96 5.0 5.0 0.5 2.3
F1 0.66 0.69 0.86 7.5 5.5 1.2 5.5
F2 1.77 0.67 0.84 8.6 6.6 2.9 13.8
F3 0.18 0.79 0.98 5.4 5.0 0.4 1.7
G1 0.53 0.78 0.97 8.7 7.5 1.0 4.6
G2 1.50 0.66 0.82 11.1 8.6 2.1 10.2
G3 1.19 0.69 0.87 7.2 5.3 2.1 10.1
G4 1.06 0.69 0.86 8.0 6.1 1.8 8.6
G5 1.69 0.71 0.89 8.3 6.4 2.9 13.9
G6 0.57 0.77 0.96 9.2 6.7 1.0 5.0
H1 0.46 0.79 0.99 7.2 6.0 0.9 4.2
H2 1.72 0.72 0.90 7.9 6.8 3.1 14.1
H3 1.41 0.75 0.94 6.3 5.0 2.8 13.2
H4 1.62 0.73 0.92 8.7 6.6 2.8 13.7
H5 1.20 0.72 0.90 8.6 6.6 2.1 9.9
H6 1.70 0.73 0.91 7.7 5.6 3.1 14.9
I1 1.13 0.73 0.92 8.1 6.0 2.0 9.8
I2 1.28 0.75 0.93 9.5 7.5 2.2 10.5
I3 0.91 0.74 0.92 10.0 8.0 1.5 7.2
I4 0.79 0.72 0.90 9.7 7.8 1.3 6.1
I5 1.57 0.73 0.91 8.1 6.0 2.8 13.6
J1 0.12 0.80 1.00 5.0 5.0 0.3 1.2
J2 0.28 0.68 0.86 6.3 5.0 0.5 2.4
Wetland 22.49 0.38 0.47 66.6 63.7 6.4 28.6
Fut-A 5.15 0.80 1.00 10.0 10.0 9.3 40.6
Fut-B 5.81 0.80 1.00 10.0 10.0 10.5 45.8
Fut-G1 8.08 0.85 1.00 10.0 10.0 15.5 63.6
Fut-G2 2.43 0.90 1.00 10.0 10.0 4.9 19.1
Fut-H 4.79 0.80 1.00 10.0 10.0 8.7 37.7
Fut-I1 3.92 0.80 1.00 10.0 10.0 7.1 30.8
Fut-I2 1.25 0.80 1.00 10.0 10.0 2.3 9.8
Fut-I3 1.15 0.80 1.00 10.0 10.0 2.1 9.1
Fut-TL1 2.62 0.90 1.00 10.0 10.0 5.3 20.6
Fut-TL2 1.10 0.90 1.00 10.0 10.0 2.2 8.7
Fut-TL3 0.83 0.90 1.00 10.0 10.0 1.7 6.5
Fut-TL4 1.42 0.90 1.00 10.0 10.0 2.9 11.2
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3. Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
`
PROPOSED
COMPOSITE RUNOFF
COEFFICIENTS
41
Table RO-11
Rational Method Runoff Coefficients for Composite Analysis
Character of Surface Runoff Coefficient
Streets, Parking Lots,
Drives:
Asphalt 0.95
Concrete 0.95
Gravel 0.5
Roofs 0.95
Recycled Asphalt 0.8
Lawns, Sandy Soil:
Flat <2% 0.1
Average 2 to 7% 0.15
Steep >7% 0.2
Lawns, Heavy Soil:
Flat <2% 0.2
Average 2 to 7% 0.25
Steep >7% 0.35
(4) A new Section 2.9 is added, to read as follows:
2.9 Composite Runoff Coefficient
Drainage sub-basins are frequently composed of land that has multiple surfaces or zoning
classifications. In such cases a composite runoff coefficient must be calculated for any
given drainage sub-basin.
The composite runoff coefficient is obtained using the following formula:
( )
t
n
i
i i
A
C A
C
∑
= = 1
*
(RO-8)
Where: C = Composite Runoff Coefficient
Ci = Runoff Coefficient for Specific Area (Ai)
Ai = Area of Surface with Runoff Coefficient of Ci, acres or feet2
n = Number of different surfaces to be considered
At = Total Area over which C is applicable, acres or feet2
(5) A new Section 2.10 is added, to read as follows:
42
2.10 Runoff Coefficient Adjustment for Infrequent Storms
The runoff coefficients provided in tables RO-10 and RO-11 are appropriate for use with
the 2-year storm event. For storms with higher intensities, an adjustment of the runoff
coefficient is required due to the lessening amount of infiltration, depression retention,
evapo-transpiration and other losses that have a proportionally smaller effect on storm
runoff. This adjustment is applied to the composite runoff coefficient.
These frequency adjustment factors are found in Table RO-12.
Table RO-12
Rational Method Runoff Coefficients for Composite Analysis
Storm Return Period
(years)
Frequency Factor
Cf
2 to 10
11 to 25
26 to 50
51 to 100
1.00
1.10
1.20
1.25
Note: The product of C times Cf cannot exceed the value of 1, in the cases where it does a value of
1 must be used
(6) Section 3.1 is deleted in its entirety.
(7) Section 3.2 is deleted in its entirety.
(8) Section 3.3 is deleted in its entirety.
(9) A new Section 4.3 is added, to read as follows:
4.3 Computer Modeling Practices
(a) For circumstances requiring computer modeling, the design storm hydrographs must
be determined using the Stormwater Management Model (SWMM). Basin and
conveyance element parameters must be computed based on the physical characteristics
of the site.
(b) Refer to the SWMM Users’ Manual for appropriate modeling methodology, practices
and development. The Users’ Manual can be found on the Environmental Protection
Agency (EPA) website (http://www.epa.gov/ednnrmrl/models/swmm/index.htm).
(c) It is the responsibility of the design engineer to verify that all of the models used in
the design meet all current City criteria and regulations.
4.3.1 Surface Storage, Resistance Factors, and Infiltration
Table RO-13 provides values for surface storage for pervious and impervious surfaces
and the infiltration rates to be used with SWMM. Table RO-13 also lists the appropriate
infiltration decay rate, zero detention depth and resistance factors, or Manning’s “n”
values, for pervious and impervious surfaces to be used for SWMM modeling in the city
of Fort Collins.
Subdivision: East Ridge Second Filing Project Name: East Ridge Second Filing
Location: CO, Fort Collins Project No.:
Calculated By: H. Feissner
Checked By: J. Prelog
INPUT User Input Date: 11/11/15
INPUT User Input Single-Family Alley-Loaded SF Attached
95% 5% 62.5% 70% 75% ← % Impervious
A1 0.52 95 0.39 72 20 0.13 5 60 0.00 0 0.77
A2 0.83 95 0.25 29 20 0.06 1 60 0.52 38 0.68
A3 1.45 95 0.37 24 20 0.09 1 60 0.99 41 0.67
A4 2.11 95 0.51 23 20 0.12 1 60 1.48 42 0.66
A5 1.96 95 0.52 25 20 0.12 1 60 1.33 41 0.67
A6 2.20 95 0.43 19 20 0.27 2 60 1.50 41 0.62
A7 0.96 95 0.20 20 20 0.05 1 60 0.71 44 0.65
A8 2.18 95 0.34 15 20 0.42 4 60 1.42 39 0.58
A9 0.46 95 0.14 28 20 0.04 2 60 0.28 37 0.67
A10 1.31 95 0.40 29 20 0.10 1 60 0.82 37 0.68
A11 1.08 95 0.28 25 20 0.03 1 60 0.77 43 0.68
A12 0.76 95 0.18 23 20 0.18 5 60 0.40 31 0.59
A13 0.36 95 0.18 48 20 0.18 10 60 0.00 0 0.58
ΣA 16.17
B1 0.61 95 0.46 72 20 0.15 5 60 0.00 0 0.77
B2 2.56 95 0.47 18 20 0.25 2 60 1.84 43 0.63
B3 2.73 95 0.47 16 20 0.22 2 60 2.04 45 0.63
B4 2.16 95 0.43 19 20 0.20 2 60 1.53 42 0.63
B5 1.35 95 0.42 29 20 0.09 1 60 0.84 37 0.68
B6 2.39 95 0.44 18 20 0.28 2 60 1.67 42 0.62
B7 1.06 95 0.22 20 20 0.27 5 60 0.56 32 0.57
B8 1.39 95 0.34 23 20 0.37 5 60 0.68 29 0.58
B9 1.34 95 0.25 18 20 0.09 1 60 1.00 45 0.64
B10 1.81 95 0.40 21 20 0.14 2 60 1.27 42 0.65
B11 0.99 95 0.28 27 20 0.11 2 60 0.60 37 0.66
B12 1.32 95 0.25 18 20 0.05 1 60 1.02 46 0.65
B13 1.43 95 0.38 25 20 0.58 8 60 0.47 20 0.53
B14 1.18 95 0.28 23 20 0.06 1 60 0.84 43 0.66
B15 0.99 95 0.33 31 20 0.09 2 60 0.58 35 0.68
B16 0.98 95 0.33 32 20 0.13 3 60 0.51 32 0.66
B17 0.82 95 0.22 26 20 0.18 4 60 0.42 31 0.61
COMPOSITE RUNOFF COEFFICIENTS
Area (ac) Area
Weighted
Asphalt + Concrete Walks Lawns, Heavy Soil: Flat <2%
Area Weighted Runoff
Coefficient Area (ac)
HFHLV0001.01
Area
Weighted
Basin ID Total Area (ac) Runoff C2
Coefficient Area (ac)
Lots (e.g., Single-Family, Alley Loaded)
Runoff
Coefficient
Page 1 of 3 11/11/2015
X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
95% 5% 62.5% 70% 75% ← % Impervious
Area (ac) Area
Weighted
Asphalt + Concrete Walks Lawns, Heavy Soil: Flat <2%
Area Weighted Runoff
Coefficient Area (ac)
Area
Weighted
Basin ID Total Area (ac) Runoff C2
Coefficient Area (ac)
Lots (e.g., Single-Family, Alley Loaded)
Runoff
Coefficient
B18 0.38 95 0.24 59 20 0.14 8 60 0.00 0 0.67
ΣB 25.50
C1 1.39 95 0.33 23 20 0.08 1 60 0.98 42 0.66
C2 1.25 95 0.28 21 20 0.07 1 60 0.90 43 0.66
C3 1.53 95 0.39 24 20 0.09 1 60 1.05 41 0.67
C4 0.53 95 0.17 30 20 0.05 2 60 0.32 36 0.68
C5 1.04 95 0.27 25 20 0.02 0 60 0.75 43 0.69
C6 0.82 95 0.34 39 20 0.08 2 60 0.40 29 0.70
C7 0.77 95 0.28 35 20 0.05 1 60 0.43 34 0.70
C8 1.01 95 0.38 36 20 0.13 3 60 0.50 29 0.68
C9 1.50 95 0.34 21 20 0.10 1 60 1.06 42 0.65
C10 1.02 95 0.34 32 20 0.12 2 60 0.56 33 0.67
C11 1.41 95 0.26 17 20 0.14 2 60 1.01 43 0.62
C12 1.75 95 0.42 23 20 0.18 2 60 1.15 39 0.64
C13 1.42 95 0.26 17 20 0.14 2 60 1.01 43 0.62
C14 2.29 95 0.51 21 20 0.21 2 60 1.58 41 0.64
C15 1.21 95 0.34 27 20 0.14 2 60 0.73 36 0.65
C16 0.87 95 0.62 68 20 0.25 6 60 0.00 0 0.73
C17 0.21 95 0.15 65 20 0.03 3 60 0.04 10 0.78
C18 2.57 95 0.24 9 20 1.44 11 60 0.90 21 0.41
ΣC 22.63
D1 0.95 95 0.32 31 20 0.07 2 60 0.56 36 0.69
D2 0.19 95 0.14 73 20 0.04 5 60 0.00 0 0.77
ΣD 1.14
E1 1.09 95 0.24 21 20 0.06 1 60 0.79 43 0.66
E2 2.15 95 0.34 15 20 0.24 2 60 1.58 44 0.61
E3 0.24 95 0.19 72 20 0.06 5 60 0.00 0 0.77
ΣE 3.48
F1 0.66 95 0.24 34 20 0.06 2 60 0.36 33 0.69
F2 1.77 95 0.47 25 20 0.08 1 60 1.23 42 0.67
F3 0.18 95 0.14 74 20 0.04 4 60 0.00 0 0.79
ΣF 2.61
G1 0.53 95 0.41 73 20 0.12 5 60 0.00 0 0.78
G2 1.50 95 0.35 22 20 0.10 1 60 1.05 42 0.66
G3 1.19 95 0.42 33 20 0.09 1 60 0.69 35 0.69
G4 1.06 95 0.35 32 20 0.07 1 60 0.64 36 0.69
G5 1.69 95 0.81 45 20 0.23 3 60 0.65 23 0.71
G6 0.57 95 0.43 72 20 0.14 5 60 0.00 0 0.77
ΣG 6.53
Page 2 of 3 11/11/2015
X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
95% 5% 62.5% 70% 75% ← % Impervious
Area (ac) Area
Weighted
Asphalt + Concrete Walks Lawns, Heavy Soil: Flat <2%
Area Weighted Runoff
Coefficient Area (ac)
Area
Weighted
Basin ID Total Area (ac) Runoff C2
Coefficient Area (ac)
Lots (e.g., Single-Family, Alley Loaded)
Runoff
Coefficient
H1 0.46 95 0.36 75 20 0.10 4 70 0.00 0 0.79
H2 1.72 95 0.64 35 20 0.25 3 70 0.83 34 0.72
H3 1.41 95 0.30 20 20 0.00 0 70 1.11 55 0.75
H4 1.62 95 0.57 33 20 0.17 2 70 0.88 38 0.73
H5 1.20 95 0.42 34 20 0.16 3 70 0.61 36 0.72
H6 1.70 95 0.39 22 20 0.10 1 70 1.21 50 0.73
ΣH 8.11
I1 1.13 95 0.22 18 20 0.04 1 70 0.88 54 0.73
I2 1.28 95 0.63 46 20 0.19 3 70 0.47 26 0.75
I3 0.91 95 0.35 36 20 0.11 2 70 0.45 35 0.74
I4 0.79 95 0.25 30 20 0.10 2 70 0.44 39 0.72
I5 1.57 95 0.34 20 20 0.08 1 70 1.16 51 0.73
ΣI 5.68
J1 0.12 95 0.10 76 20 0.02 4 70 0.00 0 0.80
J2 0.28 95 0.10 33 20 0.06 4 70 0.12 31 0.68
ΣJ 0.40
Wetland 22.49 95 0.05 0 20 19.97 18 60 2.46 7 0.25
Fut-A 5.15 0.80
Fut-B 5.81 0.80
Fut-G1 8.08 0.85
Fut-G2 2.43 0.90
Fut-H 4.79 0.80
Fut-I1 3.92 0.80
Fut-I2 1.25 0.80
Fut-I3 1.15 0.80
Fut-TL1 2.62 0.90
Fut-TL2 1.10 0.90
Fut-TL3 0.83 0.90
Fut-TL4 1.42 0.90
Page 3 of 3 11/11/2015
X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
