HomeMy WebLinkAboutVILLAGE ON REDWOOD (FORT COLLINS HOUSINTG AUTHORITY) - PDP - PDP150012 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT1218 W. ASH, STE. C, WINDSOR, COLORADO 80550
TEL. 970.674.3300 – FAX 970.674.3303
July 15, 2015
Mr. Shane Boyle
Fort Collins Utilities – Stormwater
700 Wood Street
Fort Collins, CO 80522
Re: FCHA Villages on Redwood
Preliminary Storm Drainage Report
Dear Shane,
Please accept the following letter report on behalf of the Fort Collins Housing Authority for the low
income housing development demonstrating the site’s ability to comply with the City’s stormwater
requirements.
INTRODUCTION
The project site currently is an undeveloped infill site located north of Nokomis Ct and west of Redwood
St. The site is 9.61 acres with approximately 3.0± acres being an existing detention pond and
approximately 6.6± acres of developable land. The property will be subdivided into two lots, one
containing the existing detention pond and the other being the developed portion for low income housing.
The project will consist of constructing 12 low income housing buildings, a community clubhouse, and
associated pedestrian and vehicle accesses. This project will be completed in one phase of construction.
EXISTING CONDITIONS
The project site is bound by Redwood St to the east and surrounded by previously developed properties
on the north, south, and west. The site is currently undeveloped and appears to be vegetated with native
grasses and wetland plants surrounding the existing detention pond. The existing detention pond
encompasses the western portion of the site. Based on research of the site, it appears that this detention
pond was constructed sometime after 1975. The site is within the Dry Creek basin and within the basin
limits of the Northeast College Corridor Outfall improvements. The existing site is approximately 2.7%
impervious, including the west half of Redwood St. The existing 100-yr peak runoff rate to the existing
detention pond and Redwood St is 18.33 cfs and 20.71 cfs, respectively. The runoff directed to Redwood
St is conveyed to and collected by an existing 15’ Type R inlet located near the southeast corner of the
site.
The existing runoff rates, stated above, are referenced for the stormwater release rates for the proposed
improvements. All calculations and exhibits are attached.
PROPOSED DEVELOPMENT
The project proposes to develop this infill site with 12 low income housing buildings (with a total of 72
units), a community clubhouse and associated infrastructure and site/building pedestrian and vehicle
FCHA Villages on Redwood – Preliminary Storm Drainage Report
July 15, 2015
Page 2 of 3
access. The property will be subdivided into 2 lots, one containing the existing detention pond and the
remaining containing the proposed low income housing development.
The project is required to detain the developed 100-yr runoff to the existing 100-yr runoff rate. The
detention requirements will be provided through the use of a detention pond in the southeast corner of the
site. Water quality capture volume and associated infrastructure is not required as part of this project,
though implementation of Low Impact Development (LID) techniques for water quality enhancement are
required and proposed with this project.
Similar to the existing conditions, the proposed project is divided into two major basins, one basin
draining undetained to the existing detention pond to the west (Basin D4), and the remaining basin
draining towards Redwood St (Basins D1, D2, and D3). In general, the basin limits are maintained for
the areas draining to the existing detention pond and towards Redwood, though there is a small portion of
developed area draining to the existing detention pond (Basin D4). This causes an increase of 0.05 cfs to
the existing pond and is considered negligible. Runoff from Basins D1 and D2 are conveyed to the
proposed detention pond in the southeast corner of the site, with the outfall being the connection to the
existing storm drain within Redwood St. The undetained developed portion (Basin D3) drains to the
existing inlet within Redwood St. Under the developed condition, the 100-yr peak runoff rates to the
existing detention pond and Redwood St are estimated to be 18.38 cfs and 27.59 cfs, respectively.
Detaining the developed runoff to the existing 100-yr runoff rate for the basin draining towards Redwood,
in addition to accounting for the undetained portions that drain directly to Redwood, requires a detention
volume of 0.125 acre-ft. The undetained portion has a runoff rate of 4.89 cfs, combined with detention
pond release rate of 15.82 cfs, has a peak 100-yr runoff rate of 20.71 cfs, equal to the existing 100-yr
runoff rate.
All preliminary calculations and exhibits are attached for reference.
