Loading...
HomeMy WebLinkAboutREPLAT OF EAST RIDGE - MAJOR AMENDMENT - MJA150005 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSC L TRAVEL TRAVEL PARKING PARKING WALK C L PARKWAY PARKWAY WALK UTILITY EASEMENT UTILITY EASEMENT TRAVEL TRAVEL PARKING PARKING WALK PARKWAY PARKWAY WALK UTILITY EASEMENT UTILITY EASEMENT BIKE LANE BIKE LANE C L TRAVEL TRAVEL WALK PARKWAY PARKWAY WALK UTILITY EASEMENT UTILITY EASEMENT BIKE LANE BIKE LANE TRAVEL TRAVEL UTILITY EASEMENT UTILITY EASEMENT BACK OF CURB TO BACK OF CURB (DRAINAGE TO ONE SIDE OR THE OTHER BASED ON GRADING SEE RD P&P FOR MORE DETAIL) CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 6.0 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Preliminary Drainage and Erosion Control Reports for East Ridge dated September 09, 2015 by Galloway and Company, Inc., shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not EAST VINE DRIVE TIMBERLINE DRIVE MATCHLINE-SEE SHEET EX02 LEGEND: EXISTING TELEPHONE T T T EXISTING GAS EXISTING TELEPHONE RISER EXISTING TREES NOTES: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES THE SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT ACCEPTS CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE (970) 482-1249. 4. ALL SYMBOLS ARE GRAPHICAL IN NATURE AND ARE NOT TO SCALE. 5. CONTACT THE ALTA SURVEYOR FOR INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 7. CONTRACTOR SHALL COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING TREES WITH THE APPROVED LANDSCAPE PLANS. COORDINATE THE REMOVAL OF ALL OTHER PLANTINGS WITH THE APPROVED LANDSCAPE PLANS. 8. SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT MAY OCCUR TO ANY ON-SITE, PUBLIC OR PRIVATE FACILITY AS A RESULT OF THE CONSTRUCTION PROCESS. THE CONTRACTOR SHALL PROTECT TO THE EXTENT POSSIBLE ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO OR WITHIN THE CONSTRUCTION AREA. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER THE LATEST CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS THAT IMPACT ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. EXISTING SANITARY SEWER EXISTING WATER EXISTING FENCE X X X EXISTING WATER METER PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR SAN WTR EXISTING STORM GAS EXISTING OVER-HEAD ELECTRIC E EXISTING TV TV 5015 5015 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: EXISTING WETLAND BARE EARTH / FARM LAND BARE EARTH / FARM LAND MATCHLINE-SEE SHEET EX01 LEGEND: EXISTING TELEPHONE T T T EXISTING GAS EXISTING TELEPHONE RISER EXISTING TREES NOTES: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES THE SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT ACCEPTS CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE (970) 482-1249. 4. ALL SYMBOLS ARE GRAPHICAL IN NATURE AND ARE NOT TO SCALE. 5. CONTACT THE ALTA SURVEYOR FOR INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 7. CONTRACTOR SHALL COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING TREES WITH THE APPROVED LANDSCAPE PLANS. COORDINATE THE REMOVAL OF ALL OTHER PLANTINGS WITH THE APPROVED LANDSCAPE PLANS. 8. SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT MAY OCCUR TO ANY ON-SITE, PUBLIC OR PRIVATE FACILITY AS A RESULT OF THE CONSTRUCTION PROCESS. THE CONTRACTOR SHALL PROTECT TO THE EXTENT POSSIBLE ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO OR WITHIN THE CONSTRUCTION AREA. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER THE LATEST CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS THAT IMPACT ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. EXISTING SANITARY SEWER EXISTING WATER EXISTING FENCE X X X EXISTING WATER METER PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR SAN WTR EXISTING STORM GAS EXISTING OVER-HEAD ELECTRIC E EXISTING TV TV 5015 5015 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18 ''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12'' W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 8''W12''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 8''W8''W 8''W 8''W8''W 8''SS 8''SS 8''SS 8''SS 18''SS 8''SS8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18''SS 8''W 18''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 8''SS 18''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8 ''W 8''W 8''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 118''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12'' SS 21''SS 21''SS 21''SS 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 12''SS 12''SS 12''SS 2 1''SS 21''SS 21''SS 8''SS8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 21''SS 16''W 16''W 16''W 16''W 16''W 8'' A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A LOT 1 LOT 2. LOT 16 LOT 1 LOT 15 LOT 3 LOT 14 LOT 4 LOT 13 LOT 5 LOT 12 LOT 6 LOT 11 LOT 6 LOT 13 LOT 5 LOT 14 LOT 4 LOT 15 LOT 3 LOT 16 LOT 2 LOT 17 LOT 18 LOT 2 LOT 3 LOT 4 LOT 13 LOT 12 LOT 11 LOT 1 LOT 14 LOT 1 LOT 2 LOT 3 LOT 4 TRACT A BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10 NAVION LANE VICOT WAY YEAGER STREET BARNSTORMER STREET BIPLANE STREET TIMBERLINE 1.03% 1.43% 1.45% 3.03% A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A LOT 4 LOT 5 LOT 6 LOT 11 LOT 10 LOT 7 LOT 9 LOT 8 LOT 4 LOT 5 LOT 6 LOT 7 LOT 2 LOT 3 LOT 4 LOT 7 LOT 6 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 29 LOT 28 LOT 27 LOT 31 LOT 30 LOT 25 LOT 7 LOT 8 LOT 9 LOT 24 LOT 23 LOT 6 LOT 26 LOT 10 LOT 11 LOT 12 LOT 13 LOT 1 LOT 8 LOT 14 LOT 19 LOT 22 LOT 21 LOT 20 LOT 18 LOT 17 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 9 LOT 10 LOT 1 LOT 8 LOT 11 TRACT P TRACT Q BLOCK 9 BLOCK 20 BLOCK 18 BLOCK 19 BARNSTORMER STREET BIPLANE STREET MARQUISE STREET 1.39% 1.45% 1.39% 1.39% 2.92% 2.92% B A A A A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B LOT 15 LOT 14 LOT 19 LOT 18 LOT 15 LOT 14 LOT 13 LOT 30 LOT 29 LOT 28 LOT 27 LOT 26 LOT 25 LOT 24 LOT 17 LOT 18 LOT 19 LOT 20 LOT 23 LOT 22 LOT 21 LOT 16 LOT 17 LOT 16 TRACT D TRACT AA TRACT C TRACT E TRACT E BLOCK 3 BLOCK 3 TRACT B CRUSADER STREET ZEPPELIN WAY TIGERCAT WAY TIMBERLINE INTERNATIONAL BLVD (FUTURE) A A A A A A A A A A A A A A A A B B B B B B B B B B B B B B B B B B B B B LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 6 LOT 7 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 8 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 15 LOT 9 LOT 16 LOT 10 LOT 13 LOT 12 LOT 11 LOT 16 LOT 15 LOT 14 LOT 9 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 TRACT Z BLOCK 30 BLOCK 32 BLOCK 29 BLOCK 31 BLOCK 33 TRACT Y CRUSADER STREET INTERNATIONAL BLVD (FUTURE) 5.72% 6.67% 9.60% PROPOSED WATER QUALITY MATCHLINE-SEE SHEET GR07 MATCHLINE-SEE SHEET GR06 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOT 1 LOT 2. LOT 16 LOT 1 LOT 15 LOT 3 LOT 14 LOT 4 LOT 13 LOT 5 LOT 12 LOT 6 LOT 11 LOT 6 LOT 13 LOT 5 LOT 14 LOT 4 LOT 15 LOT 3 LOT 16 LOT 2 LOT 17 LOT 18 LOT 2 LOT 3 LOT 4 LOT 13 LOT 12 LOT 11 LOT 1 LOT 14 LOT 1 LOT 2 LOT 3 LOT 4 BLOCK 8 BLOCK 9 BLOCK 7 BLOCK 10 TRACT A 227.22 LF 8" PVC N00°00'00"E 232.01 LF 8" PVC N00°11'22"E 469.52 LF 8" PVC S89°40'58"E 252.01 LF 12" PVC N89°40'53"W 227.24 LF 12" PVC N89°40'53"W 34.88 LF 8" PVC S45°00'00"W 469.03 LF 12" PVC S00°15'37"E 434.52 LF 8" PVC S00°15'37"E PROJECT BOUNDARY 30' - 53' R.O.W 9' UTIL. EASEMENT PROPOSED 12" WATERLINE (TYP.) 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 8''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 18''SS 18''SS 18''SS 18''SS 18''SS LOT 4 LOT 5 LOT 6 LOT 11 LOT 10 LOT 7 LOT 9 LOT 8 LOT 4 LOT 5 LOT 6 LOT 7 LOT 2 LOT 3 LOT 4 LOT 7 LOT 6 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 29 LOT 28 LOT 27 LOT 31 LOT 30 LOT 25 LOT 7 LOT 8 LOT 9 LOT 24 LOT 23 LOT 6 LOT 26 LOT 10 LOT 11 LOT 12 LOT 13 LOT 1 LOT 8 LOT 14 LOT 19 LOT 22 LOT 21 LOT 20 LOT 18 LOT 17 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 9 LOT 10 LOT 1 LOT 8 LOT 11 BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 9 ACT Q TRACT P 469.52 LF 8" PVC S89°40'58"E 834.05 LF 12" PVC S89°40'53"E 66.95 LF 12" PVC S44°41'58"E 252.00 LF 8" PVC N00°16'12"E 997.50 LF 8" PVC N89°40'55"W 469.85 LF 12" PVC N89°40'53"W PROJECT BOUNDARY PROPOSED 12" WATERLINE (TYP.) PROPOSED 8" WATERLINE (TYP.) PROPOSED 12" WATERLINE (TYP.) PROPOSED 8" WATERLINE (TYP.) 8''SS 18''SS 18''SS LOT 29 LOT 30 LOT 31 LOT 4 LOT 3 LOT 5 LOT 6 LOT 7 LOT 30 LOT 29 LOT 28 LOT 27 LOT 7 LOT 10 LOT 9 LOT 8 LOT 6 LOT 5 LOT 4 LOT 3 LOT 2 LOT 1 LOT 34 LOT 33 LOT 32 LOT 31 LOT 2 LOT 1 LOT 34 LOT 33 LOT 32 LOT 12 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 5 LOT 6 LOT 4 LOT 1 LOT 3 LOT 2 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 1 LOT 8 LOT 9 LOT 10 LOT 6 LOT 11 LOT 7 LOT 10 LOT 7 LOT 4 LOT 5 LOT 11 LOT 10 LOT 6 LOT 7 LOT 9 LOT 8 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 16 LOT 15 LOT 2 LOT 3 LOT 4 LOT 6 LOT 5 LOT 7 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 19 LOT 18 LOT 17 LOT 16 LOT 22 LOT 21 LOT 20 LOT 15 LOT 14 LOT 13 LOT 1 LOT 8 LOT 9 LOT 10 LOT 8 LOT 11 LOT 12 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 9 LOT 8 LOT 7 LOT 11 LOT 10 LOT 12 LOT 3 LOT 2 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 3 LOT 14 LOT 4 LOT 5 LOT 6 LOT 13 LOT 12 LOT 11 LOT 7 LOT 10 LOT 8 LOT 9 LOT 1 LOT 16 LOT 2 LOT 15 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 7 LOT 5 LOT 6 LOT 10 LOT 11 LOT 1 LOT 8 LOT 3 LOT 4 LOT 2 LOT 14 LOT 13 LOT 12 LOT 21 LOT 20 LOT 19 LOT 14 LOT 13 LOT 12 LOT 11 LOT 22 LOT 23 LOT 9 LOT 24 LOT 10 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 30 LOT 29 LOT 36 LOT 37 LOT 6 LOT 5 LOT 6 LOT 27 LOT 12 LOT 11 LOT 24 LOT 25 LOT 34 LOT 13 LOT 12 LOT 11 LOT 23 LOT 24 LOT 22 LOT 21 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 6 LOT 7 LOT 8 LOT 9 LOT 27 LOT 8 LOT 7 LOT 26 LOT 25 LOT 38 LOT 39 LOT 40 LOT 4 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 12 LOT 11 LOT 10 LOT 15 LOT 14 LOT 13 LOT 8 LOT 9 LOT 16 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 13 LOT 12 LOT 11 LOT 10 LOT 15 LOT 14 LOT 1 LOT 9 LOT 8 LOT 16 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 1 LOT 8 LOT 2 LOT 1 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 7 LOT 8 LOT 9 LOT 10 LOT 1 LOT 2 LOT 3 LOT 6 LOT 20 LOT 10 LOT 3 LOT 4 LOT 5 LOT 9 LOT 1 LOT 2 LOT 15 LOT 14 LOT 13 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 17 LOT 16 LOT 12 LOT 16 LOT 9 LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 6 LOT 10 LOT 7 LOT 8 LOT 9 BLOCK 24 BLOCK 25 BLOCK 26 BLOCK 27 BLOCK 28 BLOCK 29 BLOCK 30 BLOCK 33 BLOCK 13 BLOCK 14 BLOCK 25 BLOCK 26 BLOCK 27 BLOCK 28 TRACT Y TRACT X TRACT W LOT 15 LOT 14 LOT 19 LOT 18 LOT 15 LOT 14 LOT 13 LOT 30 LOT 29 LOT 28 LOT 27 LOT 26 LOT 25 LOT 24 LOT 17 LOT 18 LOT 19 LOT 20 LOT 23 LOT 22 LOT 21 LOT 16 LOT 17 LOT 16 BLOCK 3 BLOCK 3 TRACT D TRACT AA TRACT C TRACT E TRACT E 149.39 LF 8" PVC N00°51'18"E PROJECT BOUNDARY PROJECT BOUNDARY 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8 ''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 12' 'SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12'' SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 16''W 16''W 16''W 16''W 16''W 16''W 16''W 16''W 16''W 16''W 16''W 8''SS 8 ''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 6 LOT 7 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 8 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 15 LOT 9 LOT 16 LOT 10 LOT 13 LOT 12 LOT 11 LOT 16 LOT 15 LOT 14 LOT 9 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 BLOCK 29 BLOCK 30 BLOCK 31 BLOCK 32 BLOCK 33 BLOCK 29 BLOCK 30 T TRACT Z 58.24 LF 8" PVC N09°28'41"W 135.45 LF 8" PVC N00°17'05"E 899.98 