`
PROPOSED
STANDARD FORM SF-2
TIME OF CONCENTRATION
CALCULATIONS
Subdivision: East Ridge Second Filing Project Name: East Ridge Second Filing
Location: CO, Fort Collins Project No.:
Calculated By: H. Feissner
Checked By: J. Prelog
Date: 11/11/15
BASIN D.A. Hydrologic C2 C
5 C100
L S Ti | 2-Year T
i | 100-Year L S Cv
VEL. Tt COMP. T
c | 2-Year COMP. Tc | 100-Year
TOTAL Urbanized Tc T
c | 2-Year Tc | 100-Year
ID (AC) Soils Group Cf=1.00 C
f=1.00 Cf
=1.25 (FT) (%) (MIN) (MIN) (FT) (%) (FPS) (MIN) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) (MIN)
A1 0.52 C 0.77 0.77 0.96 15 2.00 1.9 0.8 573 0.75 20 1.7 5.5 7.4 6.3 588 13.3 7.4 6.3
A2 0.83 C 0.68 0.68 0.85 110 2.00 6.4 3.8 282 0.70 20 1.7 2.8 9.2 6.7 392 12.2 9.2 6.7
A3 1.45 C 0.67 0.67 0.83 100 2.00 6.3 3.9 486 0.75 20 1.7 4.7 11.0 8.6 586 13.3 11.0 8.6
A4 2.11 C 0.66 0.66 0.83 100 2.00 6.4 4.0 646 0.80 20 1.8 6.0 12.4 10.0 746 14.1 12.4 10.0
A5 1.96 C 0.67 0.67 0.84 100 20.00 2.9 1.8 716 0.65 20 1.6 7.4 10.3 9.2 816 14.5 10.3 9.2
A6 2.20 C 0.62 0.62 0.77 114 2.00 7.5 5.1 475 0.80 20 1.8 4.4 11.9 9.5 589 13.3 11.9 9.5
A7 0.96 C 0.65 0.65 0.82 111 2.00 6.8 4.3 369 0.60 20 1.5 4.0 10.8 8.3 480 12.7 10.8 8.3
A8 2.18 C 0.58 0.58 0.72 111 2.00 8.0 5.8 634 0.60 20 1.5 6.8 14.8 12.6 745 14.1 14.1 12.6
A9 0.46 C 0.67 0.67 0.84 58 2.00 4.8 2.9 256 0.70 20 1.7 2.5 7.3 5.5 314 11.7 7.3 5.5
A10 1.31 C 0.68 0.68 0.85 58 2.00 4.7 2.8 396 1.00 20 2.0 3.3 8.0 6.1 454 12.5 8.0 6.1
A11 1.08 C 0.68 0.68 0.85 57 2.00 4.6 2.7 383 0.60 20 1.5 4.1 8.7 6.9 440 12.4 8.7 6.9
A12 0.76 C 0.59 0.59 0.74 60 2.00 5.7 4.1 209 0.60 20 1.5 2.2 8.0 6.3 269 11.5 8.0 6.3
A13 0.36 C 0.58 0.58 0.73 27 2.00 3.9 2.8 261 0.75 20 1.7 2.5 6.4 5.3 288 11.6 6.4 5.3
B1 0.61 C 0.77 0.77 0.96 16 2.00 1.9 0.8 718 0.60 20 1.5 7.7 9.7 8.5 734 14.1 9.7 8.5
B2 2.56 C 0.63 0.63 0.78 101 2.00 6.9 4.6 710 0.60 20 1.5 7.6 14.6 12.3 811 14.5 14.5 12.3
B3 2.73 C 0.63 0.63 0.79 110 2.00 7.2 4.8 708 0.60 20 1.5 7.6 14.8 12.4 818 14.5 14.5 12.4
B4 2.16 C 0.63 0.63 0.79 111 2.00 7.2 4.8 503 0.60 20 1.5 5.4 12.6 10.2 614 13.4 12.6 10.2
B5 1.35 C 0.68 0.68 0.85 45 2.00 4.1 2.4 408 0.60 20 1.5 4.4 8.5 6.8 453 12.5 8.5 6.8
B6 2.39 C 0.62 0.62 0.77 111 2.00 7.4 5.0 697 1.30 20 2.3 5.1 12.5 10.1 808 14.5 12.5 10.1
B7 1.06 C 0.57 0.57 0.71 99 2.00 7.7 5.6 266 0.85 20 1.8 2.4 10.1 8.0 365 12.0 10.1 8.0
B8 1.39 C 0.58 0.58 0.73 45 2.00 5.1 3.7 509 0.65 20 1.6 5.3 10.3 8.9 554 13.1 10.3 8.9
B9 1.34 C 0.64 0.64 0.80 111 2.00 7.1 4.6 307 0.60 20 1.5 3.3 10.4 7.9 418 12.3 10.4 7.9
B10 1.81 C 0.65 0.65 0.81 48 2.00 4.6 2.9 599 0.65 20 1.6 6.2 10.7 9.1 647 13.6 10.7 9.1
B11 0.99 C 0.66 0.66 0.82 58 2.00 4.9 3.1 395 0.60 20 1.5 4.2 9.2 7.4 453 12.5 9.2 7.4
B12 1.32 C 0.65 0.65 0.81 66 2.00 5.3 3.4 350 1.05 20 2.0 2.8 8.2 6.2 416 12.3 8.2 6.2
B13 1.43 C 0.53 0.53 0.66 165 1.65 11.3 8.7 301 0.70 20 1.7 3.0 14.3 11.7 466 12.6 12.6 11.7
B14 1.18 C 0.66 0.66 0.83 111 2.00 6.7 4.2 307 0.70 20 1.7 3.1 9.8 7.2 418 12.3 9.8 7.2
B15 0.99 C 0.68 0.68 0.85 58 2.00 4.6 2.8 423 0.90 20 1.9 3.7 8.4 6.5 481 12.7 8.4 6.5
B16 0.98 C 0.66 0.66 0.83 58 2.00 4.8 3.0 534 0.75 20 1.7 5.1 10.0 8.1 592 13.3 10.0 8.1
B17 0.82 C 0.61 0.61 0.76 62 2.00 5.6 3.9 423 1.05 20 2.0 3.4 9.1 7.3 485 12.7 9.1 7.3
B18 0.38 C 0.67 0.67 0.83 27 2.00 3.3 2.0 360 0.60 20 1.5 3.9 7.1 5.9 387 12.2 7.1 5.9
C1 1.39 C 0.66 0.66 0.83 98 2.00 6.3 3.9 505 0.90 20 1.9 4.4 10.8 8.4 603 13.4 10.8 8.4
C2 1.25 C 0.66 0.66 0.82 111 2.00 6.8 4.3 479 1.30 20 2.3 3.5 10.3 7.8 590 13.3 10.3 7.8
C3 1.53 C 0.67 0.67 0.83 47 2.00 4.3 2.7 701 0.75 20 1.7 6.7 11.1 9.4 748 14.2 11.1 9.4
C4 0.53 C 0.68 0.68 0.85 58 2.00 4.7 2.8 191 1.85 20 2.7 1.2 5.9 4.0 249 11.4 5.9 5.0
C5 1.04 C 0.69 0.69 0.86 65 2.00 4.9 2.9 302 1.65 20 2.6 2.0 6.8 4.8 367 12.0 6.8 5.0
C6 0.82 C 0.70 0.70 0.88 60 2.00 4.5 2.5 376 1.50 20 2.4 2.6 7.0 5.0 436 12.4 7.0 5.0
C7 0.77 C 0.70 0.70 0.88 30 2.00 3.2 1.8 260 1.00 20 2.0 2.2 5.3 3.9 290 11.6 5.3 5.0
C8 1.01 C 0.68 0.68 0.85 63 2.00 4.9 2.9 378 1.50 20 2.4 2.6 7.4 5.5 441 12.5 7.4 5.5
C9 1.50 C 0.65 0.65 0.82 31 2.00 3.6 2.3 506 1.10 20 2.1 4.0 7.6 6.3 537 13.0 7.6 6.3
C10 1.02 C 0.67 0.67 0.84 30 2.00 3.4 2.1 499 1.00 20 2.0 4.2 7.6 6.3 529 12.9 7.6 6.3
C11 1.41 C 0.62 0.62 0.78 111 2.00 7.3 4.9 355 1.00 20 2.0 3.0 10.3 7.9 466 12.6 10.3 7.9
C12 1.75 C 0.64 0.64 0.80 35 2.00 3.9 2.5 593 0.80 20 1.8 5.5 9.4 8.1 628 13.5 9.4 8.1
C13 1.42 C 0.62 0.62 0.78 110 2.00 7.3 4.9 352 0.75 20 1.7 3.4 10.6 8.3 462 12.6 10.6 8.3
Subdivision: East Ridge Second Filing Project Name: East Ridge Second Filing
Location: CO, Fort Collins Project No.:
Calculated By: H. Feissner
Checked By: J. Prelog
Date: 11/11/15
BASIN D.A. Hydrologic C2 C
5 C100
L S Ti | 2-Year T
i | 100-Year L S Cv
VEL. Tt COMP. T
c | 2-Year COMP. Tc | 100-Year
TOTAL Urbanized Tc T
c | 2-Year Tc | 100-Year
ID (AC) Soils Group Cf=1.00 C
f=1.00 Cf
=1.25 (FT) (%) (MIN) (MIN) (FT) (%) (FPS) (MIN) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) (MIN)
INITIAL/OVERLAND FINAL
(Ti)
TRAVEL TIME
STANDARD FORM SF-2
TIME OF CONCENTRATION
SUB-BASIN Tc CHECK
HFHLV0001.01
DATA (Tt) (URBANIZED BASINS)
G2 1.50 C 0.66 0.66 0.82 111 2.00 6.8 4.3 400 0.60 20 1.5 4.3 11.1 8.6 511 12.8 11.1 8.6
G3 1.19 C 0.69 0.69 0.87 58 2.00 4.5 2.6 361 1.25 20 2.2 2.7 7.2 5.3 419 12.3 7.2 5.3
G4 1.06 C 0.69 0.69 0.86 59 2.00 4.6 2.6 489 1.40 20 2.4 3.4 8.0 6.1 548 13.0 8.0 6.1
G5 1.69 C 0.71 0.71 0.89 56 2.00 4.2 2.3 509 1.05 20 2.0 4.1 8.3 6.4 565 13.1 8.3 6.4
G6 0.57 C 0.77 0.77 0.96 80 2.00 4.3 1.8 525 0.80 20 1.8 4.9 9.2 6.7 605 13.4 9.2 6.7
H1 0.46 C 0.79 0.79 0.99 17 2.00 1.9 0.7 497 0.60 20 1.5 5.3 7.2 6.0 514 12.9 7.2 6.0
H2 1.72 C 0.72 0.72 0.90 18 2.00 2.3 1.2 516 0.60 20 1.5 5.6 7.9 6.8 534 13.0 7.9 6.8
H3 1.41 C 0.75 0.75 0.94 71 2.00 4.2 1.9 267 1.20 20 2.2 2.0 6.3 4.0 338 11.9 6.3 5.0
H4 1.62 C 0.73 0.73 0.92 63 2.00 4.2 2.1 528 0.95 20 1.9 4.5 8.7 6.6 591 13.3 8.7 6.6
H5 1.20 C 0.72 0.72 0.90 57 2.00 4.2 2.2 408 0.60 20 1.5 4.4 8.6 6.6 465 12.6 8.6 6.6
H6 1.70 C 0.73 0.73 0.91 63 2.00 4.3 2.2 332 0.65 20 1.6 3.4 7.7 5.6 395 12.2 7.7 5.6
I1 1.13 C 0.73 0.73 0.92 63 2.00 4.2 2.1 450 0.95 20 1.9 3.8 8.1 6.0 513 12.9 8.1 6.0
I2 1.28 C 0.75 0.75 0.93 56 2.00 3.8 1.8 574 0.70 20 1.7 5.7 9.5 7.5 630 13.5 9.5 7.5
I3 0.91 C 0.74 0.74 0.92 56 2.00 4.0 2.0 565 0.60 20 1.5 6.1 10.0 8.0 621 13.5 10.0 8.0
I4 0.79 C 0.72 0.72 0.90 57 2.00 4.2 2.2 515 0.60 20 1.5 5.5 9.7 7.8 572 13.2 9.7 7.8
I5 1.57 C 0.73 0.73 0.91 63 2.00 4.3 2.2 451 0.95 20 1.9 3.9 8.1 6.0 514 12.9 8.1 6.0
J1 0.12 C 0.80 0.80 1.00 28 2.00 2.3 0.8 192 0.60 20 1.5 2.1 4.4 2.8 220 11.2 5.0 5.0
J2 0.28 C 0.68 0.68 0.86 54 2.00 4.4 2.6 178 0.60 20 1.5 1.9 6.3 4.5 232 11.3 6.3 5.0
Wetland 22.49 C 0.25 0.25 0.31 360 1.40 26.5 24.6 831 0.20 7 0.3 44.2 70.8 68.9 1191 16.6 70.8 68.9
Fut-A 5.15 C 0.80 0.80 1.00 100 2.00 4.4 1.5 593 1.00 20 2.0 4.9 9.3 6.4 693 13.9 9.3 6.4
Fut-B 5.81 C 0.80 0.80 1.00 10.0 10.0
Fut-G1 8.08 C 0.85 0.85 1.00 10.0 10.0
Fut-G2 2.43 C 0.90 0.90 1.00 10.0 10.0
Fut-H 4.79 C 0.80 0.80 1.00 10.0 10.0
Fut-I1 3.92 C 0.80 0.80 1.00 10.0 10.0
Fut-I2 1.25 C 0.80 0.80 1.00 10.0 10.0
Fut-I3 1.15 C 0.80 0.80 1.00 10.0 10.0
Fut-TL1 2.62 C 0.90 0.90 1.00 10.0 10.0
Fut-TL2 1.10 C 0.90 0.90 1.00 10.0 10.0
Fut-TL3 0.83 C 0.90 0.90 1.00 10.0 10.0
Fut-TL4 1.42 C 0.90 0.90 1.00 10.0 10.0
NOTES:
Ti = (0.395*(1.1 - C
5)*(L)^0.5)/((S)^0.33), S in ft/ft
Tt=L/60V (Velocity From Fig. 501)
Velocity V=Cv*S^0.5, S in ft/ft
`
PROPOSED
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
2-YEAR STORM EVENT
33
(11) Section 4.0 is amended to read as follows:
4.0 Intensity-Duration-Frequency Curves for Rational Method:
The one-hour rainfall Intensity-Duration-Frequency tables for use the Rational Method
of runoff analysis are provided in Table RA-7 and in Table RA-8.
Table RA-7 -- City of Fort Collins
Rainfall Intensity-Duration-Frequency Table
for Use with the Rational Method
(5 minutes to 30 minutes)
2-Year 10-Year 100-Year
Duration
(min)
Intensity
(in/hr)
Intensity
(in/hr)
Intensity
(in/hr)
5 2.85 4.87 9.95
6 2.67 4.56 9.31
7 2.52 4.31 8.8
8 2.4 4.1 8.38
9 2.3 3.93 8.03
10 2.21 3.78 7.72
11 2.13 3.63 7.42
12 2.05 3.5 7.16
13 1.98 3.39 6.92
14 1.92 3.29 6.71
15 1.87 3.19 6.52
16 1.81 3.08 6.3
17 1.75 2.99 6.1
18 1.7 2.9 5.92
19 1.65 2.82 5.75
20 1.61 2.74 5.6
21 1.56 2.67 5.46
22 1.53 2.61 5.32
23 1.49 2.55 5.2
24 1.46 2.49 5.09
25 1.43 2.44 4.98
26 1.4 2.39 4.87
27 1.37 2.34 4.78
28 1.34 2.29 4.69
29 1.32 2.25 4.6
30 1.3 2.21 4.52
34
Table RA-8 -- City of Fort Collins
Rainfall Intensity-Duration-Frequency Table
for Use with the Rational Method
(31 minutes to 60 minutes)
2-Year 10-Year 100-Year
Duration
(min)
Intensity
(in/hr)
Intensity
(in/hr)
Intensity
(in/hr)
31 1.27 2.16 4.42
32 1.24 2.12 4.33
33 1.22 2.08 4.24
34 1.19 2.04 4.16
35 1.17 2.0 4.08
36 1.15 1.96 4.01
37 1.16 1.93 3.93
38 1.11 1.89 3.87
39 1.09 1.86 3.8
40 1.07 1.83 3.74
41 1.05 1.8 3.68
42 1.04 1.77 3.62
43 1.02 1.74 3.56
44 1.01 1.72 3.51
45 0.99 1.69 3.46
46 0.98 1.67 3.41
47 0.96 1.64 3.36
48 0.95 1.62 3.31
49 0.94 1.6 3.27
50 0.92 1.58 3.23
51 0.91 1.56 3.18
52 0.9 1.54 3.14
53 0.89 1.52 3.1
54 0.88 1.5 3.07
55 0.87 1.48 3.03
56 0.86 1.47 2.99
57 0.85 1.45 2.96
58 0.84 1.43 2.92
59 0.83 1.42 2.89
60 0.82 1.4 2.86
36
RAINFALL INTENSITY-DURATION-FREQUENCY CURVE
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00
STORM DURATION (minutes)
RAINFALL INTENSITY (inches/hour)
2-Year Storm 10-Year Storm 100-Year Storm
Figure RA-16 City of Fort Collins Rainfall Intensity-Duration-Frequency Curves
(13) Section 5.0 is deleted in its entirety.
(14) Section 6.0 is deleted in its entirety.
(15) Section 7.0 is deleted in its entirety.
(16) Section 7.1 is deleted in its entirety.
(17) Section 7.2 is deleted in its entirety.
(18) Section 7.3 is deleted in its entirety.
(19) Section 8.0 is deleted in its entirety.
(20) Table RA-1 is deleted in its entirety.
