HomeMy WebLinkAboutBROOKFIELD SECOND FILING, TRACTS D & E - PDP/FDP - FDP150025 - REPORTS - DRAINAGE REPORT301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com
1
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
August 27, 2015
RE: Drainage Memorandum
Brookfield Second Replat, Lots 1‐12, Tract E and a portion of Tract D
Fort Collins, Colorado
Project Number: 374‐020
Dear Staff:
Northern Engineering Services is pleased to submit this Drainage Memorandum for
Brookfield for your review. Brookfield Second Replat is located within Lots 1‐12, Tract E and a
portion of Tract D of the Plat of Brookfield. The Brookfield project is a proposed multi‐family
residential site. The site is located in the Northeast Quarter of Section 4, Township 6 North,
Range 68 West of the 6th Principal Median, City of Fort Collins, Larimer County, Colorado. The
site is bounded on the north, east, and west by undeveloped area. The site is bounded on the
south by Brookfield Phase 1, a multi‐family site. Fossil Creek Reservoir Inlet Ditch (FCRID) flows
north‐west to south and is located east of the site outside of the project boundary. Southeast
of the Site is Detention Pond A constructed as part of Brookfield Phase 1 development that
currently detains flows from Brookfield development Phase 1. Detention Pond A was designed
for future development of Brookfield including this site. The site falls within the East Harmony
Portion of McClellands Creek Master Drainage Basin. This Drainage Memorandum has been
prepared in compliance with technical criteria set forth in the City of Fort Collins Storm
Drainage Design Criteria, Urban Drainage and Flood Control District Criteria Manual (UDFCDCM)
and City of Fort Collins Amendments to the UDFCDCM.
The Brookfield project consists of approximately 6 acres. The development will consist
of 12 multi‐family buildings with approximately 68 units. The buildings will be two story with
the possibility of basements. Parking will be provided by on street parking, parking stalls off the
alleys, attached garages, and detached garages. The streets within the multi‐family tracts will
be private and will be maintained privately. Public streets bound the tract.
301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com
2
The proposed site has been a part of many different drainage plans and studies in the
past. The most recent drainage plan, Final Drainage Report for Brookfield by TST dated
December 14, 2001 covers the entire Brookfield development including already constructed
phases, the proposed site, and future development. The TST drainage report for Brookfield
references two previously completed Drainage Reports that are a part of the McClellands
Drainage Basin: Final Drainage Report for Willow Brook by TST, Inc. Consulting Engineers, dated
October, 2000 and East Harmony Portion of McClellands Creek Master Drainage Plan Update by
ICON Engineering, Inc. dated August, 1999. The proposed site closely matches the original
proposed development as part of the TST Brookfield Utility Plans and TST Brookfield Drainage
Report and is in compliance with the original TST Brookfield Drainage Report. The calculations
presented in the original report for the all of Brookfield including proposed and future
developments has an Imperviousness of 73% and the area corresponding to the current
proposed Site has an Imperviousness of 76%. The current proposed Site has an Imperviousness
of 63%. A Comparison Table with drainage basins and imperviousness values for the original
Brookfield plan and the current Site is included herein. Drainage Basins are named to match
the original Basin names of the TST Drainage Report for ease of comparison. Several
constraints have been identified from the original report including the maximum runoff
allowable into existing inlets and drainageways. Specifically, the Brookfield Drainage Plan
divided the site into two basins. The interior of the site drains to an existing storm sewer
system. The north and east perimeter areas drain offsite to the existing FCRID. This Drainage
Plan incorporated the 100‐yr maximum release rate from the Brookfield site as 0.5 cfs per acre.
The site currently sheet flow from west to east with an average slope of 0.5‐1.0%.
Currently most of the Site is discharged into the FCRID. The southern portion of the sites flows
into an existing curb inlet on Precision Drive and into the storm sewer system that flows into
Pond A. The existing land onsite is currently undeveloped and consists of loose soils with no
vegetation.
