Loading...
HomeMy WebLinkAboutBROOKFIELD SECOND FILING, TRACTS D & E - PDP/FDP - FDP150025 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT1 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 July 13, 2015 RE: Drainage Memorandum Brookfield Replat A, Lots 1-12, Tract E and a portion of Tract D Fort Collins, Colorado Project Number: 374-020 Dear Staff: Northern Engineering Services is pleased to submit this Drainage Memorandum for Brookfield for your review. Brookfield Replat A is located within Lots 1-12, Tract E and a portion of Tract D of the Plat of Brookfield. The Brookfield project is a proposed multi-family residential site. The site is located in the Northeast Quarter of Section 4, Township 6 North, Range 68 West of the 6th Principal Median, City of Fort Collins, Larimer County, Colorado. The site is bounded on the north, east, and west by undeveloped area. The site is bounded on the south by Brookfield Phase 1, a multi-family site. Fossil Creek Reservoir Inlet Ditch (FCRID) flows north- west to south and is located east of the site outside of the project boundary. Southeast of the Site is Detention Pond A constructed as part of Brookfield Phase 1 development that currently detains flows from Brookfield development Phase 1. Detention Pond A was designed for future development of Brookfield including this site. The site falls within the East Harmony Portion of McClellands Creek Master Drainage Basin. This Drainage Memorandum has been prepared in compliance with technical criteria set forth in the City of Fort Collins Storm Drainage Design Criteria, Urban Drainage and Flood Control District Criteria Manual (UDFCDCM) and City of Fort Collins Amendments to the UDFCDCM. The Brookfield project consists of approximately 6 acres. The development will consist of 12 multi-family buildings with approximately 68 units. The buildings will be two story with the possibility of basements. Parking will be provided by on street parking, parking stalls off the alleys, attached garages, and detached garages. The streets within the multi-family tracts will be private and will be maintained privately. Public streets bound the tract. 2 The proposed site has been a part of many different drainage plans and studies in the past. The most recent drainage plan, Final Drainage Report for Brookfield by TST dated December 14, 2001 covers the entire Brookfield development including already constructed phases, the proposed site, and future development. The TST drainage report for Brookfield references two previously completed Drainage Reports that are a part of the McClellands Drainage Basin: Final Drainage Report for Willow Brook by TST, Inc. Consulting Engineers, dated October, 2000 and East Harmony Portion of McClellands Creek Master Drainage Plan Update by ICON Engineering, Inc. dated August, 1999. The proposed site closely matches the original proposed development as part of the TST Brookfield Utility Plans and TST Brookfield Drainage Report and is in compliance with the original TST Brookfield Drainage Report. Drainage Basins are named to match the original Basin names of the TST Drainage Report for ease of comparison. Several constraints have been identified from the original report including the maximum runoff allowable into existing inlets