LOW IMPACT DEVELOPMENT TECHNIQUES
In reference to the code requirements for implementation of Low Impact Development (LID) techniques,
we have looked at many options to satisfy these requirements. This project is pursuing alternative
compliance in regards to substituting the permeable paver requirement by treating 100% of the site by
other LID techniques. The main LID being proposed to be implemented onsite is a bioretention rain
garden located near the southeast corner of the site. Approximately 80% of the developed site is proposed
to be treated by the rain garden and the remaining developed area will be treated by a combination of
grass buffers and grass swales. The rain garden is designed to directly spill into the detention area for
events beyond the capacity of the rain garden. The rain garden is designed to have a maximum depth of
12 inches. Underdrains, clean-outs, and a Standard Operations Procedure will be provided at final design
to assist in ensuring that these BMPs will adequately perform over time.
Preliminary calculations are attached for reference.
EROSION CONTROL
Erosion and sedimentation will be controlled on-site by use of silt fences, culvert inlet protection, a gravel
construction entrance, and seeding and mulch. The measures are designed to limit the overall sediment
yield increase due to construction as required by the City of Fort Collins. During overlot and final
grading the soil will be roughened and furrowed perpendicular to the prevailing winds.
During the performance of the work required by these specifications or any operations appurtenant
thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor,
FCHA Villages on Redwood – Preliminary Storm Drainage Report
July 15, 2015
Page 3 of 3
equipment, materials, and means required. The Contractor shall carry out proper efficient measures
wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from
his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to
persons. The Contractor will be held liable for any damage resulting from dust originating from his
operations under these specifications on right-of-way or elsewhere.
It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of-way.
Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to
minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized
construction entrances are required with base material consisting of 6” coarse aggregate. The contractor
will be responsible for clearing mud tracked onto city streets on a daily basis.
All temporary and permanent erosion and sediment control practices must be maintained and repaired as
needed to assure continued performance of their intended function. Silt fence will require periodic
replacement. Maintenance is the responsibility of the contractor.
All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be
considered established until a ground cover is achieved which is demonstrated to be mature enough to
control soil erosion to the satisfaction of the City Inspector and to survive severe weather condition.
Thank you in advance for your time and if you have any questions or comments please contact me at
(970) 347-8917.
Sincerely,
Jason T. Claeys, P.E., LEED AP
Interwest Consulting Group
Attachments
Hydrologic Soil Group—Larimer County Area, Colorado
(FCHA - Villages at Redwood)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/29/2015
Page 1 of 4
4494910 4494940 4494970 4495000 4495030 4495060 4495090
4494910 4494940 4494970 4495000 4495030 4495060 4495090
494050 494080 494110 494140 494170 494200 494230 494260 494290 494320 494350
494050 494080 494110 494140 494170 494200 494230 494260 494290 494320 494350
40° 36' 24'' N
105° 4' 13'' W
40° 36' 24'' N
105° 4' 0'' W
40° 36' 17'' N
105° 4' 13'' W
40° 36' 17'' N