Most of the Brookfield site (constructed and future phases) is graded to Detention Pond
A. This water quality detention pond was sized based on SDDC and Urban Drainage criteria and
has a release rate of 0.5 cfs/ac. The pond was constructed with an orifice plate with multiple
orifices to provide for an extended drainage time. The water quality volume was based on a 2‐
yr storm, with the 100‐yr storm overtopping the control structure and entering the discharge
pipe. The pond was provided with an orifice plate on the discharge pipe to control the 100‐yr
discharge from the pond. If the pond were to overtop, it will spill in a historic eastward
direction and into the FCRID. No structures will be inundated if overtopping occurs. The
required volume of the detention pond is 9.01 ac‐ft.
Offsite sheet flow from the west in Drainage Basin D‐5/9 is proposed to be intercepted
by a drainage swale and into a storm sewer system that goes to Pond A. Offsite flows north of
Le Fever Drive are channelized in a grass swale that flows into the FCRID. Offsite flows from the
eastern portion of the site include the bank above the FCRID, proposed 10’ wide trail, retaining
walls and graded slopes. As this area will be vegetated and closely match undeveloped
301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com
3
conditions it is proposed to release undetained. This undetained release will not be accounted
for in the design of the detention pond since it will be at historic rates. All developed subbasins
are proposed to discharge from the site at a release rate of 0.5 cfs per acre as dictated by the
master plan after passing through the Pond A.
The overall stormwater management strategy employed with the Brookfield Second
Replat is to closely match the original design while incorporating current LID practices to
minimize adverse impacts of urbanization on receiving waters. Several techniques have been
utilized with the proposed development to facilitate the reduction of runoff peaks, volumes,
and pollutant loads as the site is developed from the current use by implementing multiple Low
Impact Development (LID) strategies including:
Providing permeable paver areas with underground detention area to increase
time of concentration promote infiltration and provide water quality.
Providing Drywells to promote infiltration and water quality throughout the site.
Providing a Rain Garden and Grass Swale to slowly release the flood control
volume in an area and removes pollutants by treatment processes of
sedimentation, filtering, adsorption, evapotranspiration and biological uptake of
constituents.
Snouts and settling basins for water treatment prior to flows entering the
subsurface infiltration galleries and storm systems.
I. NCLUSS
The overall stormwater management strategy employed with the Brookfield Second Replat is in
compliance with the following standards:
City of Fort Collins’ Stormwater Criteria Manual.
Final Drainage Report for Brookfield by TST
There are no regulatory floodplains associated with the development.
The drainage plan and stormwater management measures proposed with the
development are compliant with all applicable State and Federal regulations
governing stormwater discharge.
The site achieves the requirements set forth by the City of Fort Collins for Low
Impact Development (LID) by providing 25% of total paved areas as permeable
pavers and providing 54% of total impervious areas as being treated through an
LID treatment. LID and Porous Pavement Calculation Tables are provided herein.
The drainage design proposed with this project will effectively comply with previous
studies and will limit any potential damage or erosion associated with its stormwater runoff.
Inlets located in the alleys are designed to collect the 100‐year flows; capacity calculations are
included herein. The proposed curb inlet (Design Point D3A) located on Northern Lights Drive is
designed to convey the majority of the 2‐year flow with 0.1cfs by‐pass to the existing
downstream curb inlet located on Precision Drive (Design Point 43). Design Point D3A matches
the TST Drainage Report, Design Point 55. The TST Drainage Report had a runoff of 2.32 cfs for
the 2‐year flow that was proposed to runoff to the curb inlet on Precision Drive (Design Point
301 N. Howes Street, Suite 100, Fort Collins, CO 80521 970.221.4158 www.northernengineering.com
4
43); therefore a reduction of 2.22 cfs is conveyed to the existing inlet on Precision Drive. All
existing downstream drainage facilities are expected to not be impacted negatively by this
development
The drainage design is anticipated to be very conservative. We have omitted any runoff
reduction that will manifest due to infiltration from drywells and pervious pavement. This is
currently unable to be calculated with available soils data.