Project Name: East Ridge Second Filing
Subdivision: East Ridge Second Filing Project No.: HFHLV0001.01
Location: CO, Fort Collins Calculated By: H. Feissner
Design Storm: Checked By: J. Prelog
Date:
TRAVEL TIME
STREET
Design Point
Basin ID
Area (Ac)
Runoff Coeff. | C 2
Tc | 2-Year (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Tc (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Slope (%)
Street Flow (cfs)
Design Flow (cfs)
Slope (%)
Pipe Size (inches)
Length (ft)
Velocity (fps)
Tt (min)
REMARKS
A1 0.52 0.77 16.0 0.40 1.82 0.7
A2 0.83 0.68 9.2 0.56 2.33 1.3
A3 1.45 0.67 11.0 0.96 2.17 2.1
A4 2.11 0.66 12.4 1.39 2.06 2.9
A5 1.96 0.67 10.3 1.31 2.23 2.9
A6 2.20 0.62 11.9 1.36 2.10 2.9
A7 0.96 0.65 10.8 0.63 2.19 1.4
A8 2.18 0.58 14.1 1.26 1.93 2.4
A9 0.46 0.67 7.3 0.31 2.54 0.8
A10 1.31 0.68 8.0 0.89 2.46 2.2
A11 1.08 0.68 8.7 0.73 2.38 1.7
A12 0.76 0.59 8.0 0.45 2.46 1.1
A13 0.36 0.58 6.4 0.21 2.66 0.6
B1 0.61 0.77 9.7 0.47 2.29 1.1
B2 2.56 0.63 14.5 1.60 1.91 3.1
B3 2.73 0.63 14.5 1.72 1.91 3.3
B4 2.16 0.63 12.6 1.36 2.04 2.8
B5 1.35 0.68 8.5 0.92 2.41 2.2
B6 2.39 0.62 12.5 1.48 2.05 3.0
B7 1.06 0.57 10.1 0.60 2.25 1.4
B8 1.39 0.58 10.3 0.80 2.23 1.8
B9 1.34 0.64 10.4 0.86 2.22 1.9
B10 1.81 0.65 10.7 1.17 2.19 2.6
B11 0.99 0.66 9.2 0.65 2.34 1.5
B12 1.32 0.65 8.2 0.86 2.44 2.1
B13 1.43 0.53 12.6 0.76 2.04 1.6
B14 1.18 0.66 9.8 0.78 2.28 1.8
B15 0.99 0.68 8.4 0.68 2.42 1.6
B16 0.98 0.66 10.0 0.65 2.26 1.5
B17 0.82 0.61 9.1 0.50 2.35 1.2
B18 0.38 0.67 7.1 0.26 2.56 0.7
C1 1.39 0.66 10.8 0.92 2.19 2.0
Project Name: East Ridge Second Filing
Subdivision: East Ridge Second Filing Project No.: HFHLV0001.01
Location: CO, Fort Collins Calculated By: H. Feissner
Design Storm: Checked By: J. Prelog
Date:
TRAVEL TIME
STREET
Design Point
Basin ID
Area (Ac)
Runoff Coeff. | C 2
Tc | 2-Year (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Tc (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Slope (%)
Street Flow (cfs)
Design Flow (cfs)
Slope (%)
Pipe Size (inches)
Length (ft)
Velocity (fps)
Tt (min)
REMARKS
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
2-Year
11/11/15
C17 0.21 0.78 7.6 0.17 2.51 0.4
C18 2.57 0.41 12.0 1.05 2.08 2.2
D1 0.95 0.69 9.2 0.65 2.33 1.5
D2 0.19 0.77 5.0 0.15 2.86 0.4
E1 1.09 0.66 10.1 0.71 2.24 1.6
E2 2.15 0.61 12.7 1.31 2.03 2.7
E3 0.24 0.77 5.0 0.19 2.86 0.5
F1 0.66 0.69 7.5 0.46 2.52 1.2
F2 1.77 0.67 8.6 1.20 2.40 2.9
F3 0.18 0.79 5.4 0.14 2.80 0.4
G1 0.53 0.78 8.7 0.41 2.39 1.0
G2 1.50 0.66 11.1 0.98 2.16 2.1
G3 1.19 0.69 7.2 0.83 2.56 2.1
G4 1.06 0.69 8.0 0.73 2.46 1.8
G5 1.69 0.71 8.3 1.20 2.42 2.9
G6 0.57 0.77 9.2 0.44 2.34 1.0
H1 0.46 0.79 7.2 0.36 2.55 0.9
H2 1.72 0.72 7.9 1.24 2.47 3.1
H3 1.41 0.75 6.3 1.06 2.68 2.8
H4 1.62 0.73 8.7 1.19 2.38 2.8
H5 1.20 0.72 8.6 0.86 2.40 2.1
H6 1.70 0.73 7.7 1.24 2.49 3.1
I1 1.13 0.73 8.1 0.83 2.45 2.0
I2 1.28 0.75 9.5 0.96 2.30 2.2
I3 0.91 0.74 10.0 0.67 2.25 1.5
I4 0.79 0.72 9.7 0.56 2.28 1.3
Project Name: East Ridge Second Filing
Subdivision: East Ridge Second Filing Project No.: HFHLV0001.01
Location: CO, Fort Collins Calculated By: H. Feissner
Design Storm: Checked By: J. Prelog
Date:
TRAVEL TIME
STREET
Design Point
Basin ID
Area (Ac)
Runoff Coeff. | C 2
Tc | 2-Year (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Tc (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Slope (%)
Street Flow (cfs)
Design Flow (cfs)
Slope (%)
Pipe Size (inches)
Length (ft)
Velocity (fps)
Tt (min)
REMARKS
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
2-Year
11/11/15
Fut-TL4 1.42 0.90 10.0 1.28 2.26 2.9
Page 3 of 3 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
`
PROPOSED
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
100-YEAR STORM EVENT
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: East Ridge Second Filing
Subdivision: East Ridge Second Filing Project No.: HFHLV0001.01
Location: CO, Fort Collins Calculated By: H. Feissner
Design Storm: Checked By: J. Prelog
Date:
TRAVEL TIME
STREET
Design Point
Basin ID
Area (Ac)
Runoff Coeff. | C 100
Tc | 100-Year (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Tc (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Slope (%)
Street Flow (cfs)
Design Flow (cfs)
Slope (%)
Pipe Size (inches)
Length (ft)
Velocity (fps)
Tt (min)
REMARKS
A1 0.52 0.96 6.3 0.49 9.32 4.6
A2 0.83 0.85 6.7 0.70 9.15 6.4
A3 1.45 0.83 8.6 1.20 8.37 10.1
A4 2.11 0.83 10.0 1.74 7.88 13.7
A5 1.96 0.84 9.2 1.64 8.15 13.3
A6 2.20 0.77 9.5 1.70 8.05 13.7
A7 0.96 0.82 8.3 0.78 8.47 6.6
A8 2.18 0.72 12.6 1.57 7.11 11.2
A9 0.46 0.84 5.5 0.39 9.72 3.8
A10 1.31 0.85 6.1 1.11 9.41 10.4
A11 1.08 0.85 6.9 0.92 9.06 8.3
A12 0.76 0.74 6.3 0.56 9.31 5.2
A13 0.36 0.73 5.3 0.26 9.81 2.6
B1 0.61 0.96 8.5 0.59 8.38 4.9
B2 2.56 0.78 12.3 2.00 7.20 14.4
B3 2.73 0.79 12.4 2.15 7.17 15.4
B4 2.16 0.79 10.2 1.70 7.82 13.3
B5 1.35 0.85 6.8 1.15 9.08 10.5
B6 2.39 0.77 10.1 1.85 7.84 14.5
B7 1.06 0.71 8.0 0.75 8.59 6.5
B8 1.39 0.73 8.9 1.01 8.24 8.3
B9 1.34 0.80 7.9 1.07 8.62 9.2
B10 1.81 0.81 9.1 1.46 8.17 11.9
B11 0.99 0.82 7.4 0.81 8.85 7.2
B12 1.32 0.81 6.2 1.07 9.35 10.0
B13 1.43 0.66 11.7 0.95 7.37 7.0
B14 1.18 0.83 7.2 0.98 8.90 8.7
B15 0.99 0.85 6.5 0.84 9.24 7.8
B16 0.98 0.83 8.1 0.81 8.54 6.9
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: East Ridge Second Filing
Subdivision: East Ridge Second Filing Project No.: HFHLV0001.01
Location: CO, Fort Collins Calculated By: H. Feissner
Design Storm: Checked By: J. Prelog
Date:
TRAVEL TIME
STREET
Design Point
Basin ID
Area (Ac)
Runoff Coeff. | C 100
Tc | 100-Year (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Tc (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Slope (%)
Street Flow (cfs)
Design Flow (cfs)
Slope (%)
Pipe Size (inches)
Length (ft)
Velocity (fps)
Tt (min)
REMARKS
PIPE
100-Year
DIRECT RUNOFF TOTAL RUNOFF STREET
11/11/15
C16 0.87 0.92 8.6 0.80 8.37 6.7
C17 0.21 0.97 5.0 0.21 9.98 2.1
C18 2.57 0.51 12.0 1.31 7.27 9.6
D1 0.95 0.86 6.6 0.81 9.16 7.5
D2 0.19 0.97 5.0 0.18 9.98 1.8
E1 1.09 0.82 7.6 0.89 8.73 7.8
E2 2.15 0.76 10.4 1.64 7.75 12.7
E3 0.24 0.96 5.0 0.23 9.98 2.3
F1 0.66 0.86 5.5 0.57 9.72 5.5
F2 1.77 0.84 6.6 1.49 9.20 13.8
F3 0.18 0.98 5.0 0.17 9.98 1.7
G1 0.53 0.97 7.5 0.52 8.78 4.6
G2 1.50 0.82 8.6 1.23 8.36 10.2
G3 1.19 0.87 5.3 1.03 9.83 10.1
G4 1.06 0.86 6.1 0.91 9.43 8.6
G5 1.69 0.89 6.4 1.50 9.27 13.9
G6 0.57 0.96 6.7 0.55 9.15 5.0
H1 0.46 0.99 6.0 0.45 9.45 4.2
H2 1.72 0.90 6.8 1.55 9.10 14.1
H3 1.41 0.94 5.0 1.33 9.98 13.2
H4 1.62 0.92 6.6 1.49 9.17 13.7
H5 1.20 0.90 6.6 1.08 9.19 9.9
H6 1.70 0.91 5.6 1.55 9.65 14.9
I1 1.13 0.92 6.0 1.03 9.48 9.8
I2 1.28 0.93 7.5 1.20 8.78 10.5
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: East Ridge Second Filing
Subdivision: East Ridge Second Filing Project No.: HFHLV0001.01
Location: CO, Fort Collins Calculated By: H. Feissner
Design Storm: Checked By: J. Prelog
Date:
TRAVEL TIME
STREET
Design Point
Basin ID
Area (Ac)
Runoff Coeff. | C 100
Tc | 100-Year (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Tc (min)
C*A (Ac)
I (in/hr)
Q (cfs)
Slope (%)
Street Flow (cfs)
Design Flow (cfs)
Slope (%)
Pipe Size (inches)
Length (ft)
Velocity (fps)
Tt (min)
REMARKS
PIPE
100-Year
DIRECT RUNOFF TOTAL RUNOFF STREET
11/11/15
Fut-TL2 1.10 1.00 10.0 1.10 7.87 8.7
Fut-TL3 0.83 1.00 10.0 0.83 7.87 6.5
Fut-TL4 1.42 1.00 10.0 1.42 7.87 11.2
Page 3 of 3 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
`
APPENDIX C
HYDRAULIC CALCULATIONS
`
UDFCD INLET CALCULATIONS
Tributary Inlet Type Inlet Size Q2 Q100
Sub-basin(s) (cfs) (cfs)
A1 CDOT Type 'R' Curb Inlet 5' 1.0 4.6
A2 & A3 CDOT Type 'R' Curb Inlet 15' 3.4 16.5
A4 & A5 CDOT Type 'R' Curb Inlet 15' 5.8 27.1
A6 CDOT Type 'R' Curb Inlet 15' 2.9 13.7
A7 & A8 CDOT Type 'R' Curb Inlet 10' 3.8 17.8
A9 CDOT Type 'R' Curb Inlet 5' 0.8 3.8
A10 CDOT Type 'R' Curb Inlet 10' 2.2 10.4
A11 CDOT Type 'R' Curb Inlet 10' 1.7 8.3
A12 CDOT Type 'R' Curb Inlet 5' 1.1 5.2
A13 CDOT Type 'R' Curb Inlet 5' 0.6 2.6
B1 CDOT Type 'R' Curb Inlet 5' 1.1 4.9
B2 CDOT Type 'R' Curb Inlet 10' 3.1 14.4
B3 CDOT Type 'R' Curb Inlet 10' 3.3 15.4
B4 CDOT Type 'R' Curb Inlet 10' 2.8 13.3
B6 CDOT Type 'R' Curb Inlet 10' 3.0 14.5
B7 CDOT Type 'R' Curb Inlet 10' 1.4 6.5
B8 CDOT Type 'R' Curb Inlet 10' 1.8 8.3
B9 CDOT Type 'R' Curb Inlet 10' 1.9 9.2
B10 CDOT Type 'R' Curb Inlet 10' 2.6 11.9
B11 CDOT Type 'R' Curb Inlet 5' 1.5 7.2
B12 CDOT Type 'R' Curb Inlet 10' 2.1 10.0
B5 & B13 - B17 CDOT Type 'R' Curb Inlet 20' 9.8 46.4
B18 CDOT Type 'R' Curb Inlet 20' 0.7 3.0
C1 - C3 CDOT Type 'R' Curb Inlet 10' 6.0 28.9
C4 CDOT Type 'R' Curb Inlet 10' 1.0 4.5
C5 - C7 CDOT Type 'R' Curb Inlet 10' 4.9 22.8
C8 CDOT Type 'R' Curb Inlet 10' 1.7 8.4
C9 CDOT Type 'R' Curb Inlet 10' 2.4 11.4
C10 CDOT Type 'R' Curb Inlet 10' 1.7 8.0
C11 CDOT Type 'R' Curb Inlet 10' 2.0 9.5
C12 CDOT Type 'R' Curb Inlet 10' 2.6 12.1
C13 CDOT Type 'R' Curb Inlet 10' 1.9 9.4
C14 CDOT Type 'R' Curb Inlet 10' 3.4 15.6
C15 CDOT Type 'R' Curb Inlet 10' 1.9 8.9
C16 CDOT Type 'R' Curb Inlet 5' 1.4 6.7
C17 CDOT Type 'R' Curb Inlet 5' 0.4 2.1
C18 TBD TBD 2.2 9.6
D1 CDOT Type 'R' Curb Inlet 5' 1.5 7.5
D2 CDOT Type 'R' Curb Inlet 5' 0.4 1.8
E1 & E2 CDOT Type 'R' Curb Inlet 10' 4.3 20.5
E3 CDOT Type 'R' Curb Inlet 10' 0.5 2.3
F1 & F2 CDOT Type 'R' Curb Inlet 10' 4.0 19.3
F3 CDOT Type 'R' Curb Inlet 10' 0.4 1.7
G1 - G5 CDOT Type 'R' Curb Inlet 20' 9.9 47.5
INLET SUMMARY TABLE
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3. Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
G6 CDOT Type 'R' Curb Inlet 15' 1.0 5.0
H1 CDOT Type 'R' Curb Inlet 5' 0.9 4.2
H2 CDOT Type 'R' Curb Inlet 10' 3.1 14.1
H3 CDOT Type 'R' Curb Inlet 10' 2.8 13.2
H4 CDOT Type 'R' Curb Inlet 10' 2.8 13.7
H5 CDOT Type 'R' Curb Inlet 10' 2.1 9.9
H6 CDOT Type 'R' Curb Inlet 10' 3.1 14.9
I1 & I2 CDOT Type 'R' Curb Inlet 10' 4.2 20.4
I3 CDOT Type 'R' Curb Inlet 10' 1.5 7.2
I4 & I5 CDOT Type 'R' Curb Inlet 15' 4.1 19.7
Wetland WQOS 3.9 17.5
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3. Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 4.25 4.25 inches
Number of Unit Inlets (Grate or Curb Opening) No = 1 1
Water Depth at Flowline (outside of local depression) Ponding Depth = 4.75 7.17 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = N/A N/A feet
Width of a Unit Grate Wo
= N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = 5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert
= 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat
= 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= 1.17 1.17 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw
(C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = 0.67 0.67
Grate Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = N/A N/A
Clogging Factor for Multiple Units Clog = N/A N/A
Grate Capacity as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= N/A N/A cfs
Interception with Clogging Qwa
= N/A N/A cfs
Grate Capacity as a Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= N/A N/A cfs
Interception with Clogging Qoa
= N/A N/A cfs
Grate Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= N/A N/A cfs
Interception with Clogging Qma
= N/A N/A cfs
Resulting Grate Capacity (assumes clogged condition) QGrate
= N/A N/A cfs
Curb Opening Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = 1.00 1.00
Clogging Factor for Multiple Units Clog = 0.10 0.10
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 4.25 4.25 inches
Number of Unit Inlets (Grate or Curb Opening) No = 2 2
Water Depth at Flowline (outside of local depression) Ponding Depth = 4.75 7.17 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = N/A N/A feet
Width of a Unit Grate Wo
= N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = 5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert
= 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat
= 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= 1.17 1.17 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw
(C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = 0.67 0.67
Grate Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = N/A N/A
Clogging Factor for Multiple Units Clog = N/A N/A
Grate Capacity as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= N/A N/A cfs
Interception with Clogging Qwa
= N/A N/A cfs
Grate Capacity as a Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= N/A N/A cfs
Interception with Clogging Qoa
= N/A N/A cfs
Grate Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= N/A N/A cfs
Interception with Clogging Qma
= N/A N/A cfs
Resulting Grate Capacity (assumes clogged condition) QGrate
= N/A N/A cfs
Curb Opening Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = 1.25 1.25
Clogging Factor for Multiple Units Clog = 0.06 0.06
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 4.25 4.25 inches
Number of Unit Inlets (Grate or Curb Opening) No = 3 3
Water Depth at Flowline (outside of local depression) Ponding Depth = 4.75 7.17 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = N/A N/A feet
Width of a Unit Grate Wo
= N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = 5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert
= 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat
= 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= 1.17 1.17 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw
(C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = 0.67 0.67
Grate Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = N/A N/A
Clogging Factor for Multiple Units Clog = N/A N/A
Grate Capacity as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= N/A N/A cfs
Interception with Clogging Qwa
= N/A N/A cfs
Grate Capacity as a Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= N/A N/A cfs
Interception with Clogging Qoa
= N/A N/A cfs
Grate Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= N/A N/A cfs
Interception with Clogging Qma
= N/A N/A cfs
Resulting Grate Capacity (assumes clogged condition) QGrate
= N/A N/A cfs
Curb Opening Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = 1.31 1.31
Clogging Factor for Multiple Units Clog = 0.04 0.04
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 4.25 4.25 inches
Number of Unit Inlets (Grate or Curb Opening) No = 4 4
Water Depth at Flowline (outside of local depression) Ponding Depth = 4.75 7.17 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = N/A N/A feet
Width of a Unit Grate Wo
= N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = 5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert
= 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat
= 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= 1.17 1.17 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw
(C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = 0.67 0.67
Grate Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = N/A N/A
Clogging Factor for Multiple Units Clog = N/A N/A
Grate Capacity as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= N/A N/A cfs
Interception with Clogging Qwa
= N/A N/A cfs
Grate Capacity as a Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= N/A N/A cfs
Interception with Clogging Qoa
= N/A N/A cfs
Grate Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= N/A N/A cfs
Interception with Clogging Qma
= N/A N/A cfs
Resulting Grate Capacity (assumes clogged condition) QGrate
= N/A N/A cfs
Curb Opening Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = 1.33 1.33
Clogging Factor for Multiple Units Clog = 0.03 0.03
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 3.00 3.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 5 5
Water Depth at Flowline (outside of local depression) Ponding Depth = 6.00 9.00 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = N/A N/A feet
Width of a Unit Grate Wo
= N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = 5.00 5.00 feet
Height of Vertical Curb Opening in Inches Hvert
= 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat
= 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= 2.00 2.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw
(C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = 0.67 0.67
Grate Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = N/A N/A
Clogging Factor for Multiple Units Clog = N/A N/A
Grate Capacity as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= N/A N/A cfs
Interception with Clogging Qwa
= N/A N/A cfs
Grate Capacity as a Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= N/A N/A cfs
Interception with Clogging Qoa
= N/A N/A cfs
Grate Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= N/A N/A cfs
Interception with Clogging Qma
= N/A N/A cfs
Resulting Grate Capacity (assumes clogged condition) QGrate
