Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FORT COLLINS HOTEL (DOWNTOWN HOTEL) - FDP - FDP150033 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS
LEVEL 01B 100' - 0" LEVEL 02 118' - 0" LEVEL 03 127' - 8" LEVEL 04 137' - 4" LEVEL 05 148' - 0" ROOF 157' - 10" 15.2 9.2 9 8 6.1 4.9 4 3.9 3 PENTHOUSE 167' - 6" 15 14 11.2 4.7 2 LEVEL 01A 101' - 0" CUSTOM ZINC PANEL BRICK - (COLOR 3) ALUMINUM STOREFRONT (COLOR 4) GROUND FACE CMU BLOCK (COLOR 5) PREFINISHED ALUMINUM PANEL (COLOR 4) PREFINISHED PERFORATED ALUMINUM SCREEN (COLOR 4) PRECAST OR CAST STONE PARAPET CAP ALUMINUM WINDOWS (COLOR 4) 13 12 10 7 4.3 1 LEVEL 01B 100' - 0" LEVEL 02 118' - 0" LEVEL 03 127' - 8" LEVEL 04 137' - 4" LEVEL 05 148' - 0" ROOF 157' - 10" C C.2 D E F H K PENTHOUSE 167' - 6" A E.8 G J LEVEL 01A 101' - 0" A.8 B INTERLOCKING ZINC PANEL (COLOR 3) BRICK - (COLOR 2) BRICK - (COLOR 1) PREFINISHED PERFORATED ALUMINUM SCREEN (COLOR 4) PRECAST OR CUT LEVEL 01B 100' - 0" LEVEL 02 118' - 0" LEVEL 03 127' - 8" LEVEL 04 137' - 4" LEVEL 05 148' - 0" ROOF 157' - 10" 3 3.9 4 4.9 6.1 8 9 15.2 PENTHOUSE 167' - 6" 2 4.7 11.2 14 LEVEL 01A 101' - 0" BRICK - COLOR 1 ALUMINUM STOREFRONT (COLOR 4) CUT LIMESTONE COLUMNS WITH PAINTED STEEL PROFILES AND HEADER (COLOR 4) BRICK - COLOR 2 COMPOSITE ZINC PANEL (COLOR 3) RESTAURANT STOREFRONT ENTRY ALUMINUM COMPOSITE PANEL PARAPET (COLOR 4) BRICK (COLOR 1) PAINTED STEEL TRELLIS SYSTEM (COLOR 4) INTERLOCKING ZINC PANEL (COLOR 3) COMPOSITE ALUMINIUM PANEL (COLOR 4) BRICK (COLOR 3) PREFINISHED PERFORATED ALUMINUM SCREEN (COLOR 4) 1 4.3 7 10 12 13 LEVEL 01B 100' - 0" LEVEL 02 118' - 0" LEVEL 03 127' - 8" LEVEL 04 137' - 4" LEVEL 05 148' - 0" ROOF 157' - 10" K H F E D C.2 C PENTHOUSE 167' - 6" J G E.8 A LEVEL 01A 101' - 0" B A.8 LEVEL 02 118' - 0" LEVEL 03 127' - 8" LEVEL 04 137' - 4" LEVEL 05 148' - 0" ROOF 157' - 10" C C.2 D E PENTHOUSE 167' - 6" A A.8 B INTERLOCKING ZINC PANEL (COLOR 3) BRICK (COLOR 3) BRICK (COLOR 1) ALUMINUM STOREFRONT (COLOR 3) PREFINISHED METAL RAILING (COLOR 4) PAINTED STEEL TRELLIS SYSTEM (COLOR 4) ALUMINUM COMPOSITE PANEL PARAPET (COLOR 4) LEVEL 02 118' - 0" LEVEL 03 127' - 8" LEVEL 04 137' - 4" LEVEL 05 148' - 0" ROOF 157' - 10" E D C.2 C PENTHOUSE 167' - 6" B A.8 A INTERLOCKING ZINC PANEL (COLOR 3) BRICK (COLOR 3) BRICK (COLOR 1) BALCONY WITH PREFINISHED METAL RAILING (COLOR 4) PAINTED STEEL TRELLIS SYSTEM (COLOR 4) BRICK (COLOR 1) ALUMINUM STOREFRONT (COLOR 3) PRECAST OR CAST STONE PARAPET CAP ISS. # KEY PLAN DESCRIPTION DATE ARCHITECT'S PROJECT NUMBER 4240 Architecture Inc. copyright 2015 NOT FOR CONSTRUCTION OWNER 4240 ARCHITECTURE INC 3507 RINGSBY COURT SUITE 117 DENVER, CO 80216 t: 303.292.3388 f: 303.292.3113 ARCHITECT 9/23/2015 8:47:43 AM A-300 COURTYARD ELEVATIONS WALNUT ST & CHESTNUT ST FORT COLLINS, CO 80524 21129.00 DOWNTOWN FORT COLLINS HOTEL MCWHINNEY 2725 ROCKY MOUNTAIN AVE STE 200 LOVELAND, CO80538 DEVELOPER SAGE HOSPITALITY 1575 WELTON STREET STE 300 DENVER, CO 80202 OPERATOR t: 970.962.9990 t: 303.595.7200 f: 303.595.7219 BOHEMIAN COMPANIES 262 E MOUNTAIN AVE FORT COLLINS, CO 