OWNER'S CERTIFICATION
THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF REAL PROPERTY
DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS
SET FORTH ON SAID PROJECT DEVELOPMENT PLAN WITHIN THE LIMIT OF DEVELOPMENT BOUNDARY.
PARCELS 1-4
FIRSTIER BANK NEBRASKA
NAME DATE
MY COMMISSION EXPIRES:
NOTARY PUBLIC
STATE OF COLORADO )
)SS
NOTARIAL CERTIFICATE
DIRECTOR OF COMMUNITY DEVELOPMENT
AND NEIGHBORHOOD SERVICES
APPROVED BY THE COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES DIRECTOR ON THIS
DAY OF , A.D., 2015.
COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES DIRECTOR
COUNTY OF LARIMER )
THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME
BY , THIS DAY OF , 2015.
APPLICANT / DEVELOPER
PROPERTY OWNER
PLANNER / CIVIL ENGINEER
SITE PLAN NOTES
POST MODERN DEVELOPMENT
144 NORTH MASON STREET SUITE 5
FORT COLLINS, CO 80524
(970) 407-7808
TST, INC. CONSULTING ENGINEERS
760 WHALERS WAY
BUILDING C, SUITE 200
FORT COLLINS, CO 80525
(970) 226-0557
LEGAL DESCRIPTION
FIRSTIER BANK NEBRASKA
115 SOUTH WALNUT STREET
KIMBALL, NE 69145
1. THIS PROJECT SITE IS LOCATED WITHIN FEMA REGULATED FLOODWAY AND FLOODPLAINS, PER FEMA FIRM MAPS
08069C0994F AND 08069C1013F, DATED DECEMBER 19, 2006.
2. PORTIONS OF THIS SITE ARE LOCATED IN THE FEMA - REGULATORY 100- AND 500-YEAR FLOOD PLAINS, AND THE 1
2 -FOOT
RISE FLOODWAY.
3. EFFECTIVE FLOODPLAIN INFORMATION SHOWN ON THIS PLAN IS BASED UPON LOMR 14-08-058OP, DATED DECEMBER 15,
2014.
4. ALL AREAS IN THE FLOODPLAIN AND FLOODWAY ARE SUBJECT TO THE STANDARDS OF CHAPTER 10 OF THE FORT COLLINS
MUNICIPAL CODE.
5. NO WORK MAY COMMENCE IN THE FLOODWAY UNTIL A FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION HAVE BEEN
APPROVED BY THE CITY OF FORT COLLINS FLOODPLAIN ADMINISTRATION DIVISION. NO-RISE CERTIFICATIONS MUST BE
RE-CERTIFIED POST PROJECT.
6. ALL WORK IN THE FLOOD FRINGE MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT.
7. CRITICAL FACILITIES ARE PROHIBITED IN THE POUDRE RIVER FLOODPLAIN.
8. NO NEW STRUCTURES OR ADDITIONS MAY BE ADDED TO THE FLOODWAY.
9. ALL STRUCTURES IN THE FLOODWAY AND FLOOD FRINGE MUST HAVE AN EMERGENCY RESPONSE PREPAREDNESS PLAN.
10. WITHIN THE FLOODWAY, A CONDITIONAL LETTER OF MAP REVISION (CLOMR) MUST BE APPROVED BY FEMA PRIOR TO
ISSUANCE OF ANY BUILDING OR GRADING PERMITS.
11. NON-RESIDENTIAL STRUCTURES OR ADDITIONS IN THE 100-YR FLOOD FRINGE MUST HAVE THEIR LOWEST FLOOR AND ALL
ELECTRICAL, MECHANICAL AND HVAC ELEVATED OR FLOODPROOFED 2.0 FEET ABOVE THE 100-YR BASE FLOOD ELEVATION
(BFE). STRUCTURAL CONSTRUCTION MUST BE FOLLOWED WITH AN AS-BUILT ELEVATION CERTIFICATE. STRUCTURES
OPTING FOR FLOODPROOFING IN LIEU OF ELEVATION MUST PROVIDE A FLOODPROOFING CERTIFICATE AFTER
7.00'
TIE INTO EXISTING WALK
7.00'
EXISTING WALK 5'
ATTACHED WALK
CONSTRUCTION.
12. NO WORK MAY COMMENCE UNTIL ALL FILL FROM THE FLOODWAY IN THE LOMR-F AREA HAS BEEN REMOVED.
1. THIS SITE IS LOCATED WITHIN THE HARMONY CORRIDOR ZONE DISTRICT (H-C).
2. THIS SITE IS LOCATED OUTSIDE OF THE EFFECTIVE 1/2 FOOT RISE FLOODWAY.
3. THE PROPOSED LAND USES FOR THE HARMONY AND STRAUSS CABIN CONVENIENCE SHOPPING CENTER AREA COMPRISE
OF CONVENIENCE SHOPPING CENTER AND OTHER SECONDARY USES UNDER H-C ZONING. OUTLOTS OUTSIDE OF THE
NEIGHBORHOOD COMMERCIAL AREA (LOT 1) AND LOT 2 ARE RESERVED FOR A FUTURE DRAINAGE CHANNEL AND FUTURE
DEVELOPMENT.
4. THIS PROJECT DEVELOPMENT PLAN IS ACCOMPANIED BY AN ECOLOGICAL CHARACTERIZATION STUDY (ECS). THIS ECS
DOCUMENTS THE EXISTING SIGNIFICANT ECOLOGICAL VALUE OF THE SITE, AND PROPOSES MITIGATION FOR THE IMPACTS
THE DEVELOPMENT WILL HAVE TO THE ECOLOGICAL VALUE ON THE SITE. THE ECS REPORT AND THE PROTECTION AND
MITIGATION WILL BE CONSISTENT WITH THE CITY OF FORT COLLINS LUC SECTION 3.4.1.
5. HACIENDA DRIVE IS DESIGNATED AS A FUTURE RIGHT IN AND RIGHT OUT ACCESS POINT AS FUTURE PARCELS DEVELOP IN
ACCORDANCE WITH THE ODP FOR THIS PROJECT.
FLOODPLAIN NOTES
PROJECT
LOCATION
INDEX TO PLANS
1 - COVER
2 - SITE PLAN OVERALL
3 - SITE PLAN DETAIL
4 - LANDSCAPE COVER
5 - LANDSCAPE OVERVIEW
6 - LANDSCAPE PLAN NORTH WEST
7 - LANDSCAPE PLAN NORTH EAST
8 - LANDSCAPE PLAN SOUTH WEST
9 - LANDSCAPE PLAN SOUTH EAST
10 - TREE MITIGATION PLAN
11 - PHOTOMETRIC SITE PLAN
12 - CUT SHEETS
13 - BUILDING ELEVATIONS
14 - BUILDING ELEVATIONS
15 - BUILDING ELEVATIONS
16 - BUILDING ELEVATIONS
17 - BUILDING ELEVATIONS
18- TRASH ENCLOSURE DETAILS
LOTS 1, 2 & TRACT B, HARMONY & STRAUSS CABIN CONVENIENCE SHOPPING CENTER SUBDIVISION FILING NO. 1