105° 4' 0'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,440 if printed on A landscape (11" x 8.5") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
64 Loveland clay loam, 0 to
1 percent slopes
C 3.4 47.1%
73 Nunn clay loam, 0 to 1
percent slopes
C 3.8 52.9%
Totals for Area of Interest 7.2 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group—Larimer County Area, Colorado FCHA - Villages at Redwood
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/29/2015
Page 3 of 4
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado FCHA - Villages at Redwood
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/29/2015
Page 4 of 4
FCHA - Villages on Redwood
DRAINAGE SUMMARY
Design Engineer:
Design Firm:
Project Number:
Date:
DRAINAGE SUMMARY:
Area (acres)
%
Imprevious
100-yr Peak
Runoff (cfs) Area (acres)
%
Imprevious
100-yr Peak
Runoff (cfs)
To Redwood 6.217 4.4% 20.71 6.049 47.3% 27.59 H1 compared to D1+D2+D3
To Existing Pond 3.785 0.0% 18.33 3.953 1.5% 18.38 H2+OF1 compared to D4
Totals 10.002 2.7% 39.04 10.002 29.2% 45.97
Basins Notes
Historical Developed
T.Alva
Interwest Consulting Group
1237-112-00
7/15/2015
FCHA - Villages on Redwood
HISTORIC IMPERVIOUS AREA CALCULATION
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006)
BASINS:
C5 C10 C100 C5 C10 C100
0.90 0.92 0.96 0.90 0.92 0.96
0.73 0.75 0.81 0.75 0.77 0.83
0.73 0.75 0.81 0.75 0.77 0.83
0.30 0.36 0.50 0.35 0.42 0.58
0.08 0.15 0.35 0.15 0.25 0.50
C5 C10 C100
H1 C 270,830 6.217 11,888 0 0 0 258,941 4.4% 0.18 0.27 0.52
H2 C 162,764 3.737 0 0 0 0 162,764 0.0% 0.15 0.25 0.50
OF1 C 2,110 0.048 0 0 0 0 2,110 0.0% 0.15 0.25 0.50
Total C 435,704 10.002 11,888 0 0 0 421,705 2.7% 0.17 0.27 0.51
COMPOSITE
Hydrologic Soil Hydrologic Soil
Gravel
Classification B
Roof
Paved
Walk
Lawns, clayey soil
Land Use
Classification C
Runoff Coefficient Runoff Coefficient
% Impervious
100%
90%
90%
40%
0%
T.Alva
Interwest Consulting Group
1237-112-00
7/15/2015
% Impervious values from Table RO-3 in the Urban Storm Drainage Criteria Manual for Hydrologic Soil Classifications
Sub-basin
Designation
Soil
Type
Atotal
(sq feet)
Atotal
(acres)
Apaved
(sq feet)
Aroof
(sq feet)
Awalk
(sq feet)
Apavers
(sq feet)
Alawn
(sq feet)
FCHA - Villages on Redwood
HISTORIC TIME OF CONCENTRATION
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006)
EQUATIONS:
-Equation RO-3 -Equation RO-4 -Urbanized Check Equation RO-5
-Equation RO-3
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition
500 ft - Overland flow shall not exceed for undeveloped condition
Final t c
= minimum of t i
+ t t
and urbanized basin check
recommended minimum t c
= 5 min for urbanized basins
BASINS:
Type of Travel
Surface
Cv
H1 H1 0.18 6.217 419 0.0043 45.81 495 0.0059 Paved Areas 20 1.54 5.37 51.19 15.08 15.08
H2 H2 0.15 3.737 32 0.2582 3.36 0 0.0001 Tilage/Field 5 0.05 0.00 5.00 10.18 5.00 All Overland Flow
OF1 OF1 0.15 0.048 15 0.0802 3.42 38 0.0251 Tilage/Field 5 0.79 0.81 5.00 10.30 5.00
LENGTH Table RO-2
(ft)
TRAVEL TIME (tt
)
REMARKS
tc Urban
Check
Final tc
(min)
tc=ti+tt
SLOPE (min)
(ft/ft)
VEL.
(ft/s)
tt (min)
SUB-BASIN DATA
INITIAL/OVERLAND
TIME (ti
)
T.Alva
Interwest Consulting Group
1237-112-00
7/15/2015
DESIGN
POINT
Sub-basin C5
AREA
(acres)
LENGTH
(ft)
SLOPE
(ft/ft)
ti (min)
FCHA - Villages on Redwood
HISTORIC PEAK RUNOFF
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006)
EQUATIONS:
Q n = n -yr peak discharge (cfs) I = rainfall intensity (in/hr)
C n = n -yr runoff coefficient P 1 = one-hour point rainfall depth (in)
I n = n -yr rainfall intensity (in/hr) t c = time of concentration (min)
A n = Basin drainage area (ac) P 1-5yr = 1.14 in
P 1-10yr = 1.40 in
P 1-100yr = 2.86 in
BASINS:
Runoff Coeff.
(C5)
C(A)
(acres)
Intensity
(in/hr)
Q (ft3/s)
Runoff Coeff.
(C10)
C(A)
(acres)
Intensity
(in/hr)
Q (ft3/s)
Runoff Coeff.
