April 22, 2015
David Schmidt
419 Canyon Ave.
Fort Collins, CO 80521
RE: Cultivation Facility (5608 S. College Ave.), PDP150004 Final Development Plan
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ryan Mounce at 970-224-6186
or rmounce@fcgov.com.
Responses to City Comments 4/16/15
Planning Response: Ripley Design
Civil Response: Northern Engineering
Comment Summary:
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/02/2015
02/02/2015: If paved, formalized access and parking is not needed along the north side of the building,
additional landscaping elements need to be provided along this wall to meet foundation planting and tree
stocking requirements.
Tree stocking can be met by planting canopy shade trees at 30-40' intervals or ornamental trees at 20-30'
intervals. Foundation plantings could consist of turf or short prairie grasses and a mix of shrubs/ground
cover.
It appears a utility easement to the north of the building may be in conflict with plantings; if this is the case,
an alternate location could be found on the south side of the building.
Planning Response: (6) Viburnum x rhytidophylloides `Alleghany` shrubs have been added.
Civil Response: Acknowledged
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Comment Number: 2 Comment Originated: 02/02/2015
02/02/2015: On the cover sheet, please provide an owner's authorization and planning approval signature
block. Examples are available if needed.
Planning Response: Added
Civil Response: Acknowledged
Comment Number: 3 Comment Originated: 02/02/2015
02/02/2015: Please add the following information on the site plan:
- Delineate or label the area west of the property line as CDOT right-of-way.
- Within the land use chart, add the existing building height.
- Within the land use chart, change the required vehicle parking column to show both minimum and
maximum required. Minimum is 0 and maximum is 5 (based on .75 spaces per employee; rounding up from
4.5 for 6 employees).
- Please identify the location of any existing or proposed exterior lights.
- Show the northern-half of the building on the property to the south and the paved area in between the two
buildings. Dimension the area between the proposed parking stalls and the building to the south (refer to
redlines).
Planning Response: CDOT notation added. Approximated building height added. Min/Max
parking added. Lighting locations added. Dimensions to South building added.
Civil Response: Acknowledged
Comment Number: 4 Comment Originated: 02/02/2015
Please add a site plan note that, "The existing building is exempt from minimum vehicle parking
requirements per Land Use Code Section 3.2.2(K)(2)(b)."
Planning Response: Added
Civil Response: Acknowledged
Comment Number: 5 Comment Originated: 02/02/2015
02/02/2015: We are seeking to document the parking and access situation for this and the neighboring
property. We still wish to obtain a letter or statement from the neighboring property owner that a verbal
agreement exists to allow both buildings access to the paved area between the structures.
In addition, please add the following note to the site plan, "If access to the parking spaces is restricted to
less than a two-way drive aisle minimum width, the parking spaces shall be removed or relocated via an
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
approved minor amendment."
Planning Response: Added
Civil Response: Acknowledged
Comment Number: 6 Comment Originated: 02/02/2015
02/02/2015: On the landscape plan, please include all material types in the legend (e.g. gravel, concrete).
The plants are hard to visualize with the cobble material appearing underneath their symbols, please
adjust.
Planning Response: Material list added and symbols changed for clarity.
Civil Response: Acknowledged
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: All development is responsible for the local street frontage improvements adjacent to the site,
but until the frontage goes away, the parkway and sidewalk along this property cannot be built. Therefore,
the applicant will need to enter into a development agreement for the payment in lieu for the frontage
construction of the sidewalk and parkway landscaping that will be collected for this property.
Planning Response: Acknowledged
Civil Response: Acknowledged
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: The site is adjacent to CDOT roadway and all access to the site is governed by an access
control plan. The applicant will need to work with CDOT to obtain the required access permits.
Planning Response: Acknowledged
Civil Response: The signed access agreement has been sent to CDOT for approval and
recordation.
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-2401, sblochowiak@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: Please include a note on the tree mitigation plan or landscape plan, as appropriate, that
requires tree removal to occur outside of the migratory songbird nesting season (February 1-July 31), or
that a survey be conducted prior to removal to ensure no active nests in the area.
Planning Response: Added
Civil Response: Acknowledged
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 02/12/2015
02/12/2015: A building permit is required to change the occupancy to a F-1 grow facility.
