Loading...
HomeMy WebLinkAboutLILAC PROFESSIONAL OFFICE - BASIC DEVELOPMENT REVIEW - BDR150007 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESStatement of Planning Objectives Lilac Professional Office – Basic Development Review Lilac Professional Office is a project within the Neighborhood Conservation Buffer District (NCB). The existing building is approximately 975 s.f. on an existing 6,804.64 s.f./0.156 acre lot. The site is located at 420 Lilac Lane in Fort Collins, Colorado. Overall the project proposes to convert and existing residential building into a professional office, a permitted use without exterior alterations. No structural changes are proposed to the exterior of the existing building. The day-to-day uses would include internal accounting and management of businesses owned by the Owner. Occasionally, visits may be made to conduct business meetings. Professional services are to be provided for internal use only and are not intended to be provided for outside visiting customers. In regards to site improvements, the project proposes to increase the width of the existing concrete drive to provide additional off-street parking. The existing, and only vehicular access, is from Lilac Lane. No access is proposed along E. Mulberry Street. (D) Land Use Standards (1) Density: The principal building is 975 s.f. with a Building Floor Ration Area of 0.14. An existing 100 s.f. shed is on site and does not meet the minimum threshold of 150 s.f. accessory building to be counted towards the Total Floor Area. (2) Residential: N/A (3) Accessory Buildings with Habitable Space: N/A (4) Accessory Building without Habitable Space: The existing shed is 100 s.f., less than the allowed maximum of 600 s.f. (5) Allowable Floor Area on Rear Half of Lots: The floor area on the rear 50% of the lot is 15.7%. (6) Dimensional Standards: a. Minimum lot width shall be 50 feet of street frontage: Proposed lot width on Lilac Lane is 67.89 feet. This site is not located within the West Central Neighborhood Plan Subarea or south of University Avenue. b. A 15’ front yard setback is provided. The distance from the existing back of walk to existing garage doors is approximately 31.98 feet. c. A 15’ rear yard setback is provided. d. A 5’ wide side yard setback is provided along the north property line. Since the south property line is adjacent to E. Mulberry Street (a corner lot), a 15’ wide side yard setback is provided. e. The existing building is a single story structure. (E) Development Standards (1) Building Design: a. N/A b. The primary existing entrance is located on the front of the building. c. The existing shed does not encroach into a front yard setback that is 10’ greater than the setback for the primary structure. d. N/A e. N/A f. N/A g. N/A (existing structures) (2) Bulk and Massing: N/A (existing structures are below the maximum heights) (3) Carriage Houses and Habitable Accessory Buildings: N/A (4) Landscape/Hardscape Material: A maximum of 40% of the front yard may be hardscape material. With the addition of the proposed driveway, the front yard will have 57% hardscape vs. landscape area. The existing front yard is at 50% hardscape vs. landscape area. (5) Site Design: Proposed ‘off-street’ parking is provided with the existing concrete driveway and the proposed driveway widening. (6) Access: N/A (no alley) (7) Subdividing of Existing Lots: N/A ADDITIONAL ITEMS Number of Employees Estimate: • A total of 3 employees is anticipated.