September 25, 2015
Steve Hultin
Colorado State University
1251 S. Mason Ave
Fort Collins, CO 80523
RE: University Square Replat, FDP150031, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/16/2015
09/16/2015: The bus stop easement being dedicated should actually be a
called a Transit Easement and the following definition should be placed on the
plat. Transit Easement – Easement for public transportation, equipment,
infrastructure and/ or use, including public access.
Response: Revised as requested
Comment Number: 2 Comment Originated: 09/16/2015
09/16/2015: John and I talked to Steve Lund about this already, but with the
vacations I would like a statement that identifies that in vacating these
easements the intent is not to vacate any other existing easements that might
overlap and be of the same type.
Response: Revised Vacation Statements
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/15/2015
09/15/2015: No comments from Light and Power Engineering
Response: Acknowledged
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 09/03/2015
09/03/2015: Emergency access has not been identified on the plant.
Response: This is being worked out with Ron and Bob from PFA in the
design of the new parking garage.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/03/2015
09/03/2015: No Comment from Erosion Control. If you need clarification
concerning this, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Response: Acknowledged
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 2 Comment Originated: 09/16/2015
09/16/2015: Please change "Engineering Department" in the Notice Of Other
Documents to "Clerk". See redlines.
Response: Revised as requested
Comment Number: 3 Comment Originated: 09/16/2015
09/16/2015: Please make changes as noted to the easement vacation
statements. See redlines.
Response: Revised as requested
Comment Number: 4 Comment Originated: 09/16/2015
09/16/2015: There are spelling issues with some text. See redlines.
Response: Revised as requested
Comment Number: 5 Comment Originated: 09/16/2015
09/16/2015: Please provide current acceptable monument records for the
aliquot corners shown. These should be emailed directly to Jeff at
jcounty@fcgov.com.
Response: Monument has been Email to Jeff.
Comment Number: 6 Comment Originated: 09/16/2015
09/16/2015: It is not necessary that you show the vacated easements on sheet
2. Showing them makes the Plat more difficult to interpret. As noted on sheet 1,
the vacation can take place with a note.
Response: Removed blanket easements with building envelopes and CSU easements
Comment Number: 7 Comment Originated: 09/16/2015
09/16/2015: Please add dedication information for all street rights of way. See
redlines.
Response: Added as requested
Comment Number: 8 Comment Originated: 09/16/2015
09/16/2015: All reception numbers for documents recorded by separate
document, must be added prior to producing mylars.
Response: Acknowledged
Comment Number: 9 Comment Originated: 09/16/2015
09/16/2015: All easements must be labeled & locatable. See redlines.
Response: Revised as requested
Comment Number: 10 Comment Originated: 09/16/2015
09/16/2015: Does the underpass along College Avenue need to be
accommodated with an easement?
Response: No easement is required
Comment Number: 11 Comment Originated: 09/16/2015
09/16/2015: How were hatched (as marked) areas dedicated? See redlines.
Response: Added as requested
Comment Number: 12 Comment Originated: 09/16/2015
09/16/2015: It appears that there are 2 monuments at the northeast corner of
Lot 2, Sorensen's PUD. Please review.
Response: Revised as requested
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/15/2015
09/15/2015: no comments
Response: Acknowledged
Department: Water-Wastewater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: Easements
Comment Number: 1 Comment Originated: 09/03/2015
09/03/2015: The standard sewer easement with is 30'. Can you please
provide an easement of this width for the sanitary sewer?
Response: Revised as requested
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/16/2015
09/16/2015: On the Plat the signature block for Planning Approval, please
change the "Director of Planning" to "Director of Community Development and
Neighborhood Services".
Response: Revised as requested