Loading...
HomeMy WebLinkAboutUNIVERSITY SQUARE REPLAT - FDP - FDP150031 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview September 25, 2015 Steve Hultin Colorado State University 1251 S. Mason Ave Fort Collins, CO 80523 RE: University Square Replat, FDP150031, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/16/2015 09/16/2015: The bus stop easement being dedicated should actually be a called a Transit Easement and the following definition should be placed on the plat. Transit Easement – Easement for public transportation, equipment, infrastructure and/ or use, including public access. Response: Revised as requested Comment Number: 2 Comment Originated: 09/16/2015 09/16/2015: John and I talked to Steve Lund about this already, but with the vacations I would like a statement that identifies that in vacating these easements the intent is not to vacate any other existing easements that might overlap and be of the same type. Response: Revised Vacation Statements Department: Light And Power Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/15/2015 09/15/2015: No comments from Light and Power Engineering Response: Acknowledged Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 09/03/2015 09/03/2015: Emergency access has not been identified on the plant. Response: This is being worked out with Ron and Bob from PFA in the design of the new parking garage. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 09/03/2015 09/03/2015: No Comment from Erosion Control. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Response: Acknowledged Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Plat Comment Number: 2 Comment Originated: 09/16/2015 09/16/2015: Please change "Engineering Department" in the Notice Of Other Documents to "Clerk". See redlines. Response: Revised as requested Comment Number: 3 Comment Originated: 09/16/2015 09/16/2015: Please make changes as noted to the easement vacation statements. See redlines. Response: Revised as requested Comment Number: 4 Comment Originated: 09/16/2015 09/16/2015: There are spelling issues with some text. See redlines. Response: Revised as requested Comment Number: 5 Comment Originated: 09/16/2015 09/16/2015: Please provide current acceptable monument records for the aliquot corners shown. These should be emailed directly to Jeff at jcounty@fcgov.com. Response: Monument has been Email to Jeff. Comment Number: 6 Comment Originated: 09/16/2015 09/16/2015: It is not necessary that you show the vacated easements on sheet 2. Showing them makes the Plat more difficult to interpret. As noted on sheet 1, the vacation can take place with a note. Response: Removed blanket easements with building envelopes and CSU easements Comment Number: 7 Comment Originated: 09/16/2015 09/16/2015: Please add dedication information for all street rights of way. See redlines. Response: Added as requested Comment Number: 8 Comment Originated: 09/16/2015 09/16/2015: All reception numbers for documents recorded by separate document, must be added prior to producing mylars. Response: Acknowledged Comment Number: 9 Comment Originated: 09/16/2015 09/16/2015: All easements must be labeled & locatable. See redlines. Response: Revised as requested Comment Number: 10 Comment Originated: 09/16/2015 09/16/2015: Does the underpass along College Avenue need to be accommodated with an easement? Response: No easement is required Comment Number: 11 Comment Originated: 09/16/2015 09/16/2015: How were hatched (as marked) areas dedicated? See redlines. Response: Added as requested Comment Number: 12 Comment Originated: 09/16/2015 09/16/2015: It appears that there are 2 monuments at the northeast corner of Lot 2, Sorensen's PUD. Please review. Response: Revised as requested Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/15/2015 09/15/2015: no comments Response: Acknowledged Department: Water-Wastewater Engineering Contact: Dan Mogen, , dmogen@fcgov.com Topic: Easements Comment Number: 1 Comment Originated: 09/03/2015 09/03/2015: The standard sewer easement with is 30'. Can you please provide an easement of this width for the sanitary sewer? Response: Revised as requested Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/16/2015 09/16/2015: On the Plat the signature block for Planning Approval, please change the "Director of Planning" to "Director of Community Development and Neighborhood Services". Response: Revised as requested