Loading...
HomeMy WebLinkAboutCHRISTIAN BROTHERS AUTOMOTIVE (CBA) REPAIR STORE - PDP - PDP150017 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY1 TRAFFIC MEMO To: City of Fort Collins CC: Baseline Project File – CO15250 From: Rick Behning, PE Date: August 5, 2015 Re: Traffic Generation Memo ‐ Lot 1 of Discount Tire at Fossil Creek, South College Avenue at Fossil Creek Pkwy – Christian Brothers Automotive OVERVIEW This traffic generation memo is prepared to accompany the Administrative (Type I) review application for the Christian Brothers Automotive facility proposed at 102 Fossil Creek Parkway, Fort Collins, Colorado. This memo provides an overview of the anticipated traffic generation associated with this site. BACKGROUND The site is located between the South College Avenue and Fossil Ridge Drive. The proposed facility will be located on a vacant lot between an existing Discount Tire store and a commercial strip mall. All adjacent roadways are paved and Snead Drive is to be extended to connect to Fossil Creek Parkway with this development. Access to the site is via two locations. The first is an existing full movement access off of Snead Drive that is shared between the proposed development and an existing use adjacent to and north of the development. The second access is a relocated access off of Fossil Creek Parkway. The access is a full turn movement access with a left turn lane that will be relocated to the east to accommodate the proposed site layout. This relocation is desirable also because the existing turn lane is not a desirable distance from the College Avenue intersection. Fossil Ridge Dr. Project Location S. College Ave. 2 The purpose of this development is to operate a light automotive service and repair facility that will have a building with an approximate area of 4,600 SF and associated parking and landscaping improvements. The site will utilize 27 parking spaces to accommodate an estimated 10 to 20 vehicle repairs a day. An average of five employees will report to the site each work day. TRIP GENERATION Operational Traffic The Institute of Transportation Engineers (ITE) manual on Trip Generation, 9th Edition, (see attached excerpt) was referenced to approximate the anticipated trip generation related to the proposed use. The ITE manual provides guidance on trip generation based on a common parameter. For the proposed use, the average generation in the AM Peak Hour is 2.25 trips per 1,000 SF of leasable square footage and the PM Peak Hour is 3.11 trips per 1,000 SF of leasable square footage. Approximate trips were rounded up to the nearest whole number. The ITE manual also predicts the percent of trips that are entering vs. exiting. The following table depicts the anticipated trip generation for the operation based on the above referenced average trip generation rates per 1,000 SF of leasable area: Table 1. Operational Traffic Trip Generation Summary Table Average Weekday Operation AM Enter AM Exit PM Enter PM Exit 66% of AM Trips 34% of AM Trips 48% of PM Trips 52% of PM Trips 7 4 7 8 Automobile Care Center (942) rates are based on 6 studies. CONCLUSION The proposed use off of Fossil Creek Parkway is an infill project between two existing uses. The adjacent roadways appear to be functioning well and the area is clearly planned to accommodate similar uses. This project will complete Snead Drive to connect to Fossil Creek Parkway and will enhance circulation and provide a route for more convenient and safe turning movements. The existing full turn movement from Fossil Creek Parkway is being moved eastward, which will enhance movement safety and visibility. The proposed trip generation associated with this site should not create a hazard or unreasonable conflicts.