If you have any questions, please feel free to contact me at your earliest convenience.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Amber Morse, PE
Project Engineer
374-020 Brookfield Second Replat
CHARACTER OF SURFACE1:
Runoff
Coefficient
Percentage
Impervious Project: 374-020 Brookfield
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Morse
Asphalt ……....……………...……….....…...……………….…………………………… 0.95 100% Date: August 27, 2015
Concrete …….......……………….….……….………………..….……………………… 0.95 90%
Gravel (packed) ……….…………………….….…………………………..…………… 0.50 40%
Roofs …….…….………………..……………….………………………………………… 0.95 90%
Pavers…………………………...………………..………………………………………… 0.40 22%
Lawns and Landscaping
Sandy Soil
Flat <2% ……………………………………………………………………………… 0.10 0%
Average 2% to 7% ……………………………………………………………………… 0.15 0%
Steep >7% ……………………………………………………………………………… 0.20 0%
Clayey Soil
Flat <2% ……………………………………………………………………………… 0.20 0%
Average 2% to 7% ……………………………………………………………………… 0.25 0%
Steep >7% ……………………………………………………………………………… 0.35 0% 2-year Cf
= 1.00 10-year Cf = 1.00 100-year C
f = 1.25
Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11
Sub-Basin ID
Sub-
BasinBasin
Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Pavers
(ac)
Area of
Roofs
(ac)
Soil Type and Average Slope
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite Runoff
Coefficient
100-year
Composite Runoff
Coefficient
Composite
% Imperv.
D-2A 0.27 0.15 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.049 0.82 0.82 1.00 79%
D-2B 0.53 0.12 0.09 0.00 0.07 Clayey | Average 2% to 7% 0.241 0.63 0.63 0.79 51%
374-020 Brookfield Second Replat
Overland Flow, Time of Concentration:
374-020 Brookfield
Gutter/Swale Flow, Time of Concentration:
Tt = L / 60V
Tc = Ti + Tt (Equation RO-2)
Velocity (Gutter Flow), V = 20·S½
Velocity (Swale Flow), V = 15·S½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf=1.00)
C*Cf
(10-yr
Cf=1.00)
C*Cf
(100-yr
Cf=1.25)
Length,
L
(ft)
Up Stream
Elevation
Down
Stream
Elevation
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Up
Stream
Elevation
Down
Stream
Elevation
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
2-yr
Tc
(min)
374-020 Brookfield Second Replat
Rational Method Equation: Project: 374-020 Brookfield
Calculations By:
Date:
Rainfall Intensity:
D2A OF-1 & D-2A 0.27 23 23 12 0.82 0.82 1.00 1.49 2.55 7.29 0.33 0.57 1.97
45 D-2B 0.53 5 5 5 0.63 0.63 0.79 2.85 4.87 9.95 0.94 1.61 4.12
42
D-2B & D-2C
(not a part) 0.77
7 7 7 0.80 0.80 1.00 2.60 4.44 9.06 1.61 2.75 6.98
D3A D-3A 0.44 5 5 5 0.74 0.74 0.93 2.85 4.87 9.95 0.93 1.59 4.07
43 D-3B 1.27 6 6 6 0.77 0.77 0.96 2.67 4.56 9.31 2.60 4.45 11.35
D3C D-3C 0.61 64 64 44 0.62 0.62 0.78 0.79 1.34 3.54 0.30 0.51 1.67
44 D-5/92 9.94 49 49 45 0.28 0.28 0.36 0.95 1.61 3.46 2.67 4.55 12.22
46 D-7 0.30 5 5 5 0.71 0.71 0.89 2.85 4.87 9.95 0.61 1.05 2.68
51 D-7.1 0.33 5 5 5 0.74 0.74 0.93 2.85 4.87 9.95 0.70 1.19 3.04
52 D-7.2 0.33 5 5 5 0.85 0.85 1.00 2.85 4.87 9.95 0.80 1.37 3.27
47 D-8 0.33 5 5 5 0.77 0.77 0.97 2.85 4.87 9.95 0.72 1.23 3.14
48 D-8.1 0.33 5 5 5 0.84 0.84 1.00 2.85 4.87 9.95 0.79 1.34 3.25
54 D-10 0.36 5 5 5 0.76 0.76 0.95 2.85 4.87 9.95 0.78 1.33 3.40
56 D-11 0.36 5 5 5 0.87 0.87 1.00 2.85 4.87 9.95 0.89 1.52 3.58
60 OF-1 0.44 51 51 46 0.31 0.31 0.39 0.91 1.56 3.41 0.12 0.21 0.58
OF2 OF-2 0.15 5 5 5 0.70 0.70 0.88 2.85 4.87 9.95 0.30 0.51 1.30
Area, A
(acres)
Intensity,
i2
(in/hr)
100-yr
Tc
(min)
PROPOSED RUNOFF COMPUTATIONS
C100
Design
Point
Flow,
Q100
(cfs)
Flow,
Q2
(cfs)
10-yr
Tc
(min)
2-yr
Tc
(min)
C2
Flow,
Q10
(cfs)
Intensity,
i100
(in/hr)
Sub-Basin(s)
A. Morse
Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8
August 27, 2015
Intensity,
H
Y
D
X X
X
S
H
Y
D
H
Y
D
D
D D
C.O. D D
C.O.