LF 8" PVC N89°29'01"W 251.99 LF 8" PVC N00°17'05"E 252.00 LF 12" PVC S00°17'10"W 286.80 LF 12" PVC S00°17'10"W PROJECT BOUNDARY 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8 ''W 18''SS18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 8''W 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12' 21''SS 21''S S 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21' 'SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 12''SS 21''SS 21''SS 21''SS 21''SS 21''SS 8''SS 8''SS 8'' 8''SS8''SS 8''SS 8''SS 8''SS 8''SS 8''SS SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 21''SS 21''SS 1 6''W 16''W 16''W 8" TEE w/JR 2 - 8" G.V. (S, E) N: 17590.36 E: 11687.50 8"6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17590.13 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21 ''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21'' SS 21''SS 21''SS 21''SS 21''SS 21''SS 42+00 43+00 44+00 45+00 51+00 50+00 49+00 48+00 47+00 46+00 56+00 55+00 54+00 53+00 52+00 MATCHLINE-SEE SHEET UT08 MATCHLINE-SEE SHEET UT10 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. ''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+ 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 21''SS 24''SS 24'' SS 24''SS 24''SS 21''SS 21''SS 21''SS 21''SS 19+00 18+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 MATCHLINE-SEE THIS SHEET PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. () (4949.0) 4949.04 (4946.6) 4946.59 (4946.3) 4946.33 (4946.7) 4946.72 (4946.4) 4946.38 (4946.0) 4946.00 (4946.0) 4945.98 (4946.0) 4945.98 (4946.0) 4945.99 (4947.0) 4946.98 (4946.1) 4946.05 (4947.1) 4947.12 (4947.2) 4947.16 (4947.0) 4947.03 (4947.1) 4947.11 (4947.2) 4947.23 (4947.0) 4946.99 EXISTING GROUND PROPOSED GRADE EX PR CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU (4947.0) 4946.99 (4947.0) 4947.05 (4946.9) 4946.87 (4946.5) 4946.49 (4946.2) 4946.21 (4945.6) 4945.62 (4945.1) 4945.09 (4944.5) 4944.49 (4943.4) 4943.36 (4942.0) 4942.01 (4941.0) 4941.03 (4940.6) 4940.62 (4940.7) 4940.65 (4940.6) 4940.56 (4940.6) 4940.59 (4940.8) 4940.83 (4941.0) 4941.03 EXISTING GROUND PROPOSED GRADE EX PR CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF (4941.0) 4941.03 (4941.4) 4941.36 (4941.5) 4941.49 (4941.9) 4941.89 (4942.3) 4942.28 (4943.0) 4943.04 (4943.4) 4943.41 (4944.2) 4944.21 (4945.0) 4944.96 (4945.8) 4945.82 (4946.6) 4946.59 (4947.1) 4947.14 (4948.0) 4947.95 (4948.7) 4948.71 (4949.0) 4949.03 (4949.7) 4949.68 (4950.1) 4950.06 EXISTING GROUND PROPOSED GRADE EX PR CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF (4950.1) 4950.06 (4950.6) 4950.58 (4951.3) 4951.35 (4951.9) 4951.91 (4952.1) 4952.07 (4952.5) 4952.45 (4952.8) 4952.84 (4953.3) 4953.33 () () () PROPOSED GRADE EXISTING GROUND EX PR CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= SYKES DRIVE to CENTERLINE 34+00.00 37+92.30 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT () (4949.6) 4949.64 (4949.1) 4949.14 (4948.6) 4948.64 (4948.3) 4948.34 (4948.0) 4948.04 (4947.7) 4947.74 (4947.4) 4947.44 (4947.1) 4947.14 (4946.8) 4946.84 (4946.5) 4946.54 (4946.2) 4946.24 (4945.9) 4945.94 (4945.6) 4945.64 (4945.2) 4945.19 (4944.3) 4944.31 (4944.3) 4944.28 (4943.7) 4943.70 (4943.4) 4943.40 (4943.1) 4943.10 EXISTING GROUND PROPOSED GRADE EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility (4943.1) 4943.10 (4942.8) 4942.80 (4942.5) 4942.52 (4942.5) 4942.52 (4942.8) 4942.80 (4943.1) 4943.10 (4943.4) 4943.40 (4943.7) 4943.70 (4944.0) 4944.00 (4944.3) 4944.30 (4944.6) 4944.60 (4944.9) 4944.90 (4945.2) 4945.20 (4945.4) 4945.38 (4945.2) 4945.18 (4944.9) 4944.88 (4944.6) 4944.58 (4944.3) 4944.28 (4944.0) 4943.98 (4943.7) 4943.68 (4943.4) 4943.38 (4943.0) 4943.01 (4942.2) 4942.24 () () PROPOSED EXISTING GRADE GROUND EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer () (4949.6) 4949.64 (4950.1) 4950.14 (4950.6) 4950.59 (4950.5) 4950.50 (4950.0) 4950.00 (4949.5) 4949.50 (4949.0) 4949.00 (4948.5) 4948.50 (4948.4) 4948.35 (4948.7) 4948.68 (4949.0) 4949.05 (4949.4) 4949.42 (4949.8) 4949.79 (4950.2) 4950.16 (4950.5) 4950.53 (4950.9) 4950.90 (4951.3) 4951.26 (4951.6) 4951.63 (4952.0) 4952.00 PROPOSED GRADE EXISTING GROUND EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility (4952.0) 4952.00 (4952.3) 4952.33 (4952.3) 4952.27 (4952.0) 4951.97 (4951.7) 4951.67 (4951.4) 4951.37 (4951.1) 4951.07 (4950.9) 4950.88 (4951.1) 4951.07 (4951.4) 4951.37 (4951.7) 4951.67 (4952.0) 4951.97 (4952.3) 4952.27 (4952.6) 4952.57 (4952.9) 4952.87 (4953.2) 4953.17 (4953.5) 4953.47 (4953.8) 4953.77 (4954.1) 4954.07 (4954.4) 4954.37 (4954.7) 4954.67 (4955.0) 4954.97 () PROPOSED GRADE EXISTING GROUND EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: () (4948.2) 4948.25 (4948.8) 4948.75 (4949.2) 4949.23 (4949.1) 4949.14 (4948.4) 4948.41 (4947.6) 4947.62 (4946.7) 4946.69 (4946.3) 4946.29 (4946.6) 4946.59 (4947.4) 4947.44 (4947.9) 4947.85 (4947.9) 4947.92 (4947.6) 4947.65 (4947.3) 4947.35 (4947.0) 4947.05 (4946.7) 4946.75 (4946.4) 4946.45 (4946.2) 4946.16 (4946.2) 4946.16 (4946.4) 4946.45 (4946.7) 4946.75 EXISTING GRADE PROPOSED GRADE EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: (4946.7) 4946.75 (4947.0) 4947.05 (4947.3) 4947.34 (4947.4) 4947.37 (4947.1) 4947.10 (4946.6) 4946.61 (4945.7) 4945.68 (4945.3) 4945.35 (4946.2) 4946.18 (4946.6) 4946.58 (4946.3) 4946.26 (4945.8) 4945.78 (4945.7) 4945.68 (4946.0) 4945.97 (4946.3) 4946.27 (4946.6) 4946.57 (4946.9) 4946.87 EXISTING GRADE PROPOSED GRADE EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF (4946.9) 4946.87 (4947.2) 4947.17 (4947.5) 4947.47 (4947.8) 4947.77 (4948.1) 4948.07 (4948.4) 4948.38 (4948.2) 4948.23 (4947.9) 4947.93 (4947.9) 4947.87 (4948.6) 4948.63 (4949.6) 4949.63 (4950.6) 4950.63 (4951.6) 4951.63 () () EXISTING GRADE PROPOSED GRADE EXISTING PROPOSED () (4952.5) 4952.54 (4951.1) 4951.10 (4949.6) 4949.60 (4948.6) 4948.58 (4947.6) 4947.60 (4947.0) 4947.00 () EXISTING GRADE PROPOSED GRADE EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer () (4948.5) 4948.49 (4948.3) 4948.28 (4948.1) 4948.10 (4948.0) 4947.98 (4948.6) 4948.55 (4947.1) 4947.09 (4945.3) 4945.34 (4943.3) 4943.33 (4941.2) 4941.19 (4939.6) 4939.59 (4938.6) 4938.56 (4938.0) 4938.02 (4937.8) 4937.77 (4937.5) 4937.48 (4937.9) 4937.89 (4938.0) 4938.02 (4938.2) 4938.22 (4938.6) 4938.63 (4938.9) 4938.91 EXISTING GRADE PROPOSED GRADE EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility (4938.9) 4938.91 (4939.1) 4939.13 (4939.3) 4939.34 (4939.5) 4939.54 (4940.0) 4940.03 (4940.7) 4940.68 (4940.9) 4940.94 (4941.1) 4941.06 (4941.7) 4941.70 (4942.1) 4942.07 (4942.2) 4942.19 (4942.2) 4942.23 (4942.1) 4942.14 (4942.1) 4942.09 (4942.0) 4942.01 (4942.0) 4941.95 (4942.0) 4941.96 () () EXISTING GRADE PROPOSED GRADE EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner () (4949.1) 4949.13 (4949.4) 4949.38 (4950.3) 4950.27 (4950.6) 4950.64 (4950.9) 4950.94 (4951.2) 4951.24 (4951.5) 4951.53 (4951.4) 4951.43 (4950.7) 4950.72 (4949.6) 4949.65 (4950.0) 4950.02 (4951.0) 4950.98 (4951.3) 4951.28 (4951.0) 4951.00 (4950.7) 4950.70 (4950.5) 4950.47 (4950.7) 4950.70 EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU (4950.7) 4950.70 (4951.0) 4951.00 (4951.3) 4951.30 (4951.6) 4951.60 (4951.9) 4951.90 (4952.2) 4952.20 (4952.5) 4952.50 (4952.8) 4952.80 (4953.1) 4953.10 (4953.4) 4953.43 (4954.0) 4954.03 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= BIPLANE STREET to CENTERLINE 18+00.00 23+40.09 50 5 () (4954.5) 4954.51 (4955.1) 4955.11 (4955.7) 4955.70 (4955.8) 4955.75 (4955.0) 4955.02 (4954.8) 4954.75 (4954.4) 4954.36 (4954.1) 4954.08 (4953.8) 4953.80 (4953.5) 4953.52 (4953.2) 4953.23 (4952.6) 4952.64 (4951.7) 4951.67 (4950.7) 4950.67 (4949.7) 4949.67 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. () (4949.0) 4949.01 (4949.3) 4949.30 (4949.9) 4949.88 (4949.8) 4949.77 (4949.4) 4949.38 (4949.0) 4948.99 (4948.6) 4948.60 (4948.2) 4948.21 (4947.7) 4947.71 (4947.2) 4947.21 () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= YEAGER STREET to CENTERLINE 10+00.00 14+75.33 50 5 # THESE PLANS ARE AN INSTRUMENT OF () (4949.2) 4946.96 (4949.6) 4946.46 (4949.9) 4946.15 (4950.2) 4946.34 (4950.6) 4946.64 (4950.7) 4946.94 (4950.7) 4947.24 (4950.8) 4947.54 (4951.0) 4947.84 (4951.0) 4948.26 (4950.9) 4948.56 (4951.0) 4949.44 (4951.2) 4949.88 (4951.5) 4950.07 (4951.8) 4949.88 (4952.0) 4949.80 (4952.0) 4950.15 (4952.0) 4950.58 (4952.4) 4951.00 EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility (4952.4) 4951.00 (4952.8) 4951.43 (4953.0) 4951.85 (4953.0) 4952.28 (4953.3) 4952.45 (4953.7) 4953.35 (4953.9) 4954.05 (4954.0) 4954.38 (4954.0) 4954.68 (4954.0) 4954.98 (4954.0) 4955.28 (4954.0) 4955.58 () CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= COLEMAN STREET to CENTERLINE 19+00.00 24+63.93 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, () (4952.6) 4952.63 (4952.2) 4952.17 (4952.0) 4951.99 (4952.0) 4951.99 (4952.0) 4951.97 (4951.9) 4951.95 (4951.9) 4951.86 (4951.5) 4951.55 (4951.2) 4951.24 (4951.0) 4951.00 (4950.8) 4950.82 (4950.4) 4950.41 (4950.0) 4950.03 EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= MARQUISE STREET to (4950.0) 4950.03 (4949.7) 4949.66 (4949.3) 4949.33 (4949.0) 4948.99 (4948.5) 4948.51 (4948.1) 4948.06 (4947.5) 4947.48 (4947.0) 4947.00 (4945.7) 4945.72 (4943.9) 4943.91 (4942.5) 4942.51 (4941.0) 4940.98 () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= MARQUISE STREET to CENTERLINE 16+00.00 21.60.95 () (4949.6) 4949.57 (4949.9) 4949.86 (4950.5) 4950.53 (4950.5) 4950.54 (4950.2) 4950.24 (4949.9) 4949.94 (4949.6) 4949.64 (4949.3) 4949.34 (4949.0) 4949.02 (4948.3) 4948.34 (4947.3) 4947.30 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= NAVION LANE to CENTERLINE 10+00.00 15+16.79 () (4949.6) 4949.58 (4949.7) 4949.75 (4950.0) 4950.04 (4950.2) 4950.24 (4950.4) 4950.44 (4950.7) 4950.75 (4951.0) 4951.00 (4951.0) 4951.00 (4951.0) 4951.04 (4951.4) 4951.42 (4951.9) 4951.86 (4952.1) 4952.14 (4952.4) 4952.39 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: () (4940.3) 4940.27 (4940.6) 4940.60 (4941.4) 4941.41 (4941.8) 4941.79 (4942.1) 4942.09 (4942.4) 4942.39 (4942.7) 4942.68 (4942.7) 4942.71 (4942.4) 4942.43 (4942.2) 4942.17 (4942.3) 4942.25 (4942.6) 4942.55 (4942.9) 4942.85 (4943.2) 4943.15 (4943.5) 4943.45 (4943.8) 4943.75 (4944.1) 4944.05 (4944.4) 4944.35 (4944.7) 4944.70 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: () (4944.9) 4944.95 (4943.4) 4943.39 (4942.5) 4942.47 (4941.4) 4941.44 (4940.2) 4940.24 (4939.2) 4939.23 () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= COMET STREET A to CENTERLINE 10+00.00 12+53.