Loading...
HomeMy WebLinkAboutALPINE DENTAL HEALTH (718 SOUTH COLLEGE AVENUE) - PDP - PDP150015 - SUBMITTAL DOCUMENTS - ROUND 1 - ARCHITECTURAL DETAILSUP UP 1 A 3.1 A 3.1 A 3.0 A 3.0 1 2 2 1 2 3 4 5 a b c d - Lobby - - Bike - Storage - Sprinker - - Mechanical - Bike Rack - Janitor - Mail - Bike - Storage Nearest fire hydrant at NE corner of College and Plum +/- 135' from SE corner of building 5' - 0" 19' - 0" 24' - 0" 19' - 0" 19' - 0" 24' - 0" 19' - 0" 19' - 0" 3' - 11 5/32" Fire Access R 25' - 0" 4' - 0" 5' - 0" R 25' - 0" Bench A 3.1 6 A 3.1 3 4 A 3.1 A 3.1 5 16' - 0" DATE: PROJECT NO: DRAWN BY: ISSUED FOR: 7/22/2015 10:01:14 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt Alpine Dental Health 718 - 726 S. College Ave. Ft. Collins, CO 80524 22 July 2015 14116.0 EW Ground Floor Plan A 2.0 Planning Review 1/8" = 1'-0" 1 Ground Floor Plan FOR DN DN UP UP 1 A 3.1 A 3.1 A 3.0 A 3.0 1 2 2 10' - 3" 10' - 3" 10' - 3" 10' - 3" 10' - 0" 11' - 6" 10' - 3" 10' - 3" 6' - 7" 10' - 3" 10' - 3" 11' - 6" 8' - 0" 12' - 9 3/4" 1 2 3 4 5 a b c d 4' - 6" 10' - 0" 11' - 6" Beverage bar - Reception - - Lobby - Drinking fountains - Waiting - - Admin - - Finance - - Consult - - Lab - - Men's - - Women's - - Sterilization - - Imaging - - Dr. TLT - Shower - Uni-sex TLT - - Dr. Office - - Dr. Conference - - Conference - - Satelite - Steril. Lockers Television - Op 1 - - Op 2 - - Op 3 - - Op 5 - - Op 6 - - Op 4 - - Op 7 - - Op 8 - - Op 9 - - Op 10 - - Private Op - - Private Op - 11' - 6" 4' - 6" DN DN 1 A 3.1 A 3.1 A 3.0 2 2 1 2 3 4 5 a b c d - Living - - Kitchen - - Study - - Pantry - - Bedroom - - Closet - - Closet - - Bedroom - - Bathroom - - Bathroom - Washer/ Dryer - Study - - Study - - Study - - Bedroom - - Bedroom - - Bedroom - - Bedroom - - Bedroom - - Bedroom - - Bedroom - - Bedroom - - Living - - Living - - Living - - Living - - Living - - Kitchen - - Kitchen - - Kitchen - - Kitchen - - Kitchen - - Bathroom - - Bathroom - - Bathroom - - Bathroom - - Bathroom - - Pantry - - Closet - - Closet - - Closet - - Closet - - Closet - - Closet - - Closet - - Closet - - Closet - Washer/ dryer Washer/ dryer Ground Level 0" Second Level 12' - 6" Third Level 25' - 0" d c b a 39' - 0" TO Building Steel railing beyond Steel trellis Brick Brick site wall/ planter Concrete column TYP. Metal storefront Wood bench Brick site wall/ planter Metal storefront Steel awning Stucco banding at top of parapet. TYP Stucco Stucco Steel awning Ground Level 0" Second Level 12' - 6" Third Level 25' - 0" 1 2 3 4 5 39' - 0" TO Building Brick Site wall/ planter Brick Site wall/ planter Steel trellis Address numbers Metal storefront Brick Site wall/ planter Stucco Stucco banding at top of parapet. TYP Signage to be reviewed and approved separately Steel trellis Stucco Stucco Stucco DATE: PROJECT NO: DRAWN BY: ISSUED FOR: 7/22/2015 10:01:32 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt Alpine Dental Health 718 - 726 S. College Ave. Ft. Collins, CO 80524 03/12/15 14116.0 EW Exterior Elevations A 3.0 Planning Review Ground Level 0" Second Level 12' - 6" Third Level 25' - 0" 5 4 3 2 1 39' - 0" Stucco banding at top of parapet. TYP Steel awning Steel awning Stucco Metal storefront Steel railing Brick site wall/ planter Brick Brick site wall/ planter Stucco Stucco Storefront beyond. Open at balcony. TYP Concrete column. TYP