D
D
C.O.
C.O.
C.O.
VAULT
CABLE
CTV
CTV
CTV
UD
UD UD
UD
UD
12" W
12" W
12" W
12" W
12" W
12" W
12" W
CINQUEFOIL LANE
NORTHERN LIGHTS DRIVE
PRECISION DRIVE
STEELHEAD STREET
20' DRAINAGE EASEMENT
20' DRAINAGE EASEMENT
20' DRAINAGE EASEMENT
20' DRAINAGE EASEMENT
BROOKFIELD DRIVE
GM
EM
EM
GM
EM
EM
12" W
12" W
12" SS 12" SS
E
E/FO/CTV E/FO/CTV
G
G
G
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 2.00 2.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 1 1
Water Depth at Flowline (outside of local depression) Flow Depth = 3.5 9.0 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = 3.00 3.00 feet
Width of a Unit Grate Wo
= 1.73 1.73 feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= 0.43 0.43
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = 0.50 0.50
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = 3.30 3.30
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = 0.60 0.60
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = N/A N/A feet
Height of Vertical Curb Opening in Inches Hvert
= N/A N/A inches
Height of Curb Orifice Throat in Inches Hthroat
= N/A N/A inches
Angle of Throat (see USDCM Figure ST-5) Theta = N/A N/A degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= N/A N/A feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = N/A N/A
Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw
(C) = N/A N/A
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = N/A N/A
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 0.9 4.9 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 0.7 3.1 cfs
INLET IN A SUMP OR SAG LOCATION
Brookfield Second Replat - Project no. 374-020
Design Point 47 - Private Alley with Type 13 Inlet at Sump
CDOT/Denver 13 Valley Grate
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
374-020 - Alley - Design Point 47 - Type 13-Single - UD Inlet 3.1.xlsm, Inlet In Sump 8/27/2015, 3:04 PM
Project =
Inlet ID =
Design Information (Input) MINOR MAJOR
Type of Inlet Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal
= 2.00 2.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 2 2
Water Depth at Flowline (outside of local depression) Flow Depth = 3.5 9.0 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo
(G) = 3.00 3.00 feet
Width of a Unit Grate Wo
= 1.73 1.73 feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio
= 0.43 0.43
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf
(G) = 0.50 0.50
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw
(G) = 3.30 3.30
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co
(G) = 0.60 0.60
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo
(C) = N/A N/A feet
Height of Vertical Curb Opening in Inches Hvert
= N/A N/A inches
Height of Curb Orifice Throat in Inches Hthroat
= N/A N/A inches
Angle of Throat (see USDCM Figure ST-5) Theta = N/A N/A degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp
= N/A N/A feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf
(C) = N/A N/A
Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw
(C) = N/A N/A
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co
(C) = N/A N/A
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa
= 1.3 10.4 cfs
Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED
= 0.9 3.6 cfs
INLET IN A SUMP OR SAG LOCATION
Brookfield Second Replat - Project no. 374-020
Maximum Flow - Design Point 56 - Private Alley with Type 13 Inlet-Double at Sump
CDOT/Denver 13 Valley Grate
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
