Loading...
HomeMy WebLinkAboutVERIZON WIRELESS, 3003 E. HARMONY RD. - PDP/FDP - FDP150014 - REPORTS - APPLICANT COMMUNICATIONAPPLICATION FOR WIRELESS TELECOMMUNICATION FACILITY 3003 E. HARMONY ROAD TYPE I REVIEW MAY 20, 2015 RAPID INCREASE IN SMARTPHONE USE • 24% increase in number of smartphones in use from 2013 to 2014 • Now at least 156 million users of smartphones • More than half of all mobile data use is data-intensive video • Video-streaming, social networking most intensive uses • Approximately 50 million U. S. consumers watched video on wireless phones in 2013 • Customer demand for 4G-LTE service to support data-intensive uses DATA INTENSIVE 4G-LTE USES • Traffic generated by smartphone = 49x more than by basic handset • Smartphone traffic expected to increase 325% by 2018 • Traffic generated by tablet – 127x more than by basic handset • Tablet traffic expected to increase 370% by 2018 • U. S. Data Usage: • 2012 = 1.468 trillion MB • 2013 = 3.23 trillion MB (More than doubled in 1 year!) • 2018 = Expected to increase by 650% 3003 E. HARMONY ROAD VICINITY MAP Lowe’s Target Intel Avago Harmony One Condominium Assoc. 3003 E. Harmony Road Zone District: HC – Harmony Corridor Proposed Site Design  6 Façade-mounted panel antennas painted to match existing façade color  2 HVAC units on ground level – east side  Electronic equipment in basement  No changes to roofline; minimal visual impact Meets All Requirements of Land Use Code  Combined Project Development and Final Plan complies with relevant administrative standards in Article 2  Combined Project Development and Final Plan complies with relevant general development standards in Article 3  Combined Project Development and Final Plan complies with relevant standards in Article 4 Section 4.26, HC District Existing View Northeast Façade Proposed View Northeast Façade Existing View Southeast Façade Proposed View Southeast Façade Existing View Southwest Façade Proposed View Southwest Façade Existing view Ground level – east side Proposed view Ground level – east side Landscape Modification North Elevation East Elevation Antenna mount detail South elevation West elevation Basement Equipment FINDINGS REQUIRED FOR APPROVAL  Combined Project Development and Final Plan complies with relevant administrative standards in Article 2  Combined Project Development and Final Plan complies with relevant general development standards in Article 3  Combined Project Development and Final Plan complies with relevant standards in Article 4 Section 4.26, HC District