= N/A N/A cfs
Curb Opening Flow Analysis (Calculated) MINOR MAJOR
Clogging Coefficient for Multiple Units Coef = 1.33 1.33
Clogging Factor for Multiple Units Clog = 0.03 0.03
`
STREET CAPACITY CALCULATIONS
Project: East Ridge Subdivision
Calculations By: H. Feissner
Date: 9/7/2015
Manning's Formula for flow in shallow triangular channels:
Q = 0.56(Z/n)S0
1/2
y
8/3
Where:
Q Theoretical Gutter Capacity, cfs
y Depth of Flow at Face of Gutter, ft
n Roughness Coefficient, see below
S0 Longitudinal Channel Slope, ft/ft
Sa Cross-Slope of Gutter Pan, ft/ft
Sb Cross-Slope of Gutter Pan, ft/ft
Sc Cross-Slope of Asphalt, ft/ft
Z Reciprocal of Cross-Slope, ft/ft
n 0.016
Sa 27.94% Za = 1/Sa 3.58 Za/n 223.69
Sb 9.82% Zb = 1/Sb 10.18 Zb/n 636.46
Sc 2.00% Zc = 1/Sc 50.00 Zc/n 3125.00
FL to FL Distance 15' CL to FL (DO) Select
y 0.3915 water depth at flowline, ft
`` 0.2766 water depth at EOP, ft
S0 = See Below longitudinal slope of street, %
a b b' c
0.56(Z/n)y
8/3
= 84.77 10.27 29.23 11.58 56.84
Longitudinal Reduction Factor
Street Name Grade Calculated Allowable Determination
S0, % Q, cfs (See Figure ST-2) Q, cfs
TBD TBD 15 Local 1.00 0.50% 5.99 1.00 5.99 Okay
TBS TBD 15 Local 1.00 0.60% 6.57 1.00 6.57 Okay
TBD TBD 15 Local 1.00 0.70% 7.09 1.00 7.09 Okay
TBD TBD 15 Local 1.00 0.80% 7.58 1.00 7.58 Okay
TBD TBD 15 Local 1.00 0.90% 8.04 1.00 8.04 Okay
TBD TBD 15 Local 1.00 1.00% 8.48 1.00 8.48 Okay
TBD TBD 15 Local 1.00 1.10% 8.89 1.00 8.89 Okay
TBD TBD 15 Local 1.00 1.20% 9.29 1.00 9.29 Okay
TBD TBD 15 Local 1.00 1.30% 9.67 1.00 9.67 Okay
TBD TBD 15 Local 1.00 1.40% 10.03 1.00 10.03 Okay
TBD TBD 15 Local 1.00 1.50% 10.38 1.00 10.38 Okay
Street Capacity Calculations
Drive-Over Curb & Gutter - 15' CL to FL | 2-Year Storm Event
Design Point Width FL to
CL, ft Street Classification
Inputs
Results
Developed
Q2, cfs
Sa
Sb
Sc
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00600 ft/ft
Normal Depth 0.60 ft
Section Definitions
Station (ft) Elevation (ft)
0+00 100.00
0+04.5 99.91
0+10.0833 99.80
0+11.5 99.40
0+12.6667 99.52
0+26.5 99.80
Roughness Segment Definitions
Start Station Ending Station
Roughness
Coefficient
(0+00, 100.00) (0+04.5, 99.91) 0.016
(0+04.5, 99.91) (0+10.0833, 99.80) 0.025
(0+10.0833, 99.80) (0+26.5, 99.80) 0.016
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.00500 16.28 2.34 6.95 26.77 26.50
0.00600 17.83 2.57 6.95 26.77 26.50
0.00700 19.26 2.77 6.95 26.77 26.50
0.00800 20.59 2.96 6.95 26.77 26.50
0.00900 21.84 3.14 6.95 26.77 26.50
0.01000 23.02 3.31 6.95 26.77 26.50
Major Storm Event - Drive Over Curb C&G (1/2 Section) | 15' CL to FL
11/11/2015 5:49:48 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Major Storm Event - Drive Over Curb C&G (1/2 Section) | 15' CL to FL
Input Data
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.01100 24.14 3.47 6.95 26.77 26.50
0.01200 25.22 3.63 6.95 26.77 26.50
0.01300 26.25 3.78 6.95 26.77 26.50
0.01400 27.24 3.92 6.95 26.77 26.50
0.01500 28.19 4.06 6.95 26.77 26.50
0.01600 29.12 4.19 6.95 26.77 26.50
0.01700 30.01 4.32 6.95 26.77 26.50
0.01800 30.88 4.45 6.95 26.77 26.50
0.01900 31.73 4.57 6.95 26.77 26.50
0.02000 32.55 4.69 6.95 26.77 26.50
11/11/2015 5:49:48 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00600 ft/ft
Normal Depth 0.50 ft
Section Definitions
Station (ft) Elevation (ft)
0+00 100.00
0+04.5 99.91
0+10.0833 99.80
0+11.5 99.40
0+12.6667 99.52
0+26.5 99.80
0+40.3333 99.52
0+41.5 99.40
0+42.9167 99.80
0+48.5 99.91
0+53 100.00
Roughness Segment Definitions
Start Station Ending Station
Roughness
Coefficient
(0+00, 100.00) (0+04.5, 99.91) 0.016
(0+04.5, 99.91) (0+10.0833, 99.80) 0.025
(0+10.0833, 99.80) (0+53, 100.00) 0.016
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.00500 19.57 2.15 9.10 43.11 42.98
Major Storm Event - Drive Over Curb C&G (Full Section) | 15' CL to FL
11/11/2015 5:50:40 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Major Storm Event - Drive Over Curb C&G (Full Section) | 15' CL to FL
Input Data
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.00600 21.44 2.36 9.10 43.11 42.98
0.00700 23.16 2.55 9.10 43.11 42.98
0.00800 24.75 2.72 9.10 43.11 42.98
0.00900 26.26 2.89 9.10 43.11 42.98
0.01000 27.68 3.04 9.10 43.11 42.98
0.01100 29.03 3.19 9.10 43.11 42.98
0.01200 30.32 3.33 9.10 43.11 42.98
0.01300 31.56 3.47 9.10 43.11 42.98
0.01400 32.75 3.60 9.10 43.11 42.98
0.01500 33.90 3.73 9.10 43.11 42.98
0.01600 35.01 3.85 9.10 43.11 42.98
0.01700 36.09 3.97 9.10 43.11 42.98
0.01800 37.13 4.08 9.10 43.11 42.98
0.01900 38.15 4.19 9.10 43.11 42.98
0.02000 39.14 4.30 9.10 43.11 42.98
11/11/2015 5:50:40 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
Project: East Ridge Subdivision
Calculations By: H. Feissner
Date: 9/7/2015
Manning's Formula for flow in shallow triangular channels:
Q = 0.56(Z/n)S0
1/2
y
8/3
Where:
Q Theoretical Gutter Capacity, cfs
y Depth of Flow at Face of Gutter, ft
n Roughness Coefficient, see below
S0 Longitudinal Channel Slope, ft/ft
Sa Cross-Slope of Gutter Pan, ft/ft
Sb Cross-Slope of Gutter Pan, ft/ft
Sc Cross-Slope of Asphalt, ft/ft
Z Reciprocal of Cross-Slope, ft/ft
n 0.016
Sa 0.00% Za = 1/Sa 0.00 Za/n 0.00
Sb 8.33% Zb = 1/Sb 12.00 Zb/n 750.30
Sc 2.00% Zc = 1/Sc 50.00 Zc/n 3125.00
FL to FL Distance 15' CL to FL (Vert.) Select
y 0.4266 water depth at flowline, ft
y' 0.2600 water depth at EOP, ft
S0 = See Below longitudinal slope of street, %
a b b' c
0.56(Z/n)y
8/3
= 79.95 0.00 43.33 11.57 48.19
Longitudinal Reduction Factor
Street Name Grade Calculated Allowable Determination
S0, % Q, cfs (See Figure ST-2) Q, cfs
TBD TBD 15 Local 1.00 0.50% 5.65 1.00 5.65 Okay
TBD TBD 15 Local 1.00 0.60% 6.19 1.00 6.19 Okay
TBD TBD 15 Local 1.00 0.70% 6.69 1.00 6.69 Okay
TBD TBD 15 Local 1.00 0.80% 7.15 1.00 7.15 Okay
TBD TBD 15 Local 1.00 0.90% 7.59 1.00 7.59 Okay
TBD TBD 15 Local 1.00 1.00% 8.00 1.00 8.00 Okay
TBD TBD 15 Local 1.00 1.10% 8.39 1.00 8.39 Okay
TBD TBD 15 Local 1.00 1.20% 8.76 1.00 8.76 Okay
TBD TBD 15 Local 1.00 1.30% 9.12 1.00 9.12 Okay
TBD TBD 15 Local 1.00 1.40% 9.46 1.00 9.46 Okay
TBD TBD 15 Local 1.00 1.50% 9.79 0.87 8.52 Okay
Street Capacity Calculations
Vertical Curb & Gutter - 15' CL to FL | 2-Year Storm Event
Inputs
Results
Design Point Width FL to
CL, ft Street Classification
Developed
Q2, cfs
Sc
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00600 ft/ft
Normal Depth 0.72 ft
Section Definitions
Station (ft) Elevation (ft)
0+00 100.00
0+04.5 99.91
0+11 99.78
0+11.5 99.78
0+11.5 99.28
0+13.5 99.45
0+26.5 99.71
Roughness Segment Definitions
Start Station Ending Station
Roughness
Coefficient
(0+00, 100.00) (0+04.5, 99.91) 0.016
(0+04.5, 99.91) (0+11, 99.78) 0.025
(0+11, 99.78) (0+26.5, 99.71) 0.016
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.00500 20.40 2.52 8.10 27.31 26.50
0.00600 22.35 2.76 8.10 27.31 26.50
0.00700 24.14 2.98 8.10 27.31 26.50
0.00800 25.80 3.19 8.10 27.31 26.50
0.00900 27.37 3.38 8.10 27.31 26.50
100-Year Storm Event - Vertical C&G | 15' CL to FL
9/8/2015 4:21:29 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
100-Year Storm Event - Vertical C&G | 15' CL to FL
Input Data
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.01000 28.85 3.56 8.10 27.31 26.50
0.01100 30.26 3.74 8.10 27.31 26.50
0.01200 31.60 3.90 8.10 27.31 26.50
0.01300 32.89 4.06 8.10 27.31 26.50
0.01400 34.13 4.22 8.10 27.31 26.50
0.01500 35.33 4.36 8.10 27.31 26.50
0.01600 36.49 4.51 8.10 27.31 26.50
0.01700 37.61 4.65 8.10 27.31 26.50
0.01800 38.70 4.78 8.10 27.31 26.50
0.01900 39.76 4.91 8.10 27.31 26.50
0.02000 40.80 5.04 8.10 27.31 26.50
9/8/2015 4:21:29 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
Project: East Ridge Subdivision
Calculations By: H. Feissner
Date: 9/7/2015
Manning's Formula for flow in shallow triangular channels:
Q = 0.56(Z/n)S0
1/2
y
8/3
Where:
Q Theoretical Gutter Capacity, cfs
y Depth of Flow at Face of Gutter, ft
n Roughness Coefficient, see below
S0 Longitudinal Channel Slope, ft/ft
Sa Cross-Slope of Gutter Pan, ft/ft
Sb Cross-Slope of Gutter Pan, ft/ft
Sc Cross-Slope of Asphalt, ft/ft
Z Reciprocal of Cross-Slope, ft/ft
n 0.016
Sa 0.00% Za = 1/Sa 0.00 Za/n 0.00
Sb 8.33% Zb = 1/Sb 12.00 Zb/n 750.30
Sc 2.00% Zc = 1/Sc 50.00 Zc/n 3125.00
FL to FL Distance 25' CL to FL (Vert.) Select
y 0.5000 water depth at flowline, ft
y' 0.3334 water depth at EOP, ft
S0 = See Below longitudinal slope of street, %
a b b' c
0.56(Z/n)y
8/3
= 137.25 0.00 66.17 22.46 93.53
Longitudinal Reduction Factor
Street Name Grade Calculated Allowable Determination
S0, % Q, cfs (See Figure ST-2) Q, cfs
TBD TBD #N/A Local 1.00 0.50% 9.70 1.00 9.70 Okay
TBD TBD #N/A Local 1.00 0.60% 10.63 1.00 10.63 Okay
TBD TBD #N/A Local 1.00 0.70% 11.48 1.00 11.48 Okay
TBD TBD #N/A Local 1.00 0.80% 12.28 1.00 12.28 Okay
TBD TBD #N/A Local 1.00 0.90% 13.02 1.00 13.02 Okay
TBD TBD #N/A Local 1.00 1.00% 13.72 1.00 13.72 Okay
TBD TBD #N/A Local 1.00 1.10% 14.39 1.00 14.39 Okay
TBD TBD #N/A Local 1.00 1.20% 15.03 1.00 15.03 Okay
TBD TBD #N/A Local 1.00 1.30% 15.65 1.00 15.65 Okay
TBD TBD #N/A Local 1.00 1.40% 16.24 1.00 16.24 Okay
TBD TBD #N/A Local 1.00 1.50% 16.81 0.87 14.62 Okay
Street Capacity Calculations
Vertical Curb & Gutter - 25' CL to FL | 2-Year Storm Event
Inputs
Results
Design Point Width FL to
CL, ft Street Classification
Developed
Q2, cfs
Sc
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00600 ft/ft
Normal Depth 0.75 ft
Section Definitions
Station (ft) Elevation (ft)
0+00 100.00
0+05 99.90
0+12.5 99.75
0+13 99.75
0+13 99.25
0+15 99.42
0+38 99.88
Roughness Segment Definitions
Start Station Ending Station
Roughness
Coefficient
(0+00, 100.00) (0+05, 99.90) 0.016
(0+05, 99.90) (0+12.5, 99.75) 0.025
(0+12.5, 99.75) (0+38, 99.88) 0.016
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.00500 28.25 2.53 11.15 38.64 38.00
0.00600 30.95 2.78 11.15 38.64 38.00
0.00700 33.43 3.00 11.15 38.64 38.00
0.00800 35.73 3.21 11.15 38.64 38.00
0.00900 37.90 3.40 11.15 38.64 38.00
100-Year Storm Event - Vertical C&G | 25' CL to FL
9/8/2015 4:22:34 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
100-Year Storm Event - Vertical C&G | 25' CL to FL
Input Data
Channel Slope (ft/ft) Discharge (ft³/s) Velocity (ft/s) Flow Area (ft²) Wetted Perimeter (ft) Top Width (ft)
0.01000 39.95 3.58 11.15 38.64 38.00
0.01100 41.90 3.76 11.15 38.64 38.00
0.01200 43.76 3.93 11.15 38.64 38.00
0.01300 45.55 4.09 11.15 38.64 38.00
0.01400 47.27 4.24 11.15 38.64 38.00
0.01500 48.93 4.39 11.15 38.64 38.00
0.01600 50.54 4.53 11.15 38.64 38.00
0.01700 52.09 4.67 11.15 38.64 38.00
0.01800 53.60 4.81 11.15 38.64 38.00
0.01900 55.07 4.94 11.15 38.64 38.00
0.02000 56.50 5.07 11.15 38.64 38.00
9/8/2015 4:22:34 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
Project: East Ridge Subdivision
Calculations By: H. Feissner
Date: 9/7/2015
Manning's Formula for flow in shallow triangular channels:
Q = 0.56(Z/n)S0
1/2
y
8/3
Where:
Q Theoretical Gutter Capacity, cfs
y Depth of Flow at Face of Gutter, ft
n Roughness Coefficient, see below
S0 Longitudinal Channel Slope, ft/ft
Sa Cross-Slope of Gutter Pan, ft/ft
Sb Cross-Slope of Gutter Pan, ft/ft
Sc Cross-Slope of Asphalt, ft/ft
Z Reciprocal of Cross-Slope, ft/ft
n 0.016
Sa 27.94% Za = 1/Sa 3.58 Za/n 223.69
Sb 9.82% Zb = 1/Sb 10.18 Zb/n 636.46
Sc 2.00% Zc = 1/Sc 50.00 Zc/n 3125.00
FL to FL Distance 18.5833' EOC to FL Select
y 0.40 water depth at flowline, ft
y' 0.28 water depth at EOP, ft
S0 = See Below longitudinal slope of street, %
a b b' c
0.56(Z/n)y
8/3
= 87.87 10.58 30.11 12.07 59.25
Longitudinal Reduction Factor
Street Name Grade Calculated Allowable Determination
S0, % Q, cfs (See Figure ST-2) Q, cfs
TBD TBD 17.58 Local 1.00 0.50% 6.21 1.00 6.21 Okay
TBD TBD 17.58 Local 1.00 0.60% 6.81 1.00 6.81 Okay
TBD TBD 17.58 Local 1.00 0.70% 7.35 1.00 7.35 Okay
TBD TBD 17.58 Local 1.00 0.80% 7.86 1.00 7.86 Okay
TBD TBD 17.58 Local 1.00 0.90% 8.34 1.00 8.34 Okay
TBD TBD 17.58 Local 1.00 1.00% 8.79 1.00 8.79 Okay
TBD TBD 17.58 Local 1.00 1.25% 9.82 1.00 9.82 Okay
TBD TBD 17.58 Local 1.00 1.50% 10.76 1.00 10.76 Okay
TBD TBD 17.58 Local 1.00 2.00% 12.43 1.00 12.43 Okay
Street Capacity Calculations
Drive-Over Curb & Gutter - ALLEY | 2-Year Storm Event
Design Point Width FL to
CL, ft Street Classification
Inputs
Results
Developed
Q2, cfs
Sa
Sb
Sc
`
SWALE CAPACITY CALCULATIONS
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00700 ft/ft
Normal Depth 1.50 ft
Section Definitions
Station (ft) Elevation (ft)
0+00 100.00
0+16 96.00
0+17 96.00
0+23 97.50
0+24 97.50
0+30 96.00
0+36 96.00
0+52 100.00
Roughness Segment Definitions
Start Station Ending Station Roughness Coefficient
(0+00, 100.00) (0+52, 100.00) 0.035
Options
Current Roughness Weighted
Method Pavlovskii's Method
Open Channel Weighting Method Pavlovskii's Method
Closed Channel Weighting Method Pavlovskii's Method
Results
Discharge 94.22 ft³/s
Elevation Range 96.0000 to 100.0000 ft
Flow Area 28.50 ft²
Wetted Perimeter 31.7386 ft
Hydraulic Radius 0.90 ft
Split Swale | A-Basins and G-, H-Basins
11/11/2015 4:47:11 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Results
Top Width 31.0000 ft
Normal Depth 1.50 ft
Critical Depth 1.17 ft
Critical Slope 0.02027 ft/ft
Velocity 3.31 ft/s
Velocity Head 0.17 ft
Specific Energy 1.67 ft
Froude Number 0.61
Flow Type Subcritical
GVF Input Data
Downstream Depth 0.00 ft
Length 0.0000 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.00 ft
Profile Description
Profile Headloss 0.00 ft
Downstream Velocity Infinity ft/s
Upstream Velocity Infinity ft/s
Normal Depth 1.50 ft
Critical Depth 1.17 ft
Channel Slope 0.00700 ft/ft
Critical Slope 0.02027 ft/ft
Split Swale | A-Basins and G-, H-Basins
11/11/2015 4:47:11 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00700 ft/ft
Normal Depth 1.50 ft
Discharge 94.22 ft³/s
Cross Section Image
Cross Section for A-Basins and G-, H-Basins Split Swale
11/11/2015 4:46:04 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1
Project Description
Friction Method Manning Formula
Solve For Discharge
Input Data
Channel Slope 0.00700 ft/ft
Normal Depth 3.00 ft
Discharge 465.14 ft³/s
Cross Section Image
Cross Section for A-Basins and G-, H-Basins Split Swale
11/11/2015 4:45:11 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1
`
STORM DRAIN SIZING
CALCULATIONS
Project Description
Friction Method Manning Formula
Solve For Full Flow Capacity
Input Data
Roughness Coefficient 0.013
Channel Slope 0.00500 ft/ft
Normal Depth 1.50 ft
Diameter 1.50 ft
Discharge 7.43 ft³/s
Diameter (ft)
Channel Slope
(ft/ft)
Normal Depth
(ft)
Discharge
(ft³/s) Velocity (ft/s) Flow Area (ft²)
Wetted
Perimeter (ft) Top Width (ft)
1.50 0.00500 1.50 7.43 4.20 1.77 4.71 0.00
1.50 0.00750 1.50 9.10 5.15 1.77 4.71 0.00
1.50 0.01000 1.50 10.50 5.94 1.77 4.71 0.00
2.00 0.00500 2.00 16.00 5.09 3.14 6.28 0.00
2.00 0.00750 2.00 19.59 6.24 3.14 6.28 0.00
2.00 0.01000 2.00 22.62 7.20 3.14 6.28 0.00
2.50 0.00500 2.50 29.00 5.91 4.91 7.85 0.00
2.50 0.00750 2.50 35.52 7.24 4.91 7.85 0.00
2.50 0.01000 2.50 41.01 8.36 4.91 7.85 0.00
3.00 0.00500 3.00 47.16 6.67 7.07 9.42 0.00
3.00 0.00750 3.00 57.76 8.17 7.07 9.42 0.00
3.00 0.01000 3.00 66.69 9.44 7.07 9.42 0.00
3.50 0.00500 3.50 71.14 7.39 9.62 11.00 0.00
3.50 0.00750 3.50 87.13 9.06 9.62 11.00 0.00
3.50 0.01000 3.50 100.60 10.46 9.62 11.00 0.00
4.00 0.00500 4.00 101.57 8.08 12.57 12.57 0.00
4.00 0.00750 4.00 124.39 9.90 12.57 12.57 0.00
4.00 0.01000 4.00 143.64 11.43 12.57 12.57 0.00
4.50 0.00500 4.50 139.04 8.74 15.90 14.14 0.00
4.50 0.00750 4.50 170.29 10.71 15.90 14.14 0.00
4.50 0.01000 4.50 196.64 12.36 15.90 14.14 0.00
5.00 0.00500 5.00 184.15 9.38 19.63 15.71 0.00
5.00 0.00750 5.00 225.54 11.49 19.63 15.71 0.00
5.00 0.01000 5.00 260.43 13.26 19.63 15.71 0.00
Preliminary Storm Drain Pipe Sizing
9/8/2015 4:16:23 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2
Preliminary Storm Drain Pipe Sizing
Input Data
Diameter (ft)
Channel Slope
(ft/ft)
Normal Depth
(ft)
Discharge
(ft³/s) Velocity (ft/s) Flow Area (ft²)
Wetted
Perimeter (ft) Top Width (ft)
5.50 0.00500 5.50 237.44 9.99 23.76 17.28 0.00
5.50 0.00750 5.50 290.80 12.24 23.76 17.28 0.00
5.50 0.01000 5.50 335.79 14.13 23.76 17.28 0.00
6.00 0.00500 6.00 299.45 10.59 28.27 18.85 0.00
6.00 0.00750 6.00 366.75 12.97 28.27 18.85 0.00
6.00 0.01000 6.00 423.49 14.98 28.27 18.85 0.00
9/8/2015 4:16:23 PM
Bentley Systems, Inc. Haestad Methods Solution BentleCyenter FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2
`
PRELIMINARY DETENTION POND
SIZING
(EPA SWMM 5.0)
35
(12) A new Section 4.1 is added, to read as follows:
4.1 Intensity-Duration-Frequency Curves for SWMM:
The hyetograph input option must be selected when creating SWMM input files.