374-020 - Alley - Design Point 56 - UD Inlet 3.1.xlsm, Inlet In Sump 8/27/2015, 2:27 PM
Project:
Inlet ID:
Design Information (Input) MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') aLOCAL = 2.0 2.0 inches
Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1
Length of a Single Unit Inlet (Grate or Curb Opening) Lo = 3.00 3.00 ft
Width of a Unit Grate (cannot be greater than W from Q-Allow) Wo = 2.00 2.00 ft
Clogging Factor for a Single Unit Grate (typical min. value = 0.5) Cf-G = 0.50 0.50
Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) Cf-C = 0.10 0.10
Street Hydraulics: OK - Q < maximum allowable from sheet 'Q-Allow' MINOR MAJOR
Total Inlet Interception Capacity Q = 0.8 2.1 cfs
Total Inlet Carry-Over Flow (flow bypassing inlet) Qb = 0.1 1.9 cfs
Capture Percentage = Qa/Q
o = C% = 90 52 %
INLET ON A CONTINUOUS GRADE
Brookfield Second Replat - Project no. 374-020
Northern Lights Drive (Local Street) with Combination Inlet - Design Point D3A
CDOT/Denver 13 Combination
374-020 - Design Point D3A - Northern Lights - UD Inlet 3.1.xlsm, Inlet On Grade 8/27/2015, 2:49 PM
X X
UD
UD
UD
BROOKFIELD DRIVE
MORNINGSIDE
VILLAGE CONDOS
FOSSIL CREEK RESERVOIR INLET DITCH
WETLAND
1
2
3
4
5
6
7
8
9
10
11
12
13
14
RAIN GARDEN
PERMEABLE
PAVEMENT
PERMEABLE
PAVEMENT
PERMEABLE
PAVEMENT
PERMEABLE
PAVEMENT
GRASS SWALE
DRY WELL
KEYMAP
LEGEND:
5013
PROPOSED CONTOUR 93
EXISTING CONTOUR
EXISTING STORM SEWER
LID AREA 1
LID BOUNDARY
PROPOSED STORM SEWER
FOR LID REVIEW ONLY
NOT FOR CONSTRUCTION
( IN FEET )
0
1 INCH = 70 FEET
70 70 140 210
N O R T H E RN
2015.06.23
D:\PROJECTS\374-020\DWG\EXHIBITS\374-020_LID.DWG
LOW IMPACT DEVELOPMENT (LID) AREAS
FIGURE 1
374-020 Brookfield Second Replat
LID ID
LID Area
(ac)
Area of
Concrete
(ac)
Area of
Pavers
(ac)
Area of
Roofs
(ac)
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite Runoff
Coefficient
100-year
Composite Runoff
Coefficient
Composite
% Imperv.
Impervious
Area (ac)
Basin
Treated thru
LID?
LID Treated
Impervious Area
(ac)
LID Treated Type
1 0.22 0.08 0.00 0.11 0.03 0.86 0.86 1.00 78% 0.17 YES 0.17 Curb Inlet to Dry Well
2 0.35 0.07 0.00 0.19 0.16 0.81 0.81 1.00 66% 0.23 YES 0.23 Dry Well
3 0.39 0.10 0.05 0.15 0.18 0.77 0.77 0.97 63% 0.24 YES 0.24 Permeable Pavement, Dry Well
4 0.46 0.07 0.00 0.19 0.20 0.65 0.65 0.81 51% 0.23 YES 0.23 Grass Swale
5 0.82 0.24 0.00 0.36 0.44 0.84 0.84 1.00 66% 0.54 NO N/A N/A
6 0.32 0.02 0.00 0.15 0.15 0.62 0.62 0.78 48% 0.15 NO N/A N/A
7 0.36 0.02 0.05 0.20 0.12 0.71 0.71 0.89 60% 0.22 YES 0.22 Permeable Pavement
8 0.31 0.04 0.07 0.11 0.13 0.65 0.65 0.82 52% 0.16 YES 0.14 Permeable Pavement
9 0.23 0.02 0.00 0.13 0.08 0.70 0.70 0.87 58% 0.14 NO N/A N/A
10 0.15 0.02 0.00 0.08 0.06 0.69 0.69 0.87 57% 0.09 YES 0.09 Rain Garden
11 0.37 0.13 0.00 0.14 0.23 0.85 0.85 1.00 66% 0.24 NO N/A N/A
12 0.13 0.01 0.00 0.07 0.04 0.70 0.70 0.88 58% 0.07 NO N/A N/A
13 0.52 0.12 0.07 0.18 0.26 0.74 0.74 0.92 58% 0.30 YES 0.30 Permeable Pavement
14 1.55 0.15 0.00 0.08 1.32 0.35 0.35 0.44 13% 0.21 NO N/A N/A
TOTAL: 6.17 2.99 1.61
LID Requirements
Total Proposed Impermeable Area(ac)= 2.99
Total Impermeable Area Treated with LID(ac)= 1.61
Percent Treated with LID= 54%
LOW IMPACT DEVELOPMENT (LID) CALCULATIONS
8/27/2015 3:18 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\LID
374-020 Brookfield Second Replat
LID ID
LID Area
(ac)
New Area of
Pavement
(ac)
New Area of
Pavers
(ac)
Basin
Treated by
Porous
Pavement?