Ground Level 0" Second Level 12' - 6" Third Level 25' - 0" 39' - 0" TO Building Stucco Stucco Steel awning beyond Wooden bench beyond Brick site wall/ planter Brick 12' - 6" 6' - 4" 4" 4" precast concrete cap Brick 19' - 0" 16' - 0" 6' - 4" 6" 4" 4" precast concrete cap 4x4x1/4 Steel post secured to wall and embeded into concrete footing. Water-tight weldplate on top. 4x4x1/4 Steel post embeded into concrete footing. Water-tight weldplate on top. 4x4x1/4 Steel post secured to wall and embeded into concrete footing. Water-tight weldplate on top. Canebolt bolt Cane Heavy duty hinges welded to steel post; DATE: PROJECT NO: DRAWN BY: ISSUED FOR: 7/22/2015 10:02:16 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt Alpine Dental Health 718 - 726 S. College Ave. Ft. Collins, CO 80524 22 July 2015 14116.0 EW Perspective Sketches A 9.0 Planning Review 1 NW 2 West 3 SW 4 Bird's Eye - NW 5 NE 6 Bird's Eye - SE REVISIONS #DateDescription FOR COORDINATION PURPOSES ONLY NOT FOR CONSTRUCTION sized for loads Padlock and hasp. TYP Trash enclosure gates: 1-1/2" steel decking welded to 1- 3/4" steel angle framing. 12' - 6" Padlock and Hasp 4" precast concrete top Trash enclosure gates: 1-1/2" steel decking welded to 1-3/4" steel angle framing. Brick Heavy duty hinges welded to steel post; sized for loads 4x4x1/4 Steel post secured to wall and embeded into concrete footing. Water-tight weldplate on top. 19' - 0" 4" precast concrete top Brick DATE: PROJECT NO: DRAWN BY: ISSUED FOR: 7/22/2015 10:01:42 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt Alpine Dental Health 718 - 726 S. College Ave. Ft. Collins, CO 80524 03/12/15 14116.0 EW Exterior Elevations A 3.1 Planning Review 1 3/16" = 1'-0" East 2 3/16" = 1'-0" South REVISIONS #DateDescription 1/4" = 1'-0" 3 Trash/ Recycling Enclosure - North 1/4" = 1'-0" 4 Trash/ Recycling Enclosure - East 1/4" = 1'-0" 5 Trash/ Recycling Enclosure - South 6 1/4" = 1'-0" Trash/ Recycling Enclosure - West FOR COORDINATION PURPOSES ONLY NOT FOR CONSTRUCTION 1 3/16" = 1'-0" North 2 3/16" = 1'-0" West REVISIONS #DateDescription FOR COORDINATION PURPOSES ONLY NOT FOR CONSTRUCTION Washer/ dryer Washer/ dryer - Closet - - Closet - Area of refuge 4' - 0" DATE: PROJECT NO: DRAWN BY: ISSUED FOR: 7/22/2015 10:01:16 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt Alpine Dental Health 718 - 726 S. College Ave. Ft. Collins, CO 80524 22 July 2015 14116.0 EW Third Floor Plan A 2.2 Planning Review 1 3/16" = 1'-0" Third Level FOR COORDINATION PURPOSES ONLY NOT FOR CONSTRUCTION REVISIONS #DateDescription 13' - 7" - Closet - - IT - - Staff TLT - - Changing Room- - Staff - 22' - 0" 12' - 4 3/4" 14' - 1 7/16" 7' - 10" 7' - 10" 21' - 11 1/2" 4' - 0" - Storage - 6' - 3 3/4" 26' - 1" 25' - 9" 8' - 6 1/2" Cerec Clinic CPU station. E4D cart storage below 4' - 6" Display 4' - 0" Area of refuge 4' - 0" 2' - 1" DATE: PROJECT NO: DRAWN BY: ISSUED FOR: 7/22/2015 10:01:15 AM C:\Users\Eric White\Documents\Revit Worksets\Alpine Dental Health - Central_Eric White.rvt Alpine Dental Health 718 - 726 S. College Ave. Ft. Collins, CO 80524 22 July 2015 14116.0 EW Second Floor Plan A 2.1 Planning Review FOR COORDINATION PURPOSES ONLY NOT FOR CONSTRUCTION 3/16" = 1'-0" 1 Second Level REVISIONS #DateDescription COORDINATION PURPOSES ONLY NOT FOR CONSTRUCTION REVISIONS #DateDescription