Hyetographs for the 2-, 5-, 10-, 25-, 50-, and 100-year City of Fort Collins rainfall events
are provided in Table RA-9.
Table RA-9 – City of Fort Collins
Rainfall Intensity-Duration-Frequency Table
for Use with SWMM
2-Year 5-Year 10-Year 25-Year 50-Year 100-Year
Duration
(min)
Intensity
(in/hr)
Intensity
(in/hr)
Intensity
(in/hr)
Intensity
(in/hr)
Intensity
(in/hr)
Intensity
(in/hr)
5 0.29 0.40 0.49 0.63 0.79 1.00
10 0.33 0.45 0.56 0.72 0.90 1.14
15 0.38 0.53 0.65 0.84 1.05 1.33
20 0.64 0.89 1.09 1.41 1.77 2.23
25 0.81 1.13 1.39 1.80 2.25 2.84
30 1.57 2.19 2.69 3.48 4.36 5.49
35 2.85 3.97 4.87 6.30 7.90 9.95
40 1.18 1.64 2.02 2.61 3.27 4.12
45 0.71 0.99 1.21 1.57 1.97 2.48
50 0.42 0.58 0.71 0.92 1.16 1.46
55 0.35 0.49 0.60 0.77 0.97 1.22
60 0.30 0.42 0.52 0.67 0.84 1.06
65 0.20 0.28 0.39 0.62 0.79 1.00
70 0.19 0.27 0.37 0.59 0.75 0.95
75 0.18 0.25 0.35 0.56 0.72 0.91
80 0.17 0.24 0.34 0.54 0.69 0.87
85 0.17 0.23 0.32 0.52 0.66 0.84
90 0.16 0.22 0.31 0.50 0.64 0.81
95 0.15 0.21 0.30 0.48 0.62 0.78
100 0.15 0.20 0.29 0.47 0.60 0.75
105 0.14 0.19 0.28 0.45 0.58 0.73
110 0.14 0.19 0.27 0.44 0.56 0.71
115 0.13 0.18 0.26 0.42 0.54 0.69
120 0.13 0.18 0.25 0.41 0.53 0.67
43
Table RO-13
SWMM Input Parameters
Depth of Storage on Impervious Areas 0.1 inches
Depth of Storage on Pervious Areas 0.3 inches
Maximum Infiltration Rate 0.51 inches/hour
Minimum Infiltration Rate 0.50 inches/hour
Decay Rate 0.0018 inches/sec
Zero Detention Depth 1%
Manning’s n Value for Pervious Surfaces 0.025
Manning’s n Value for Impervious Surfaces 0.016
4.3.2 Pervious-Impervious Area
Table RO-14 should be used to determine preliminary percentages of impervious land
cover for a given land-use or zoning. The final design must be based on the actual
physical design conditions of the site.
Table RO-14
Percent Imperviousness Relationship to Land Use*
LAND USE OR ZONING
PERCENT IMPERVIOUS
(%)
Business:
T
CCN, CCR, CN
E, RDR, CC, LC
C, NC, I, D, HC, CS
20
70
80
90
Residential:
RF,UE
RL, NCL
LMN,NCM
MMN, NCB
30
45
50
70
Open Space:
Open Space and Parks (POL)
Open Space along foothills ridge
(POL,RF)
RC
10
20
20
*For updated zoning designations and definitions, please refer to Article Four of the City Land
Use Code, as amended
Project: East Ridge Subdivision
Project Location: Fort Collins, Colorado Date: 9/9/2015
Calculations By: H. Feissner
Pond Description: Detention Pond
User Input Cell: Blue Text
Design Point: Outfall
Design Storm: WQCV
Required Volume: 0 ft3 4928.00 ft
Design Storm: 10-year
Required Volume: 0 ft3 4928.00 ft
Design Storm: 1st 100-year
Required Volume: 1612561 ft3 4936.11 ft
Design Storm1: 2nd 100-year
Required Volume: 3225122 ft3 4939.69 ft
1. 2
nd
100-year storm required per Section 3.3.4 Retention Facilities of the FCSCM
Contour
Elevation
Contour
Area Depth
Incremental
Volume
Cummulative
Volume
Incremental
Volume
Cummulative
Volume
Cummulative
Volume
ft ft2 ft ft3 ft3 ft3 ft3 ac-ft
4928.00 3780 0.0 0 0 0 0
4929.00 63583 1.0 33681 33681 27622 27622 0.6
4930.00 75419 1.0 69501 103182 69417 97039 2.2
4931.00 183977 1.0 129698 232881 125730 222769 5.1
4932.00 218001 1.0 200989 433870 200749 423518 9.7
4933.00 254754 1.0 236377 670247 236139 659657 15.1
4934.00 287989 1.0 271371 941618 271201 930858 21.4
4935.00 320258 1.0 304124 1245742 303981 1234839 28.3
4936.00 352867 1.0 336563 1582304 336431 1571270 36.1
4937.00 388203 1.0 370535 1952839 370394 1941664 44.6
4938.00 442122 1.0 415162 2368001 414870 2356534 54.1
4939.00 521366 1.0 481744 2849745 481200 2837734 65.1
4940.00 607936 1.0 564651 3414396 564097 3401831 78.1
Detention Pond
Stage-Storage Calculations
Average End Area Method:
Required Volume Water Surface Elevation
Conic Volume Method:
1st 100-year
2nd 100-year
4926
4928
4930
4932
4934
4936
4938
4940
B-Basins
A-Basins
G-Basins_H-Basins
C-Basins
I-Basins
Park/Wetland
F-Basins
E-Basins
D-Basins
C1
TemporaryOutfall
J1
Out1
DetentionPond
FortCollins,CO
SWMM 5.1 | East Ridge Subdivision
SWMM.txt
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.009)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... DYNWAVE
Starting Date ............ SEP-02-2015 00:00:00
Ending Date .............. SEP-07-2015 00:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 30.00 sec
Variable Time Step ....... YES
Maximum Trials ........... 8
Number of Threads ........ 1
Head Tolerance ........... 0.005000 ft
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 46.871 3.669
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 7.859 0.615
Surface Runoff ........... 38.563 3.019
Final Storage ............ 0.813 0.064
Continuity Error (%) ..... -0.778
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 38.563 12.566
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 29.830 9.721
Flooding Loss ............ 8.733 2.846
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.000 0.000
Page 1
SWMM.txt
Continuity Error (%) ..... -0.001
***************************
Time-Step Critical Elements
***************************
Link C1 (94.36%)
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 5.33 sec
Average Time Step : 7.61 sec
Maximum Time Step : 30.00 sec
Percent in Steady State : 0.00
Average Iterations per Step : 2.00
Percent Not Converging : 0.00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
--------------------
Total Total Total Total Total
Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Coeff
Subcatchment in in in in in
10^6 gal CFS
------------------------------------------------------------------------------------
--------------------
B-Basins 3.67 0.00 0.00 0.52 3.11
2.65 216.78 0.849
A-Basins 3.67 0.00 0.00 0.51 3.12
1.81 156.32 0.850
G-Basins_H-Basins 3.67 0.00 0.00 0.42 3.21
3.00 278.12 0.874
C-Basins 3.67 0.00 0.00 0.51 3.11
1.91 158.85 0.849
I-Basins 3.67 0.00 0.00 0.42 3.21
1.20 113.30 0.875
Park/Wetland 3.67 0.00 0.00 1.42 2.24
1.37 68.82 0.611
F-Basins 3.67 0.00 0.00 0.42 3.21
0.23 23.80 0.875
E-Basins 3.67 0.00 0.00 0.50 3.13
0.30 30.13 0.854
D-Basins 3.67 0.00 0.00 0.42 3.21
0.10 11.03 0.876
******************
Page 2
SWMM.txt
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
J1 JUNCTION 0.94 1.00 4929.00 0 00:11 1.00
Out1 OUTFALL 0.79 0.84 4927.84 0 00:15 0.84
DetentionPond STORAGE 5.02 8.09 4936.09 0 02:59 8.09
*******************
Node Inflow Summary
*******************
------------------------------------------------------------------------------------
-------------
Maximum Maximum Lateral
Total Flow
Lateral Total Time of Max Inflow
Inflow Balance
Inflow Inflow Occurrence Volume
Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6
gal Percent
------------------------------------------------------------------------------------
-------------
J1 JUNCTION 0.00 5.00 0 00:12 0
12.6 -0.000
Out1 OUTFALL 0.00 3.87 0 00:15 0
9.72 0.000
DetentionPond STORAGE 1057.16 1057.16 0 00:40 12.6
12.6 -0.001
**********************
Node Surcharge Summary
**********************
Surcharging occurs when water rises above the top of the highest conduit.
---------------------------------------------------------------------
Max. Height Min. Depth
Hours Above Crown Below Rim
Node Type Surcharged Feet Feet
---------------------------------------------------------------------
J1 JUNCTION 93.31 0.000 0.000
DetentionPond STORAGE 120.00 8.085 3.915
*********************
Node Flooding Summary
*********************
Flooding refers to all water that overflows a node, whether it ponds or not.
--------------------------------------------------------------------------
Total Maximum
Maximum Time of Max Flood Ponded
Hours Rate Occurrence Volume Depth
Node Flooded CFS days hr:min 10^6 gal Feet
Page 3
SWMM.txt
--------------------------------------------------------------------------
J1 93.31 1.13 0 00:12 2.846 0.000
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------
--------------
Average Avg Evap Exfil Maximum Max Time
of Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt
Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days
hr:min CFS
------------------------------------------------------------------------------------
--------------
DetentionPond 777.690 23 0 0 1612.561 47 0
02:59 5.00
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Out1 94.39 3.87 3.87 9.720
-----------------------------------------------------------
System 94.39 3.87 3.87 9.720
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
C1 CONDUIT 3.87 0 00:15 6.14 1.09 0.92
TemporaryOutfall PUMP 5.00 0 00:12 1.00
***************************
Flow Classification Summary
***************************
------------------------------------------------------------------------------------
-
Adjusted ---------- Fraction of Time in Flow Class
----------
/Actual Up Down Sub Sup Up Down Norm
Inlet
Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd
Page 4
SWMM.txt
Ctrl
------------------------------------------------------------------------------------
-
C1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00
0.00
*************************
Conduit Surcharge Summary
*************************
----------------------------------------------------------------------------
Hours Hours
--------- Hours Full -------- Above Full Capacity
Conduit Both Ends Upstream Dnstream Normal Flow Limited
----------------------------------------------------------------------------
C1 0.01 93.31 0.01 93.32 0.01
***************
Pumping Summary
***************
------------------------------------------------------------------------------------
---------------------
Min Avg Max Total
Power % Time Off
Percent Number of Flow Flow Flow Volume
Usage Pump Curve
Pump Utilized Start-Ups CFS CFS CFS 10^6 gal
Kw-hr Low High
------------------------------------------------------------------------------------
---------------------
TemporaryOutfall 77.85 1 0.00 5.00 5.00 12.565
171.08 0.0 0.0
Analysis begun on: Tue Sep 08 16:52:55 2015
Analysis ended on: Tue Sep 08 16:52:55 2015
Total elapsed time: < 1 sec
Page 5
Node DetentionPond Volume (ft3)
Elapsed Time (hours)
02468101214161820222426283032343638404244464850525456586062646668707274767880828486889092949698100102104106108110112114116 118 120
Volume (ft3)
1800000.0
1750000.0
1700000.0
1650000.0
1600000.0
1550000.0
1500000.0
1450000.0
1400000.0
1350000.0
1300000.0
1250000.0
1200000.0
1150000.0
1100000.0
1050000.0
1000000.0
950000.0
900000.0
850000.0
800000.0
750000.0
700000.0
650000.0
600000.0
550000.0
500000.0
450000.0
400000.0
350000.0
300000.0
250000.0
200000.0
150000.0
100000.0
50000.0
0.0
SWMM 5.1 | East Ridge Subdivision
Stormwater Facility Name:
Facility Location & Jurisdiction:
User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined
Watershed Slope = 0.010 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs]
Watershed Length-to-Width Ratio = 1.00 L:W 0.00 676 0.00 0.00
Watershed Area = 153.29 acres 1.00 52,003 1.00 5.00
Watershed Imperviousness = 70.0% percent 2.00 97,024 2.00 5.00
Percentage Hydrologic Soil Group A = percent 3.00 115,628 3.00 5.00
Percentage Hydrologic Soil Group B = percent 4.00 170,007 4.00 5.00
Percentage Hydrologic Soil Groups C/D = 100.0% percent 5.00 217,214 5.00 5.00
6.00 241,816 6.00 5.00
User Input 17 7.00 262,566 7.00 5.00
8.00 328,301 8.00 5.00
9.00 349,120 9.00 5.00
User Input: Detention Basin Characteristics 10.00 371,084 10.00 5.00
WQCV Design Drain Time = 40.00 hours
After completing and printing this worksheet to a pdf, go to:
https://maperture.digitaldataservices.com/gvh/?viewer=cswdif
create a new stormwater facility, and
attach the pdf of this worksheet to that record.
Routed Hydrograph Results
Design Storm Return Period = WQCV 2 Year 5 Year 10 Year 50 Year 100 Year
One-Hour Rainfall Depth = 0.43 0.88 1.16 1.47 2.48 3.05 in
Calculated Runoff Volume = 3.476 7.670 11.202 15.030 28.056 35.813 acre-ft
OPTIONAL Override Runoff Volume = acre-ft
Inflow Hydrograph Volume = 3.475 7.669 11.200 15.025 28.048 35.812 acre-ft
Time to Drain 97% of Inflow Volume = 8.9 18.4 26.6 35.5 66.0 84.2 hours
Time to Drain 99% of Inflow Volume = 9.5 19.2 27.5 36.5 67.5 86.0 hours
Maximum Ponding Depth = 2.25 3.72 4.58 5.35 7.58 8.61 ft
Maximum Ponded Area = 2.330 3.540 4.523 5.183 6.892 7.827 acres
Maximum Volume Stored = 2.861 6.947 10.435 14.242 27.241 34.972 acre-ft
Stormwater Detention and Infiltration Design Data Sheet
East Ridge Second Filing | PRELIMINARY
Fort Collins, Colorado
Location for 1-hr Rainfall Depths (use dropdown):
Workbook Protected Worksheet Protected
HFHLV0001.01_SDI_Design_Data_v1.03.xlsm, Design Data 11/11/2015, 4:21 PM
Doing_Clear_Formatting Yes =
CountA= 1
0 1 2 3
#N/A
#N/A
0 1 2 3
#N/A
#N/A
Check Data Set 1 Check Data Set 1
Stormwater Detention and Infiltration Design Data Sheet
Area
Discharge
0
100
200
300
400
500
600
700
800
900
0.1 1 10
FLOW [cfs]
TIME [hr]
100YR IN
100YR OUT
50YR IN
50YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
7
8
9
10
0.1 1 10 100
PONDING DEPTH [ft]
DRAIN TIME [hr]
100YR
50YR
10YR
5YR
2YR
WQCV
HFHLV0001.01_SDI_Design_Data_v1.03.xlsm, Design Data 11/11/2015, 4:21 PM
`
PRELIMINARY EDB AND LID SIZING
CALCULATIONS
Sheet 1 of 1
Designer:
Company:
Date:
Project:
Location:
1. Design Discharge for 2-Year Return Period Q2 = 26.5 cfs
2. Hydraulic Residence Time
A) : Length of Grass Swale LS = 450 ft
B) Calculated Residence Time (based on design velocity below) THR= 8.3 minutes
3. Longitudinal Slope (vertical distance per unit horizontal)
A) Available Slope (based on site constraints) Savail = 0.0025 ft / ft
B) Design Slope SD = 0.0025 ft / ft
4. Swale Geometry
A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 5 ft / ft
B) Bottom Width of Swale (enter 0 for triangular section) WB = 30 ft
5. Vegetation
A) Type of Planting (seed vs. sod, affects vegetal retardance factor)
6. Design Velocity (1 ft / s maximum) V2 = 0.90 ft / s
7. Design Flow Depth (1 foot maximum) D2 = 0.86 ft
A) Flow Area A2 = 29.5 sq ft
B) Top Width of Swale WT = 38.6 ft
C) Froude Number (0.50 maximum) F = 0.18
D) Hydraulic Radius RH = 0.76
E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.68
F) Manning's n (based on SCS vegetal retardance curve D for sodded grass) n = 0.069
G) Cumulative Height of Grade Control Structures Required HD = 0.00 ft
AN UNDERDRAIN IS
8. Underdrain REQUIRED IF THE
(Is an underdrain necessary?) DESIGN SLOPE < 2.0%
9. Soil Preparation
(Describe soil amendment)
10. Irrigation
Notes:
City of Fort Collins Seed Mix
Design Procedure Form: Grass Swale (GS)
H. Feissner
Galloway
November 11, 2015
East Ridge Second Filing
Fort Collins, Colorado | A-Basins
Choose One
Temporary Permanent
Choose One
Grass From Seed Grass From Sod
Choose One
YES NO
HFHLV0001.01_UD-BMP_v3.03_Swale_A-Basins.xlsm, GS 11/11/2015, 4:26 PM
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 66 %
(100% if all paved and roofed areas upstream of sand filter)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.66
C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.23 watershed inches
WQCV= 0.9 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including sand filter area) Area = 1,629,144 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 31,565 cu ft
VWQCV = WQCV / 12 * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 31,565 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth DWQCV = 2.9 ft
B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft
4:1 or flatter preferred). Use "0" if sand filter has vertical walls.