1 0.22 0.00 0.00 NO
2 0.35 0.07 0.00 NO
3 0.39 0.09 0.05 YES
4 0.46 0.00 0.00 NO
5 0.82 0.23 0.00 NO
6 0.32 0.00 0.00 NO
7 0.36 0.02 0.05 YES
8 0.31 0.04 0.07 YES
9 0.23 0.00 0.00 NO
10 0.15 0.00 0.00 NO
11 0.37 0.13 0.00 NO
12 0.13 0.00 0.00 NO
13 0.52 0.12 0.07 YES
14 1.55 0.00 0.00 NO
TOTAL: 0.70 0.24
Porous Pavement Requirements
New Areas of Pavement including Pavers (ac)= 0.94
Total Porous Pavement (ac)= 0.24
Percent Porous Pavement= 25%
POROUS PAVEMENT CALCULATIONS
8/27/2015 3:20 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Porous Pavement
374-020 Brookfield Second Replat
DESIGN
POINT
BASIN
ID
AREA
(acres)
%
Impervious
BASIN
ID
AREA
(acres)
% Impervious
D2A OF-1 & D-2A 0.27 79%
45 D-2B 0.53 51%
42 D-2B & D-2C (not a part) 0.77 73%
D3A D-3A 0.44 67%
43 D-3B 1.27 66%
D3C D-3C 0.61 69%
44 D-5/92 - - D5, D9
46 D-7 0.30 63% D7 0.25 86%
51 D-7.1 0.33 5% D7.1 0.22 86%
52 D-7.2 0.33 57% D7.2 0.79 86%
47 D-8 0.33 65% D8 0.29 83%
48 D-8.1 0.33 68% D8.1 0.22 83%
60 OF-1 0.36 63%
OF2 OF-2 0.36 70%
Totals: 6.22 63% Totals: 6.12 76%
(1) - Drainage Memorandum for Brookfield Second Replat by Northern Engineering dated August 28, 2015
(2) - Final Drainage Report for Brookfield by TST dated December 14, 2001
Not a Part of Site
Not a Part of Site
Proposed Future Commercial
Northern Engineering Drainiage Memo
(1)
TST Drainiage Report
(2)
IMPERVIOUSNESS COMPARISON TABLE
D3 2.73 67%
D2 1.62 81%
E/CTV
TRACT F
PLAT OF BROOKFIELD
MORNINGSIDE
VILLAGE CONDOS
FOSSIL CREEK RESERVOIR INLET DITCH
WETLAND
POND A
47
D-8
D-8.1 0.39 AC
0.33 AC 48
52
D-7.2
0.79 AC
D-3C
0.61 AC
D-7.1
0.33 AC
51
46
D-7
0.30 AC
43
D-5/9
9.94 AC
44
OF2
0.15 AC
OF2
D11
0.36 AC
56
D-10
0.49 AC
54
D-2B
0.53 AC
45
OF1
0.44 AC
60
D-3A
0.44 AC
D-2A
0.27 AC
D-3B
1.27 AC
D-2C
0.77 AC
42
D3A
D3C
D2A
0.0%
50' HABITAT
BUFFER ZONE
50' HABITAT
BUFFER ZONE
KEYMAP
FOX DEN
BUFFER ZONE
NORTHERN BROOKFIELD LIGHTS DRIVE DRIVE
COVERED
ENTRY ENTRY
COVERED
DECK
COVERED
COVERED ENTRY
ENTRY
COVERED
ENTRY
DECK DECK DECK
DECK
COVERED
ENTRY
ENTRY
COVERED
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
ENTRY
COVERED
DECK
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
DECK DECK DECK
DECK
COVERED
ENTRY
ENTRY
COVERED
DECK
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
DECK
DECK DECK
DECK
COVERED
ENTRY
ENTRY
COVERED
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
ENTRY
COVERED
COVERED
ENTRY
COVERED
ENTRY
COVERED
ENTRY
No. Revisions: By: Date:
REVIEWED BY:
R. Banning
