HomeMy WebLinkAboutALPINE DENTAL HEALTH (718 SOUTH COLLEGE AVENUE) - PDP - PDP150015 - SUBMITTAL DOCUMENTS - ROUND 1 - ARCHITECTURAL DETAILSUP
UP
1 A 3.1
A 3.1
A 3.0
A 3.0
1
2
2
1
2
3
4
5
a b c d
- Lobby -
- Bike -
Storage
- Sprinker -
- Mechanical -
Bike
Rack
- Janitor -
Mail
- Bike -
Storage
Nearest fire hydrant at NE corner of College
and Plum +/- 135' from SE corner of building
5' - 0"
19' - 0" 24' - 0" 19' - 0"
19' - 0" 24' - 0" 19' - 0" 19' - 0" 3' - 11 5/32"
Fire Access
R 25' - 0"
4' - 0" 5' - 0"
R 25' - 0"
Bench
A 3.1 6
A 3.1
3
4 A 3.1
A 3.1
5
16' - 0"
DATE:
PROJECT NO:
DRAWN BY:
ISSUED FOR:
7/22/2015 10:01:14 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt
Alpine Dental Health
718 - 726 S. College Ave.
Ft. Collins, CO 80524
22 July 2015
14116.0
EW
Ground Floor Plan
A 2.0
Planning Review
1/8" = 1'-0"
1 Ground Floor Plan
FOR
DN
DN
UP
UP
1 A 3.1
A 3.1
A 3.0
A 3.0
1
2
2
10' - 3" 10' - 3" 10' - 3" 10' - 3"
10' - 0" 11' - 6"
10' - 3" 10' - 3" 6' - 7" 10' - 3" 10' - 3"
11' - 6" 8' - 0"
12' - 9 3/4"
1
2
3
4
5
a b c d
4' - 6"
10' - 0"
11' - 6"
Beverage
bar
- Reception -
- Lobby -
Drinking
fountains
- Waiting -
- Admin -
- Finance -
- Consult -
- Lab -
- Men's -
- Women's -
- Sterilization -
- Imaging -
- Dr. TLT -
Shower
- Uni-sex TLT -
- Dr. Office -
- Dr. Conference -
- Conference -
- Satelite -
Steril.
Lockers
Television
- Op 1 -
- Op 2 -
- Op 3 -
- Op 5 -
- Op 6 -
- Op 4 -
- Op 7 - - Op 8 - - Op 9 - - Op 10 -
- Private Op -
- Private Op -
11' - 6" 4' - 6"
DN
DN
1 A 3.1
A 3.1
A 3.0 2
2
1
2
3
4
5
a b c d
- Living - - Kitchen -
- Study -
- Pantry -
- Bedroom -
- Closet -
- Closet -
- Bedroom -
- Bathroom -
- Bathroom -
Washer/
Dryer
- Study -
- Study -
- Study -
- Bedroom -
- Bedroom -
- Bedroom - - Bedroom -
- Bedroom -
- Bedroom -
- Bedroom -
- Bedroom -
- Living -
- Living -
- Living -
- Living -
- Living -
- Kitchen -
- Kitchen -
- Kitchen -
- Kitchen -
- Kitchen -
- Bathroom -
- Bathroom -
- Bathroom -
- Bathroom -
- Bathroom -
- Pantry -
- Closet -
- Closet - - Closet -
- Closet - - Closet -
- Closet -
- Closet -
- Closet -
- Closet -
Washer/
dryer
Washer/
dryer
Ground Level
0"
Second Level
12' - 6"
Third Level
25' - 0"
d c b a
39' - 0" TO Building
Steel railing
beyond
Steel trellis
Brick
Brick site wall/ planter Concrete column TYP. Metal storefront Wood bench Brick site wall/ planter
Metal storefront
Steel awning
Stucco banding at top
of parapet. TYP
Stucco
Stucco
Steel awning
Ground Level
0"
Second Level
12' - 6"
Third Level
25' - 0"
1 2 3 4 5
39' - 0" TO Building
Brick Site wall/
planter
Brick Site wall/
planter
Steel trellis
Address numbers
Metal storefront
Brick Site wall/
planter
Stucco
Stucco banding at top
of parapet. TYP
Signage to be
reviewed and
approved separately
Steel trellis
Stucco
Stucco Stucco
DATE:
PROJECT NO:
DRAWN BY:
ISSUED FOR:
7/22/2015 10:01:32 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt
Alpine Dental Health
718 - 726 S. College Ave.
Ft. Collins, CO 80524
03/12/15
14116.0
EW
Exterior Elevations
A 3.0
Planning Review
Ground Level
0"
Second Level
12' - 6"
Third Level
25' - 0"
5 4 3 2 1
39' - 0"
Stucco banding at
top of parapet. TYP
Steel awning
Steel awning
Stucco
Metal storefront
Steel railing
Brick site wall/ planter Brick Brick site wall/ planter
Stucco
Stucco
Storefront beyond.
