HomeMy WebLinkAboutBUCKINGHAM PLACE, SECOND FILING - PDP/FDP - FDP150001 - SUBMITTAL DOCUMENTS - ROUND 1 - REVISIONS (3)Response to Comments
Buckingham Place, Second Filing, FDP150001
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/28/2015
01/28/2015: Street tree placements need to be adjusted to maintain the
minumum 6 feet from service lines.
Response: Street tree placements have now been adjusted as requested.
Comment Number: 2 Comment Originated: 01/28/2015
01/28/2015: For the ornamental street tree, please change this to a Chanticleer
Pear or Red Baron Crabapple, both of which have a more narrow upright
branching that are more appropriate along a street.
Response: The tree species has been changed as requested.
Comment Number: 3 Comment Originated: 01/28/2015
01/28/2015: I received a comment from Don Kapperman with Comcast:
"Developer needs to place 1 inch conduit from Lot 1 and Lot 2 back to pole
area to service both lots."
Response: This comment was with regard to placing conduit under the shared driveway, which we are no
longer proposing, thus this comment is no longer applicable.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/27/2015
01/27/2015: A payment in lieu of constructing the local street portion of the
frontage improvements along 3rd Street will need to be collected prior to the
issuance of building permit. At this time the payment amount is $209 per L.F. of
property frontage. We are in the process of updating this number for the year
2015 and the price per L.F may change prior to project approval.
Response: As discussed with the owner, an appropriate payment-in-lieu will be calculated
for this project.
Comment Number: 2 Comment Originated: 01/27/2015
01/27/2015: An additional payment will be needed for the City to remove and
fill the Coy Ditch along the property frontage.
Response: As discussed, the Coy is being removed as part of a City capital project.
Comment Number: 3 Comment Originated: 01/27/2015
01/27/2015: A development agreement will need to be signed and recorded
prior to project approval. Please contact me to begin this process after hearing
Response: We hope to finalize the DA as soon as possible.
Comment Number: 4 Comment Originated: 01/27/2015
01/27/2015: Conduits need to be shown and labeled on the utility plan and
installed as part of this project in preparation for undergrounding of the existing
overhead utility lines.
Response: The electric is already underground in this area. The existing pole has telecom
wires only. We have added two 1.5” PVC conduits in the utility easement along the frontage.
Comment Number: 5 Comment Originated: 01/27/2015
01/27/2015: Sheet C8- 3rd Street East Flowline Profile: Please revise the sag
curve at station 10+61.13. Use multiple grade breaks into the inlet instead of VC.
Response: This vertical curve has been replaced with grades breaks as requested.
Comment Number: 6 Comment Originated: 01/27/2015
01/27/2015: Please label the size of the sewer services into the property
Response: These labels have been added to the utility plan.
Comment Number: 7 Comment Originated: 01/27/2015
01/27/2015: Site Plan: Please add our standard asphalt patching note to the
site plan or remove proposed asphalt patching limits from the site plan.
Response: The proposed asphalt patching limits have been removed from the site and landscape
plans as requested.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/28/2015
01/28/2015:
The note that references the possible mitigation for the two boxelder on the
neighbor’s property to the south should state that conifers trees would be 8 feet
height and not 6 feet height.
Please change the Autumn Blaze Pear shown as street trees to Chanticleer Pear.
Response: Response: The tree height in the note has been changed to 8 feet from 6 feet as
requested, and tree species changed as requested.
Comment Number: 2 Comment Originated: 01/28/2015
01/28/2015:
There is a 4 inch Green Ash shown to be transplanted. Since the review that
occurred in 2013, Emerald Ash Borer has been found in Boulder, Colorado and
it will likely be found in Fort Collins in the near future. With this potential threat to
all ash trees in Fort Collins the transplanting a small ash tree generally would not
be advised. Ash are currently marked as do not plant in the Front Range Tree
Recommendation List.
Response: Ash is no longer proposed as requested.
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/19/2015
01/19/2015: 1. The Landscape Plan shows a proposed canopy tree (1-AB)
that is located to close to the existing street light. It is identified under note 12 of
the Landscape Notes that there must be 40 ft. between canopy trees and street
lights and 15 feet between ornamental trees and street lights.
Response: Revised accordingly.
Comment Number: 2 Comment Originated: 01/19/2015
01/19/2015: 2. Please show the existing electrical secondary box, located
next to street light, on the utility drawing.
Response: These are shown on sheet C3.
Comment Number: 3 Comment Originated: 01/19/2015
01/19/2015: 3. Electric utility development charges will apply for this new construction
and modification charges may apply to any changes made to existing electrical equipment.
A link to the electric development fee estimator for new development charges is below.
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees/electric-development-fee-estimator?id=1
Response: Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 6 Comment Originated: 01/28/2015
01/28/2015: Section A.7 of Appendix C - "washing out concrete trucks" silt
fence and straw wattles are not acceptable BMPs to prevent the pollutants
associated with concrete washout, choose better BMP.
Response: Straw wattles have been removed from the erosion control plan. Concrete washout
will not be allowed within the construction site.
Section B.2.E - "Waterline, sanitary sewer, and storm sewer will be covered and placed on the
pallets". Are these the utility infrastructure? Or the stuff in the ground please clarify.
Response: The majority of these materials will consist of water and sanitary sewer piping associated
with Phase One. Phase Two includes a small amount of water and sanitary sewer service piping.
Section B.2.J - If concrete work is to occur on a site then yes a BMP needs to be used
to keep concrete and other trades men from washing in the curbline.
Response: Phase One does not include any concrete placement. Phase Two includes
concrete placement work for the foundations and hardscape typical for construction of a single-family
home, which is often accomplished without an on-site washout area. Concrete washout will
not be allowed on-site or adjacent to the site.