and drainageways. Specifically, the Brookfield Drainage Plan divided the site into two basins. The interior of the site drains to an existing storm sewer system. The north and east perimeter areas drain offsite to the existing FCRID. This Drainage Plan incorporated the 100-yr maximum release rate from the Brookfield site as 0.5 cfs per acre. The site currently sheet flow from west to east with an average slope of 0.5-1.0%. Most of the Site is discharged into the FCRID. The southern portion of the sites flows into an existing curb inlet on Precision Drive and into the storm sewer system that flows into Pond A. The existing land onsite is currently undeveloped and consists of loose soils with no vegetation. Most of the Brookfield site (constructed and future phases) is graded to Detention Pond A. This water quality detention pond was sized based on SDDC and Urban Drainage criteria and has a release rate of 0.5 cfs/ac. The pond was constructed with an orifice plate with multiple orifices to provide for an extended drainage time. The water quality volume was based on a 2- yr storm, with the 100-yr storm overtopping the control structure and entering the discharge pipe. The pond was provided with an orifice plate on the discharge pipe to control the 100-yr discharge from the pond. If the pond were to overtop, it will spill in a historic eastward direction and into the FCRID. No structures will be inundated if overtopping occurs. The required volume of the detention pond is 9.01 ac-ft. Offsite sheet flow from the west in Drainage Basin D-5/9 is proposed to be intercepted by a drainage swale and into a storm sewer system that goes to Pond A. Offsite flows north of Le Fever Drive are channelized in a grass swale that flows into the FCRID. Offsite flows from the eastern portion of the site include the bank above the FCRID, proposed 10’ wide trail, retaining walls and graded slopes. As this area will be vegetated and closely match undeveloped conditions it is proposed to release undetained. This undetained release will not be accounted for in the design of the detention pond since it will be at historic rates. All developed subbasins are proposed to discharge from the site at a release rate of 0.5 cfs per acre as dictated by the master plan after passing through the Pond A. 3 The overall stormwater management strategy employed with the Brookfield Replat A is to closely match the original design while incorporating current LID practices to minimize adverse impacts of urbanization on receiving waters. Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Providing permeable paver areas with underground detention area to increase time of concentration promote infiltration and provide water quality. Providing Drywells to promote infiltration and water quality throughout the site. Providing a Rain Garden and Grass Swale to slowly release the flood control volume in an area and removes pollutants by treatment processes of sedimentation, filtering, adsorption, evapotranspiration and biological uptake of constituents. Snouts and settling basins for water treatment prior to flows entering the subsurface infiltration galleries and storm systems. I. NCLUSS The overall stormwater management strategy employed with the Brookfield Replat A is in compliance with the following standards: City of Fort Collins’ Stormwater Criteria Manual. Final Drainage Report for Brookfield by TST There are no regulatory floodplains associated with the development. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 25% of total paved areas as permeable pavers and providing 51% of total impervious areas as being treated through an LID treatment. The drainage design proposed with this project will effectively comply with previous studies and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development The proposed development will not have any impact on the Master Drainage Plan recommendations for Brookfield. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration from drywells and pervious pavement. This is currently unable to be calculated with available soils data. If you have any questions, please feel free to contact me at your earliest convenience. 4 Sincerely, NORTHERN ENGINEERING SERVICES, INC. Amber Morse, PE Project Engineer 374-020 Brookfield CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: 374-020 Brookfield Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Morse Asphalt ……....……………...……….....…...……………….…………………………… 0.95 100% Date: July 14, 2015 Concrete …….......……………….….……….………………..….……………………… 0.95 90% Gravel (packed) ……….…………………….….…………………………..…………… 0.50 40% Roofs …….…….………………..……………….………………………………………… 0.95 90% Pavers…………………………...………………..………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………… 0.10 0% Average 2% to 7% ……………………………………………………………………… 0.15 0% Steep >7% ……………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………… 0.20 0% Average 2% to 7% ……………………………………………………………………… 0.25 0% Steep >7% ……………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year C f = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. D-2A 0.27 0.15 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.049 0.82 0.82 1.00 79% D-2B 0.53 0.12 0.09 0.00 0.07 Clayey | Average 2% to 7% 0.241 0.63 0.63 0.79 51% Brookfield Overland Flow, Time of Concentration: 374-020 Brookfield Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Up Stream Elevation Down Stream Elevation Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Up Stream Elevation Down Stream Elevation Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Brookfield Rational Method Equation: Project: 374-020 Brookfield Calculations By: Date: Rainfall Intensity: D2A OF-1 & D-2A 0.27 23 23 12 0.82 0.82 1.00 1.49 2.55 7.29 0.33 0.57 1.97 45 D-2B 0.53 5 5 5 0.63 0.63 0.79 2.85 4.87 9.95 0.94 1.61 4.12 42 D-2B & D-2C(not a part) 0.77 7 7 7 0.80 0.80 1.00 2.60 4.44 9.06 1.61 2.75 6.98 D3A D-3A 0.44 5 5 5 0.74 0.74 0.93 2.85 4.87 9.95 0.93 1.59 4.07 43 D-3B 1.27 6 6 6 0.77 0.77 0.96 2.67 4.56 9.31 2.60 4.45 11.35 D3C D-3C 0.61 64 64 44 0.62 0.62 0.78 0.79 1.34 3.54 0.30 0.51 1.67 44 D-5/92 9.94 49 49 45 0.28 0.28 0.36 0.95 1.61 3.46 2.67 4.55 12.22 46 D-7 0.30 5 5 5 0.71 0.71 0.89 2.85 4.87 9.95 0.61 1.05 2.68 51 D-7.1 0.33 5 5 5 0.74 0.74 0.93 2.85 4.87 9.95 0.70 1.19 3.04 52 D-7.2 0.33 5 5 5 0.85 0.85 1.00 2.85 4.87 9.95 0.80 1.37 3.27 47 D-8 0.33 5 5 5 0.77 0.77 0.97 2.85 4.87 9.95 0.72 1.23 3.14 48 D-8.1 0.33 5 5 5 0.84 0.84 1.00 2.85 4.87 9.95 0.79 1.34 3.25 54 D-10 0.36 5 5 5 0.76 0.76 0.95 2.85 4.87 9.95 0.78 1.33 3.40 56 D-11 0.36 5 5 5 0.87 