Loading...
HomeMy WebLinkAboutHARMONY & STRAUSS CABIN CONVENIENCE SHOPPING CENTER (FORMERLY HARMONY & I-25 NORTH) - FDP - FDP150030 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLANVICINITY MAP OWNER'S CERTIFICATION THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH ON SAID PROJECT DEVELOPMENT PLAN WITHIN THE LIMIT OF DEVELOPMENT BOUNDARY. PARCELS 1-4 FIRSTIER BANK NEBRASKA NAME DATE MY COMMISSION EXPIRES: NOTARY PUBLIC STATE OF COLORADO ) )SS NOTARIAL CERTIFICATE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES APPROVED BY THE COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES DIRECTOR ON THIS DAY OF , A.D., 2015. COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES DIRECTOR COUNTY OF LARIMER ) THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME BY , THIS DAY OF , 2015. APPLICANT / DEVELOPER PROPERTY OWNER PLANNER / CIVIL ENGINEER SITE PLAN NOTES POST MODERN DEVELOPMENT 144 NORTH MASON STREET SUITE 5 FORT COLLINS, CO 80524 (970) 407-7808 TST, INC. CONSULTING ENGINEERS 760 WHALERS WAY BUILDING C, SUITE 200 FORT COLLINS, CO 80525 (970) 226-0557 LEGAL DESCRIPTION FIRSTIER BANK NEBRASKA 115 SOUTH WALNUT STREET KIMBALL, NE 69145 1. THIS PROJECT SITE IS LOCATED WITHIN FEMA REGULATED FLOODWAY AND FLOODPLAINS, PER FEMA FIRM MAPS 08069C0994F AND 08069C1013F, DATED DECEMBER 19, 2006. 2. PORTIONS OF THIS SITE ARE LOCATED IN THE FEMA - REGULATORY 100- AND 500-YEAR FLOOD PLAINS, AND THE 1 2 -FOOT RISE FLOODWAY. 3. EFFECTIVE FLOODPLAIN INFORMATION SHOWN ON THIS PLAN IS BASED UPON LOMR 14-08-058OP, DATED DECEMBER 15, 2014. 4. ALL AREAS IN THE FLOODPLAIN AND FLOODWAY ARE SUBJECT TO THE STANDARDS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. 5. NO WORK MAY COMMENCE IN THE FLOODWAY UNTIL A FLOODPLAIN USE PERMIT AND NO-RISE CERTIFICATION HAVE BEEN APPROVED BY THE CITY OF FORT COLLINS FLOODPLAIN ADMINISTRATION DIVISION. NO-RISE CERTIFICATIONS MUST BE RE-CERTIFIED POST PROJECT. 6. ALL WORK IN THE FLOOD FRINGE MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT. 7. CRITICAL FACILITIES ARE PROHIBITED IN THE POUDRE RIVER FLOODPLAIN. 8. NO NEW STRUCTURES OR ADDITIONS MAY BE ADDED TO THE FLOODWAY. 9. ALL STRUCTURES IN THE FLOODWAY AND FLOOD FRINGE MUST HAVE AN EMERGENCY RESPONSE PREPAREDNESS PLAN. 10. WITHIN THE FLOODWAY, A CONDITIONAL LETTER OF MAP REVISION (CLOMR) MUST BE APPROVED BY FEMA PRIOR TO ISSUANCE OF ANY BUILDING OR GRADING PERMITS. 11. NON-RESIDENTIAL STRUCTURES OR ADDITIONS IN THE 100-YR FLOOD FRINGE MUST HAVE THEIR LOWEST FLOOR AND ALL ELECTRICAL, MECHANICAL AND HVAC ELEVATED OR FLOODPROOFED 2.0 FEET ABOVE THE 100-YR BASE FLOOD ELEVATION (BFE). STRUCTURAL CONSTRUCTION MUST BE FOLLOWED WITH AN AS-BUILT ELEVATION CERTIFICATE. STRUCTURES OPTING FOR FLOODPROOFING IN LIEU OF ELEVATION MUST PROVIDE A FLOODPROOFING CERTIFICATE AFTER 7.00' TIE INTO EXISTING WALK 7.00' EXISTING WALK 5' ATTACHED WALK Sim Sim CONSTRUCTION. 12. NO WORK MAY COMMENCE UNTIL ALL FILL FROM THE FLOODWAY IN THE LOMR-F AREA HAS BEEN REMOVED. 1. THIS SITE IS LOCATED WITHIN THE HARMONY CORRIDOR ZONE DISTRICT (H-C). 2. THIS SITE IS LOCATED OUTSIDE OF THE EFFECTIVE 1/2 FOOT RISE FLOODWAY. 3. THE PROPOSED LAND USES FOR THE HARMONY AND STRAUSS CABIN CONVENIENCE SHOPPING CENTER AREA INCLUDE NEIGHBORHOOD COMMERCIAL. OUTLOTS OUTSIDE OF THE NEIGHBORHOOD COMMERCIAL AREA (LOT 1) AND LOT 2 ARE RESERVED FOR A FUTURE DRAINAGE CHANNEL AND FUTURE DEVELOPMENT. 4. THIS PROJECT DEVELOPMENT PLAN IS ACCOMPANIED BY AN ECOLOGICAL CHARACTERIZATION STUDY (ECS). THIS ECS DOCUMENTS THE EXISTING SIGNIFICANT ECOLOGICAL VALUE OF THE SITE, AND PROPOSES MITIGATION FOR THE IMPACTS THE DEVELOPMENT WILL HAVE TO THE ECOLOGICAL VALUE ON THE SITE. THE ECS REPORT AND THE PROTECTION AND MITIGATION WILL BE CONSISTENT WITH THE CITY OF FORT COLLINS LUC SECTION 3.4.1. 5. HACIENDA DRIVE IS DESIGNATED AS A FUTURE RIGHT IN AND RIGHT OUT ACCESS POINT AS FUTURE PARCELS DEVELOP IN ACCORDANCE WITH THE ODP FOR THIS PROJECT. FLOODPLAIN NOTES PROJECT LOCATION INDEX TO PLANS 1 - COVER 2 - SITE PLAN OVERALL 3 - SITE PLAN DETAIL 4 - LANDSCAPE COVER 5 - LANDSCAPE OVERVIEW 6 - LANDSCAPE PLAN NORTH WEST 7 - LANDSCAPE PLAN NORTH EAST 8 - LANDSCAPE PLAN SOUTH WEST 9 - LANDSCAPE PLAN SOUTH EAST 10 - TREE MITIGATION PLAN 11 - PHOTOMETRIC PLAN 12 - LIGHTING DETAILS 13 - BUILDING ELEVATIONS 14 - BUILDING ELEVATIONS 15 - BUILDING ELEVATIONS 16 - BUILDING ELEVATIONS 17 - BUILDING ELEVATIONS 18- TRASH ENCLOSURE DETAILS LOTS 1, 2 & TRACT B, HARMONY & STRAUSS CABIN CONVENIENCE SHOPPING CENTER SUBDIVISION FILING NO. 1