Open at balcony. TYP
Concrete column. TYP
Ground Level
0"
Second Level
12' - 6"
Third Level
25' - 0"
39' - 0" TO Building
Stucco Stucco
Steel awning beyond
Wooden bench beyond
Brick site wall/ planter Brick
12' - 6"
6' - 4"
4"
4" precast concrete cap
Brick
19' - 0"
16' - 0"
6' - 4"
6" 4"
4" precast
concrete cap
4x4x1/4 Steel post
secured to wall and
embeded into
concrete footing.
Water-tight
weldplate on top.
4x4x1/4 Steel post embeded into concrete
footing. Water-tight weldplate on top.
4x4x1/4 Steel post
secured to wall and
embeded into
concrete footing.
Water-tight
weldplate on top.
Canebolt bolt Cane
Heavy duty hinges
welded to steel post;
DATE:
PROJECT NO:
DRAWN BY:
ISSUED FOR:
7/22/2015 10:02:16 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt
Alpine Dental Health
718 - 726 S. College Ave.
Ft. Collins, CO 80524
22 July 2015
14116.0
EW
Perspective Sketches
A 9.0
Planning Review
1 NW
2 West
3 SW
4 Bird's Eye - NW
5 NE
6 Bird's Eye - SE
REVISIONS
#DateDescription
FOR
COORDINATION
PURPOSES ONLY
NOT FOR
CONSTRUCTION
sized for loads
Padlock and hasp. TYP
Trash enclosure gates: 1-1/2"
steel decking welded to 1-
3/4" steel angle framing.
12' - 6"
Padlock and Hasp
4" precast concrete top Trash enclosure gates: 1-1/2"
steel decking welded to 1-3/4"
steel angle framing.
Brick
Heavy duty hinges welded to steel post;
sized for loads
4x4x1/4 Steel post secured to wall and
embeded into concrete footing.
Water-tight weldplate on top.
19' - 0"
4" precast concrete top
Brick
DATE:
PROJECT NO:
DRAWN BY:
ISSUED FOR:
7/22/2015 10:01:42 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt
Alpine Dental Health
718 - 726 S. College Ave.
Ft. Collins, CO 80524
03/12/15
14116.0
EW
Exterior Elevations
A 3.1
Planning Review
1 3/16" = 1'-0"
East
2 3/16" = 1'-0"
South
REVISIONS
#DateDescription
1/4" = 1'-0"
3 Trash/ Recycling Enclosure - North
1/4" = 1'-0"
4 Trash/ Recycling Enclosure - East
1/4" = 1'-0"
5 Trash/ Recycling Enclosure - South
6 1/4" = 1'-0"
Trash/ Recycling Enclosure - West
FOR
COORDINATION
PURPOSES ONLY
NOT FOR
CONSTRUCTION
1 3/16" = 1'-0"
North
2 3/16" = 1'-0"
West
REVISIONS
#DateDescription
FOR
COORDINATION
PURPOSES ONLY
NOT FOR
CONSTRUCTION
Washer/
dryer
Washer/
dryer
- Closet -
- Closet -
Area of
refuge
4' - 0"
DATE:
PROJECT NO:
DRAWN BY:
ISSUED FOR:
7/22/2015 10:01:16 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt
Alpine Dental Health
718 - 726 S. College Ave.
Ft. Collins, CO 80524
22 July 2015
14116.0
EW
Third Floor Plan
A 2.2
Planning Review
1 3/16" = 1'-0"
Third Level
FOR
COORDINATION
PURPOSES ONLY
NOT FOR
CONSTRUCTION
REVISIONS
#DateDescription
13' - 7"
- Closet -
- IT -
- Staff TLT - - Changing
Room-
- Staff -
22' - 0" 12' - 4 3/4"
14' - 1 7/16" 7' - 10" 7' - 10"
21' - 11 1/2"
4' - 0"
- Storage -
6' - 3 3/4"
26' - 1"
25' - 9"
8' - 6 1/2"
Cerec
Clinic CPU station. E4D
cart storage below
4' - 6"
Display
4' - 0"
Area of
refuge
4' - 0"
2' - 1"
DATE:
PROJECT NO:
DRAWN BY:
ISSUED FOR:
7/22/2015 10:01:15 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt
Alpine Dental Health
718 - 726 S. College Ave.
Ft. Collins, CO 80524
22 July 2015
14116.0
EW
Second Floor Plan
A 2.1
Planning Review
FOR
COORDINATION
PURPOSES ONLY
NOT FOR
CONSTRUCTION
3/16" = 1'-0"
1 Second Level
REVISIONS
#DateDescription
COORDINATION
PURPOSES ONLY
NOT FOR
CONSTRUCTION
REVISIONS
#DateDescription