(C100)
C(A)
(acres)
Intensity
(in/hr)
Q (ft3/s)
H1 H1 6.217 15.08 0.18 1.11 2.58 2.85 0.27 1.71 3.16 5.40 0.52 3.20 6.46 20.71
H2 H2 3.737 5.00 0.15 0.56 3.86 2.16 0.25 0.93 4.74 4.43 0.50 1.87 9.68 18.09
OF1 OF1 0.048 5.00 0.15 0.01 3.86 0.03 0.25 0.01 4.74 0.06 0.50 0.02 9.68 0.23
5-yr Peak Runoff 100-yr Peak Runoff
T.Alva
Interwest Consulting Group
1237-112-00
7/15/2015
City of Fort Collins - Storm Water Criteria Manual (1997)
Design
Point
Sub-basin Area (acres) tc (min)
10-yr Peak Runoff
Q n = C n I n A n
0.786651)
1
( 10 )
28 . 5
t c
P
I
+
=
FCHA - Villages on Redwood
DEVELOPED IMPERVIOUS AREA CALCULATION
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006)
BASINS:
C2 C5 C10 C100 C2 C5 C10 C100
0.89 0.90 0.92 0.96 0.89 0.90 0.92 0.96
0.71 0.73 0.75 0.81 0.73 0.75 0.77 0.83
0.71 0.73 0.75 0.81 0.73 0.75 0.77 0.83
0.23 0.30 0.36 0.50 0.28 0.35 0.42 0.58
0.02 0.08 0.15 0.35 0.04 0.15 0.25 0.50
C2 C5 C10 C100
D1 C 129,793 2.980 25,906 23,986 8,542 0 71,360 42.5% 0.29 0.36 0.43 0.59
D2 C 85,386 1.960 24,566 14,573 5,238 0 41,009 49.7% 0.34 0.40 0.46 0.60
D3 C 48,328 1.109 17,121 4,612 6,328 0 20,267 55.8% 0.38 0.43 0.49 0.62
D4 C 172,194 3.953 0 2,427 532 0 169,235 1.5% 0.05 0.16 0.26 0.51
Total C 435,702 10.002 67,593 45,598 20,640 0 301,871 29.2% 0.22 0.30 0.38 0.57
To Rain Garden (D1+D2) C 215,180 4.940 50,472 38,560 13,779 0 112,369 45.3% 0.31 0.37 0.44 0.59
To Redwood (D1+D2+D3) C 263,508 6.049 67,593 43,172 20,107 0 132,635 47.3% 0.32 0.38 0.45 0.60
T.Alva
Interwest Consulting Group
1237-112-00
7/15/2015
% Impervious values from Table RO-3 in the Urban Storm Drainage Criteria Manual for Hydrologic Soil Classifications
Sub-basin
Designation
Apaved
(sq feet)
Atotal
(acres)
Atotal
(sq feet)
Soil
Type
Land Use % Impervious
Hydrologic Soil
Classification B
Runoff Coefficient
Hydrologic Soil
Classification C
Runoff Coefficient
Paved 100%
Roof 90%
Weighted % COMPOSITE
Impervious
Alawn
(sq feet)
Apavers
(sq feet)
Lawns, clayey soil
Awalk
(sq feet)
Aroof
(sq feet)
0%
Pavers 40%
FCHA - Villages on Redwood
DEVELOPED TIME OF CONCENTRATION
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006)
EQUATIONS:
-Equation RO-2 -Equation RO-4 -Urbanized Check Equation RO-5
-Equation RO-3
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition
500 ft - Overland flow shall not exceed for undeveloped condition
Final t c = minimum of t i + t t and urbanized basin check
recommended minimum t c = 5 min for urbanized basins
BASINS:
Type of Travel
Surface
Cv
D1 D1 0.36 2.980 19 0.0385 3.81 332 0.0099 Paved Areas 20 1.99 2.77 6.59 11.95 6.59
D2 D2 0.40 1.960 79 0.0292 8.03 274 0.0110 Paved Areas 20 2.10 2.18 10.20 11.96 10.20
D3 D3 0.43 1.109 67 0.0425 6.19 485 0.0046 Paved Areas 20 1.36 5.94 12.13 13.06 12.13
D4 D4 0.16 3.953 37 0.0530 6.02 0 0.0001 Paved Areas 20 0.20 0.00 6.02 10.21 6.02 All Overland Flow
T.Alva
Interwest Consulting Group
1237-112-00
July 15, 2015
SLOPE
(ft/ft)
ti
(min)
LENGTH Table RO-2
(ft)
SUB-BASIN DATA
INITIAL/OVERLAND
TIME (ti)
DESIGN
POINT
Sub-basin C5
AREA
(acres)
LENGTH
(ft)
TRAVEL TIME (tt)
REMARKS
tc
Urban
Check
Final tc
(min)
tc
=ti
+tt
SLOPE (min)
(ft/ft)
VEL.