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 () (4937.6) 4937.63 (4938.3) 4938.26 (4939.0) 4938.98 (4939.7) 4939.73 (4940.4) 4940.41 (4941.4) 4941.36 (4942.0) 4942.01 (4942.9) 4942.92 (4943.5) 4943.48 (4944.4) 4944.38 (4944.7) 4944.75 (4945.5) 4945.50 (4946.2) 4946.15 (4946.8) 4946.84 (4947.7) 4947.69 (4948.5) 4948.47 (4949.0) 4949.01 (4949.0) 4949.00 (4950.1) 4950.07 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: () (4943.1) 4943.07 (4942.0) 4942.00 (4942.0) 4942.00 (4942.1) 4942.11 (4942.3) 4942.30 (4942.5) 4942.48 (4942.7) 4942.67 (4942.9) 4942.86 (4943.0) 4943.02 (4943.0) 4942.97 (4942.7) 4942.73 (4942.5) 4942.49 (4942.3) 4942.27 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: () (4939.9) 4939.95 (4940.9) 4940.86 (4942.1) 4942.13 (4943.4) 4943.38 (4943.0) 4943.04 (4942.8) 4942.78 (4942.4) 4942.41 (4942.1) 4942.08 (4941.9) 4941.93 (4941.5) 4941.53 (4940.9) 4940.93 (4940.6) 4940.60 (4940.3) 4940.29 (4940.2) 4940.23 (4940.2) 4940.23 (4940.6) 4940.60 (4941.0) 4940.99 (4941.0) 4940.97 (4941.6) 4941.55 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: () (4952.8) 4952.78 (4951.9) 4951.90 (4951.4) 4951.42 (4951.1) 4951.06 (4950.7) 4950.70 (4950.3) 4950.34 (4950.0) 4949.98 (4949.6) 4949.62 (4949.3) 4949.26 (4948.9) 4948.90 (4948.5) 4948.54 (4948.2) 4948.18 (4947.8) 4947.82 (4947.4) 4947.37 (4946.5) 4946.54 (4946.6) 4946.56 () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF () (4942.7) 4942.73 (4941.6) 4941.64 (4941.0) 4940.98 (4940.7) 4940.68 (4940.4) 4940.38 (4940.1) 4940.13 (4940.2) 4940.22 (4940.5) 4940.52 (4940.6) 4940.63 (4940.4) 4940.38 (4940.1) 4940.13 (4940.2) 4940.22 (4940.5) 4940.52 (4940.8) 4940.82 (4941.0) 4941.05 (4940.9) 4940.90 (4940.6) 4940.60 (4940.3) 4940.30 (4940.1) 4940.11 (4940.3) 4940.30 (4940.8) 4940.76 (4941.7) 4941.74 () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: () (4952.4) 4952.36 (4951.3) 4951.32 (4950.4) 4950.36 (4949.4) 4949.40 (4948.4) 4948.44 (4947.6) 4947.62 (4947.1) 4947.13 (4946.7) 4946.71 (4946.3) 4946.29 (4945.9) 4945.87 (4945.4) 4945.45 (4945.0) 4945.03 (4944.6) 4944.61 (4944.2) 4944.19 (4943.8) 4943.76 (4943.3) 4943.34 (4942.9) 4942.92 (4942.3) 4942.32 (4941.5) 4941.54 (4940.8) 4940.77 (4940.5) 4940.53 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: () (4947.2) 4947.20 (4947.5) 4947.54 (4948.4) 4948.39 (4948.6) 4948.59 (4947.8) 4947.77 (4946.8) 4946.77 (4945.8) 4945.77 (4945.4) 4945.43 (4946.0) 4946.01 (4946.8) 4946.80 (4947.0) 4947.05 (4946.8) 4946.82 (4946.4) 4946.39 (4945.4) 4945.44 (4944.4) 4944.44 (4944.1) 4944.14 (4944.5) 4944.52 (4945.4) 4945.37 (4945.7) 4945.72 PROPOSED GRADE EXISTING GROUND EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: (4945.7) 4945.72 (4946.0) 4946.02 (4946.3) 4946.32 (4946.6) 4946.62 (4946.9) 4946.89 (4946.5) 4946.52 (4945.5) 4945.55 (4944.5) 4944.55 (4944.6) 4944.56 (4945.4) 4945.44 (4945.5) 4945.54 (4945.2) 4945.24 (4944.9) 4944.94 (4944.7) 4944.73 (4945.1) 4945.14 (4945.7) 4945.66 (4946.2) 4946.18 (4946.7) 4946.70 (4947.2) 4947.22 PROPOSED GRADE EXISTING GROUND EXISTING PROPOSED CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado (4947.2) 4947.22 (4947.7) 4947.74 (4948.3) 4948.26 (4948.6) 4948.64 (4948.1) 4948.10 (4947.7) 4947.66 (4948.0) 4947.96 (4949.0) 4948.96 (4949.8) 4949.78 (4950.6) 4950.60 (4951.4) 4951.42 (4952.2) 4952.24 (4953.1) 4953.06 (4953.3) 4953.25 (4952.4) 4952.40 () () PROPOSED GRADE EXISTING GROUND EX PR CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF () () (4945.3) 4945.25 (4946.0) 4946.01 (4945.7) 4945.75 (4945.1) 4945.11 (4944.5) 4944.47 (4943.8) 4943.83 (4943.5) 4943.46 (4944.2) 4944.22 (4944.7) 4944.68 (4945.1) 4945.14 (4945.6) 4945.60 (4946.1) 4946.05 (4945.9) 4945.92 (4945.7) 4945.67 (4945.9) 4945.90 (4946.1) 4946.08 (4945.6) 4945.63 EXISTING PROPOSED PROPOSED EXISTING GRADE GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU 4930 4935 4940 4945 4950 4930 4935 4940 4945 4950 18+50 19+00 20+00 21+00 22+00 23+00 (4945.6) 4945.63 (4945.2) 4945.17 (4944.7) 4944.71 (4944.3) 4944.26 (4943.8) 4943.80 (4943.3) 4943.34 (4942.9) 4942.88 (4942.3) 4942.31 (4941.4) 4941.35 () -0.92% -2.00% STA: 22+69.27 ELEV=4940.91 STA: 22+85.27 ELEV=4941.32 HP STA:21+68.71 HP ELEV:4942.71 PVI STA:21+93.71 PVI ELEV:4942.5 K:46.21 LVC:50.00 BVCS:21+68.71 BVCE:4942.71 EVCS:22+18.71 EVCE:4941.98 CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: () () (4940.7) 4940.67 (4941.3) 4941.33 (4942.0) 4941.99 (4942.7) 4942.65 (4943.3) 4943.31 (4944.0) 4943.97 (4944.6) 4944.63 (4944.7) 4944.70 (4944.4) 4944.41 (4944.7) 4944.65 (4945.2) 4945.19 (4945.7) 4945.73 (4946.3) 4946.27 (4946.8) 4946.81 (4947.4) 4947.35 (4947.9) 4947.89 (4948.4) 4948.43 (4949.0) 4949.00 () () () PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: () (4944.2) 4944.20 (4944.1) 4944.10 (4944.8) 4944.84 (4944.5) 4944.53 (4943.9) 4943.85 (4943.2) 4943.17 (4942.5) 4942.49 (4941.8) 4941.81 (4941.7) 4941.67 (4942.0) 4941.99 (4942.3) 4942.31 (4942.6) 4942.63 (4943.0) 4942.95 (4943.6) 4943.59 (4944.5) 4944.53 (4944.7) 4944.70 (4944.3) 4944.25 EXISTINGPROPOSED PROPOSED EXISTINGGRADE GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF (4944.3) 4944.25 (4943.8) 4943.79 (4943.3) 4943.33 (4942.9) 4942.87 (4942.4) 4942.41 (4942.0) 4941.95 (4941.5) 4941.49 (4941.0) 4941.03 (4941.5) 4941.46 (4941.7) 4941.74 (4941.4) 4941.39 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE () () (4941.8) 4941.76 (4941.5) 4941.46 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND () (4944.5) 4944.50 (4944.0) 4943.99 (4943.7) 4943.69 () () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND () (4942.6) 4942.59 (4942.9) 4942.88 (4943.7) 4943.65 (4943.8) 4943.77 (4943.1) 4943.06 (4942.6) 4942.64 (4942.2) 4942.20 (4941.9) 4941.90 () EXISTING PROPOSED PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: () (4949.0) 4949.33 (4946.6) 4948.33 (4946.3) 4947.45 (4946.7) 4946.98 (4946.4) 4946.63 (4946.0) 4946.28 (4946.0) 4945.93 (4946.0) 4945.58 (4946.0) 4945.23 (4947.0) 4944.88 (4946.1) 4944.53 (4947.1) 4944.18 (4947.2) 4944.05 (4947.0) 4944.30 (4947.1) 4944.60 (4947.2) 4944.90 (4947.0) 4945.20 PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF (4947.0) 4945.20 (4947.0) 4945.50 (4946.9) 4945.57 (4946.5) 4945.31 (4946.2) 4945.01 (4945.6) 4944.71 (4945.1) 4944.41 (4944.5) 4944.11 (4943.4) 4943.81 (4942.0) 4943.52 (4941.0) 4943.51 (4940.6) 4943.80 (4940.7) 4944.08 (4940.6) 4944.04 (4940.6) 4943.75 (4940.8) 4943.45 (4941.0) 4943.15 (4941.4) 4942.85 (4941.5) 4942.55 PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL (4941.5) 4942.55 (4941.9) 4942.25 (4942.3) 4942.18 (4943.0) 4942.59 (4943.4) 4943.09 (4944.2) 4943.60 (4945.0) 4944.10 (4945.8) 4944.60 (4946.6) 4945.10 (4947.1) 4945.60 (4948.0) 4946.08 (4948.7) 4946.15 (4949.0) 4945.94 (4949.7) 4946.34 (4950.1) 4947.09 (4950.6) 4947.85 (4951.3) 4948.61 (4951.9) 4949.37 (4952.1) 4950.13 (4952.5) 4950.89 (4952.8) 4951.65 (4953.3) 4952.40 () PROPOSED GRADE EXISTING GROUND CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: (4957.9) 4957.86 (4957.3) 4957.27 (4956.5) 4956.46 (4955.4) 4955.41 (4954.2) 4954.23 (4953.1) 4953.09 (4952.6) 4952.56 (4952.0) 4952.04 (4951.3) 4951.31 (4950.6) 4950.65 (4950.0) 4950.05 (4949.6) 4949.63 (4949.2) 4949.23 (4948.8) 4948.84 (4948.5) 4948.46 (4948.1) 4948.09 (4947.8) 4947.76 (4947.4) 4947.45 (4947.1) 4947.13 (4946.8) 4946.84 (4946.6) 4946.57 (4946.3) 4946.30 (4946.0) 4946.03 SYKES STREET CONNECTION STA=21+89.03 ELEV=4949.318 CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: (4946.0) 4946.03 (4945.7) 4945.69 (4945.4) 4945.35 (4945.0) 4945.01 (4944.8) 4944.77 (4944.5) 4944.54 (4944.3) 4944.30 (4944.1) 4944.09 (4943.9) 4943.89 (4943.7) 4943.69 (4943.5) 4943.50 (4943.3) 4943.30 (4943.1) 4943.11 (4942.9) 4942.91 (4942.7) 4942.71 (4942.5) 4942.52 (4942.3) 4942.32 (4942.1) 4942.12 (4941.7) 4941.74 (4941.3) 4941.33 (4940.9) 4940.92 (4940.5) 4940.51 (4940.1) 4940.10 CONNECTION TO CRUSADER STREET STA=33+02.11 ELEV=4943.097 CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: BARNSTORMER STREET BIPLANE STREET COLEMAN STREET SUPERCUB LANE CONQUEST STREET SYKES DRIVE COMET STREET RELIANT STREET CRUSADER STREET VICOT WAY ALLEYAA ZEPPELINWAY TIGERCATWAY NAVION LANE VICOT WAY YEAGER STREET MARQUISESTREET FAIRCHILD STREET QUINBYSTREET FAIRCHILD STREET DASSAULT STREET DELOZIERROAD SYKES DRIVE BARNSTORMER STREET BIPLANE STREET COLEMAN STREET VICOT WAY VICOT WAY CONQUEST STREET CONQUEST STREET CONQUESTWAY ALLEY A ALLEY A ALLEY A ALLEYA ALLEY A ALLEY A QUINBY STREET MARQUISESTREET CRUSADER STREET ZEPPELINWAY Z EPPELINWAY SYKES DRIVE ALLEY B COMET STREET A LLEY C B6 D1C14 C13 C12 C11 E1 E2 F2 C10 C9 C5 C7 B10 B9 B7 C3 C2 C1 B6 B4 B3 B2 Fut-B B5 B13 B16 A3 A4 A5 A6 B14 B8 Fut-A A2 A8 Fut-I3 I2 I1 I3 A1 B1 B15 B7 B3 B4 B2 B1 Fut-B Fut-A A1 A4 A6 B8 B9 B10 B11 C2 C4 C7 C8 C9 C10 C11 C12 C13 C14 C15 D2 E3 D1 D2 E3 E2 F3 F2 F3 B18 B16 B18 A12 A13 A11 A8 A9 A10 G5 G6 Fut-H H1 H2 H4 H5 H6 Fut-I1 I3 I5 A7 B12 B12 C16 J2 A5 A7 B5 B13 B17 C3 C1 C5 C6 C17 C16 C17 C15 C18 C8 C6 B11 C4 F1 B17 E1 F1 Fut-G1 G1 G2 G3 G4 H3 Fut-TL3 I2 Fut-I3 J1 J1 J2 I4 A9 B14 B15 Fut-I2 Fut-I2 Fut-TL4 Fut-G2 C18 Fut-TL1 Fut-TL2 Wtlnd CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 LEGEND: DRAINAGE SYMBOLS: BASIN ID MINOR RUNOFF COEFFICIENT MAJOR RUNOFF COEFFICIENT BASIN AREA (ACRES) EASEMENT LINE FUTURE LOTLINE PROPOSED LOTLINE FUTURE RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY PROPOSED STORM INLET PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR 4900 4900 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= TIMBERLINE ROAD to CENTERLINE 27+00.00 38+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP TIMBERVINE ROAD RD42 RD41 FUTURE DESIGN NOT TO BE CONSTRUCTED WITH THIS PLAN SET. PROPOSED FLOWLINE TO BE AT 2% FROM EXISTING PAVEMENT. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= TIMBERLINE ROAD to CENTERLINE 16+00.00 27+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD42 FUTURE DESIGN NOT TO BE CONSTRUCTED WITH THIS PLAN SET. PROPOSED FLOWLINE TO BE AT 2% FROM EXISTING PAVEMENT. RD41 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= INTERNATIONAL BLVD. to CENTERLINE 27+00.00 37+92.30 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD43 RD42 RD41 FUTURE DESIGN NOT TO BE CONSTRUCTED WITH THIS PLAN SET. Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= INTERNATIONAL BLVD. to CENTERLINE 18+00.00 27+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD43 RD42 RD41 FUTURE DESIGN NOT TO BE CONSTRUCTED WITH THIS PLAN SET. UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= INTERNATIONAL BLVD. to CENTERLINE 10+00.00 18+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD43 RD42 RD41 FUTURE DESIGN NOT TO BE CONSTRUCTED WITH THIS PLAN SET. CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= ALLEY E to CENTERLINE 10+00.00 11+26.50 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP STA: SCALE: H: 1"= V: 1"= ALLEY D to CENTERLINE 10+00.00 11+26.50 50 5 STA: SCALE: H: 1"= V: 1"= ALLEY C to CENTERLINE 10+00.00 13+79.50 50 5 ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP STA: SCALE: H: 1"= V: 1"= TIGERCAT WAY to CENTERLINE 18+00.00 23+39.27 50 5 RD39 RD38 UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP STA: SCALE: H: 1"= V: 1"= TIGERCAT WAY to CENTERLINE 10+00.00 18+00.00 50 5 RD39 RD38 Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP STA: SCALE: H: 1"= V: 1"= ALLEY B to CENTERLINE 10+00.00 19+19.99 50 5 RD37 CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP STA: SCALE: H: 1"= V: 1"= ALLEY AA to CENTERLINE 18+50.00 22+85.27 50 5 RD35 RD36 DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP STA: SCALE: H: 1"= V: 1"= ALLEY AA to CENTERLINE 10+00.00 18+50.00 50 5 RD36 RD35 COLORADO R STA: SCALE: H: 1"= V: 1"= ALLEY A to CENTERLINE 28+00.00 35+40.91 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD33 RD34 RD32 UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= ALLEY A to CENTERLINE 19+00.00 28+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD33 RD34 RD32 CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= ALLEY A to CENTERLINE 10+00.00 19+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD33 RD34 RD32 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= DELOZIER ROAD to CENTERLINE 10+00.00 20+44.59 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD31 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= DASSAULT STREET to CENTERLINE 10+00.00 20+81.66 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD30 UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= QUINBY STREET to CENTERLINE 10+00.00 17+52.61 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD29 CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= CRUSADER STREET B to CENTERLINE 10+00.00 19+19.98 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP ROLL OVER CURB AND GUTTER ROLL OVER CURB AND GUTTER RD28 SCALE: H: 1"= V: 1"= CRUSADER STREET A to CENTERLINE 10+00.00 16+30.47 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD27 CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= COMET STREET B to CENTERLINE 10+00.00 19+19.99 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD26 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD25 CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= RELIANT STREET to CENTERLINE 10+00.00 19+19.98 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD24 SCALE: H: 1"= V: 1"= SUPERCUB LANE to CENTERLINE 10+00.00 16+41.45 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD23 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD22 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD20 RD21 CENTERLINE 10+00.00 16+00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD20 RD21 DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD18 RD19 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= COLEMAN STREET to CENTERLINE 10+00.00 19+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD18 RD19 SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD17 CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= FAIRCHILD STREET to CENTERLINE 10+00.00 17+24.58 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD16 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD14 RD15 DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= BIPLANE STREET to CENTERLINE 10+00.00 18+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD14 RD15 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= ZEPPELIN WAY to CENTERLINE 19+00.00 27+25.45 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD13 RD12 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= ZEPPELIN WAY to CENTERLINE 10+00.00 19+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD13 RD12 Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= CONQUEST STREET to CENTERLINE 28+00 34+41.26 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD09 RD10 RD11 STA: SCALE: H: 1"= V: 1"= CONQUEST WAY to CENTERLINE 10+00.00 12+96.05 50 5 UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= CONQUEST STREET to CENTERLINE 20+00.00 28+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD09 RD10 RD11 CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= CONQUEST STREET to CENTERLINE 10+00.00 20+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD09 RD10 RD11 CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= BARNSTORMER STREET to CENTERLINE 19+00.00 29+72.15 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD07 RD08 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= BARNSTORMER STREET to CENTERLINE 10+00.00 19+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD07 RD08 Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= VICOT WAY to CENTERLINE 19+00.00 30+45.54 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD05 RD06 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= VICOT WAY to CENTERLINE 10+00.00 19+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD05 RD06 THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD01 RD02 RD03 RD04 UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= SYKES DRIVE to CENTERLINE 26+00.00 34+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD01 RD02 RD03 RD04 UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= SYKES DRIVE to CENTERLINE 18+00.00 26+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD01 RD02 RD03 RD04 DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R STA: SCALE: H: 1"= V: 1"= SYKES DRIVE to CENTERLINE 10+00.00 18+00.00 50 5 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EXISTING EDGE OF ASPHALT PROPOSED CONCRETE CROSSPAN (TYP.) 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. SEE SOILS REPORT BY CTL FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. CONTRACTOR SHALL ADJUST EXISTING SANITARY AND STORM SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL EXTENT OF STREET CUT TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. REPAIRS SHALL BE PER THE LATEST CITY STANDARDS. 5. EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE PER WITH CITY STREET REPAIR STANDARDS. 7. SEE SHEET CV01 FOR TYPICAL SECTIONS. 8. ELEVATIONS ARE TO FLOWLINE OF CURB AND GUTTER OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED. 9. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (4948.71 = 4948.71). 10. MATCHLINES ARE BASED ON CENTERLINE ALIGNMENTS. LEGEND: NOTES: PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED RIGHT-OF-WAY PROPOSED BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION (33.45) 33.45 KEYMAP RD01 RD02 RD03 RD04 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 MATCHLINE-SEE SHEET UT10 MATCHLINE-SEE THIS SHEET MATCHLINE-SEE THIS SHEET MATCHLINE-SEE THIS SHEET MATCHLINE-SEE THIS SHEET MATCHLINE-SEE THIS SHEET UT09-10 (OFFSITE) 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) E: 11713.99 8"6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17586.52 E: 12114.49 8"6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17582.57 E: 12551.86 12"x8" CROSS w/TB 2 - 12" G.V. (N, S) 2 - 8" G.V. (E, W) N: 17582.26 E: 12587.44 TEMPORARY FH N: 17295.46 E: 12585.91 8"6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17411.28 E: 11694.12 TEMPORARY FH N: 17397.48 E: 11696.32 11.25° BEND w/TB N: 17454.92 E: 11686.84 155.15 LF 16" PVC N70°00'03"E 54.28 LF 16" PVC S88°50'31"E 22.5° BEND w/TB N: 17334.48 E: 11438.30 TIE INTO EXISTING 16" MAIN N: 17333.38 E: 11492.57 12"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17369.32 E: 12586.38 MATCHLINE-SEE SHEET UT07 MATCHLINE-SEE SHEET UT06 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 MATCHLINE-SEE SHEET UT08 UT09-10 (OFFSITE) 8''W 8''W 8''W 8" TEE w/TB 2 - 8" G.V. (S, W) N: 17601.36 E: 10610.80 8" TEE w/TB 2 - 8" G.V. (W, S) N: 17600.23 E: 10722.25 8" TEE w/TB 2 - 8" G.V (N, E) N: 17604.09 E: 10357.70 8" TEE w/TB 2 - 8" G.V (N, E) N: 17602.79 E: 10477.18 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (S) & FH ASSEMBLY N: 17607.06 E: 10063.75 TIE INTO EXISTING 16" MAIN N: 17608.17 E: 9957.96 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (S) & FH ASSEMBLY N: 17629.15 E: 10477.49 TEMPORARY FH N: 17431.35 E: 10719.54 TEMPORARY FH N: 17405.04 E: 10607.84 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (E) & FH ASSEMBLY N: 17408.10 E: 10607.69 62.18 LF 16" PVC S88°50'31"E 188.56 LF 16" PVC S71°33'57"E 210.69 LF 16" PVC S88°50'31"E 155.15 LF 16" PVC N70°00'03"E TIE INTO EXISTING 16" MAIN N: 17346.56 E: 10840.82 22.5° BEND w/TB N: 17345.30 E: 10902.98 22.5° BEND w/TB N: 17285.68 E: 11081.87 22.5° BEND w/TB N: 17281.42 E: 11292.51 MATCHLINE-SEE SHEET UT08 MATCHLINE-SEE SHEET UT05 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) TRACT V TRACT U 251.99 LF 8" PVC N00°17'05"E 899.98 LF 8" PVC N89°29'01"W 252.02 LF 8" PVC N00°18'11"E 947.99 LF 8" PVC S89°28'40"E 140.85 LF 8" PVC N00°14'27"E 658.84 LF 12" PVC N89°29'01"W 576.90 LF 8" PVC R=1500.00' 303.50 LF 12" PVC S00°17'10"W 232.00 LF 12" PVC S00°17'10"W 252.00 LF 12" PVC S00°17'10"W PROJECT BOUNDARY 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 8''W 8''W 8''W 18''SS 18''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8' 'SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8' 'SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18' 'SS 18''SS 18''SS 18''SS SS 8''SS 18''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' 'W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12 ''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 18''SS 18''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8" TEE w/TB 2 - 8" G.V. (E, S) N: 17842.35 E: 11688.76 12"x8" CROSS w/TB 2 - 12" G.V. (N, S) 2 - 8" G.V. (E, W) N: 17834.25 E: 12588.70 12"x8" CROSS w/JR 2 - 12" G.V. (N, S) 1- 8" G.V. (W) 1 - 6" G.V. (E) N: 18086.25 8" TEE w/TB E: 12589.86 2 - 8" G.V. (S, E) N: 18094.36 E: 11690.01 8" CROSS w/TB 2 - 8" G.V. (S, E) N: 18399.65 E: 11725.06 12" TEE w/ TB 2 - 12" G.V. (N, E) N: 18372.98 E: 12233.41 8" CROSS w/TB 2 - 8" G.V. (N, E) N: 18489.90 E: 11418.78 BEGIN PIPE DEFLECTION N: 18375.25 E: 11980.56 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18405.97 E: 11692.46 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18373.57 E: 12182.19 12"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18370.25 E: 12550.39 12" TEE w/ TB 1 - 8" G.V. (E) 1 - 12" G.V. (W) N: 18369.67 E: 12591.40 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18090.57 E: 12116.62 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17838.58 E: 12114.17 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17842.02 E: 11732.22 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18048.40 E: 11689.87 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17834.65 E: 12550.69 11.25° BEND w/TB N: 18235.34 E: 11690.71 TEMPORARY FH N: 18369.23 E: 12639.40 TEMPORARY FH N: 18085.73 E: 12637.98 TEMPORARY FH N: 17833.74 E: 12636.72 MATCHLINE-SEE SHEET UT05 MATCHLINE-SEE SHEET UT08 MATCHLINE-SEE SHEET UT04 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) LOT 3 LOT 2 LOT 1 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 20 LOT 19 LOT 18 LOT 17 LOT 14 LOT 15 LOT 16 LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 26 LOT 10 LOT 9 LOT 10 BLOCK 1 BLOCK 2 BLOCK 4 BLOCK 1 BLOCK 2 BLOCK 2 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 4 TRACT I TRACT K TRACT E TRACT F TRACT J TRACT H TRACT G TRACT E TRACT E TRACT E TRACT E TRACT E TRACT B TRACT BB 415.12 LF 8" PVC N00°51'18"E 142.00 LF 8" PVC N12°04'31"E 6 24 .5 3 LF 8 " P VC R =3 00 0 .00 ' 3 7 3. 8 5 L F 8 " P V C R = 2 0 0 0 .0 0 ' 21.14 LF 8" PVC S23°34'51"W 163.88 LF 8" PVC S12°19'40"W 489.98 LF 8" PVC S00°49'45"W PROJECT BOUNDARY 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''SS 8''SS 8''SS 8''SS 8' 'SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8 ''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8 ''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8 ''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8'' W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 164.13 LF 8" PVC N10°19'33"E 485.88 LF 8" PVC N00°49'40"E 96.19 LF 8" PVC N19°49'33"E 399.17 LF 8" PVC N29°26'21"E BEGIN PIPE DEFLECTION N: 18272.19 E: 10527.72 11.25° BEND w/TB N: 18252.81 E: 10519.26 11.25° BEND w/TB N: 18092.72 E: 10484.26 11.25° BEND w/TB N: 18015.38 E: 10728.16 11.25° BEND w/TB N: 18154.24 E: 10757.87 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18156.99 E: 10644.83 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18358.90 E: 10857.53 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (E) & FH ASSEMBLY N: 17965.00 E: 10362.91 11.25° BEND w/TB N: 18251.30 E: 10394.13 11.25° BEND w/TB N: 18341.79 E: 10426.75 8"X6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 17921.96 E: 10726.78 11.25° BEND w/TB N: 18089.85 E: 10364.74 8" TEE w/TB 3 - 8" G.V. (N, E, S) N: 18213.89 E: 10387.31 8" CROSS w/TB 4 - 8" G.V. (N, E, S, W) N: 18188.73 E: 10505.26 8" CROSS w/TB 3 - 8" G.V. (N, S, W) N: 18132.35 E: 10753.20 MATCHLINE-SEE SHEET UT06 MATCHLINE-SEE SHEET UT07 MATCHLINE-SEE SHEET UT03 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) LOT 1 LOT 1 LOT 2 LOT 3 LOT 6 LOT 10 LOT 11 LOT 4 LOT 5 LOT 7 LOT 8 LOT 9 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 5,503 SQ.FT. LOT 4 LOT 5 LOT 6 LOT 7 LOT 9 LOT 8 LOT 12 LOT 11 LOT 10 LOT 13 BLOCK 10 BLOCK 13 BLOCK 15 BLOCK 16 BLOCK 17 BLOCK 18 BLOCK 22 BLOCK 23 BLOCK 11 BLOCK 12 BLOCK 13 BLOCK 14 BLOCK 19 BLOCK 21 BLOCK 22 BLOCK 16 BLOCK 23 BLOCK 24 TRACT T TRACT S TRACT R TRACT Q TRACT U 576.90 LF 8" PVC R=1500.00' 3 0 0 . 