0.87 1.00 2.85 4.87 9.95 0.89 1.52 3.58 60 OF-12 0.44 51 51 46 0.31 0.31 0.39 0.91 1.56 3.41 0.12 0.21 0.58 July 14, 2015 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) A. Morse 374-020 Brookfield LID ID LID Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Impervious Area (ac) Basin Treated thru LID? LID Treated Impervious Area (ac) LID Treated Type 1 0.22 0.00 0.08 0.00 0.11 Clayey | Average 2% to 7% 0.03 0.86 0.86 1.00 78% 0.17 YES 0.17 Curb Inlet to Dry Well 2 0.35 0.00 0.07 0.00 0.19 Clayey | Average 2% to 7% 0.16 0.81 0.81 1.00 66% 0.23 YES 0.23 Dry Well 3 0.39 0.00 0.10 0.05 0.15 Clayey | Average 2% to 7% 0.18 0.77 0.77 0.97 63% 0.24 YES 0.24 Permeable Pavement, Dry Well 4 0.46 0.00 0.07 0.00 0.19 Clayey | Average 2% to 7% 0.20 0.65 0.65 0.81 51% 0.23 YES 0.23 Grass Swale 5 0.82 0.00 0.24 0.00 0.36 Clayey | Average 2% to 7% 0.44 0.84 0.84 1.00 66% 0.54 NO N/A N/A 6 0.32 0.00 0.02 0.00 0.15 Clayey | Average 2% to 7% 0.15 0.62 0.62 0.78 48% 0.15 NO N/A N/A 7 0.36 0.00 0.02 0.05 0.20 Clayey | Average 2% to 7% 0.11 0.70 0.70 0.88 59% 0.21 YES 0.21 Permeable Pavement 8 0.31 0.00 0.06 0.05 0.11 Clayey | Average 2% to 7% 0.15 0.70 0.70 0.87 55% 0.17 YES 0.07 Permeable Pavement 9 0.23 0.00 0.02 0.00 0.13 Clayey | Average 2% to 7% 0.08 0.70 0.70 0.87 58% 0.14 NO N/A N/A 10 0.15 0.00 0.02 0.00 0.08 Clayey | Average 2% to 7% 0.06 0.69 0.69 0.87 57% 0.09 YES 0.09 Rain Garden 11 0.37 0.00 0.13 0.00 0.14 Clayey | Average 2% to 7% 0.23 0.85 0.85 1.00 66% 0.24 NO N/A N/A 12 0.13 0.00 0.01 0.00 0.07 Clayey | Average 2% to 7% 0.04 0.70 0.70 0.88 58% 0.07 NO N/A N/A 13 0.52 0.00 0.12 0.07 0.18 Clayey | Average 2% to 7% 0.26 0.73 0.73 0.91 58% 0.30 YES 0.30 Permeable Pavement 14 1.55 0.00 0.15 0.00 0.08 Clayey | Average 2% to 7% 1.32 0.35 0.35 0.44 13% 0.21 NO N/A N/A TOTAL: 6.17 3.00 1.54 LID Requirements Permeable Pavement LID Treatment X X UD UD BROOKFIELD DRIVE MORNINGSIDE VILLAGE CONDOS FOSSIL CREEK RESERVOIR INLET DITCH WETLAND BLDG 31 BLDG 23 BLDG 22 POND A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 RAIN GARDEN PERMEABLE PAVEMENT PERMEABLE PAVEMENT PERMEABLE PAVEMENT PERMEABLE PAVEMENT GRASS SWALE DRY WELL KEYMAP LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR EXISTING STORM SEWER LID AREA 1 LID BOUNDARY PROPOSED STORM SEWER FOR LID REVIEW ONLY NOT FOR CONSTRUCTION ( IN FEET ) 0 1 INCH = 70 FEET 70 70 140 210 N O R T H E RN 2015.06.23 D:\PROJECTS\374-020\DWG\EXHIBITS\374-020_LID.DWG LOW IMPACT DEVELOPMENT (LID) AREAS (1) Private Drive Pavement (ac)= 0.94 Total Proposed Impermeable Area(ac)= 2.70 3.00 Total Permeable Pavement (ac)= 0.23 Total Impermeable Area Treated with LID(ac)= 1.24 1.54 Percent Permeable Pavement= 25% Percent Treated with LID= 46% 51% LOW IMPACT DEVELOPMENT (LID) CALCULATIONS 7/14/2015 1:42 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\LID Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Q = C f (C )( i )(A ) 7/14/2015 1:35 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Runoff Tc (min) 100-yr Tc (min) D2A OF-1 & D-2A Yes 0.82 0.82 1.00 700 4.56 1.47 0.44% 18.0 18.0 6.5 412 100.60 98.84 0.43% 1.31 5.3 23.2 23.2 11.8 45 D-2B No 0.63 0.63 0.79 0 0.00 0.00 N/A N/A N/A N/A 395 98.84 96.42 0.61% 1.57 4.2 5.0 5.0 5.0 42 D-2B & D-2C(not a part) No 0.80 0.80 1.00 0 0.00 0.00 N/A N/A