C) Mimimum Filter Area (Flat Surface Area) AMin = 7014 sq ft
D) Actual Filter Area AActual = 7557 sq ft
E) Volume Provided VT = 31565 cu ft
3. Filter Material
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 1.5 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 31,565 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 2 in
East Ridge Second Filing
Fort Collins, Colorado | B, E and F Basins
Design Procedure Form: Sand Filter (SF)
H. Feissner
Galloway
November 11, 2015
Choose One
Choose One
18" CDOT Class C Filter Material
Other (Explain):
YES
NO
HFHLV0001.01_UD-BMP_v3.03_SF_B E and F-Basins.xlsm, SF 11/11/2015, 4:27 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6-7. Inlet / Outlet Works
A) Describe the type of energy dissipation at inlet points and means of
conveying flows in excess of the WQCV through the outlet
Notes:
Design Procedure Form: Sand Filter (SF)
H. Feissner
Galloway
November 11, 2015
East Ridge Second Filing
Fort Collins, Colorado | B, E and F Basins
Choose One
YES NO
HFHLV0001.01_UD-BMP_v3.03_SF_B E and F-Basins.xlsm, SF 11/11/2015, 4:27 PM
Project: East Ridge Second Filing
Project Location: Fort Collins, Colorado Date: 11/11/2015
Calculations By: H. Feissner
Pond Description: SF for B, E and F-Basins
User Input Cell: Blue Text
Design Point: Outfall
Design Storm: WQCV
Required Volume: 31565 ft3 4933.87 ft
Design Storm: 10-year
Required Volume: 0 ft3 N/A ft
Design Storm: 100-year
Required Volume: 0 ft3 N/A ft
Contour
Elevation
Contour
Area Depth
Incremental
Volume
Cummulative
Volume
Incremental
Volume
Cummulative
Volume
Cummulative
Volume
ft ft2 ft ft3 ft3 ft3 ft3 ac-ft
4931.00 7557 0.0 0 0 0 0 0.00
4932.00 9841 1.0 8699 8699 8674 8674 0.20
4933.00 12283 1.0 11062 19761 11040 19714 0.45
4934.00 14881 1.0 13582 33343 13561 33275 0.76
Sand Filter (SF) | B, E and F-Basins
Stage-Storage Calculations
Required Volume Water Surface Elevation
Average End Area Method: Conic Volume Method:
WQCV
4931
4932
4933
4934
4935
0 5000 10000 15000 20000 25000 30000 35000
Contour Elevation, ft
Cummulative Volume, ft3
Stage - Storage | Sand Filter (SF)
Tributary area includes the B, E and F developed basins
plus the Fut-B basins
Sheet 1 of 4
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia
Ia = 64 %
B) Tributary Area's Imperviousness Ratio (i = Ia / 100 ) i = 0.642
C) Contributing Watershed Area Area = 23.76 ac
D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in
Runoff Producing Storm
E) Design Concept
(Select EURV when also designing for flood control)
F) Design Volume (1.2 WQCV) Based on 40-hour Drain Time VDESIGN
= 0.60 ac-ft
(VDESIGN = (1.0 * (0.91 * i
3
- 1.19 * i
2
+ 0.78 * i) / 12 * Area * 1.2)
G) For Watersheds Outside of the Denver Region, VDESIGN OTHER
= ac-ft
Water Quality Capture Volume (WQCV) Design Volume
(VWQCV OTHER = (d
6*(VDESIGN
/0.43))
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER
= ac-ft
(Only if a different WQCV Design Volume is desired)
I) Predominant Watershed NRCS Soil Group
J) Excess Urban Runoff Volume (EURV) Design Volume
For HSG A: EURVA = (0.1878i - 0.0104)*Area EURV = ac-f t
For HSG B: EURVB = (0.1178i - 0.0042)*Area
For HSG C/D: EURVC/D = (0.1043i - 0.0031)*Area
2. Basin Shape: Length to Width Ratio L : W = 2.0 : 1
(A basin length to width ratio of at least 2:1 will improve TSS reduction.)
3. Basin Side Slopes
A) Basin Maximum Side Slopes Z = 8.00 ft / ft
(Horizontal distance per unit vertical, 4:1 or flatter preferred)
4. Inlet
A) Describe means of providing energy dissipation at concentrated
inflow locations:
Design Procedure Form: Extended Detention Basin (EDB)
East Ridge
Galloway
November 11, 2015
Fort Collins, Colorado | C and D-Basins
H. Feissner
Choose One
Excess Urban Runoff Volume (EURV)
Choose One
A
B
C / D
Water Quality Capture Volume (WQCV)
HFHLV0001.01_UD-BMP_v3.03_EDB_C and D-Basins.xlsm, EDB 11/11/2015, 4:28 PM
Sheet 2 of 4
Designer:
Company:
Date:
Project:
Location:
5. Forebay
A) Minimum Forebay Volume VFMIN
= 0.015 ac-ft
(VFMIN = 3% of the WQCV)
B) Actual Forebay Volume VF
= ac-ft
C) Forebay Depth DF
= in
(DF = 18 inch maximum)
D) Forebay Discharge
i) Undetained 100-year Peak Discharge Q100
= cfs
ii) Forebay Discharge Design Flow QF
= cfs
(QF = 0.02 * Q
100)
E) Forebay Discharge Design
F) Discharge Pipe Size (minimum 8-inches) Calculated DP = in
G) Rectangular Notch Width Calculated WN
= in
6. Trickle Channel
A) Type of Trickle Channel
F) Slope of Trickle Channel S = 0.0050 ft / ft
7. Micropool and Outlet Structure
A) Depth of Micropool (2.5-feet minimum) DM
= 2.5 ft
B) Surface Area of Micropool (10 ft
2
minimum) A
M = 10 sq ft
C) Outlet Type
D) Depth of Design Volume (EURV or 1.2 WQCV) Based on the Design H = 3.10 feet
Concept Chosen Under 1.E.
E) Volume to Drain Over Prescribed Time WQCV = 0.497 ac-ft
F) Drain Time TD
= 40 hours
(Min TD for WQCV= 40 hours; Max T
D for EURV= 72 hours)
G) Recommended Maximum Outlet Area per Row, (Ao) A
o = 1.06 square inches
H) Orifice Dimensions:
i) Circular Orifice Diameter or Dorifice
= 1 - 1 / 8 inches
ii) Width of 2" High Rectangular Orifice Worifice
= inches
I) Number of Columns nc
= 1 number
J) Actual Design Outlet Area per Row (Ao) A
o = 0.99 square inches
K) Number of Rows (nr) nr
= 9 number
L) Total Outlet Area (Aot) A
ot = 9.2 square inches
M) Depth of WQCV (HWQCV) H
Sheet 3 of 4
Designer:
Company:
Date:
Project:
Location:
8. Initial Surcharge Volume
A) Depth of Initial Surcharge Volume DIS
= in
(Minimum recommended depth is 4 inches)
B) Minimum Initial Surcharge Volume VIS = cu ft
(Minimum volume of 0.3% of the WQCV)
C) Initial Surcharge Provided Above Micropool Vs= cu ft
9. Trash Rack
A) Type of Water Quality Orifice Used
B) Water Quality Screen Open Area: At = Aot * 38.5*(e
-0.095D
) At
= 320 square inches
C) For 1-1/4"", or Smaller, Circular Opening (See Fact Sheet T-12):
i) Width of Water Quality Screen and Concrete Opening (Wopening) W
opening = 12.0 inches
ii) Height of Water Quality Screen (HTR) H
TR = 65.2 inches
iii) Type of Screen, Describe if "Other"
D) For Circular Opening (greater than 1-1/4" diameter)
OR 2" High Rectangular Opening (See Fact Sheet T-12):
i) Width of Water Quality Screen Opening (Wopening) W
opening = ft
ii) Height of Water Quality Screen (HTR) H
TR = ft
iii) Type of Screen, Describe if "Other"
v) Cross-bar Spacing inches
vi) Minimum Bearing Bar Size
H. Feissner
Design Procedure Form: Extended Detention Basin (EDB)
November 11, 2015
East Ridge
Fort Collins, Colorado | C and D-Basins
Galloway
Choose One
Circular (up to 1-1/4" diameter)
Circular (greater than 1-1/4" diameter) OR Rectangular (2" high)
Choose One
S.S. Well Screen with 60% Open Area*
Other (Describe):
Choose One
Aluminum Amico-Klemp SR Series (or equal)
Other (Describe):
HFHLV0001.01_UD-BMP_v3.03_EDB_C and D-Basins.xlsm, EDB 11/11/2015, 4:28 PM
Sheet 4 of 4
Designer:
Company:
Date:
Project:
Location:
10. Overflow Embankment
A) Describe embankment protection for 100-year and greater overtopping:
B) Slope of Overflow Embankment ZE
= ft / ft
(Horizontal distance per unit vertical, 4:1 or flatter preferred)
11. Vegetation
12. Access
A) Describe Sediment Removal Procedures
Notes:
East Ridge
Fort Collins, Colorado | C and D-Basins
Design Procedure Form: Extended Detention Basin (EDB)
November 11, 2015
Galloway
H. Feissner
Choose One
Irrigated
Not Irrigated
HFHLV0001.01_UD-BMP_v3.03_EDB_C and D-Basins.xlsm, EDB 11/11/2015, 4:28 PM
Project: East Ridge Second Filing
Project Location: Fort Collins, Colorado Date: 11/11/2015
Calculations By: H. Feissner
Pond Description: EDB for C and D-Basins
User Input Cell: Blue Text
Design Point: Outfall
Design Storm: WQCV
Required Volume: 26136 ft3 4931.10 ft
Design Storm: 10-year
Required Volume: 0 ft3 N/A ft
Design Storm: 100-year
Required Volume: 0 ft3 N/A ft
Contour
Elevation
Contour
Area Depth
Incremental
Volume
Cummulative
Volume
Incremental
Volume
Cummulative
Volume
Cummulative
Volume
ft ft2 ft ft3 ft3 ft3 ft3 ac-ft
4928.00 0 0.0 0 0 0 0 0.00
4929.00 8695 1.0 4348 4348 2898 2898 0.07
4930.00 10890 1.0 9793 14141 9772 12671 0.29
4931.00 13122 1.0 12006 26147 11989 24659 0.57
4931.50 15090 0.5 7053 33199 7047 31707 0.73
Extended Detantion Basin (EDB) | C and D-Basins
Stage-Storage Calculations
Required Volume Water Surface Elevation
Average End Area Method: Conic Volume Method:
WQCV
4927
4928
4929
4930
4931
4932
0 5000 10000 15000 20000 25000 30000 35000
Contour Elevation, ft
Cummulative Volume, ft3
Stage - Storage | Sand Filter (SF)
Tributary area includes the C and D developed basins
Sheet 1 of 4
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia
Ia = 76 %
B) Tributary Area's Imperviousness Ratio (i = Ia / 100 ) i = 0.759
C) Contributing Watershed Area Area = 34.49 ac
D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in
Runoff Producing Storm
E) Design Concept
(Select EURV when also designing for flood control)
F) Design Volume (1.2 WQCV) Based on 40-hour Drain Time VDESIGN
= 1.05 ac-ft
(VDESIGN = (1.0 * (0.91 * i
3
- 1.19 * i
2
+ 0.78 * i) / 12 * Area * 1.2)
G) For Watersheds Outside of the Denver Region, VDESIGN OTHER
= ac-ft
Water Quality Capture Volume (WQCV) Design Volume
(VWQCV OTHER = (d
6*(VDESIGN
/0.43))
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER
= ac-ft
(Only if a different WQCV Design Volume is desired)
I) Predominant Watershed NRCS Soil Group
J) Excess Urban Runoff Volume (EURV) Design Volume
For HSG A: EURVA = (0.1878i - 0.0104)*Area EURV = ac-f t
For HSG B: EURVB = (0.1178i - 0.0042)*Area
For HSG C/D: EURVC/D = (0.1043i - 0.0031)*Area
2. Basin Shape: Length to Width Ratio L : W = 2.0 : 1
(A basin length to width ratio of at least 2:1 will improve TSS reduction.)
3. Basin Side Slopes
A) Basin Maximum Side Slopes Z = 8.00 ft / ft
(Horizontal distance per unit vertical, 4:1 or flatter preferred)
4. Inlet
A) Describe means of providing energy dissipation at concentrated
inflow locations:
Design Procedure Form: Extended Detention Basin (EDB)
East Ridge
Galloway
November 11, 2015
Fort Collins, Colorado | G and H Basins, Fut-G and Fut-H Basins
H. Feissner
Choose One
Excess Urban Runoff Volume (EURV)
Choose One
A
B
C / D
Water Quality Capture Volume (WQCV)
HFHLV0001.01_UD-BMP_v3.03_EDB_G and H-Basins.xlsm, EDB 11/11/2015, 4:29 PM
Sheet 2 of 4
Designer:
Company:
Date:
Project:
Location:
5. Forebay
A) Minimum Forebay Volume VFMIN
= 0.026 ac-ft
(VFMIN = 3% of the WQCV)
B) Actual Forebay Volume VF
= ac-ft
C) Forebay Depth DF
= in
(DF = 30 inch maximum)
D) Forebay Discharge
i) Undetained 100-year Peak Discharge Q100
= cfs
ii) Forebay Discharge Design Flow QF
= cfs
(QF = 0.02 * Q
100)
E) Forebay Discharge Design
F) Discharge Pipe Size (minimum 8-inches) Calculated DP = in
G) Rectangular Notch Width Calculated WN
= in
6. Trickle Channel
A) Type of Trickle Channel
F) Slope of Trickle Channel S = 0.0050 ft / ft
7. Micropool and Outlet Structure
A) Depth of Micropool (2.5-feet minimum) DM
= 2.5 ft
B) Surface Area of Micropool (10 ft
2
minimum) A
M = 10 sq ft
C) Outlet Type
D) Depth of Design Volume (EURV or 1.2 WQCV) Based on the Design H = 3.41 feet
Concept Chosen Under 1.E.
E) Volume to Drain Over Prescribed Time WQCV = 0.875 ac-ft
F) Drain Time TD
= 40 hours
(Min TD for WQCV= 40 hours; Max T
D for EURV= 72 hours)
G) Recommended Maximum Outlet Area per Row, (Ao) A
o = 1.65 square inches
H) Orifice Dimensions:
i) Circular Orifice Diameter or Dorifice
= 1 - 7 / 16 inches
ii) Width of 2" High Rectangular Orifice Worifice
= inches
I) Number of Columns nc
= 1 number
J) Actual Design Outlet Area per Row (Ao) A
o = 1.62 square inches
K) Number of Rows (nr) nr
= 10 number
L) Total Outlet Area (Aot) A
ot = 16.6 square inches
M) Depth of WQCV (HWQCV) H
Sheet 3 of 4
Designer:
Company:
Date:
Project:
Location:
8. Initial Surcharge Volume
A) Depth of Initial Surcharge Volume DIS
= in
(Minimum recommended depth is 4 inches)
B) Minimum Initial Surcharge Volume VIS = cu ft
(Minimum volume of 0.3% of the WQCV)
C) Initial Surcharge Provided Above Micropool Vs= cu ft
9. Trash Rack
A) Type of Water Quality Orifice Used
B) Water Quality Screen Open Area: At = Aot * 38.5*(e
-0.095D
) At
= 558 square inches
C) For 1-1/4"", or Smaller, Circular Opening (See Fact Sheet T-12):
i) Width of Water Quality Screen and Concrete Opening (Wopening) W
opening = inches
ii) Height of Water Quality Screen (HTR) H
TR = inches
iii) Type of Screen, Describe if "Other"
D) For Circular Opening (greater than 1-1/4" diameter)
OR 2" High Rectangular Opening (See Fact Sheet T-12):
i) Width of Water Quality Screen Opening (Wopening) W
opening = 1.0 ft
ii) Height of Water Quality Screen (HTR) H
TR = 5.7 ft
iii) Type of Screen, Describe if "Other"
v) Cross-bar Spacing inches
vi) Minimum Bearing Bar Size
Galloway
November 11, 2015
East Ridge
Fort Collins, Colorado | G and H Basins, Fut-G and Fut-H Basins
H. Feissner
Design Procedure Form: Extended Detention Basin (EDB)
Choose One
Circular (up to 1-1/4" diameter)
Circular (greater than 1-1/4" diameter) OR Rectangular (2" high)
Choose One
S.S. Well Screen with 60% Open Area*
Other (Describe):
Choose One
Aluminum Amico-Klemp SR Series (or equal)
Other (Describe):
HFHLV0001.01_UD-BMP_v3.03_EDB_G and H-Basins.xlsm, EDB 11/11/2015, 4:29 PM
Sheet 4 of 4
Designer:
Company:
Date:
Project:
Location:
10. Overflow Embankment
A) Describe embankment protection for 100-year and greater overtopping:
B) Slope of Overflow Embankment ZE
= ft / ft
(Horizontal distance per unit vertical, 4:1 or flatter preferred)
11. Vegetation
12. Access
A) Describe Sediment Removal Procedures
Notes:
Fort Collins, Colorado | G and H Basins, Fut-G and Fut-H Basins
Design Procedure Form: Extended Detention Basin (EDB)
November 11, 2015
Galloway
H. Feissner
East Ridge
Choose One
Irrigated
Not Irrigated
HFHLV0001.01_UD-BMP_v3.03_EDB_G and H-Basins.xlsm, EDB 11/11/2015, 4:29 PM
Project: East Ridge Second Filing
Project Location: Fort Collins, Colorado Date: 11/11/2015
Calculations By: H. Feissner
Pond Description: EDB for G and H-Basins
User Input Cell: Blue Text
Design Point: Outfall
Design Storm: WQCV
Required Volume: 45738 ft3 4932.41 ft
Design Storm: 10-year
Required Volume: 0 ft3 N/A ft
Design Storm: 100-year
Required Volume: 0 ft3 N/A ft
Contour
Elevation
Contour
Area Depth
Incremental
Volume
Cummulative
Volume
Incremental
Volume
Cummulative
Volume
Cummulative
Volume
ft ft2 ft ft3 ft3 ft3 ft3 ac-ft
4929.00 0 0.0 0 0 0 0 0.00
4930.00 13851 1.0 6926 6926 4617 4617 0.11
4931.00 16893 1.0 15372 22298 15347 19964 0.46
4932.00 20085 1.0 18489 40786 18466 38430 0.88
4933.00 15485 1.0 17785 58571 17735 56165 1.29
Extended Detention Basin (EDB) | G and H-Basins
Stage-Storage Calculations
Required Volume Water Surface Elevation
Average End Area Method: Conic Volume Method:
WQCV
4929
4930
4931
4932
4933
4934
0 10000 20000 30000 40000 50000 60000
Contour Elevation, ft
Cummulative Volume, ft3
Stage - Storage | Extended Detention Basin
Tributary area includes the G and H developed basins
plus the Fut-G, Fut-H and Fut-TL1 through Fut-TL3 basins
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 75 %
(100% if all paved and roofed areas upstream of sand filter)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.750
C) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 0.27 watershed inches
WQCV= 0.9 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including sand filter area) Area = 601,999 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 13,524 cu ft
VWQCV = WQCV / 12 * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 13,524 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth DWQCV = 1.3 ft
B) Sand Filter Side Slopes (Horizontal distance per unit vertical, Z = 4.00 ft / ft
4:1 or flatter preferred). Use "0" if sand filter has vertical walls.