7 1 L F 8 " P V C R = 1 1 4 6 .0 0 ' 442.85 LF 8" PVC R=1146.00' 279.33 LF 8" PVC S89°29'01"E 252.00 LF 12" PVC S89°29'01"E 263.15 LF 8" PVC N89°29'01"W 195.19 LF 8" PVC R=912.93' 187.13 LF 8" PVC N79°28'41"W 228.61 LF 8" PVC S00°17'45"W 252.03 LF 8" PVC S00°16'14"W 481.51 LF 12" PVC N00°16'57"E 116.03 LF 8" PVC N89°40'53"W 252.00 LF 8" PVC N89°40'53"W 629.32 LF 8" PVC N89°40'53"W 443.42 LF 8" PVC N89°40'53"W 204.67 LF 12" PVC S00°16'57"W 266.18 LF 8" PVC N23°13'05"E 129.11 LF 8" PVC N23°15'51"E 100.71 LF 8" PVC N11°34'07"E 62.08 LF 8" PVC N11°34'28"E 116.49 LF 8" PVC N00°13'03"E 252.00 LF 8" PVC N00°16'12"E PROJECT BOUNDARY 8''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8' 'SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18''SS 18''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8 ''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''W8''W 8''W8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12"x8" CROSS w/TB 1 - 12" G.V. (E) 1 - 8" (N) N: 18644.97 E: 12234.75 12"x8" TEE w/TB 1 - 12" G.V. (N) 1 - 8" G.V. (E) N: 18642.71 E: 12486.74 12"x8" CROSS w/TB 2 - 12" G.V. (N, S) 2- 8" G.V. (W, E) N: 19124.21 E: 12489.12 8" TEE w/TB 2 - 8" G.V. (S, W) N: 19125.61 E: 12237.12 8" TEE w/TB 2 - 8" G.V. (N, W) N: 18896.98 E: 12236.00 8" TEE w/TB 2 - 8" G.V. (N, E) N: 18951.81 E: 11594.91 8" CROSS w/TB 4 - 8" G.V. (N, E, S, W) N: 18735.89 E: 11524.31 8" CROSS w/TB 4 - 8" G.V. (N, E, S, W) N: 19129.05 E: 11607.78 BEGIN PIPE DEFLECTION N: 18647.49 E: 11955.43 BEGIN PIPE DEFLECTION N: 18899.35 E: 11972.85 END PIPE DEFLECTION N: 18917.71 E: 11778.51 11.25° BEND w/TB N: 19012.62 E: 11607.37 11.25° BEND w/TB N: 18853.14 E: 11574.72 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 19124.05 E: 12517.84 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18642.43 E: 12516.87 12"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18644.75 E: 12259.65 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18897.44 E: 12184.37 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18902.94 E: 11879.27 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18657.66 E: 11813.09 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 19084.07 E: 11607.64 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 19126.74 E: 12033.02 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 19130.26 E: 11399.02 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18687.35 E: 11503.49 MATCHLINE-SEE SHEET UT03 MATCHLINE-SEE SHEET UT06 MATCHLINE-SEE SHEET UT02 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) LOT 6 LOT 13 LOT 8 LOT 9 LOT 8 LOT 11 LOT 12 LOT 10 LOT 9. LOT 3 LOT 4 LOT 12 LOT 11 LOT 1 LOT 2 LOT 14 LOT 13 LOT 1 LOT 2 LOT 11 LOT 12 LOT 13 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 BLOCK 5 BLOCK 6 BLOCK 7 BLOCK 11 BLOCK 12 BLOCK 1 BLOCK 1 BLOCK 4 BLOCK 4 BLOCK 5 BLOCK 6 BLOCK 8 BLOCK 12 TRACT M TRACT K TRACT N TRACT L TRACT O TRACT E 396.34 LF 8" PVC R=1500.00' 175.03 LF 8" PVC N53°18'31"W 91.24 LF8" PVC N65°27'33"W 64.10 LF 8" PVC N78°12'33"W 82.97 LF 8" PVC N78°12'33"W 84.15 LF 8" PVC S89°44'23"W 142.51 LF 12" PVC S79°37'18"W 168.21 LF 12" PVC S69°52'17"W 17.10 LF 12" PVC S71°37'51"W 30.56 LF 8" PVC N17°32'19"W 109.67 LF 8" PVC N07°28'54"W 130.23 LF 8" PVC N07°28'54"W 46.06 LF 8" PVC N36°01'06"E 226.86 LF 8" PVC R=15040.23' 106.19 LF 8" PVC N89°16'30"E 91.17 LF 8" PVC S89°59'19"E 147.30 LF 8" PVC S80°46'55"E 6.07 LF 8" PVC S80°46'55"E 168.85 LF 8" PVC S69°31'55"E 61.67 LF 8" PVC S59°47'31"E 1 4 8 . 2 8 L F 8 " P V C R = 1 1 4 2 .8 6 ' 62.62 LF 8" PVC S52°22'07"E 443.42 LF 8" PVC N89°40'53"W 35.23 LF 8" PVC N45°00'00"W 227.22 LF 8" PVC N00°00'00"E 264.26 LF 12" PVC S00°16'10"E 85.38 LF 8" PVC S10°13'05"W 112.58 LF 8" PVC S11°47'27"W 136.91 LF 8" PVC S23°02'27"W 10.55 LF 8" PVC S34°17'27"W PROJECT BOUNDARY 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8 ''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8 ''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8' 'W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''SS 8''SS 8''SS 8''SS 8''S S 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8 ''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12 ''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8 ''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''S S 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8" TEE w/TB 3 - 8" G.V. (S, W) N: 19098.53 E: 10875.09 12"x8" CROSS w/TB 2 - 12" G.V. (N, S) 2- 8" G.V. (W, E) N: 19122.19 E: 10638.51 12"x8" CROSS w/JR 2 - 12" G.V. (N, S) 1- 8" G.V. (W) 1 - 6" G.V. (E) N: 18860.39 E: 10639.74 8" TEE w/TB 2 - 8" G.V. (W, S) N: 18695.47 E: 11067.23 END PIPE DEFLECTION N: 18688.22 E: 11076.97 11.25° BEND w/TB N: 18792.80 E: 10936.61 11.25° BEND w/TB N: 18830.70 E: 10853.62 8" TEE w/TB 2 - 8" G.V. (W, S) N: 18843.75 E: 10790.84 11.25° BEND w/TB N: 18860.75 E: 10709.65 11.25° BEND w/TB N: 18860.37 E: 10625.50 11.25° BEND w/TB N: 18834.69 E: 10485.32 12"x8" TEE w/TB 1 - 12" G.V. (E) 1 - 8" G.V. (N) N: 18775.30 E: 10322.62 BEGIN PIPE DEFLECTION N: 18771.42 E: 10311.16 END PIPE DEFLECTION N: 18744.10 E: 10144.40 45° BEND w/TB N: 19042.30 E: 10282.17 45° BEND w/TB N: 19079.37 E: 10309.59 11.25° BEND w/TB N: 19120.85 E: 10532.33 11.25° BEND w/TB N: 19122.17 E: 10729.67 11.25° BEND w/TB N: 19097.63 E: 10881.07 11.25° BEND w/TB N: 19038.60 E: 11039.23 END PIPE DEFLECTION N: 19007.53 E: 11092.54 BEGIN PIPE DEFLECTION N: 18924.83 E: 11215.49 END PIPE DEFLECTION N: 18886.60 E: 11265.09 45° BEND w/TB N: 19131.58 E: 11164.40 45° BEND w/TB N: 19156.49 E: 11139.48 11.25° BEND w/TB N: 18733.59 E: 10767.86 END PIPE DEFLECTION N: 18598.89 E: 10708.33 11.25° BEND w/TB N: 18607.60 E: 10714.28 11.25° BEND w/TB N: 18832.83 E: 10309.68 8"x6" SWIVEL TEE w/TB & FH ASSEMBLY N: 19122.19 E: 10666.02 8"x6" SWIVEL TEE w/TB & FH ASSEMBLY N: 19033.45 E: 11048.03 12"x6" SWIVEL TEE w/TB 1 - 6" G.V. (N) & FH ASSEMBLY N: 18788.82 E: 10360.15 12"x6" SWIVEL TEE w/TB & FH ASSEMBLY N: 18890.71 E: 10639.58 8"x6" SWIVEL TEE w/TB 1 - 6" G.V. (S) & FH ASSEMBLY N: 18802.54 E: 10915.23 8"x6" SWIVEL TEE w/TB & FH ASSEMBLY N: 18623.17 E: 11167.98 8" TEE w/TB 2 - 8" G.V. (E, S) N: 18860.41 E: 10647.44 11.25° BEND w/TB N: 18852.30 12"x6" SWIVEL TEE w/TB E: 10647.60 & FH ASSEMBLY N: 18743.01 E: 10086.20 11.25° BEND w/TB N: 18689.42 E: 10622.95 8"x6" SWIVEL TEE w/TB & FH ASSEMBLY N: 18568.51 E: 10554.71 TIE INTO EXISTING 16" MAIN N: 18740.94 E: 9972.04 164.73 LF 8" PVC N08°36'23"E 399.17 LF 8" PVC N29°26'21"E MATCHLINE-SEE SHEET UT04 MATCHLINE-SEE SHEET UT05 MATCHLINE-SEE SHEET UT01 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 18''SS 18''SS 18''SS 18''SS 18''SS 18''SS 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 8''W12''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 12''W 8''SS8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 12''W 12''W 12''W 12''W 12''W 8''W 8''W 18''SS 18''SS 18''SS 18''SS 18''SS 12"x8" CROSS w/TB 2 - 12" G.V. (N, E) 2 - 8" G.V. (W, S)) N: 19381.11 E: 11609.00 45° BEND w/TB N: 19376.47 E: 12443.03 45° BEND w/TB N: 19328.88 E: 12490.13 8"x6" SWIVEL TEE 1 - G.V. (S) & FH ASSEMBLY N: 19612.93 E: 11641.57 45° BEND w/TB 1 - G.V. (S) & FH ASSEMBLY N: 19607.60 E: 12597.45 12"x8" TEE w/TB 1 - 12" G.V. (W) 1 - 8" G.V. (S) N: 19613.10 E: 11610.02 8"x6" SWIVEL TEE 1 - G.V. (N) & FH ASSEMBLY N: 19378.41 E: 12090.37 8"x6" SWIVEL TEE 1 - G.V. (N) & FH ASSEMBLY N: 19380.95 E: 11633.87 MATCHLINE-SEE SHEET UT01 MATCHLINE-SEE SHEET UT04 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12"x8" TEE w/TB 1 - 12" G.V. (E) 1 -8" G.V. (S) N: 19617.07 E: 10888.26 8" TEE w/TB 2 - 8" G.V. (S, E) N: 19383.66 E: 11139.46 45° BEND w/TB N: 19618.38 E: 10661.01 45° BEND w/TB N: 19593.72 E: 10636.34 8"x6" SWIVEL TEE 1 - G.V. (W) & FH ASSEMBLY N: 19565.30 E: 10888.48 8"x6" SWIVEL TEE 1 - G.V. (W) & FH ASSEMBLY N: 19563.90 E: 11140.49 12"x8" TEE w/TB 1 - 12" G.V. (E) 1 -8" G.V. (S) w/ FH ASSEMBLY N: 19615.67 E: 11140.27 8"x6" SWIVEL TEE 1 - G.V. (W) & FH ASSEMBLY N: 19331.94 E: 11139.48 PROPOSED RIGHT-OF-WAY EXISTING WATER MAIN PROPOSED 8" WATER MAIN PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED WATER SERVICE/METER PROPOSED 12" SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ELECTRIC W 8" PROPOSED 8" SANITARY SEWER SS 8" SS 12" PROPOSED WATER LOWERING PROPOSED MANHOLE PROPOSED 4" UNDERDRAIN UD SAN WTR GAS LEGEND: 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. WATER SERVICE PROVIDED BY EAST LARIMER COUNTY (ELCO) WATER DISTRICT. WATER CONSTRUCTION SHALL BE PER ELCO WATER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3. SEWER SERVICE PROVIDED BY BOXELDER SANITATION DISTRICT. SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITATION DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4. MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5' AND MAXIMUM COVER SHALL BE 5.5' UNLESS OTHERWISE NOTED. 5. SANITARY SEWER SERVICES SHALL BE SDR-35 PVC AND WATER MAINS SHALL BE AWWA C-900 PVC. 6. ALL WATER FITTINGS AND VALVES ARE ARE NOT TO SCALE AND ARE ONLY GRAPHICALLY REPRESENTED. 7. UTILITY SERVICES SHOWN ARE SCHEMATIC ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 9. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 10. THE LIMITS OF STREET CUT ARE APPROXIMATE. FINAL STREET CUT LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE PER THE CITY STREET REPAIR STANDARDS. 11. CONTRACTOR SHALL ADJUST EXISTING SANITARY SEWER MANHOLES AND SUBDRAIN CLEANOUTS WITHIN THE RIGHT-OF-WAY PER CITY STANDARDS. ALL MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 12. SEE SHEET EX01 FOR EXISTING BOUNDARY CORNER COORDINATES. NOTES: MATCHLINE-SEE SHEET UT02 MATCHLINE-SEE SHEET UT03 UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 UT01 UT03 UT05 UT07 UT08 UT06 UT04 UT02 UT09-10 (OFFSITE) LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 1.02% 2.85% 3.45% 3.69% 2.80% 5.92% 5.24% 9.74% 11.08% 6.67% PROPOSED WATER QUALITY PROPOSED WATER QUALITY PROPOSED WETLANDS PROPOSED EDGE OF PAVEMENT MATCHLINE-SEE SHEET GR08 MATCHLINE-SEE SHEET GR05 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B LOT 15 LOT 14 LOT 13 LOT 12 LOT 21 LOT 20 LOT 19 LOT 18 LOT 14 LOT 13 LOT 12 LOT 11 LOT 22 LOT 23 LOT 9 LOT 24 LOT 10 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 30 LOT 29 LOT 36 LOT 37 LOT 6 LOT 5 LOT 6 LOT 27 LOT 12 LOT 11 LOT 24 LOT 25 LOT 34 LOT 13 LOT 12 LOT 11 LOT 23 LOT 24 LOT 22 LOT 21 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 6 LOT 7 LOT 8 LOT 9 LOT 27 LOT 8 LOT 7 LOT 26 LOT 25 LOT 38 LOT 39 LOT 40 LOT 4 LOT 3 LOT 2 LOT 1 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 20 LOT 19 LOT 18 LOT 17 LOT 14 LOT 15 LOT 16 LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 26 LOT 10 LOT 9 LOT 10 TRACT I TRACT K TRACT E TRACT F TRACT J TRACT H TRACT G TRACT E TRACT E TRACT E TRACT E TRACT E TRACT B TRACT BB BLOCK 1 BLOCK 4 BLOCK 4 BLOCK 1 BLOCK 2 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 2 BLOCK 2 TRACT AA VICOT WAY ALLEY AA ZEPPELIN WAY TIGERCAT WAY VICOT WAY COMET STREET ALLEY C TIMBERLINE 1.28% 1.30% 0.75% 1.09% 0.71% 1.02% 12.03% 9.74% 1.30% PROPOSED WATER QUALITY PLD SWALE FUTURE PARK SITE PROPOSED EDGE OF PAVEMENT