N/A N/A 525 98.34 96.00 0.45% 1.34 6.6 6.6 6.6 6.6 D3A D-3A No 0.74 0.74 0.93 0 0.00 0.00 N/A N/A N/A N/A 375 100.96 98.23 0.73% 1.71 3.7 5.0 5.0 5.0 43 D-3B No 0.77 0.77 0.96 0 0.00 0.00 N/A N/A N/A N/A 626 99.63 95.60 0.64% 1.60 6.5 6.5 6.5 6.5 D3C D-3C No 0.62 0.62 0.78 160 1.00 0.99 0.01% 61.5 61.5 41.6 210 100.86 99.63 0.59% 1.53 2.3 63.8 63.8 43.9 44 D-5/92 Yes 0.28 0.28 0.36 660 104.10 99.21 0.74% 43.3 43.3 39.5 440 99.85 98.00 0.42% 1.30 5.7 49.0 49.0 45.2 46 D-7 No 0.71 0.71 0.89 0 0.00 0.00 N/A N/A N/A N/A 135 98.25 96.72 1.13% 2.13 1.1 5.0 5.0 5.0 51 D-7.1 No 0.74 0.74 0.93 0 0.00 0.00 N/A N/A N/A N/A 68 98.68 98.07 0.90% 1.89 0.6 5.0 5.0 5.0 52 D-7.2 No 0.85 0.85 1.00 0 0.00 0.00 N/A N/A N/A N/A 225 100.14 97.50 1.17% 2.17 1.7 5.0 5.0 5.0 47 D-8 No 0.77 0.77 0.97 0 0.00 0.00 N/A N/A N/A N/A 150 100.14 98.67 0.98% 1.98 1.3 5.0 5.0 5.0 48 D-8.1 No 0.84 0.84 1.00 0 0.00 0.00 N/A N/A N/A N/A 50 0.37 0.18 0.38% 1.23 0.7 5.0 5.0 5.0 54 D-10 No 0.76 0.76 0.95 0 0.00 0.00 N/A N/A N/A N/A 210 98.45 97.09 0.65% 1.61 2.2 5.0 5.0 5.0 56 D-11 No 0.87 0.87 1.00 0 0.00 0.00 N/A N/A N/A N/A 105 98.45 97.93 0.50% 1.41 1.2 5.0 5.0 5.0 60 OF-12 Yes 0.31 0.31 0.39 700 4.56 1.47 0.44% 51.4 51.4 46.3 0 0.00 0.00 N/A N/A N/A 51.4 51.4 46.3 OF2 OF-2 No 0.70 0.70 0.88 70 98.97 97.40 2.24% 4.8 4.8 2.7 0 0.00 0.00 N/A N/A N/A 5.0 5.0 5.0 PROPOSED TIME OF CONCENTRATION COMPUTATIONS A. Morse July 14, 2015 Design Point Sub-Basin(s) Overland Flow Gutter/Pipe Flow Time of Concentration (Equation RO-4) () 3 1 1 . 87 1 . 1 * S Ti C Cf L − = 7/14/2015 1:34 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Tc D-2C2 0.77 0.11 0.29 0.00 0.22 Clayey | Average 2% to 7% 0.160 0.80 0.80 1.00 73% TOTAL BASIN D2 1.57 0.38 0.45 0.00 0.29 Clayey | Average 2% to 7% 0.450 0.75 0.75 0.94 67% D-3A 0.44 0.12 0.08 0.00 0.11 Clayey | Average 2% to 7% 0.131 0.74 0.74 0.93 66% D-3B 1.27 0.36 0.30 0.00 0.28 Clayey | Average 2% to 7% 0.335 0.77 0.77 0.96 69% D-3C 0.61 0.06 0.07 0.00 0.19 Clayey | Average 2% to 7% 0.287 0.62 0.62 0.78 49% TOTAL BASIN D3 2.32 0.54 0.45 0.00 0.58 Clayey | Average 2% to 7% 0.753 0.72 0.72 0.90 63% D-5/92 9.94 0.41 0.07 0.00 0.00 Clayey | Average 2% to 7% 9.456 0.28 0.28 0.36 5% D-7 0.30 0.00 0.06 0.05 0.11 Clayey | Average 2% to 7% 0.138 0.71 0.71 0.89 57% D-7.1 0.33 0.00 0.02 0.05 0.20 Clayey | Average 2% to 7% 0.079 0.74 0.74 0.93 65% D-7.2 0.79 0.00 0.24 0.00 0.36 Clayey | Average 2% to 7% 0.421 0.85 0.85 1.00 68% D-8 0.39 0.00 0.10 0.05 0.15 Clayey | Average 2% to 7% 0.180 0.77 0.77 0.97 63% D-8.1 0.33 0.00 0.07 0.00 0.19 Clayey | Average 2% to 7% 0.141 0.84 0.84 1.00 70% D-10 0.49 0.00 0.12 0.07 0.18 Clayey | Average 2% to 7% 0.234 0.76 0.76 0.95 61% D-11 0.36 0.00 0.13 0.00 0.14 Clayey | Average 2% to 7% 0.221 0.87 0.87 1.00 68% TOTAL BASIN D 16.82 1.33 1.71 0.23 2.19 Clayey | Average 2% to 7% 12.074 0.48 0.48 0.60 29% OF-12 0.44 0.03 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.399 0.31 0.31 0.39 8% OF-2 0.15 0.00 0.02 0.00 0.08 Clayey | Average 2% to 7% 0.053 0.70 0.70 0.88 58% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis 2. Sub-Basin outside of Project Boundary Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 7/14/2015 1:32 PM D:\Projects\374-020\Drainage\Hydrology\374-020_Proposed_Rational_Calcs.xlsx\Composite C