Planning Response: Acknowledged
Civil Response: Acknowledged
Department: Light and Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/03/2015
If there is an increase in capacity then this will most likely require an existing open delta bank to be
upgraded to a three phase transformer which will affect the neighbor to the south. That would depend on
their approval, if their even able to switch to a different configuration. The other option is to re-feed the
building with a new dedicated transformer placed on this property. To do that we need to know if there is a
right of way along the front lot of 5616 S. College Ave as well as this site.
Planning Response: Acknowledged
Civil Response: Acknowledged
Comment Number: 2 Comment Originated: 02/03/2015
A C-1 form and one line diagram will need to be provided to Light and Power. Here is the link for the C-1
form. http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Planning Response: Form will be provided to the owner.
Civil Response: Acknowledged
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Department: Outside Agencies
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: CDOT: The applicant will need to get a new access permit for the changes proposed within
the state right-of-way. Contact: Gloria Hice-Idler. gloria.hice-idler@state.co.us. 970-350-2148.
Planning Response: Acknowledged
Civil Response: A signed access agreement has been sent to CDOT for approval and recordation.
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: Comcast: See map of Comcast facilities in area. Facilities may be relocated at owners
expense. Contact: Don Kapperman. don_kapperman@cable.comcast.com. 970-567-0245.
Planning Response: Acknowledged
Civil Response: Acknowledged
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 02/04/2015
02/04/2015: WATER SUPPLY: The building is expected to meet current fire code requirements through
the change of use. As such, a fire hydrant is required within 300' of the building. The existing utility
infrastructure does not support code compliance with this section of the code and the Poudre Fire Authority
is asking that the building have a 1-hour wall, fire separation in lieu of adding a hydrant. Another option
would be to install a fire sprinkler system to the building. If fire separation is used, the containment
construction shall be reviewed and approved by the Poudre Fire Authority prior to installation.
Planning Response: Acknowledged
Civil Response: A 1-hour wall has been designed in lieu of adding a hydrant.
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Comment Number: 2 Comment Originated: 02/04/2015
02/04/2015: GROW FACILITIES Grow facilities for marijuana must meet minimum fire hazard and exit
requirements. The applicant is responsible for obtaining and completing a "Marijuana Check Sheet". The
check sheet is available from the City of Fort Collins at such time a business permit is obtained. The
completed check sheet is to be returned to the Poudre Fire Authority as directed. This document will be
reviewed with the applicant at time of final inspection. For more information, contact PFA Captain Shawn
McGaffin at 416-2863.
Planning Response: Acknowledged
Civil Response: Acknowledged
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com
Topic: Drainage Report
Comment Number: 1 Comment Originated: 02/05/2015
02/05/2015: No water quality treatment is currently shown. Since the impervious area is being reduced, no
water quantity detention will be required, however, water quality treatment should be provided for the site,
for both basins draining to the east and to the west. It is suggested that a rain garden/bioretention area be
designed for the east draining area before flows enter the drainage channel. The basin draining to the west
can be treated in the landscaped area planned in the front of the building capturing as much of the parking
area and the building downspouts as possible. A meeting is suggested to work out the details of these
treatment systems.
Planning Response: Acknowledged
Civil Response: A small bio-retention pond has been designed at the northeast corner of the site to
provide some water quality for the overall project.
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: What is the total area of disturbance? If the site disturbs more than 10,000 sq-ft Erosion and
Sediment Control Materials need to be submitted. The erosion control requirements are in the Stormwater
Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control
Materials Submitted does not meet requirements. Please submit Erosion Control Report, and an Escrow /
Security Calculation. Erosion Control Plan needs a sequence chart and details for the BMPs. If you need
clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Planning Response: The site is an existing building and new construction effects less than 10,000
sf of area.
Civil Response: Acknowledged
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 02/02/2015
02/02/2015: No comments.
Planning Response: Acknowledged
Civil Response: Acknowledged
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 02/02/2015
02/02/2015: The titles in the sheet index do not match the titles on the marked sheets. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Comment Number: 3 Comment Originated: 02/02/2015: The City has moved to the NAVD88 vertical
datum. Please provide the following information in the EXACT format shown below.