C) Mimimum Filter Area (Flat Surface Area) AMin = 3005 sq ft
D) Actual Filter Area AActual = 8847 sq ft
E) Volume Provided VT = 13524 cu ft
3. Filter Material
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 1.5 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 13,524 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 2 in
East Ridge
Fort Collins, Colorado | I and J Basins, Fut-I Basins and Fut-TL4
Design Procedure Form: Sand Filter (SF)
H. Feissner
Galloway
November 11, 2015
Choose One
Choose One
18" CDOT Class C Filter Material
Other (Explain):
YES
NO
HFHLV0001.01_UD-BMP_v3.03_SF_I and J-Basins.xlsm, SF 11/11/2015, 4:30 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6-7. Inlet / Outlet Works
A) Describe the type of energy dissipation at inlet points and means of
conveying flows in excess of the WQCV through the outlet
Notes:
Design Procedure Form: Sand Filter (SF)
H. Feissner
Galloway
November 11, 2015
East Ridge
Fort Collins, Colorado | I and J Basins, Fut-I Basins and Fut-TL4
Choose One
YES NO
HFHLV0001.01_UD-BMP_v3.03_SF_I and J-Basins.xlsm, SF 11/11/2015, 4:30 PM
Project: East Ridge Second Filing
Project Location: Fort Collins, Colorado Date: 11/11/2015
Calculations By: H. Feissner
Pond Description: SF for I and J-Basins
User Input Cell: Blue Text
Design Point: Outfall
Design Storm: WQCV
Required Volume: 13524 ft3 4930.31 ft
Design Storm: 10-year
Required Volume: 0 ft3 N/A ft
Design Storm: 100-year
Required Volume: 0 ft3 N/A ft
Contour
Elevation
Contour
Area Depth
Incremental
Volume
Cummulative
Volume
Incremental
Volume
Cummulative
Volume
Cummulative
Volume
ft ft2 ft ft3 ft3 ft3 ft3 ac-ft
4929.00 8847 0.0 0 0 0 0 0.00
4930.00 10805 1.0 9826 9826 9809 9809 0.23
4931.00 12810 1.0 11807 21633 11793 21603 0.50
Sand Filter (SF) | I and J-Basins
Stage-Storage Calculations
Required Volume Water Surface Elevation
Average End Area Method: Conic Volume Method:
WQCV
4929
4930
4931
4932
0 5000 10000 15000 20000 25000
Contour Elevation, ft
Cummulative Volume, ft3
Stage - Storage | Sand Filter (SF)
Tributary area includes the I and J developed basins
plus the Fut-I basins and Fut-TL4 (future east half of
Timberline Road)
`
APPENDIX D
SUPPORTING DOCUMENTATION
`
LAKE CANAL AGREEMENT
`
BARKER AGREEMENT
`
APPENDIX E
DRAINAGE MAPS
`
DEVELOPED CONDITION DRAINAGE
MAP
BARNSTORMER STREET
BIPLANE STREET
COLEMAN STREET
SUPERCUB LANE
CONQUEST STREET
SYKES DRIVE
COMET STREET
RELIANT STREET
CRUSADER STREET
VICOT WAY
PRIVATE DRIVEAA
ZEPPELINWAY
PRIVATE DRIVE TIGERCATWAY
NAVION LANE
VICOT WAY
YEAGER STREET
MARQUISESTREET
FAIRCHILD STREET
QUINBYSTREET
FAIRCHILD STREET
DASSAULT STREET
DELOZIERROAD
SYKES DRIVE
BARNSTORMER STREET
BIPLANE STREET
COLEMAN STREET
VICOT WAY
VICOT WAY
CONQUEST STREET
CONQUEST STREET
CONQUESTWAY
ALLEY A
ALLEY
A
ALLEY A
ALLEYA
ALLEY A
ALLEY A
QUINBY STREET
MARQUISESTREET
CRUSADER STREET
ZEPPELINWAY
Z
EPPELINWAY
SYKES DRIVE
ALLEY B
COMETSTREE
T
PRIVATE DRIVEC
PRIVATE DRIVED
PRIVATE DRIVE E
PRIVATE DR
IVE C
PRIVATE DRIVE TIGERCATWAY
B6
D1C14
C13
C12
C11
E1
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
#
THESE PLANS ARE AN INSTRUMENT OF
SERVICE AND ARE THE PROPERTY OF
GALLOWAY, AND MAY NOT BE DUPLICATED,
DISCLOSED, OR REPRODUCED WITHOUT
THE WRITTEN CONSENT OF THE
ARCHITECT. COPYRIGHTS AND
INFRINGEMENTS WILL BE ENFORCED AND
PROSECUTED.
3760 E. 15th Street, Suite 202
Loveland, CO 80538
970.800.3300 O
www.gallowayUS.com
C 2015. Galloway & Company, Inc. All Rights Reserved
SHEET TITLE:
Date:
Drawn By:
Project No:
Checked By:
HFHLV0001.01
11/11/2015
EAST RIDGE HOLDINGS
4801 Goodman Rd.
Timnath, CO 80547
970.674.1109
NOT FOR CONSTRUCTION
11/11/15
Tributary Area C
2 C100
tc | 2-Year tc | 100-Year Q
2 Q100
Sub-basin (acres) (min) (min) (cfs) (cfs)
A1 0.52 0.77 0.96 7.4 6.3 1.0 4.6
A2 0.83 0.68 0.85 9.2 6.7 1.3 6.4
A3 1.45 0.67 0.83 11.0 8.6 2.1 10.1
A4 2.11 0.66 0.83 12.4 10.0 2.9 13.7
A5 1.96 0.67 0.84 10.3 9.2 2.9 13.3
A6 2.20 0.62 0.77 11.9 9.5 2.9 13.7
A7 0.96 0.65 0.82 10.8 8.3 1.4 6.6
A8 2.18 0.58 0.72 14.1 12.6 2.4 11.2
A9 0.46 0.67 0.84 7.3 5.5 0.8 3.8
A10 1.31 0.68 0.85 8.0 6.1 2.2 10.4
A11 1.08 0.68 0.85 8.7 6.9 1.7 8.3
A12 0.76 0.59 0.74 8.0 6.3 1.1 5.2
A13 0.36 0.58 0.73 6.4 5.3 0.6 2.6
B1 0.61 0.77 0.96 9.7 8.5 1.1 4.9
B2 2.56 0.63 0.78 14.5 12.3 3.1 14.4
B3 2.73 0.63 0.79 14.5 12.4 3.3 15.4
B4 2.16 0.63 0.79 12.6 10.2 2.8 13.3
B5 1.35 0.68 0.85 8.5 6.8 2.2 10.5
B6 2.39 0.62 0.77 12.5 10.1 3.0 14.5
B7 1.06 0.57 0.71 10.1 8.0 1.4 6.5
B8 1.39 0.58 0.73 10.3 8.9 1.8 8.3
B9 1.34 0.64 0.80 10.4 7.9 1.9 9.2
B10 1.81 0.65 0.81 10.7 9.1 2.6 11.9
B11 0.99 0.66 0.82 9.2 7.4 1.5 7.2
B12 1.32 0.65 0.81 8.2 6.2 2.1 10.0
B13 1.43 0.53 0.66 12.6 11.7 1.6 7.0
B14 1.18 0.66 0.83 9.8 7.2 1.8 8.7
B15 0.99 0.68 0.85 8.4 6.5 1.6 7.8
B16 0.98 0.66 0.83 10.0 8.1 1.5 6.9
B17 0.82 0.61 0.76 9.1 7.3 1.2 5.5
B18 0.38 0.67 0.83 7.1 5.9 0.7 3.0
C1 1.39 0.66 0.83 10.8 8.4 2.0 9.7
C2 1.25 0.66 0.82 10.3 7.8 1.8 8.9
C3 1.53 0.67 0.83 11.1 9.4 2.2 10.3
C4 0.53 0.68 0.85 5.9 5.0 1.0 4.5
C5 1.04 0.69 0.86 6.8 5.0 1.9 8.9
C6 0.82 0.70 0.88 7.0 5.0 1.5 7.2
C7 0.77 0.70 0.88 5.3 5.0 1.5 6.7
C8 1.01 0.68 0.85 7.4 5.5 1.7 8.4
C9 1.50 0.65 0.82 7.6 6.3 2.4 11.4
C10 1.02 0.67 0.84 7.6 6.3 1.7 8.0
C11 1.41 0.62 0.78 10.3 7.9 2.0 9.5
C12 1.75 0.64 0.80 9.4 8.1 2.6 12.1
C13 1.42 0.62 0.78 10.6 8.3 1.9 9.4
C14 2.29 0.64 0.80 9.6 8.3 3.4 15.6
C15 1.21 0.65 0.82 8.9 7.0 1.9 8.9
C16 0.87 0.73 0.92 10.0 8.6 1.4 6.7
C17 0.21 0.78 0.97 7.6 5.0 0.4 2.1
C18 2.57 0.41 0.51 12.0 12.0 2.2 9.6
D1 0.95 0.69 0.86 9.2 6.6 1.5 7.5
D2 0.19 0.77 0.97 5.0 5.0 0.4 1.8
E1 1.09 0.66 0.82 10.1 7.6 1.6 7.8
E2 2.15 0.61 0.76 12.7 10.4 2.7 12.7
E3 0.24 0.77 0.96 5.0 5.0 0.5 2.3
F1 0.66 0.69 0.86 7.5 5.5 1.2 5.5
F2 1.77 0.67 0.84 8.6 6.6 2.9 13.8
F3 0.18 0.79 0.98 5.4 5.0 0.4 1.7
G1 0.53 0.78 0.97 8.7 7.5 1.0 4.6
G2 1.50 0.66 0.82 11.1 8.6 2.1 10.2
G3 1.19 0.69 0.87 7.2 5.3 2.1 10.1
G4 1.06 0.69 0.86 8.0 6.1 1.8 8.6
G5 1.69 0.71 0.89 8.3 6.4 2.9 13.9
G6 0.57 0.77 0.96 9.2 6.7 1.0 5.0
H1 0.46 0.79 0.99 7.2 6.0 0.9 4.2
H2 1.72 0.72 0.90 7.9 6.8 3.1 14.1
H3 1.41 0.75 0.94 6.3 5.0 2.8 13.2
H4 1.62 0.73 0.92 8.7 6.6 2.8 13.7
H5 1.20 0.72 0.90 8.6 6.6 2.1 9.9
H6 1.70 0.73 0.91 7.7 5.6 3.1 14.9
I1 1.13 0.73 0.92 8.1 6.0 2.0 9.8
I2 1.28 0.75 0.93 9.5 7.5 2.2 10.5
I3 0.91 0.74 0.92 10.0 8.0 1.5 7.2
I4 0.79 0.72 0.90 9.7 7.8 1.3 6.1
I5 1.57 0.73 0.91 8.1 6.0 2.8 13.6
J1 0.12 0.80 1.00 5.0 5.0 0.3 1.2
J2 0.28 0.68 0.86 6.3 5.0 0.5 2.4
Wetland 22.49 0.25 0.31 70.8 68.9 3.9 17.5
Fut-A 5.15 0.80 1.00 9.3 6.4 9.6 47.8
Fut-B 5.81 0.80 1.00 10.0 10.0 10.5 45.8
Fut-G1 8.08 0.85 1.00 10.0 10.0 15.5 63.6
Fut-G2 2.43 0.90 1.00 10.0 10.0 4.9 19.1
Fut-H 4.79 0.80 1.00 10.0 10.0 8.7 37.7
Fut-I1 3.92 0.80 1.00 10.0 10.0 7.1 30.8
Fut-I2 1.25 0.80 1.00 10.0 10.0 2.3 9.8
Fut-I3 1.15 0.80 1.00 10.0 10.0 2.1 9.1
Fut-TL1 2.62 0.90 1.00 10.0 10.0 5.3 20.6
Fut-TL2 1.10 0.90 1.00 10.0 10.0 2.2 8.7
Fut-TL3 0.83 0.90 1.00 10.0 10.0 1.7 6.5
Fut-TL4 1.42 0.90 1.00 10.0 10.0 2.9 11.2
DRAINAGE SUMMARY TABLE | DEVELOPED CONDITIONS
CityDate Engineer
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
E2
F2
C10
C9
C5
C7
B10
B9
B7
C3
C2
C1
B6
B4
B3
B2
Fut-B
B5
B13
B16
A3
A4
A5
A6
B14
B8
Fut-A
A2
A8
Fut-I3
I2
I1
I3
A1 B1
B15
B7
B3
B4
B2
B1
Fut-A Fut-B
A1
A4
A6
B8
B9
B10
B11
C2
C4
C7
C8
C9
C10
C11
C12
C13
C14
C15
D1
D2
E3 E2
F3
F2
F3
B18
B16
B18
A12
A13
A11
A8
A9
A10
G5
G6
Fut-H H1
H2
H4
H5
H6
Fut-I1
I3
I5
A7
B12
B12
C16
J2
A5
A7
B5
B13
B17
C3 C1
C5
C6
C17 C16
C17
C15
C18
C8
C6
B11 C4
F1
B17
E1
F1
Fut-G1
G1 G2
G3
G4
H3
Fut-TL3
I2
Fut-I3
J1
J1 J2
I4
A9
B14
B15
Fut-I2
Fut-I2
Fut-TL4
Fut-G2
C18
Fut-TL1
Fut-TL2
Wtlnd
PROPOSED OUTLET STRUCTURE
(DRAINS TO LAKE CANAL DITCH)
FUTURE SINGLE-FAMILY
ATTACHED (TRACT B) FUTURE SINGLE-FAMILY
ATTACHED (TRACT B)
FUTURE MULTI-FAMILY
TRACT A
FUTURE SINGLE-FAMILY
ATTACHED (TRACT E)
FUTURE SINGLE-FAMILY
ATTACHED (TRACT E)
FUTURE MULTI-FAMILY
TRACT A
PROPOSED STORM
DRAIN (TYP.)
PROPOSED STORM
DRAIN (TYP.)
FUTURE NEIGHBORHOOD
PARK (±8.2 AC)
PROPOSED STORM
DRAIN (TYP.)
PROPOSED TYPE 'R'
CURB INLET (TYP.)
PROPOSED TYPE 'R'
CURB INLET (TYP.)
PROPOSED STORM
DRAIN (TYP.)
PROPOSED TYPE 'R'
CURB INLET (TYP.) PROPOSED DETENTION POND
100-YEAR WSEL: 4935.89
PROPOSED CONNECTION
TO NO. 10 DITCH
PROPOSED ALIGNMENT
FOR FUTURE ULTIMATE
OUTFALL TO DRY CREEK
PROPOSED IRRIGATION
CONNECTION TO BARKER
PROPERTY
PROPOSED IRRIGATION
SPLITTER BOX
PROPOSED IRRIGATION
LINE FOR PARK IRRIGATION
POND
2
3
4
5
6
D2
E3
1
7
6
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
#
THESE PLANS ARE AN INSTRUMENT OF
SERVICE AND ARE THE PROPERTY OF
GALLOWAY, AND MAY NOT BE DUPLICATED,
DISCLOSED, OR REPRODUCED WITHOUT
THE WRITTEN CONSENT OF THE
ARCHITECT. COPYRIGHTS AND
INFRINGEMENTS WILL BE ENFORCED AND
PROSECUTED.