Section B.2.N - "If sanitary facilities are located on paved surfaces, a secondary containment
BMP will need to be constructed". If facilities are on hard surfaces something needs to be in
place to prevent them from tipping. Detail EC4 on page C10 has shown to cause flooding
issues in higher flow conditions. Please design for overflow in case of increased water to that inlet.
Response: The sanitary facility will be located within the project site, off paved or hard surfaces.
Please show calculation verifying that the site escrow is $1500. If you need clarification
concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Response: A calculation has been included.
Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com
Topic: Floodplain
Comment Number: 1 Comment Originated: 01/21/2015
01/21/2015: In the drainage letter, mention that the site is in the Poudre River
500-year Floodplain (Zone X, Protected by Levee) and that "At-Risk Population
and Essential Service" critical facilities are not allowed.
Response: This language has been added to the drainage letter and the plans.
Comment Number: 2 Comment Originated: 01/21/2015
01/21/2015: On the Ultimate Site Plan and Interim Site Plan, include a note that
the development is within the Poudre River 500-year Floodplain (Zone X,
Protected by Levee) and must conform to the safety standards of Chapter 10 of
City Code.
Response: There is no longer an interim plan. The requested note has been added to the site plan.
Comment Number: 3 Comment Originated: 01/21/2015
01/21/2015: On the Ultimate Site Plan and Interim Site Plan, include a note that
"At-Risk Population and Essential Service" critical facilities are not allowed
within the floodplain.
Response: There is no longer an interim plan. The requested note has been added to the site plan.
Comment Number: 4 Comment Originated: 01/21/2015
01/21/2015: On the plat, add a note that the entire site is within the Poudre
River 500-year floodplain (Zone X, Protected by Levee).
Response: Request has been accommodated in the revised plat drawing.
Comment Number: 5 Comment Originated: 01/21/2015
01/21/2015: On the Grading and Drainage Plan, include a note that "At-Risk
Population and Essential Service" critical facilities are not allowed within the
Poudre River 500-year floodplain.
Response: This has been added.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 01/26/2015
01/26/2015: The City has moved to the NAVD88 vertical datum. Please
provide the following information in the EXACT format shown below.
If your project is started on NAVD88 datum:
1) PROJECT DATUM: NAVD88
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
OR, if project has already been surveyed in NAVD29 Unadjusted datum:
2) PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT
COLLINS DATUM)
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
If using NGVD29 UNADJUSTED the following equation statement will be
needed.
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29
UNADJUSTED + X.XX’
Response: Revisions have been made as requested.
Comment Number: 2 Comment Originated: 01/26/2015
01/26/2015: The Basis Of Bearings statement does not match the Subdivision
Plat.
Response: This statement has been revised to match the plat.
Comment Number: 3 Comment Originated: 01/26/2015
01/26/2015: Please tie the coordinate values shown for utilities to the project
boundary. We would prefer that this be done by adding property corner values
to each sheet, or showing the property corner values on the horizontal control
plans and adding a note to each sheet with coordinate values.
Response: Coordinates have been provided for the existing front property corners.
Comment Number: 4 Comment Originated: 01/26/2015
01/26/2015: There are line over text issues. See redlines.
Response: Revised as requested.
Comment Number: 5 Comment Originated: 01/26/2015
01/26/2015: There is text that needs to be rotated 180 degrees. See redlines.
Response: Revised as requested.
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 01/26/2015
01/26/2015: There are line over text issues. See redlines.
Response: The line over text issues have now been fixed.
Comment Number: 7 Comment Originated: 01/26/2015
01/26/2015: There is text that needs to be rotated 180 degrees. See redlines.
Response: The text has been rotated as requested.
Topic: Plat
Comment Number: 8 Comment Originated: 01/26/2015
01/26/2015: Please verify whether or not the Coy Ditch still exists.
Response: The Coy Ditch no longer exists.
Comment Number: 9 Comment Originated: 01/26/2015
01/26/2015: Please correct the spelling of "Larimer" in the legal description.
See redlines.
Response: Request has been accommodated in the revised plat drawing.
Comment Number: 10 Comment Originated: 01/26/2015
01/26/2015: Are there any Lienholders for this property? If so, please add a
signature block. If not, please add a note stating there are none, and include
response in written comments.
Response: Request has been accommodated in the revised plat drawing. There are no lienholders.
Comment Number: 11 Comment Originated: 01/26/2015
01/26/2015: Please add "of the" as marked, to the Basis Of Bearings
statement. See redlines.
Response: Request has been accommodated in the revised plat drawing.
Topic: Site Plan
Comment Number: 12 Comment Originated: 01/26/2015
01/26/2015: There are line over text issues. See redlines.
Response: The line over text issues have now been fixed.
Comment Number: 13 Comment Originated: 01/26/2015
01/26/2015: There is text that needs to be rotated 180 degrees. See redlines.
Response: The text has been rotated as requested.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/27/2015
01/27/2015: Traffic Operations and Transportation Planning have no comments.
Response: Thank you!
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/28/2015
01/28/2015: Each single family home requires one off street parking space.
Response: Will be accommodated with building permit site plan review.
Comment Number: 2 Comment Originated: 01/28/2015
01/28/2015: The setbacks are: front 20 feet, rear 15 feet and side 5 feet.
Response: Will be accommodated with building permit site plan review.
Comment Number: 3 Comment Originated: 01/28/2015
01/28/2015: Street facing garages must be recessed behind either a front
facade or a covered porch (measuring at least 6 feet by 8 feet) at least 4 feet.
Response: Will be accommodated with building permit site plan review.