80524 t: 970.490.2626 NORTHERN ENGINEERING, INC 200 S COLLEGE AVE FORT COLLINS, CO 80524 CIVIL RUSSELL + MILLS STUDIOS 141 S COLLEGE AVE FORT COLLINS, CO 80524 LANDSCAPE t: 970.568.5415 f: 970.221.4159 t: 970.484.8855 1COURTYARD SCALE: 1/8" = 1'-0" (SOUTH) 2COURTYARD SCALE: 1/8" = 1'-0" (NORTH) A PDP SUBMITTAL 24 JUNE 2015 B PDP RESUBMITTAL 22 JULY 2015 C PDP RESUBMITTAL 26 AUG. 2015 D FDP SUBMITTAL 23 SEP 2015 PREFINISHED PERFORATED ALUMINUM SCREEN (COLOR 4) GROUND FACE CMU BLOCK (COLOR 5) ALUMINUM COMPOSITE PANEL PARAPET (COLOR 4) BRICK (COLOR 3) ALUMINUM WINDOWS (COLOR 4) INTERLOCKING ZINC PANEL (COLOR 3) ALUMINUM WINDOWS (COLOR 3) PREFINISHED ALUMINUM PANEL (COLOR 4) HOLLOW METAL DOORS (COLOR 6) ISS. # KEY PLAN DESCRIPTION DATE ARCHITECT'S PROJECT NUMBER 4240 Architecture Inc. copyright 2015 NOT FOR CONSTRUCTION OWNER 4240 ARCHITECTURE INC 3507 RINGSBY COURT SUITE 117 DENVER, CO 80216 t: 303.292.3388 f: 303.292.3113 ARCHITECT 9/23/2015 8:47:29 AM A-200 BUILDING ELEVATIONS WALNUT ST & CHESTNUT ST FORT COLLINS, CO 80524 21129.00 DOWNTOWN FORT COLLINS HOTEL MCWHINNEY 2725 ROCKY MOUNTAIN AVE STE 200 LOVELAND, CO80538 DEVELOPER SAGE HOSPITALITY 1575 WELTON STREET STE 300 DENVER, CO 80202 OPERATOR t: 970.962.9990 t: 303.595.7200 f: 303.595.7219 BOHEMIAN COMPANIES 262 E MOUNTAIN AVE FORT COLLINS, CO 80524 t: 970.490.2626 NORTHERN ENGINEERING, INC 200 S COLLEGE AVE FORT COLLINS, CO 80524 CIVIL RUSSELL + MILLS STUDIOS 141 S COLLEGE AVE FORT COLLINS, CO 80524 LANDSCAPE t: 970.568.5415 f: 970.221.4159 t: 970.484.8855 1SW SCALE: WALNUT 1/8" = 1'-0" (WEST) 2NW SCALE: CITY 1/8" = 1'-0" PARCEL (NORTH) C PDP RESUBMITTAL 26 AUG. 2015 STONE PARAPET CAP ALUMINUM STOREFRONT (COLOR 4) ALUMINUM COMPOSITE PANEL PARAPET (COLOR 4) PREFINISHED PERFORATED ALUMINUM SCREEN (COLOR 4) ALUMINUM STOREFRONT (COLOR 4) PREFINISHED ALUMINUM CANOPY (COLOR 4) ALUMINUM WINDOWS (COLOR 4) CUT LIMESTONE COLUMNS WITH PAINTED STEEL PROFILES AND HEADER (COLOR 4) CUT LIMESTONE PLANTERS (SMOOTH TEXTURE) BRICK - (COLOR 3) ALUMINUM WINDOWS (COLOR 4) ISS. # KEY PLAN DESCRIPTION DATE ARCHITECT'S PROJECT NUMBER 4240 Architecture Inc. copyright 2015 NOT FOR CONSTRUCTION OWNER 4240 ARCHITECTURE INC 3507 RINGSBY COURT SUITE 117 DENVER, CO 80216 t: 303.292.3388 f: 303.292.3113 ARCHITECT 9/23/2015 8:46:28 AM A-100 BUILDING ELEVATIONS WALNUT ST & CHESTNUT ST FORT COLLINS, CO 80524 21129.00 DOWNTOWN FORT COLLINS HOTEL MCWHINNEY 2725 ROCKY MOUNTAIN AVE STE 200 LOVELAND, CO80538 DEVELOPER SAGE HOSPITALITY 1575 WELTON STREET STE 300 DENVER, CO 80202 OPERATOR t: 970.962.9990 t: 303.595.7200 f: 303.595.7219 BOHEMIAN COMPANIES 262 E MOUNTAIN AVE FORT COLLINS, CO 80524 t: 970.490.2626 NORTHERN ENGINEERING, INC 200 S COLLEGE AVE FORT COLLINS, CO 80524 CIVIL RUSSELL + MILLS STUDIOS 141 S COLLEGE AVE FORT COLLINS, CO 80524 LANDSCAPE t: 970.568.5415 f: 970.221.4159 t: 970.484.8855 1NE SCALE: FIREHOUSE 1/8" = 1'-0" ALLEY (EAST) 2SE SCALE: CHESTNUT 1/8" = 1'-0" (SOUTH) A PDP SUBMITTAL 24 JUNE 2015 B PDP RESUBMITTAL 22 JULY 2015 C PDP RESUBMITTAL 26 AUG. 2015 D FDP SUBMITTAL 23 SEP 2015