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
August 28, 2015
PROJECT:
374-020
Sheet
Of 34
BROOKFIELD SECOND REPLAT
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
08/28/15
E N G I N E E R I N G
N O R T H E RN
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
PHONE: 970.221.4158
www.northernengineering.com
LEGEND:
5013
PROPOSED CONTOUR 93
EXISTING CONTOUR
PROPERTY BOUNDARY
EXISTING STORM SEWER
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN
ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF
ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE
RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.REFER TO THE DRAINAGE MEMORANDUM BROOKFIELD SECOND REPLAT BY NORTHERN ENGINEERING, DATED
AUGUST 28, 2015 FOR ADDITIONAL INFORMATION.
3.HABITAT BUFFER ZONE IS TO BE MAINTAINED IN A NATIVE LANDSCAPE. SEE SECTION 3.4.1 OF THE LAND USE
CODE FOR ALLOWABLE USES WITHIN THE BUFFER ZONE.
{
}
NOTES:
FLOW PATH
DRAINAGE BASIN BUBBLE
A
144 ac
DESIGN POINT A
BASIN BOUNDARY
PROPOSED STORM SEWER
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
DR1
DRAINAGE PLAN
R. Banning
A. Boese
1"=60'
24
( IN FEET )
0
1 INCH = 60 FEET
60 60 120 180
i10
(in/hr)
C10
Q = C f (C )( i )(A )
8/27/2015 3:16 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Runoff
10-yr
Tc
(min)
100-yr
Tc
(min)
D2A OF-1 & D-2A Yes 0.82 0.82 1.00 700 4.56 1.47 0.44% 18.0 18.0 6.5 412 100.60 98.84 0.43% 1.31 5.3 23.2 23.2 11.8
45 D-2B No 0.63 0.63 0.79 0 0.00 0.00 N/A N/A N/A N/A 395 98.84 96.42 0.61% 1.57 4.2 5.0 5.0 5.0
42
D-2B & D-2C
(not a part) No
0.80 0.80 1.00 0 0.00 0.00 N/A N/A N/A N/A 525 98.34 96.00 0.45% 1.34 6.6 6.6 6.6 6.6
D3A D-3A No 0.74 0.74 0.93 0 0.00 0.00 N/A N/A N/A N/A 375 100.96 98.23 0.73% 1.71 3.7 5.0 5.0 5.0
43 D-3B No 0.77 0.77 0.96 0 0.00 0.00 N/A N/A N/A N/A 626 99.63 95.60 0.64% 1.60 6.5 6.5 6.5 6.5
D3C D-3C No 0.62 0.62 0.78 160 1.00 0.99 0.01% 61.5 61.5 41.6 210 100.86 99.63 0.59% 1.53 2.3 63.8 63.8 43.9
44 D-5/92 Yes 0.28 0.28 0.36 660 104.10 99.21 0.74% 43.3 43.3 39.5 440 99.85 98.00 0.42% 1.30 5.7 49.0 49.0 45.2
46 D-7 No 0.71 0.71 0.89 0 0.00 0.00 N/A N/A N/A N/A 135 98.25 96.72 1.13% 2.13 1.1 5.0 5.0 5.0
51 D-7.1 No 0.74 0.74 0.93 0 0.00 0.00 N/A N/A N/A N/A 68 98.68 98.07 0.90% 1.89 0.6 5.0 5.0 5.0
52 D-7.2 No 0.85 0.85 1.00 0 0.00 0.00 N/A N/A N/A N/A 225 100.14 97.50 1.17% 2.17 1.7 5.0 5.0 5.0
47 D-8 No 0.77 0.77 0.97 0 0.00 0.00 N/A N/A N/A N/A 150 100.14 98.67 0.98% 1.98 1.3 5.0 5.0 5.0