MATCHLINE-SEE SHEET GR05 MATCHLINE-SEE SHEET GR08 MATCHLINE-SEE SHEET GR04 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B LOT 15 LOT 14 LOT 13 LOT 12 LOT 21 LOT 20 LOT 19 LOT 18 LOT 14 LOT 13 LOT 12 LOT 11 LOT 22 LOT 23 LOT 9 LOT 24 LOT 10 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 30 LOT 29 LOT 36 LOT 37 LOT 6 LOT 5 LOT 6 LOT 27 LOT 12 LOT 11 LOT 24 LOT 25 LOT 34 LOT 13 LOT 12 LOT 11 LOT 23 LOT 24 LOT 22 LOT 21 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 6 LOT 7 LOT 8 LOT 9 LOT 27 LOT 8 LOT 7 LOT 26 LOT 25 LOT 38 LOT 39 LOT 40 LOT 4 LOT 3 LOT 2 LOT 1 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 20 LOT 19 LOT 18 LOT 17 LOT 14 LOT 15 LOT 16 LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 26 LOT 10 LOT 9 LOT 10 TRACT I TRACT K TRACT E TRACT F TRACT J TRACT H TRACT G TRACT E TRACT E TRACT E TRACT E TRACT E TRACT B TRACT BB BLOCK 1 BLOCK 4 BLOCK 4 BLOCK 1 BLOCK 2 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 2 BLOCK 2 TRACT AA VICOT WAY ALLEY AA ZEPPELIN WAY TIGERCAT WAY VICOT WAY COMET STREET ALLEY C TIMBERLINE 1.28% 1.30% 0.75% 1.09% 0.71% 1.02% 12.03% 9.74% 1.30% PROPOSED WATER QUALITY PLD SWALE FUTURE PARK SITE PROPOSED EDGE OF PAVEMENT MATCHLINE-SEE SHEET GR06 MATCHLINE-SEE SHEET GR07 MATCHLINE-SEE SHEET GR03 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B LOT 4 LOT 5 LOT 11 LOT 10 LOT 6 LOT 7 LOT 9 LOT 8 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 16 LOT 15 LOT 2 LOT 3 LOT 4 LOT 6 LOT 5 LOT 7 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 19 LOT 18 LOT 17 LOT 16 LOT 22 LOT 21 LOT 20 LOT 15 LOT 14 LOT 13 LOT 1 LOT 8 LOT 9 LOT 10 LOT 8 LOT 11 LOT 12 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 9 LOT 8 LOT 7 LOT 11 LOT 10 LOT 12 LOT 3 LOT 2 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 3 LOT 14 LOT 4 LOT 5 LOT 6 LOT 13 LOT 12 LOT 11 LOT 7 LOT 10 LOT 8 LOT 9 LOT 1 LOT 16 LOT 2 LOT 15 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 7 LOT 5 LOT 6 LOT 10 LOT 11 LOT 1 LOT 8 LOT 3 LOT 4 LOT 2 LOT 1 LOT 1 LOT 2 LOT 3 LOT 6 LOT 10 LOT 11 LOT 4 LOT 5 LOT 7 LOT 8 LOT 9 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 9 LOT 8 LOT 12 LOT 11 LOT 10 LOT 13 TRACT T TRACT S TRACT R TRACT Q TRACT U BLOCK 10 BLOCK 18 BLOCK 19 BLOCK 21 BLOCK 22 BLOCK 23 BLOCK 17 BLOCK 12 BLOCK 13 BLOCK 11 BLOCK 15 BLOCK 16 BLOCK 16 BLOCK 23 BLOCK 22 BLOCK 24 BLOCK 14 BLOCK 13 COLEMAN STREET SUPERCUB LANE CONQUEST STREET FAIRCHILD STREET QUINBY STREET FAIRCHILD STREET STREET ALLEY A ALLEY A ALLEY A MARQUISE STREET MATCHLINE-SEE SHEET GR03 MATCHLINE-SEE SHEET GR06 MATCHLINE-SEE SHEET GR02 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B B LOT 29 LOT 30 LOT 31 LOT 4 LOT 3 LOT 5 LOT 6 LOT 7 LOT 30 LOT 29 LOT 28 LOT 27 LOT 7 LOT 10 LOT 9 LOT 8 LOT 6 LOT 5 LOT 4 LOT 3 LOT 2 LOT 1 LOT 34 LOT 33 LOT 32 LOT 31 LOT 2 LOT 1 LOT 34 LOT 33 LOT 32 LOT 12 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 5 LOT 6 LOT 4 LOT 1 LOT 3 LOT 2 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 1 LOT 8 LOT 9 LOT 10 LOT 6 LOT 11 LOT 7 LOT 10 LOT 7 LOT 6 LOT 13 LOT 8 LOT 9 LOT 8 LOT 11 LOT 12 LOT 10 LOT 9. LOT 3 LOT 4 LOT 12 LOT 11 LOT 1 LOT 2 LOT 14 LOT 13 LOT 1 LOT 2 LOT 11 LOT 12 LOT 13 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 TRACT M TRACT K TRACT N TRACT L TRACT O TRACT E BLOCK 11 BLOCK 8 BLOCK 7 BLOCK 6 BLOCK 12 BLOCK 6 BLOCK 5 BLOCK 5 BLOCK 1 BLOCK 1 BLOCK 4 BLOCK 4 BLOCK 12 TRACT B NA SYKES DRIVE COLEMAN STREET VICOT WAY CONQUEST STREET CONQUEST STREET CONQUEST WAY ALLEY A ALLEY A ALLEY A ZEPPELIN WAY SYKES DRIVE ALLEY C YEAGER STREET TIMBERLINE 1.16% 1.87% MATCHLINE-SEE SHEET GR04 MATCHLINE-SEE SHEET GR05 MATCHLINE-SEE SHEET GR01 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 2.95% MATCHLINE-SEE SHEET GR01 MATCHLINE-SEE SHEET GR04 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 1.11% MATCHLINE-SEE SHEET GR02 MATCHLINE-SEE SHEET GR03 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED PAN EXISTING CONTOUR PROPOSED CURB AND GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1. ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 2. REFER TO THE PLAT FOR LOT, TRACT, EASEMENTS AND OTHER SURVEY INFORMATION. 3. ELEVATIONS SHOWN HAVE BEEN ABBREVIATED. THE ENTIRE ELEVATION IS THE ELEVATION SHOWN PLUS 4900 FEET (43.71 = 4943.71). 4. CONTOURS SHOWN OUTSIDE OF STREET RIGHT-OF-WAY ARE OVERLOT CONTOURS. CONTOURS SHOWN WITHIN THE STREET RIGHT-OF-WAY ARE FINISHED GRADE. 5. CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE LOT CORNERS, OVERLOT OR FINISHED GRADE FOR LANDSCAPE AREAS. 6. SEE DETAIL SHEETS FOR LOT TEMPLATES. 7. 4:1 MAX TIE TO EXISTING SURFACE AT END OF PHASE IF REQUIRED. 9. FHA GRADING TO BE PROVIDED WITH FINAL COMPLIANCE DOCUMENTS. 10. SEE SECTION 3.4.1 OF LANDUSE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 11. REVEGITATION SHALL BE PER THE APPROVED LANDSCAPE PLAN. 12. FHA GRADING SHOWN FOR REFERENCE ONLY. LOT SPECIFIC PLOT PLANS TO BE SUBMITTED TO THE CITY FOR APPROVAL ONCE INDIVIDUAL FOOTPRINTS ARE DETERMINED. PROPOSED STORM INLET 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) PROPOSED RIGHT OF WAY LEGEND: NOTES: 4900 4900 LOT TEMPLATE A B KEYMAP # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 GR01 GR03 GR05 GR07 GR08 GR06 GR04 GR02 SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' 'W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8'' W 8''W 8''W 8''W 8''W 8''W LOT 15 LOT 14 LOT 13 LOT 12 LOT 21 LOT 20 LOT 19 LOT 18 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 22 LOT 23 LOT24 9 LOT LOT 10 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 35 LOT 34 LOT 33 LOT 32 LOT 31 LOT 30 LOT 29 LOT 28 LOT 27 LOT 26 LOT 25 LOT 24 LOT 17 LOT 18 LOT 19 LOT 20 LOT 23 LOT 22 LOT 21 LOT 36 LOT 37 LOT 6 LOT 5 LOT27 6 LOT LOT 12 LOT 11 LOT 24 LOT 25 LOT 34 LOT 13 LOT 12 LOT 11 LOT 23 LOT 24 LOT 22 LOT 21 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 6 LOT 7 LOT 8 LOT 9 LOT 27 LOT 16 LOT 17 LOT 16 LOT 8 LOT 7 LOT 26 LOT 25 LOT 38 LOT 39 LOT 40 LOT 4 LOT 3 LOT 2 LOT 1 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 20 LOT 19 LOT 18 LOT 17 LOT 14 LOT 15 LOT 16 LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 26 LOT 10 LOT 9 LOT 10 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT11 12 LOT10 LOT LOT14 15 LOT13 LOT LOT 8 LOT 9 LOT 16 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT12 13 LOT11 LOT10 LOT LOT14 15 LOT LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 7 LOT2 1 LOT3 LOT4 LOT5 LOT6 LOT LOT 1 LOT 1 LOT 9 LOT 8 LOT 8 LOT 16 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT13 14 LOT12 LOT11 LOT10 LOT LOT 15 LOT 8 LOT 9 LOT 16 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT12 13 LOT11 LOT10 LOT LOT14 15 LOT LOT 1 LOT 9 LOT 8 LOT 16 LOT 2 LOT 1 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT5 4 LOT6 LOT7 LOT8 LOT LOT8 7 LOT9 LOT10 LOT1 LOT2 LOT3 LOT LOT 6 LOT 20 LOT 10 LOT4 3 LOT5 LOT9 LOT LOT2 1 LOT LOT14 15 LOT13 LOT15 LOT14 LOT13 LOT12 LOT11 LOT10 LOT LOT16 17 LOT LOT16 12 LOT9 LOT LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 6 LOT 10 LOT 7 LOT 8 LOT 9 TRACT I TRACTYTRACTX TRACTW TRACT D TRACTV TRACTK TRACTU TR ACT E TRACT F TRACTJ TRACT H TRACT Z TRACT AA TRACT C TRACT G TRACT E TRACT E TRACTE TRACTE TRACTE TRACT E TRACT E TRACT B TRACT BB BLOCK 3 BLOCK 3 BLOCK 2 BLOCK 2 BLOCK 3 BLOCK 3 BLOCK 2 BLOCK 2 BLOCK 1 BLOCK 4 BLOCK 4 BLOCK 1 BLOCK 13 BLOCK 14 BLOCK 24 BLOCK 25 BLOCK 26 BLOCK 25 BLOCK 26 BLOCK 28 BLOCK 30 BLOCK 28 BLOCK 27 BLOCK 30 BLOCK 29 BLOCK 31 BLOCK 32 BLOCK 33 BLOCK 29 BLOCK 27 BLOCK 33 SYKES DRIVE COMET STREET RELIANT STREET CRUSADER STREET VICOT WAY ALLEY AA ZEPPELIN WAY TIGERCATWAY DASSAULT STREET DELOZIER ROAD VICOT WAY ALLEY A ALLEY A QUINBY STREET CRUSADER STREET ZEPPELIN WAY ALLEY B COMET STREET ALLEY C PHASE 1 PHASE 1 PHASE 1 2 PHASE 2 PHASE 4 CITY PARK 1 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 MATCHLINE-SEE SHEET PH01 1. THE PHASE LINES SHOWN DELINEATE THE LOTS THAT ARE INCLUDED WITHIN A PHASE. GRADING AND INSTALLATION OF INFRASTRUCTURE OUTSIDE THE LIMITS OF THE PHASE MAY BE REQUIRED. 2. ROADWAYS MAY REQUIRE SAWCUTS, MILLING AND/OR PATCHING OF ASPHALT. FINAL LIMITS WILL BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL PATCHING AND STREET REPAIRS SHALL BE PER THE MOST CURRENT CITY STANDARDS. 3. THE PHASING DESIGNATIONS SHOWN ARE FOR REFERENCE ONLY, THEY MAY NOT HAVE ANY RELATIONSHIP TO THE CONSTRUCTION SEQUENCE. 4. TEMPORARY FIRE HYDRANTS ARE REQUIRED AT THE UPSTREAM END OF ALL "DEAD-END" WATER LINES IN EACH PHASE. THE FIRE HYDRANTS SHALL BE REMOVED UPON CONTINUATION OF THE WATER MAIN DURING THE CONSTRUCTION OF THE NEXT PHASE. 5. SANITARY SEWER MAIN SHALL BE EXTENDED TO THE NEXT MANHOLE BEYOND THE PHASE LINE. 6. FOR DETAILED OVERLOT GRADING SEE SHEETS GR01-GR08 NOTES: LEGEND: PROJECT BOUNDARY PHASE LINE TEMP. FIRE HYDRANT PROPOSED ROADWAY END OF PHASE ROADWAY AND UTILITY TERMINATIONS TYPE III BARRICADE 10'x5'x1.5' TYPE 'L' RIPRAP PAD 10'x5'x1.5' TYPE 'L' RIPRAP PAD CONSTRUCT SANITARY TO SS 8" NEXT MANHOLE W 8" W 8" SS 8" CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner GENERAL MANAGER REVIEWED BY: DATE: UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. GENERAL MANAGER REVIEWED BY: DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW PHASING LEGEND: PHASE ONE - PHASE TWO - PHASE THREE - PHASE FOUR - PHASE FIVE- PHASE SIX - PHASE SEVEN - PHASE EIGHT - CITY PARK - 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 12''W 12''W 8''W 8''W 12''W 8''W 8''W 8''W 8''W 8''W 12''W 12''W 8''W 12''W 12''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W12''W 8''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 12''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8' 'W 8''W 8''W 8''W 8''W 18''SS 18''SS 8''W 8''W 8''W 8''SS 8''W 8''W 8''W L OT 30 LOT 31 LOT 4 LOT 3 LOT 5 LOT 6 LOT 7 LOT 30 LOT 29 LOT 28 LOT 27 LOT 7 LOT 9 LOT 8 LOT 6 LOT 5 LOT 4 LOT 3 LOT 2 LOT 1 LOT 34 LOT 33 LOT 32 LOT 31 LOT 2 LOT 1 LOT 34 LOT 33 LOT 32 LOT 12 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT6 5 LOT LOT 4 LOT 1 LOT 3 LOT 2 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 1 LOT 8 LOT 9 LOT 10 LOT 1 LOT 2. LOT1 16 LOT LOT 15 LOT14 3 LOT LOT 4 LOT 13 LOT12 5 LOT LOT 6 LOT 11 LOT10 7 LOT LOT 7 LOT 6 LOT 13 LOT 5 LOT 14 LOT 4 LOT 15 LOT 3 LOT 16 LOT17 2 LOT LOT 18 LOT 8 LOT 9 LOT 8 LOT 11 LOT 12 LOT 10 LOT 9. LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT12 13 LOT11 LOT10 LOT LOT 1 LOT 14 LOT 7 LOT8 9 LOT LOT 3 LOT 4 LOT 5 LOT11 12 LOT10 LOT LOT 1 LOT 2 LOT13 14 LOT LOT 6 LOT 7 LOT8 9 LOT LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 2 LOT 3 LOT 4 LOT 7 LOT 6 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT28 29 LOT27 LOT LOT30 31 LOT LOT 25 LOT 7 LOT 8 LOT 9 LOT23 24 LOT LOT 6 LOT 26 LOT 10 LOT 11 LOT 12 LOT 13 LOT 1 LOT 8 LOT 14 LOT 19 LOT21 22 LOT20 LOT LOT 18 LOT 17 LOT 16 LOT 15 LOT 2 LOT 3 LOT 4 LOT5 6 LOT LOT 7 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT18 19 LOT17 LOT16 LOT LOT21 22 LOT20 LOT LOT 15 LOT 14 LOT 13 LOT9 8 LOT10 LOT LOT 1 LOT 8 LOT 11 LOT 12 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT8 9 LOT7 LOT LOT10 11 LOT LOT 12 LOT 3 LOT 2 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 3 LOT 14 LOT 4 LOT 5 LOT 6 LOT 13 LOT 12 LOT 11 LOT10 7 LOT LOT 8 LOT 9 LOT 1 LOT 16 LOT15 2 LOT LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT7 7 LOT 8 LOT 9 LOT LOT6 5 LOT11 LOT 10 LOT1 LOT8 LOT LOT4 3 LOT LOT 2 LOT 1 LOT 1 LOT 2 LOT 3 LOT 10 LOT 11 LOT 4 LOT 5 LOT 7 LOT 8 LOT 9 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 