If your project is started on NAVD88 datum:
1. PROJECT DATUM: NAVD88
BENCHMARK #1 w/ DESCRIPTION
ELEVATION: BENCHMARK #2 w/ DESCRIPTION
ELEVATION: OR, if project has already been surveyed in NAVD29 Unadjusted datum:
2. PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM)
BENCHMARK #1 w/ DESCRIPTION
ELEVATION: BENCHMARK #2 w/ DESCRIPTION
ELEVATION: If using NGVD29 UNADJUSTED the following equation statement will be needed.
3. NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED + X.XX
Planning Response: See revised plan.
Civil Response: See revised plan.
Comment Number: 4 Comment Originated: 02/02/2015: The description of benchmark Y401 does not
match the published NGS description. Please consider using the complete descriptions, instead of
abbreviating them.
Planning Response: Acknowledged
Civil Response: The complete description has been used.
Comment Number: 5 Comment Originated: 02/02/2015: Please change the Basis of Bearings
statement as marked. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Comment Number: 6 Comment Originated: 02/02/2015
02/02/2015: All benchmark statements need to match on all sheets.
Planning Response: See revised plan.
Civil Response: See revised plan.
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Comment Number: 7 Comment Originated: 02/02/2015
02/02/2015: There are line over text issues. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Comment Number: 8 Comment Originated: 02/02/2015
02/02/2015: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Comment Number: 9 Comment Originated: 02/02/2015
02/02/2015: There is text that needs to be rotated 180 degrees. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Topic: Landscape Plans
Comment Number: 10 Comment Originated: 02/02/2015
02/02/2015: There are line over text issues. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Topic: Site Plan
Comment Number: 11 Comment Originated: 02/02/2015
02/02/2015: There are line over text issues. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Comment Number: 12 Comment Originated: 02/02/2015
02/02/2015: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Planning Response: See revised plan.
Civil Response: See revised plan.
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: Site Plan
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: Work with the engineering department on whether any adjacent street improvements will be
needed.
Planning Response: Acknowledged
Civil Response: Acknowledged
Comment Number: 3 Comment Originated: 02/03/2015
02/03/2015: You may want to check your drive aisle width on the south side of the property. I'm not sure
it’s wide enough for parking vehicles to turn.
Planning Response: Acknowledged
Civil Response: There is currently an agreement with the property owner to the south to have a shared
access that would provide adequate width for parking vehicles to turn.
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: The anticipated change in traffic volume is not expected to rise to the threshold of needing a
TIS. Based on section 4.2.3.D of LCUASS, the Traffic Impact Study requirement is waived.
Planning Response: Acknowledged
Civil Response: Acknowledged
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/03/2015
02/03/2015: Please include the Land Use in the Land Use chart
Planning Response: Acknowledged
Civil Response: Acknowledged
Thinking outside of the box for over two decades.
419 Canyon Ave., Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
Comment Number: 2 Comment Originated: 02/03/2015
02/03/2015: Please add a detail of the proposed gate. The drive behind the gated area will need to be
surfaced if it is intended for vehicle use. If it is only for emergency access only, then it can remain the
gravel requirements of PFA and the gates would be required.
Planning Response: Gate detail added.
Civil Response: Acknowledged
Comment Number: 3 Comment Originated: 02/03/2015
02/03/2015: Is the billboard type of sign on the property?
Planning Response: Sign located off property.
Civil Response: Acknowledged
Department: Fort Collins – Loveland Water District
Contact: Mr. Terry W. Farrill, 970-226-3104, tfarrill@aol.com
Topic: Utility Plans
Comment Number: 1 Comment Originated: 03/31/2015
03/31/2015: A reduced pressure principle Back-Flow-Prevention-Device is required on the domestic water
service.
Planning Response: Acknowledged
Civil Response: A note has been added to the Utility Plan
Comment Number: 2 Comment Originated: 03/31/2015
03/31/2015: The owner will need to obtain, complete and submit the District’s Wastewater Questionnaire
for review and approval. The questionnaire can be obtained by downloading the District’s Commercial
Review Packet at FCLWD.com
Planning Response: Acknowledged
Civil Response: Acknowledged
Comment Number: 3 Comment Originated: 03/31/2015
03/31/2015: All references to the City of Fort Collins with respect to the water and sanitary sewer
requirements are to be deleted.
Planning Response: Acknowledged
Civil Response: All references to the City of Fort Collins has been removed.