(ft/s)
tt
(min)
FCHA - Villages on Redwood
DEVELOPED PEAK RUNOFF
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised August 2006)
EQUATIONS: I = rainfall intensity (in/hr)
Q n = n -yr peak discharge (cfs) P 1 = one-hour point rainfall depth (in)
C n = n -yr runoff coefficient t c = time of concentration (min)
I n = n -yr rainfall intensity (in/hr) P 1-5yr = 1.14 in
A n = Basin drainage area (ac) P 1-10yr = 1.40 in
P 1-100yr = 2.86 in
BASINS:
Runoff Coeff.
(C5)
C(A)
(acres)
Intensity
(in/hr)
Q (ft3/s)
Runoff Coeff.
(C10)
C(A)
(acres)
Intensity
(in/hr)
Q (ft3/s)
Runoff Coeff.
(C100)
C(A)
(acres)
Intensity
(in/hr)
Q (ft3/s)
D1 D1 2.980 6.59 0.36 1.07 3.57 3.83 0.43 1.27 4.38 5.56 0.59 1.75 8.95 15.65
D2 D2 1.960 10.20 0.40 0.78 3.05 2.37 0.46 0.89 3.75 3.35 0.60 1.18 7.66 9.04
D3 D3 1.109 12.13 0.43 0.48 2.84 1.36 0.49 0.54 3.49 1.88 0.62 0.69 7.13 4.89
D4 D4 3.953 6.02 0.16 0.63 3.66 2.32 0.26 1.02 4.50 4.61 0.51 2.00 9.19 18.38
100-yr Peak Runoff
T.Alva
Interwest Consulting Group
1237-112-00
7/15/2015
10-yr Peak Runoff
Design
Point
Sub-basin Area (acres) tc (min)
5-yr Peak Runoff
City of Fort Collins - Storm Water Criteria Manual (1997)
Q n = C n I n A n
0.786651)
1
( 10 )
28 . 5
t c
P
I
+
FCHA - Villages at Redwood
Attenuated Flows for Pipe Sizing
Design Engineer:
Design Firm:
Project Number:
Date:
DESIGN CRITERIA:
Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001
EQUATIONS:
-Equation RO-2 -Equation RO-4
-Equation RO-3
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check
500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins
Qn = n -yr peak discharge (cfs) I = rainfall intensity (in/hr)
Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in)
In = n -yr rainfall intensity (in/hr) tc = time of concentration (min)
A = drainage area (ac) P1-5yr = 1.14 in. P1-100yr = 2.86
P1-10yr = 1.40 in.