5,503 SQ.FT. LOT 4 LOT 5 LOT 6 LOT 7 LOT8 9 LOT LOT11 12 LOT10 LOT LOT 13 TRACT T TRACTS TRACT R TRACTP TRACT M TRACTK TRACTN TRACTL TRACTQ TRACT O TRACT A TRACT E BLOCK 5 BLOCK 5 BLOCK 1 BLOCK 1 BLOCK 4 BLOCK 4 BLOCK 12 BLOCK 13 BLOCK 14 BLOCK 24 BLOCK 22 BLOCK 23 BLOCK 16 BLOCK 16 BLOCK 15 BLOCK 11 BLOCK 12 BLOCK 6 BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 11 BLOCK 17 BLOCK 23 BLOCK 22 BLOCK 21 BLOCK 19 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 18 BLOCK 10 BLOCK 9 BLOCK 10 BLOCK 9 BLOCK 8 BLOCK 7 BARNSTORMER STREET BIPLANE STREET COLEMAN STREET SUPERCUB LANE CONQUEST STREET VICOT WAY NAVION LANE VICOT WAY YEAGER STREET MARQUISE STREET FAIRCHILD STREET QUINBY STREET FAIRCHILD STREET SYKES DRIVE BARNSTORMER STREET BIPLANE STREET COLEMAN STREET VICOT WAY CONQUEST STREET CONQUEST STREET CONQUEST WAY ALLEY A ALLEY A ALLEY A ALLE Y A ALLEY A ALLEY A MARQUISE STREET ZEPPELIN WAY SYKES DRIVE PHASE 3 PHASE 2 PHASE 4 PHASE 3 PHASE 5 PHASE 5 PHASE 8 PHASE 6 PHASE 7 PHASE 8 PHASE 6 PHASE 1 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 MATCHLINE-SEE SHEET PH02 CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner GENERAL MANAGER REVIEWED BY: DATE: UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. GENERAL MANAGER REVIEWED BY: DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW TEMP. FIRE HYDRANT PROPOSED ROADWAY END OF PHASE ROADWAY AND UTILITY TERMINATIONS TYPE III BARRICADE 10'x5'x1.5' TYPE 'L' RIPRAP PAD 10'x5'x1.5' TYPE 'L' RIPRAP PAD CONSTRUCT SANITARY TO SS 8" NEXT MANHOLE W 8" W 8" SS 8" 1. THE PHASE LINES SHOWN DELINEATE THE LOTS THAT ARE INCLUDED WITHIN A PHASE. GRADING AND INSTALLATION OF INFRASTRUCTURE OUTSIDE THE LIMITS OF THE PHASE MAY BE REQUIRED. 2. ROADWAYS MAY REQUIRE SAWCUTS, MILLING AND/OR PATCHING OF ASPHALT. FINAL LIMITS WILL BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL PATCHING AND STREET REPAIRS SHALL BE PER THE MOST CURRENT CITY STANDARDS. 3. THE PHASING DESIGNATIONS SHOWN ARE FOR REFERENCE ONLY, THEY MAY NOT HAVE ANY RELATIONSHIP TO THE CONSTRUCTION SEQUENCE. 4. TEMPORARY FIRE HYDRANTS ARE REQUIRED AT THE UPSTREAM END OF ALL "DEAD-END" WATER LINES IN EACH PHASE. THE FIRE HYDRANTS SHALL BE REMOVED UPON CONTINUATION OF THE WATER MAIN DURING THE CONSTRUCTION OF THE NEXT PHASE. 5. SANITARY SEWER MAIN SHALL BE EXTENDED TO THE NEXT MANHOLE BEYOND THE PHASE LINE. 6. FOR DETAILED OVERLOT GRADING SEE SHEETS GR01-GR08 NOTES: LEGEND: PROJECT BOUNDARY PHASE LINE PHASING LEGEND: PHASE ONE - PHASE TWO - PHASE THREE - PHASE FOUR - PHASE FIVE- PHASE SIX - PHASE SEVEN - PHASE EIGHT - CITY PARK - Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner GENERAL MANAGER REVIEWED BY: DATE: UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. GENERAL MANAGER REVIEWED BY: DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner GENERAL MANAGER REVIEWED BY: DATE: UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS. GENERAL MANAGER REVIEWED BY: DATE: EAST LARIMER COUNTY WATER DISTRICT UTILITY PLAN REVIEW CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: "FORT COLLINS VERTICAL CONTROL #92-3 2" ALUMINUM CAP STAMPED "92-3" SET OF THE SOUTH END OF EAST PARAPET WALL ON TIMVERLINE ROAD AT LARIMER WELD IRRIGATION DITCH. ELEVATION 4965.66 (CITY OF FORT COLLINS 1929 VERTICAL DATUM) "FORT COLLINS VERTICAL CONTROL #41-01" ON THE NORTH SIDE OF EAST VINE DRIVE AND WEST OF 3024 EAST VINE DRIVE ON THE NORTH SIDE OF A ROUND ELECTRICAL VAULT. ELEVATION 4966.54 (CITY OF FORT COLLINS, 1929 VERTICAL DATUM) 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: ALTBIER STREET, TRAPPIST STREET, PILSNER STREET, PALE ALE STREET, SOUR STREET, PINT STREET, SHANDY STREET Approved Variances are listed as follows: SIGHT DISTANCE TRIANGLES LEVEL OF SERVICE AT TIMBERLINE / VINE INTERSECTION CONSTRUCTION NOTES A. GRADING AND EROSION CONTROL NOTES 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. B. STREET IMPROVEMENT NOTES 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. STORM DRAINAGE NOTE 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Preliminary Drainage and Erosion Control Reports for East Ridge dated September 09, 2015 by Galloway and Company, shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. ELCO STANDARD NOTES: The following information is condensed from the current "Standard Construction Specification for Water Mains" as adopted by the East Larimer County Water District (‘ELCO’ or ‘District’) and is to be considered as such. In the event of any question the full document shall take precedence. 1. It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In event of damage to any existing utility Contractor shall immediately notify owner of the utility involved and, unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. Cost of repairs shall be the responsibility of the Contractor. 2. Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. 3. All water main installation within the ELCO Water District shall be subject to current OSHA and COSHA safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 4. No construction shall begin without prior design approval from ELCO. District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. District shall inspect the construction as necessary and shall observe all line testing. Construction or testing shall conform to District Specifications at all times. In event that State or City road excavation permit(s) are required Contractor shall notify District of proposed construction schedule well in advance to allow time for District to obtain the required permit(s). Contractor is responsible for obtaining all County road permits which may be required. No verbal authorization for field revision shall be given. All requests for such field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on As-Built drawings as detailed in Item 14 of these Notes. 5. Materials: Plastic Pipe - All water piping shall be Polyvinyl Chloride (PVC). All PVC piping through 12-inch shall be manufactured in accordance with AWWA Standard C900, "Polyvinyl Chloride (PVC) Pressure Pipe, 4-inch through 12-inch, For Water Distribution", Class 150 (SDR 18). All PVC piping 14-inch through 36-inch shall be manufactured in accordance with AWWA Standard C905, "Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14-inch through 36", Class 200 (SDR 18). Approved manufacturers are JM Eagle, Certainteed, Gifford Hills or Carlon. Size of the pipe as shown on the approved plans. All non-metal water piping shall be installed with a twelve (12) gauge braided copper wire, plastic coated, six hundred (600) volt taped to top of pipe and surfaced at each fire hydrant. Pipe joints shall be made using an integral bell with an elastomeric gasket push-on type joint or using machined couplings of a sleeve type with rubber ring gaskets and machined pipe ends to form a push-on type joint. All materials installed shall be free of manufacturer defects. Any defective or damaged materials noted on the construction site shall be so marked and removed from the site. All fittings shall be mechanical joint, cast iron or ductile, manufactured in accordance with AWWA Standard C110. Fittings shall be furnished with a cement-mortar lining of standard thickness class with a 250 psi pressure rating. Under no circumstances shall any PVC piping be installed utilizing mechanical equipment to seat the joints. Gate Valve - Gate valves shall conform to AWWA Standard C509-87 with mechanical joint, 2" open left operating nut and resilient seat. Valve shall be Mueller A-2380-20 or approved equal. Butterfly Valve - Butterfly valves shall conform to AWWA Standard C504-80 with mechanical joint, 2" open left operating nut, resilient seat. Valve shall be Mueller or approved equal. Fire Hydrant Assembly - Hydrant shall conform to AWWA Standard C502-85, 1" square open right operating nut, no American Darling units. Mueller Super Centurion with epoxy coated shoe or American Flo Control Waterous Pacer WB-67-250X with epoxy coated shoe. Fittings - All fittings shall be swing assemblies with anchor couplings. 6. Bedding: All water main installation shall include bedding. Bedding shall be 3/4" washed rock uniformly graded and compacted. Trench shall be excavated to a depth below established grade equal to 1/4 of pipe diameter (min. 4"). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2" uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30" backfill above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 7. Concrete: All concrete construction, including thrust blocks, shall be completed utilizing Type 5 or equal cement only. 8. Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall be placed in lifts not greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway areas and 90% in all other locations. Compaction testing of bedding and backfill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority. 9. All fittings, tees, plugs and fire hydrants shall be provided with anchor couplings, or Foster adapters, and concrete thrust blocks in accordance with ELCO Specifications. All fittings, valves, fire hydrant shoes and plugs shall be poly wrapped prior to backfill. 10. In event that asphalt pavement is involved that has been in place less than two years (according to City or County Engineer's record) and is cut, the cut shall be a minimum of 20 feet in width and will be replaced to the specified depth by a paving machine. 11. A minimum cover of 4-1/2 feet shall be maintained throughout the waterline and service line installation, particularly in areas of new grading and drainage swales. Extra bury depth may be required to maintain minimum cover at drainage culvert crossings and/or fire hydrant runs. Maximum allowable cover shall be 6 feet, unless specifically approved by the District. 12. All connections to existing waterlines shall be completed at developer's expense by ELCO personnel or the District's authorized contractor with no exception. 13. ELCO shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in these Specifications. The District shall also have the authority to assign an inspector to check any and all work, including all materials to be incorporated in the work, excavation, bedding, backfill, testing and all construction methods and practices. 14. Testing and Acceptance: All lines shall be pressure tested, chlorinated and flushed by the Contractor in accordance with District Specifications and under the District's supervision. Upon passing chlorination testing, bacteriological testing will be completed by an accredited water quality control laboratory. Copies of all passing test results, including soils compaction in the area of water main construction, shall be provided to the District. 