48 D-8.1 No 0.84 0.84 1.00 0 0.00 0.00 N/A N/A N/A N/A 50 0.37 0.18 0.38% 1.23 0.7 5.0 5.0 5.0
54 D-10 No 0.76 0.76 0.95 0 0.00 0.00 N/A N/A N/A N/A 210 98.45 97.09 0.65% 1.61 2.2 5.0 5.0 5.0
56 D-11 No 0.87 0.87 1.00 0 0.00 0.00 N/A N/A N/A N/A 105 98.45 97.93 0.50% 1.41 1.2 5.0 5.0 5.0
60 OF-1 Yes 0.31 0.31 0.39 700 4.56 1.47 0.44% 51.4 51.4 46.3 0 0.00 0.00 N/A N/A N/A 51.4 51.4 46.3
OF2 OF-2 No 0.70 0.70 0.88 70 98.97 97.40 2.24% 4.8 4.8 2.7 0 0.00 0.00 N/A N/A N/A 5.0 5.0 5.0
PROPOSED TIME OF CONCENTRATION COMPUTATIONS
A. Morse
August 27, 2015
Design
Point
Sub-Basin(s)
Overland Flow Gutter/Pipe Flow Time of Concentration
(Equation RO-4)
( )
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
−
=
8/27/2015 3:12 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Tc
D-2C2 0.77 0.11 0.29 0.00 0.22 Clayey | Average 2% to 7% 0.160 0.80 0.80 1.00 73%
TOTAL BASIN D2 1.57 0.38 0.45 0.00 0.29 Clayey | Average 2% to 7% 0.450 0.75 0.75 0.94 67%
D-3A 0.44 0.12 0.08 0.00 0.11 Clayey | Average 2% to 7% 0.131 0.74 0.74 0.93 66%
D-3B 1.27 0.36 0.30 0.00 0.28 Clayey | Average 2% to 7% 0.335 0.77 0.77 0.96 69%
D-3C 0.61 0.06 0.07 0.00 0.19 Clayey | Average 2% to 7% 0.287 0.62 0.62 0.78 49%
TOTAL BASIN D3 2.32 0.54 0.45 0.00 0.58 Clayey | Average 2% to 7% 0.753 0.72 0.72 0.90 63%
D-5/92 9.94 0.41 0.07 0.00 0.00 Clayey | Average 2% to 7% 9.456 0.28 0.28 0.36 5%
D-7 0.30 0.00 0.06 0.05 0.11 Clayey | Average 2% to 7% 0.138 0.71 0.71 0.89 57%
D-7.1 0.33 0.00 0.02 0.05 0.20 Clayey | Average 2% to 7% 0.079 0.74 0.74 0.93 65%
D-7.2 0.79 0.00 0.24 0.00 0.36 Clayey | Average 2% to 7% 0.421 0.85 0.85 1.00 68%
D-8 0.39 0.00 0.10 0.05 0.15 Clayey | Average 2% to 7% 0.180 0.77 0.77 0.97 63%
D-8.1 0.33 0.00 0.07 0.00 0.19 Clayey | Average 2% to 7% 0.141 0.84 0.84 1.00 70%
D-10 0.49 0.00 0.12 0.07 0.18 Clayey | Average 2% to 7% 0.234 0.76 0.76 0.95 61%
D-11 0.36 0.00 0.13 0.00 0.14 Clayey | Average 2% to 7% 0.221 0.87 0.87 1.00 68%
TOTAL BASIN D 16.82 1.33 1.71 0.23 2.19 Clayey | Average 2% to 7% 12.074 0.48 0.48 0.60 29%
OF-12 0.44 0.03 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.399 0.31 0.31 0.39 8%
OF-2 0.15 0.00 0.02 0.00 0.08 Clayey | Average 2% to 7% 0.053 0.70 0.70 0.88 58%
1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis
2. Sub-Basin outside of Project Boundary
Composite Runoff Coefficient with Adjustment
PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
8/27/2015 3:13 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Composite C