BASINS:
UD-Sewer - DP/Manhole D1
Contributing Basins D1+D2
Contributing Area (acres) 4.94
C5 C10 C100
Runoff Coefficients 0.37 0.44 0.59
Overland Flow Time
Length (ft) 19
Slope (ft/ft) 0.04
ti
(min) 3.74
Travel Time
Length (ft) Slope (%)
Type of Travel
Surface Cv Velocity (ft/s) tt (min)
332 0.99% Paved Areas 20 1.99 2.77
112 0.50% Paved Areas 20 1.41 1.33
102 0.50% Paved Areas 20 1.41 1.20
57 0.50% Paved Areas 20 1.41 0.67
16 0.50% Paved Areas 20 1.41 0.19
Total Time 6.15
Final Time of Concentration - tc (min)
tc
(min) 9.89
Intensities (in/hr)
5-yr 10-yr 100-yr
3.09 3.80 7.75
Discharge (cfs)
5-yr 10-yr 100-yr
5.71 8.21 22.70
T.Alva
Interwest Consulting Group
1237-112-00
July 15, 2015
City of Fort Collins - Storm Water Criteria Manual (1997)
( ) 0 .786
1
10
28 . 5
t c
P
Project:
Basin ID:
Design Information (Input): Design Information (Input):
Catchment Drainage Imperviousness Ia = 45.30 percent Catchment Drainage Imperviousness I
a = 45.30 percent
Catchment Drainage Area A = 4.940 acres Catchment Drainage Area A = 4.940 acres
Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D
Return Period for Detention Control T = 5 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100)
Time of Concentration of Watershed Tc = 10 minutes Time of Concentration of Watershed Tc = 10 minutes
Allowable Unit Release Rate q = 3.20 cfs/acre Allowable Unit Release Rate q = 3.20 cfs/acre
One-hour Precipitation P1 = 1.14 inches One-hour Precipitation P
1 = 2.86 inches
Design Rainfall IDF Formula i = C1* P
1/(C2
+Tc)^C
3 Design Rainfall IDF Formula i = C1
* P1/(C
2+Tc
)^C3
Coefficient One C1 = 28.50 Coefficient One C
1 = 28.50
Coefficient Two C2 = 10 Coefficient Two C
2 = 10
Coefficient Three C3 = 0.787 Coefficient Three C
3 = 0.787
Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated):
Runoff Coefficient C = 0.37 Runoff Coefficient C = 0.59
Inflow Peak Runoff Qp-in = 5.65 cfs Inflow Peak Runoff Qp-in = 22.61 cfs
Allowable Peak Outflow Rate Qp-out = 15.82 cfs Allowable Peak Outflow Rate Qp-out = 15.82 cfs
Mod. FAA Minor Storage Volume = 0 cubic feet Mod. FAA Major Storage Volume = 5,448 cubic feet
Mod. FAA Minor Storage Volume = 0.000 acre-ft Mod. FAA Major Storage Volume = 0.125 acre-ft
5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes)
Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage
Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume
minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet
(input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output)
0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000
5 3.86 0.049 1.00 15.82 0.109 -0.060 5 9.68 0.194 1.00 15.82 0.109 0.085
10 3.08 0.077 0.99 15.73 0.217 -0.139 10 7.72 0.310 0.99 15.73 0.217 0.093
15 2.58 0.098 0.83 13.13 0.271 -0.174 15 6.48 0.390 0.83 13.13 0.271 0.119
20 2.24 0.113 0.75 11.82 0.326 -0.213 20 5.61 0.451 0.75 11.82 0.326 0.125
25 1.98 0.125 0.70 11.04 0.380 -0.255 25 4.97 0.499 0.70 11.04 0.380 0.119
30 1.78 0.135 0.66 10.52 0.435 -0.300 30 4.48 0.539 0.66 10.52 0.435 0.105
35 1.63 0.143 0.64 10.15 0.489 -0.346 35 4.08 0.573 0.64 10.15 0.489 0.084
40 1.50 0.151 0.62 9.87 0.544 -0.393 40 3.76 0.603 0.62 9.87 0.544 0.060
45 1.39 0.157 0.61 9.65 0.598 -0.441 45 3.48 0.630 0.61 9.65 0.598 0.031