15. Project As-Built and Record Drawing Requirements: As-built drawings are prepared by the contractor. They confirm, in red ink, on-site changes to the original construction documents. The As Built drawings shall be forwarded to engineer for conversion to Record Drawings. Record drawings are prepared by the engineer and reflect on-site changes the contractor noted in the as-built drawings. The Record Drawings shall be approved by ELCO prior to Preliminary Acceptance of the project. Record Drawings to be AutoCAD or approved ArcView shape files. These documents shall accurately reflect any change made in the field which varies from the approved construction plan and including, at a minimum, field dimensions and elevations, horizontal and vertical locations of underground utilities and appurtenances. Include with the Record Drawings a complete copy of the recorded Filing Plat and a written confirmation of total costs of all water system improvements involved. The Contractor shall warrant the materials, installation workmanship and surface restoration for a period of two years from date of Preliminary Acceptance. During this warranty period the Contractor shall repair any defects in the work and maintain the work area. At the close of the two year warranty period and upon satisfactory correction of any deficiencies noted, the District shall accept the constructed lines and appurtenances as the sole property and responsibility of ELCO. F. BOXELDER SANITATION DISTRICT CONSTRUCTION NOTES: The following information is condensed from the current “Standard Construction Specification for Sewer Mains” as adopted by the Boxelder Sanitation District (District) and is to be considered as such. In the event of any question the full document shall take precedence. 1. Existing Utility Locates: It shall be the responsibility of the Contractor to coordinate field locates of all existing utilities prior to commencement of any construction. Contractor shall also notify all affected utility companies prior to commencing construction. In the event of damage to any existing utility, the contractor shall immediately notify the owner of the utility involved and unless authorized in writing by the owner of the subject utility, shall not attempt to make repairs. The cost of repairs shall be the responsibility of the Contractor. 2. District Owned Easement Pictures: Contractor to provide sequential digital pictures spaced at no more than 300 feet detailing conditions of the off-site Boxelder Owned Easement Conditions and any structures that could be affected, to the District and the property owner prior to the start of any off-site work. These pictures shall include all existing fence, ditches, ditch structures, out buildings, water troughs, trees and all other landscaping. Pictures are to be placed at no more than four (4) pictures on a 11x8 sheet of photo paper inserted into transparent sleeves and delivered with the drawings of record in a three (3) ring binder. 3. Protection of Property: Contractor shall continuously maintain adequate protection from damage of all public and private property through which the work is done. 4. Safety: All sewer main installation within the District shall be subject to current (Occupational Safety and Heath Association (OSHA) and the Colorado Safety Association, (CSA) safety requirements. Contractor shall also comply with any and all requirements and regulations as set forth by City, County, State and Federal agencies having applicable authority. 5. Start of Construction: No construction shall begin without prior design review of the District. The District shall be notified 48 hours in advance of starting construction or testing to allow for scheduling. 6. Road Excavation Permits: In event that State, County or City road excavation permit(s) are required, the Contractor is responsible for obtaining all road permits which may be required. 7. Other Permits: The Contractor shall be responsible for obtaining all permits required for construction. 8. Revisions: No verbal authorization for field revision shall be given. All requests for field revision shall be made in writing accompanied by proposed change indicated on copy of the approved design drawings. Any field revision approved and installed shall also be accurately documented on the Drawings of Record. 9. Materials: Plastic Pipe -All gravity sanitary sewer piping shall be Polyvinyl Chloride (PVC) unless otherwise noted on the approved drawings. Pipe 15” and smaller shall conform to ASTM D3034, Type PSM, and SDR 35. Pipe 18” and larger shall conform to ASTM F679. All fittings shall be (PVC) unless otherwise noted. 10. Pipe Cover: A minimum cover of 3-1/2 feet of cover shall be maintained throughout the sewer line and service line installation. 11. Bedding: All sewer main installation shall include bedding. Bedding shall be ¾” washed rock uniformly graded and compacted. Refer to force main desgin for force main bedding requirements. Trench shall be excavated to a depth below established grade equal to ¼ of pipe diameter (min. 4”). Bell depressions shall be provided for all joints. In event that unstable trench conditions are encountered at pipeline grade 1-1/2” uniformly graded washed rock shall be used for stabilization. Bedding material shall be placed and compacted under and around sides of the pipe. Place bedding in such a manner as to provide solid, uniform bearing surface for full length of barrel. Minimum 30” initial lift above pipe before other than hand compaction equipment is to be used. Note maximum trench width detail. 12. Backfill: Backfilling of trench shall be performed as soon as practical, subsequent to inspection and approval. Backfilling of acceptable material shall not be placed in lifts of greater than one (1) foot. Backfill shall be compacted to 95% of optimum density in roadway and residential areas and 90% in all off-site easement areas unless otherwise noted. Compaction testing of bedding and back fill shall be at least five tests per 1,000 feet and at varying depths and locations in accordance with the requirements of the applicable authority or as required in project specific specifications. 13. Concrete: All concrete construction shall be completed utilizing 3,000 psi at twenty-eight (28) days or equal concrete. 14. Pavement or Other Repairs: In event that asphalt or concrete pavement, sidewalks, storm sewers, waterline or any other public or privately owned property is damaged or requires reconstruction due to the work, repairs or replacement will be made in accordance with the requirements of the appropriate governing authority. Private property will be returned to its original condition or as close to original condition as reasonably possible, unless otherwise noted on the drawings. 15. Service Taps on Existing Lines: All taps made on existing lines shall be completed at developer's expense by District personnel or the District's authorized contractor with no exception. 16. Inspection: Construction shall conform to District Standards and Specifications or project specific specifications at all times. The District shall inspect the construction as necessary and shall observe all line testing. The District shall have the authority to ascertain that all construction of facilities is equal to or better than minimum construction requirements as set forth in 17. Testing: All lines shall be pressure tested and flushed by the Contractor in accordance with District Standards and Specifications and under the District's supervision. Upon passing, copies of all passing test results including soils compaction in the area of sewer main construction shall be provided to the District. 18. Acceptance: Upon completion of all utility construction (sewer and other) and fulfillment of all District requirements, preliminary acceptance of new sewer system improvements will occur in accordance with District's acceptance procedure. 19. Warranty: The Contractor shall warrant the materials, installation, workmanship and surface restoration for a period of two years from date of preliminary acceptance. During this warranty period the Developer shall promptly repair any defects in the work and maintain the work area. At the close of the two-year warranty period the District will make a field inspection. Upon satisfactory correction of any deficiencies noted the District would make final acceptance of the lines and work. The lines and the appurtenances shall then become the sole property and responsibility of Boxelder Sanitation District. 20. Drawings of Record and Total Costs: Within 90 days of preliminary acceptance of the new facilities, the District shall be provided with acceptable Drawings of Record of the complete system consisting of two sets of fill size reproduced prints, two sets of ½-size reproduced prints, one set of 6 mil double matted reproducible mylars and one complete digital file equivalent (software and version to be confirmed at time of delivery). Written confirmation of the total cost of all sewer system improvements shall also be submitted with the Drawings of Record. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 SEPTEMBER, 2015 UTILITY PLANS FOR: REPLAT OF EAST RIDGE COVER SHEET GENERAL AND CONSTRUCTION NOTES CV01 CV02 PROJECT BENCHMARKS: BENCHMARKS "FORT COLLINS VERTICAL CONTROL #92-3 2" ALUMINUM CAP STAMPED "92-3" SET OF THE SOUTH END OF EAST PARAPET WALL ON TIMVERLINE ROAD AT LARIMER WELD IRRIGATION DITCH. ELEVATION 4965.66 (CITY OF FORT COLLINS 1929 VERTICAL DATUM) "FORT COLLINS VERTICAL CONTROL #41-01" ON THE NORTH SIDE OF EAST VINE DRIVE AND WEST OF 3024 EAST VINE DRIVE ON THE NORTH SIDE OF A ROUND ELECTRICAL VAULT. ELEVATION 4966.54 (CITY OF FORT COLLINS, 1929 VERTICAL DATUM) East Ridge Holdings LLC. Landon Hoover 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 CTL Thompson Inc. 351 Linden Street, Unit 140 Fort Collins, Colorado 80524 (303) 206-9455 PROJECT TEAM: These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. CERTIFICATION STATEMENT: SHEET INDEX Matt Delich, PE Delich Associates 2272 Glen Haven Drive Loveland, Colorado 80538 (970) 669-2061 Russell + Mills Studios Craig Russell, RLA, ASLA 141 S. College Avenue, Suite 104 Fort Collins, CO 80524 (970) 484-8855 UTILITY CONTACT LIST: * A REPLAT OF EAST RIDGE SUBDIVISION PLAT, SITUATE IN THE EAST HALF OF SECTION 8 AND THE NORTHWEST QUARTER OF SECTION 9, T7N, R68W OF THE 6TH P.M.; CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO Galloway & Company Rob Van Uffelen 3760 E. 15 Street, Suite 202 Loveland, Colorado 80538 (303) 770-8884 UTILITY PLAN REVIEW BOXELDER SANITATION DISTRICT UTILITY PLAN REVIEW EAST LARIMER COUNTY WATER DISTRICT E. VINE DRIVE S. TIMBERLINE RD. N. LEMAY AVE. GAS Xcel Energy Stephanie Rich (970) 225-7828 ELECTRIC City of Fort Collins Light and Power Doug Martine (970) 224-6152 CABLE Xfinity Don Kapperman (970) 567-0425 TELECOM. Centurylink William Johnson (970) 377-6401 WATER ELCO Mike Scheid (970) 493-2044 WASTEWATER Boxelder Sanitation District Karen Reynolds (970) 498-0604 STORMWATER City of Fort Collins Utilities Glen Schlueter (970) 221-6700 UTILITY COMPANY CONTACT PHONE NUMBER * ALL UTILITY LOCATIONS SHOWN ARE BASED ON MAPS PROVIDED BY THE APPROPRIATE UTILITY COMPANY AND FIELD SURFACE EVIDENCE AT THE TIME OF SURVEY AND IS TO BE CONSIDERED AN APPROXIMATE LOCATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES, PUBLIC OR PRIVATE, WHETHER SHOWN ON THE PLANS OR NOT, PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEEER PRIOR TO CONSTRUCTION. King Surveying Inc. Steve Lund 650 East Garden Dr. Windsor, Colorado 80550 (970) 686-5011 # THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF GALLOWAY, AND MAY NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. COPYRIGHTS AND INFRINGEMENTS WILL BE ENFORCED AND PROSECUTED. 3760 E. 15th Street, Suite 202 Loveland, CO 80538 970.800.3300 O www.gallowayUS.com C 2015. Galloway & Company, Inc. All Rights Reserved SHEET TITLE: Date: Drawn By: Project No: Checked By: HFHLV0001.01 09/09/15 EAST RIDGE HOLDINGS 4801 Goodman Rd. Timnath, CO 80547 970.674.1109 NOT FOR CONSTRUCTION 09/09/15 EX01-EX02 EXISTING CONDITIONS GR01-PLANSGR08 GRADING UT01-PLANSUT10 UTILITY RD01-RD45 ROAD PLAN AND PROFILES DR01 DRAINAGE PLAN PH01-PH02 PHASING PLAN TYPICAL ROAD SECTIONS VICINITY MAP