3760 E. 15th Street, Suite 202
Loveland, CO 80538
970.800.3300 O
www.gallowayUS.com
C 2015. Galloway & Company, Inc. All Rights Reserved
SHEET TITLE:
Date:
Drawn By:
Project No:
Checked By:
HFHLV0001.01
11/11/2015
EAST RIDGE HOLDINGS
4801 Goodman Rd.
Timnath, CO 80547
970.674.1109
NOT FOR CONSTRUCTION
11/11/15
C9
DESIGN POINT
MAJOR BASIN BOUNDARY
SUB-BASIN BOUNDARY
OVERLAND FLOW DIRECTION
BASIN ID
MINOR RUNOFF COEFFICIENT
MAJOR RUNOFF COEFFICIENT
BASIN AREA
(ACRES)
EASEMENT LINE
FUTURE LOTLINE
PROPOSED LOTLINE
FUTURE RIGHT-OF-WAY
PROPOSED RIGHT-OF-WAY
PROPOSED STORM INLET
PROPOSED STORM SEWER
EXISTING STORM SEWER
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR 4900
4900
1. GRASS SWALE (GS) - LID:
TRIBUTARY AREA: A BASINS (INCLUDES FUT-A)
DESIGN FLOW: Q2 ~ 26.5 CFS
LENGTH: 450 FT, CHANNEL SLOPE: 0.0025 FT/FT, CHANNEL SIDE SLOPES: 5:1, BOTTOM WIDTH: 30 FT
2. SAND FILTER (SF) - LID:
TRIBUTARY AREA: B, E AND F BASINS (INCLUDES FUT-B)
DESIGN VOLUME: 0.72 AC-FT
3. EXTENDED DETENTION BASIN (EDB) - WQCV:
TRIBUTARY AREA: C AND D BASINS
DESIGN VOLUME: 0.60 AC-FT
4. EXTENDED DETENTION BASIN (EDB) - WQCV:
TRIBUTARY AREA: G AND H BASINS (INCLUDES FUT-G,
FUT-H AND FUT-TL1 THROUGH FUT TL3)
DESIGN VOLUME: 1.05 AC-FT
5. SAND FILTER (SF) - LID:
TRIBUTARY AREA: I AND J BASINS (INCLUDES FUT-I BASINS
AND FUT-TL4)
DESIGN VOLUME: 0.31 AC-FT
GRASS BUFFER (GB) - LID:
TRIBUTARY AREA: VARIES
LENGTH: 14 FT (MIN.)
PROPOSED IRRIGATION POND
NOTES:
1
DRAINAGE SYMBOLS:
LEGEND:
2
3
4
5
6
7
OVERLAND FLOW DIRECTION
Stormwater Quality Strategy/Detention Water Surface
Elevation
Volume
AC-FT
Release Rate
CFS
1 - Grass Swale (GS) N/A N/A N/A
2 - Sand Filter (SF) 4933.87 0.72 N/A
3 - Extended Detention Basin (EDB) 4931.10 0.60 40-Hour Drain Time
4 - Extended Detention Basin (EDB) 4932.41 1.05 40-Hour Drain Time
5 - Sand Filter (SF) 4930.31 0.31 N/A
6 - Grass Buffer N/A N/A N/A
Detention Pond 4935.89 37.02 5
WQ AND DETENTION SUMMARY
CityDate Engineer
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
WQCV = feet
(Estimate using actual stage-area-volume relationship and VWQCV)
N) Ensure Minimum 40 Hour Drain Time for WQCV TD WQCV
= hours
Fort Collins, Colorado | G and H Basins, Fut-G and Fut-H Basins
H. Feissner
East Ridge
November 11, 2015
Galloway
Design Procedure Form: Extended Detention Basin (EDB)
Choose One
Wall with Rect. Notch
Berm With Pipe
Choose One
Orifice Plate
Other (Describe):
Choose One
Concrete
Soft Bottom
Wall with V-Notch Weir
HFHLV0001.01_UD-BMP_v3.03_EDB_G and H-Basins.xlsm, EDB 11/11/2015, 4:29 PM
WQCV = feet
(Estimate using actual stage-area-volume relationship and VWQCV)
N) Ensure Minimum 40 Hour Drain Time for WQCV TD WQCV
= hours
East Ridge
November 11, 2015
Galloway
Design Procedure Form: Extended Detention Basin (EDB)
(flow too small for berm w/ pipe)
Fort Collins, Colorado | C and D-Basins
H. Feissner
Choose One
Wall with Rect. Notch
Berm With Pipe
Choose One
Orifice Plate
Other (Describe):
Choose One
Concrete
Soft Bottom
Wall with V-Notch Weir
HFHLV0001.01_UD-BMP_v3.03_EDB_C and D-Basins.xlsm, EDB 11/11/2015, 4:28 PM
4942
0 500000 1000000 1500000 2000000 2500000 3000000 3500000 4000000
Contour Elevation, ft
Cummulative Volume, ft3
Stage - Storage | Detention Pond
Curb Opening as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= 23.46 64.47 cfs
Interception with Clogging Qwa
= 22.84 62.75 cfs
Curb Opening as an Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= 48.77 59.22 cfs
Interception with Clogging Qoa
= 47.47 57.65 cfs
Curb Opening Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= 31.46 57.46 cfs
Interception with Clogging Qma
= 30.62 55.94 cfs
Resulting Curb Opening Capacity (assumes clogged condition) QCurb
= 22.84 55.94 cfs
Resultant Street Conditions MINOR MAJOR
Total Inlet Length L = 25.00 25.00 feet
Resultant Street Flow Spread (based on sheet Q-Allow geometry) T = 18.7 31.2 ft.>T-Crown
Resultant Flow Depth at Street Crown dCROWN
= 0.0 1.5 inches
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 22.84 55.94 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 22.84 55.94 cfs
INLET IN A SUMP OR SAG LOCATION
East Ridge Subdivision
25' Type 'R' Curb Inlet | 25' CL to FL
CDOT Type R Curb Opening
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Override Depths
HFHLV001.01_UD-Inlet_v3.14_25 Type R-25 CL to FL.xlsm, Inlet In Sump 9/8/2015, 2:18 PM
Curb Opening as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= 10.68 29.27 cfs
Interception with Clogging Qwa
= 10.33 28.30 cfs
Curb Opening as an Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= 39.01 45.88 cfs
Interception with Clogging Qoa
= 37.72 44.35 cfs
Curb Opening Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= 18.98 34.08 cfs
Interception with Clogging Qma
= 18.35 32.95 cfs
Resulting Curb Opening Capacity (assumes clogged condition) QCurb
= 10.33 28.30 cfs
Resultant Street Conditions MINOR MAJOR
Total Inlet Length L = 20.00 20.00 feet
Resultant Street Flow Spread (based on sheet Q-Allow geometry) T = 15.2 25.3 ft.>T-Crown
Resultant Flow Depth at Street Crown dCROWN
= 0.1 2.5 inches
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 10.33 28.30 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 10.33 28.30 cfs
INLET IN A SUMP OR SAG LOCATION
East Ridge Subdivision
20' Type 'R' Curb Inlet | 15' CL to FL
CDOT Type R Curb Opening
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Override Depths
HFHLV001.01_UD-Inlet_v3.14_20 Type R.xlsm, Inlet In Sump 9/8/2015, 2:20 PM
Curb Opening as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= 8.01 21.96 cfs
Interception with Clogging Qwa
= 7.66 21.00 cfs
Curb Opening as an Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= 29.26 34.41 cfs
Interception with Clogging Qoa
= 27.98 32.91 cfs
Curb Opening Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= 14.24 25.56 cfs
Interception with Clogging Qma
= 13.62 24.45 cfs
Resulting Curb Opening Capacity (assumes clogged condition) QCurb
= 7.66 21.00 cfs
Resultant Street Conditions MINOR MAJOR
Total Inlet Length L = 15.00 15.00 feet
Resultant Street Flow Spread (based on sheet Q-Allow geometry) T = 15.2 25.3 ft.>T-Crown
Resultant Flow Depth at Street Crown dCROWN
= 0.1 2.5 inches
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 7.66 21.00 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 7.66 21.00 cfs
INLET IN A SUMP OR SAG LOCATION
East Ridge Subdivision
15' Type 'R' Curb Inlet | 15' CL to FL
CDOT Type R Curb Opening
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Override Depths
HFHLV001.01_UD-Inlet_v3.14_15 Type R.xlsm, Inlet In Sump 9/8/2015, 2:21 PM
Curb Opening as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= 6.49 17.08 cfs
Interception with Clogging Qwa
= 6.08 16.01 cfs
Curb Opening as an Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= 19.51 22.94 cfs
Interception with Clogging Qoa
= 18.29 21.51 cfs
Curb Opening Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= 10.46 18.41 cfs
Interception with Clogging Qma
= 9.81 17.26 cfs
Resulting Curb Opening Capacity (assumes clogged condition) QCurb
= 6.08 16.01 cfs
Resultant Street Conditions MINOR MAJOR
Total Inlet Length L = 10.00 10.00 feet
Resultant Street Flow Spread (based on sheet Q-Allow geometry) T = 15.2 25.3 ft.>T-Crown
Resultant Flow Depth at Street Crown dCROWN
= 0.1 2.5 inches
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 6.08 16.01 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 6.08 16.01 cfs
INLET IN A SUMP OR SAG LOCATION
East Ridge Subdivision
10' Type 'R' Curb Inlet | 15' CL to FL
CDOT Type R Curb Opening
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Override Depths
HFHLV001.01_UD-Inlet_v3.14_10 Type R.xlsm, Inlet In Sump 9/8/2015, 2:39 PM
Curb Opening as a Weir (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qwi
= 3.81 8.58 cfs
Interception with Clogging Qwa
= 3.43 7.72 cfs
Curb Opening as an Orifice (based on UDFCD - CSU 2010 Study) MINOR MAJOR
Interception without Clogging Qoi
= 9.75 11.47 cfs
Interception with Clogging Qoa
= 8.78 10.32 cfs
Curb Opening Capacity as Mixed Flow MINOR MAJOR
Interception without Clogging Qmi
= 5.67 9.22 cfs
Interception with Clogging Qma
= 5.10 8.30 cfs
Resulting Curb Opening Capacity (assumes clogged condition) QCurb
= 3.43 7.72 cfs
Resultant Street Conditions MINOR MAJOR
Total Inlet Length L = 5.00 5.00 feet
Resultant Street Flow Spread (based on sheet Q-Allow geometry) T = 15.2 25.3 ft.>T-Crown
Resultant Flow Depth at Street Crown dCROWN
= 0.1 2.5 inches
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 3.43 7.72 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 3.43 7.72 cfs
INLET IN A SUMP OR SAG LOCATION
East Ridge Subdivsion
5' Type 'R' Curb Inlet | 15' CL to FL
CDOT Type R Curb Opening
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Override Depths
HFHLV001.01_UD-Inlet_v3.14_5 Type R.xlsm, Inlet In Sump 9/8/2015, 2:40 PM
I3 0.91 0.92 8.0 0.84 8.57 7.2
I4 0.79 0.90 7.8 0.71 8.68 6.1
I5 1.57 0.91 6.0 1.44 9.45 13.6
J1 0.12 1.00 5.0 0.12 9.98 1.2
J2 0.28 0.86 5.0 0.24 9.98 2.4
Wetland 22.49 0.31 68.9 6.91 2.54 17.5
Fut-A 5.15 1.00 6.4 5.15 9.28 47.8
Fut-B 5.81 1.00 10.0 5.81 7.87 45.8
Fut-G1 8.08 1.00 10.0 8.08 7.87 63.6
Fut-G2 2.43 1.00 10.0 2.43 7.87 19.1
Fut-H 4.79 1.00 10.0 4.79 7.87 37.7
Fut-I1 3.92 1.00 10.0 3.92 7.87 30.8
Fut-I2 1.25 1.00 10.0 1.25 7.87 9.8
Fut-I3 1.15 1.00 10.0 1.15 7.87 9.1
Fut-TL1 2.62 1.00 10.0 2.62 7.87 20.6
Page 2 of 3 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
B17 0.82 0.76 7.3 0.62 8.86 5.5
B18 0.38 0.83 5.9 0.32 9.52 3.0
C1 1.39 0.83 8.4 1.15 8.44 9.7
C2 1.25 0.82 7.8 1.02 8.67 8.9
C3 1.53 0.83 9.4 1.28 8.07 10.3
C4 0.53 0.85 5.0 0.45 9.98 4.5
C5 1.04 0.86 5.0 0.89 9.98 8.9
C6 0.82 0.88 5.0 0.72 9.95 7.2
C7 0.77 0.88 5.0 0.67 9.98 6.7
C8 1.01 0.85 5.5 0.86 9.73 8.4
C9 1.50 0.82 6.3 1.22 9.31 11.4
C10 1.02 0.84 6.3 0.85 9.34 8.0
C11 1.41 0.78 7.9 1.10 8.64 9.5
C12 1.75 0.80 8.1 1.41 8.56 12.1
C13 1.42 0.78 8.3 1.10 8.48 9.4
C14 2.29 0.80 8.3 1.84 8.49 15.6
C15 1.21 0.82 7.0 0.99 9.00 8.9
PIPE
100-Year
DIRECT RUNOFF TOTAL RUNOFF STREET
11/11/15
Page 1 of 3 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
I5 1.57 0.73 8.1 1.15 2.45 2.8
J1 0.12 0.80 5.0 0.10 2.86 0.3
J2 0.28 0.68 6.3 0.19 2.67 0.5
Wetland 22.49 0.25 70.8 5.52 0.71 3.9
Fut-A 5.15 0.80 9.3 4.12 2.32 9.6
Fut-B 5.81 0.80 10.0 4.65 2.26 10.5
Fut-G1 8.08 0.85 10.0 6.87 2.26 15.5
Fut-G2 2.43 0.90 10.0 2.19 2.26 4.9
Fut-H 4.79 0.80 10.0 3.83 2.26 8.7
Fut-I1 3.92 0.80 10.0 3.13 2.26 7.1
Fut-I2 1.25 0.80 10.0 1.00 2.26 2.3
Fut-I3 1.15 0.80 10.0 0.92 2.26 2.1
Fut-TL1 2.62 0.90 10.0 2.36 2.26 5.3
Fut-TL2 1.10 0.90 10.0 0.99 2.26 2.2
Fut-TL3 0.83 0.90 10.0 0.74 2.26 1.7
Page 2 of 3 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
C2 1.25 0.66 10.3 0.82 2.23 1.8
C3 1.53 0.67 11.1 1.02 2.16 2.2
C4 0.53 0.68 5.9 0.36 2.73 1.0
C5 1.04 0.69 6.8 0.71 2.60 1.9
C6 0.82 0.70 7.0 0.58 2.58 1.5
C7 0.77 0.70 5.3 0.54 2.81 1.5
C8 1.01 0.68 7.4 0.69 2.53 1.7
C9 1.50 0.65 7.6 0.98 2.50 2.4
C10 1.02 0.67 7.6 0.68 2.51 1.7
C11 1.41 0.62 10.3 0.88 2.23 2.0
C12 1.75 0.64 9.4 1.13 2.31 2.6
C13 1.42 0.62 10.6 0.88 2.20 1.9
C14 2.29 0.64 9.6 1.47 2.29 3.4
C15 1.21 0.65 8.9 0.79 2.37 1.9
C16 0.87 0.73 10.0 0.64 2.25 1.4
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
2-Year
11/11/15
Page 1 of 3 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
Tc Check = 10+L/180
For Urbanized basins a minimum Tc of 5.0 minutes is required.
For non-urbanized basins a minimum Tc of 10.0 minutes is required
Future Developed Area | Tract A - Multi-Family
Future Developed Area | Tract A - Multi-Family
Future Developed Area | Tract E - Single Family Attached
Future Developed Area | Tract E - Single Family Attached
Future Developed Area | Tract E - Single Family Attached
Future Timberline Road Right-of-Way
Future Timberline Road Right-of-Way
Future Timberline Road Right-of-Way
Future Developed Area | Tract B - Single Family Attached
Future Timberline Road Right-of-Way
Future Developed Area | Tract A - Multi-Family
Page 2 of 2 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
C14 2.29 C 0.64 0.64 0.80 35 2.00 3.9 2.6 592 0.75 20 1.7 5.7 9.6 8.3 627 13.5 9.6 8.3
C15 1.21 C 0.65 0.65 0.82 61 2.00 5.1 3.2 352 0.60 20 1.5 3.8 8.9 7.0 413 12.3 8.9 7.0
C16 0.87 C 0.73 0.73 0.92 30 2.00 2.9 1.5 976 1.30 20 2.3 7.1 10.0 8.6 1006 15.6 10.0 8.6
C17 0.21 C 0.78 0.78 0.97 184 2.00 6.3 2.5 184 1.50 20 2.4 1.3 7.6 3.7 368 12.0 7.6 5.0
C18 2.57 C 0.41 0.41 0.51 184 2.00 13.6 11.6 184 1.50 20 2.4 1.3 14.9 12.9 368 12.0 12.0 12.0
D1 0.95 C 0.69 0.69 0.86 110 2.00 6.3 3.7 273 0.60 20 1.5 2.9 9.2 6.6 383 12.1 9.2 6.6
D2 0.19 C 0.77 0.77 0.97 15 2.00 1.8 0.7 191 0.50 20 1.4 2.3 4.1 3.0 206 11.1 5.0 5.0
E1 1.09 C 0.66 0.66 0.82 111 2.00 6.8 4.3 335 0.70 20 1.7 3.3 10.1 7.6 446 12.5 10.1 7.6
E2 2.15 C 0.61 0.61 0.76 111 2.00 7.5 5.2 505 0.65 20 1.6 5.2 12.7 10.4 616 13.4 12.7 10.4
E3 0.24 C 0.77 0.77 0.96 15 2.00 1.8 0.8 204 0.50 20 1.4 2.4 4.3 3.2 219 11.2 5.0 5.0
F1 0.66 C 0.69 0.69 0.86 63 2.00 4.7 2.7 333 1.00 20 2.0 2.8 7.5 5.5 396 12.2 7.5 5.5
F2 1.77 C 0.67 0.67 0.84 70 2.00 5.2 3.1 411 1.00 20 2.0 3.4 8.6 6.6 481 12.7 8.6 6.6
F3 0.18 C 0.79 0.79 0.98 44 2.00 3.0 1.1 231 0.65 20 1.6 2.4 5.4 3.5 275 11.5 5.4 5.0
G1 0.53 C 0.78 0.78 0.97 16 2.00 1.9 0.7 631 0.60 20 1.5 6.8 8.7 7.5 647 13.6 8.7 7.5
INITIAL/OVERLAND FINAL
(Ti)
TRAVEL TIME
STANDARD FORM SF-2
TIME OF CONCENTRATION
SUB-BASIN Tc CHECK
HFHLV0001.01
DATA (Tt) (URBANIZED BASINS)
Page 1 of 2 11/11/2015 X:\1520000.all\1528001\Excel\US Highway 85\Drainage\HFHLV0001.01_Drainage_Calcs_Template_v2.0-CoFC.xls
Survey Area Data: Version 9, Sep 22, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Apr 22, 2011—Apr 28,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
(East Ridge Subdivision)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/24/2015
Page 2 of 4