50 1.30 0.163 0.60 9.47 0.653 -0.489 50 3.25 0.653 0.60 9.47 0.653 0.001
55 1.22 0.169 0.59 9.33 0.707 -0.538 55 3.06 0.675 0.59 9.33 0.707 -0.032
60 1.15 0.174 0.58 9.21 0.761 -0.588 60 2.88 0.694 0.58 9.21 0.761 -0.067
65 1.09 0.178 0.58 9.11 0.816 -0.638 65 2.73 0.712 0.58 9.11 0.816 -0.104
70 1.03 0.182 0.57 9.03 0.870 -0.688 70 2.60 0.729 0.57 9.03 0.870 -0.141
75 0.99 0.186 0.57 8.95 0.925 -0.739 75 2.47 0.745 0.57 8.95 0.925 -0.180
80 0.94 0.190 0.56 8.89 0.979 -0.789 80 2.37 0.760 0.56 8.89 0.979 -0.220
85 0.90 0.193 0.56 8.83 1.034 -0.840 85 2.27 0.774 0.56 8.83 1.034 -0.260
90 0.87 0.197 0.55 8.78 1.088 -0.892 90 2.18 0.787 0.55 8.78 1.088 -0.302
95 0.84 0.200 0.55 8.73 1.143 -0.943 95 2.10 0.799 0.55 8.73 1.143 -0.344
100 0.81 0.203 0.55 8.69 1.197 -0.995 100 2.02 0.811 0.55 8.69 1.197 -0.386
105 0.78 0.206 0.55 8.65 1.252 -1.046 105 1.95 0.822 0.55 8.65 1.252 -0.430
110 0.75 0.208 0.54 8.62 1.306 -1.098 110 1.89 0.833 0.54 8.62 1.306 -0.473
115 0.73 0.211 0.54 8.59 1.361 -1.150 115 1.83 0.843 0.54 8.59 1.361 -0.517
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 45.3 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.453
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.15 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 215,180 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 2,779.2 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum) DWQCV = 12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin = 1853 sq ft
D) Actual Flat Surface Area AActual = 1950 sq ft
E) Area at Design Depth (Top Surface Area) ATop = 2500 sq ft
F) Rain Garden Total Volume VT= 2,225 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 3.5 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 2,779 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 1.08 in
Design Procedure Form: Rain Garden (RG)
J. Claeys
Interwest Consulting Group
July 15, 2015
FCHA - Villages at Redwood
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
1237-112-00 UD-BMP_v3.03.xlsm, RG 7/15/2015, 10:54 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
NO SPRINKLER HEADS ON FLAT SURFACE
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
J. Claeys
Interwest Consulting Group
July 15, 2015
FCHA - Villages at Redwood
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
1237-112-00 UD-BMP_v3.03.xlsm, RG 7/15/2015, 10:54 AM
120 0.71 0.213 0.54 8.56 1.415 -1.202 120 1.77 0.853 0.54 8.56 1.415 -0.562
125 0.69 0.216 0.54 8.54 1.470 -1.254 125 1.72 0.863 0.54 8.54 1.470 -0.607
130 0.67 0.218 0.54 8.51 1.524 -1.306 130 1.67 0.872 0.54 8.51 1.524 -0.652
135 0.65 0.220 0.54 8.49 1.579 -1.358 135 1.63 0.881 0.54 8.49 1.579 -0.698
140 0.63 0.222 0.54 8.47 1.633 -1.411 140 1.58 0.890 0.54 8.47 1.633 -0.744
145 0.61 0.224 0.53 8.45 1.688 -1.463 145 1.54 0.898 0.53 8.45 1.688 -0.790
150 0.60 0.226 0.53 8.43 1.742 -1.516 150 1.50 0.906 0.53 8.43 1.742 -0.836
155 0.59 0.228 0.53 8.41 1.797 -1.568 155 1.47 0.914 0.53 8.41 1.797 -0.883
160 0.57 0.230 0.53 8.40 1.851 -1.621 160 1.43 0.921 0.53 8.40 1.851 -0.930
165 0.56 0.232 0.53 8.38 1.905 -1.673 165 1.40 0.929 0.53 8.38 1.905 -0.977
170 0.55 0.234 0.53 8.37 1.960 -1.726 170 1.37 0.936 0.53 8.37 1.960 -1.024
175 0.53 0.236 0.53 8.36 2.014 -1.779 175 1.34 0.943 0.53 8.36 2.014 -1.072
180 0.52 0.237 0.53 8.34 2.069 -1.832 180 1.31 0.950 0.53 8.34 2.069 -1.119
185 0.51 0.239 0.53 8.33 2.123 -1.884 185 1.29 0.956 0.53 8.33 2.123 -1.167
190 0.50 0.241 0.53 8.32 2.178 -1.937 190 1.26 0.963 0.53 8.32 2.178 -1.215
195 0.49 0.242 0.53 8.31 2.232 -1.990 195 1.24 0.969 0.53 8.31 2.232 -1.263
200 0.48 0.244 0.52 8.30 2.287 -2.043 200 1.21 0.975 0.52 8.30 2.287 -1.312
205 0.48 0.245 0.52 8.29 2.341 -2.096 205 1.19 0.981 0.52 8.29 2.341 -1.360
210 0.47 0.247 0.52 8.28 2.396 -2.149 210 1.17 0.987 0.52 8.28 2.396 -1.409
215 0.46 0.248 0.52 8.27 2.450 -2.202 215 1.15 0.993 0.52 8.27 2.450 -1.457
220 0.45 0.250 0.52 8.27 2.505 -2.255 220 1.13 0.999 0.52 8.27 2.505 -1.506
225 0.44 0.251 0.52 8.26 2.559 -2.308 225 1.11 1.004 0.52 8.26 2.559 -1.555
230 0.44 0.252 0.52 8.25 2.614 -2.361 230 1.09 1.010 0.52 8.25 2.614 -1.604
235 0.43 0.254 0.52 8.24 2.668 -2.414 235 1.08 1.015 0.52 8.24 2.668 -1.653
240 0.42 0.255 0.52 8.24 2.723 -2.468 240 1.06 1.020 0.52 8.24 2.723 -1.702
245 0.42 0.256 0.52 8.23 2.777 -2.521 245 1.04 1.025 0.52 8.23 2.777 -1.752
250 0.41 0.258 0.52 8.22 2.832 -2.574 250 1.03 1.031 0.52 8.22 2.832 -1.801
255 0.40 0.259 0.52 8.22 2.886 -2.627 255 1.01 1.035 0.52 8.22 2.886 -1.851
260 0.40 0.260 0.52 8.21 2.941 -2.680 260 1.00 1.040 0.52 8.21 2.941 -1.900
265 0.39 0.261 0.52 8.21 2.995 -2.734 265 0.98 1.045 0.52 8.21 2.995 -1.950
270 0.39 0.262 0.52 8.20 3.049 -2.787 270 0.97 1.050 0.52 8.20 3.049 -2.000
275 0.38 0.264 0.52 8.19 3.104 -2.840 275 0.96 1.055 0.52 8.19 3.104 -2.049
280 0.38 0.265 0.52 8.19 3.158 -2.894 280 0.94 1.059 0.52 8.19 3.158 -2.099
285 0.37 0.266 0.52 8.18 3.213 -2.947 285 0.93 1.064 0.52 8.18 3.213 -2.149
290 0.37 0.267 0.52 8.18 3.267 -3.000 290 0.92 1.068 0.52 8.18 3.267 -2.199
295 0.36 0.268 0.52 8.18 3.322 -3.054 295 0.91 1.073 0.52 8.18 3.322 -2.249
300 0.36 0.269 0.52 8.17 3.376 -3.107 300 0.89 1.077 0.52 8.17 3.376 -2.300
Mod. FAA Minor Storage Volume (cubic ft.) = 0 Mod. FAA Major Storage Volume (cubic ft.) = 5,448
Mod. FAA Minor Storage Volume (acre-ft.) = 0.0000 Mod. FAA Major Storage Volume (acre-ft.) = 0.1251
Determination of MAJOR Detention Volume Using Modified FAA Method
(For catchments less than 160 acres only. For larger catchments, use hydrograph routing method)
(NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended)
UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015
Determination of MINOR Detention Volume Using Modified FAA Method
DETENTION VOLUME BY THE MODIFIED FAA METHOD
FCHA - Villages at Redwood
1237-112-00 UD-Detention_v2.35.xls, Modified FAA 7/15/2015, 10:52 AM
I
+
Q n = C n I n A =
t c = t i + t t 0 . 5
V = C v S w
V
L
tt
60
( ) =
0 .33
5
0 . 395 1 . 1
S
C L
ti
−
=
=
( )
0 .33
0 . 395 1 . 1 5
S
C L
ti
−
=
t c = t i + t t 0 . 5
V = C v S w 10
180
= +
L
tc
V
L
tt 60
=
Walk 90%
( )
0 .33
0 . 395 1 . 1 5
S
C L
ti
−
=
t c = t i + t t 0 . 5
V = C v S w 10
180
= +
L
tc
V
L
tt 60
=
Weighted %
Impervious
Survey Area Data: Version 9, Sep 22, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Apr 22, 2011—Apr 28,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
(FCHA - Villages at Redwood)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/29/2015
Page 2 of 4