February 03, 2015
Mark Melchi
MAV
Development
Co. 2723 S.
State, Suite
250 Ann
Arbor, MI
48104
RE: HTP Harmony Frontage Infrastructure - Preliminary Design Review, PDR150001,
Round Number
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions
about any comments, you may contact the individual commenter or direct your
questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313,
nbeals@fcgov.com Topic: General
Comment Number: 1 Comment Originated:
01/20/2015
01/20/2015: This project will need to be in compliance with the HTP
ODP 7th amendment. BHA: Acknowledged.
Where is the bike and ped connections that runs through the site? BHA: Bike
and ped connections will be provided with development of the lots south of
Harmony Road. No development plan exists yet to make a logical connection.
Comment Number: 2 Comment
Originated: 01/20/2015 01/20/2015: The project will need to include a
landscaping plan. BHA: A landscape plan is provided.
Comment Number: 3 Comment
Originated: 01/20/2015 01/20/2015: If the project is not pursuing to
approve any uses, then it can proceed
as a Basic Development review for the ROW improvements and infrastructure.
BHA: Acknowledged.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567,
mvirata@fcgov.com Topic: General
Comment Number: 20 Comment Originated:
01/21/2015
01/21/2015: "Back in the day" when Technology Parkway was
intended to be the first signalized intersection and Lady Moon Drive
would be signalized at a later date (when meeting signalized
warrants), the design for Harmony Technology Park 2nd Filling
required that Lady Moon Drive be in the interim, constructed as a 3/4
movement (left in's off of Harmony) and limily Lady Moon Drive/HP
access to Harmony Road to right-in, right-out. This may need to be
explored now with Technology Parkway to address an interim
situation in which the roadway is constructed but not meet warrants
for signalization. BHA: Acknowledged, Design is based on long term
condition which includes a signal at Technology Parkway.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/20/2015
01/20/2015: Larimer County Road Impact Fees and Street Oversizing Fees are due
at the time of building permit. Please contact Matt Baker at 224-6108 if you have
any questions. BHA: Acknowledged.
Comment Number: 2 Comment Originated: 01/20/2015
01/20/2015: The City's Transportation Development Review Fee (TDRF) is due at
the time of submittal. For additional information on these fees, please see:
http://www.fcgov.com/engineering/dev-review.php BHA: Acknowledged.
Comment Number: 3 Comment Originated: 01/20/2015
01/20/2015: Any damaged curb, gutter and sidewalk existing prior to construction,
as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed
due to construction of this project, shall be replaced or restored to City of Fort
Collins standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
BHA: Acknowledged.
Comment Number: 4 Comment Originated: 01/20/2015
01/20/2015: All public sidewalk, driveways and ramps existing or proposed adjacent
or within the site need to meet ADA standards, if they currently do not, they will need
to be reconstructed so that they do meet current ADA standards as a part of this
project. The existing driveway will need to be evaluated to determine if the slopes
and width will meet ADA requirements or if they need to be reconstructed so that
they do. BHA: Acknowledged.
Comment Number: 5 Comment Originated: 01/20/2015
01/20/2015: Any public improvements must be designed and built in accordance
with the Larimer County Urban Area Street Standards (LCUASS). They are available
online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm BHA:
Acknowledged.
Comment Number: 6 Comment Originated: 01/20/2015
01/20/2015: A reimbursement is due to the City for the cost to widen Harmony
Road adjacent to the Proeprty. This will be due prior to the issuance of the first
building permit. BHA: Acknowledged.
Comment Number: 7 Comment Originated: 01/20/2015
01/20/2015: Does Timberwood Drive align and fit within the platted right-of-way? If
it doesn’t we will need to go to City Council to vacate and right-of-way that is no
longer needed. BHA: Timberwood Drive is proposed to fit within the current ROW.
Comment Number: 8 Comment Originated: 01/20/2015
01/20/2015: How will the pedestrian and bicycle circulation that is shown on the
ODP be accomplished through this site? BHA: Ped and bicycle circulation will be
provided through the site with development of the lots south of Harmony Road. At a
minimum one north south connection will be made. Location will be determined
based on development plans that are not part of this submittal.
Comment Number: 9 Comment Originated: 01/20/2015
01/20/2015: The median in Technology Parkway will need to be landscaped in
accordance with the median landscaping standards and LCUASS requirements and
will be the responsibility of this development to install and maintain the median and
it’s landscaping. BHA: Acknowledged. Landscaping is provided in the median of
Technology Parkway.
Comment Number: 10 Comment Originated: 01/20/2015
01/20/2015: Need to provide roadway designs for Timberwood Drive and
Technology Parkway and construct these streets as a part of the project.
Preliminary off site design shall also be provided for Technology Parkway.
BHA: Acknowledged. Engineering drawings are provided.
01/20/2015: Sidewalk will need to be designed and installed along the south side of
Harmony Road adjacent to the site, the east side of Technology Parkway adjacent
to the site, the north side of Timberwood Drive adjacent to the site, and the south
side of Timberwood Drive along the frontage of the pond. BHA: The walk along
Harmony Road is provided with this project. Walks along Technology Parkway and
Timberwood Drive will be provided with adjacent development.
Comment Number: 12 Comment Originated: 01/20/2015
01/20/2015: Traffic Study will be used to determine if any additional improvements
are necessary to accommodate the development and the proposed accesses. BHA:
A TIS has been prepared for this project.
Comment Number: 13 Comment Originated: 01/20/2015
01/20/2015: A reimbursement for a portion of the cost of the right turn lane that has
been constructed onto Lady Moon will likely be due from this project to reimburse
Banner for the development proportionate share of this turn lane. Banner has the
ability to file for reimbursement. BHA: Acknowledged.
Comment Number: 14 Comment Originated: 01/20/2015
01/20/2015: Are you proposing to replat the property? It would make more sense
than trying to vacate and dedicate easements by separate document. BHA: The
project fits within current platted boundaries. No new plat is considered for this
project.
Comment Number: 15 Comment Originated: 01/20/2015
01/20/2015: This project is responsible for dedicating any right-of-way and
easements that are necessary for this project. BHA: Acknowledged.
Comment Number: 16 Comment Originated: 01/20/2015
01/20/2015: Utility plans will be required and a Development Agreement will be
recorded once the project is finalized. BHA: Acknowledged. Utility plans are
provided.
Comment Number: 17 Comment Originated: 01/20/2015
01/20/2015: A Development Construction Permit (DCP) will need to be obtained
prior to starting any work on the site. BHA: Acknowledged.
Comment Number: 18 Comment Originated: 01/20/2015
01/20/2015: LCUASS parking setbacks (Figure 19-6) apply and will need to be
followed depending on parking design. BHA: Acknowledged. No parking is proposed
as part of this project.
Comment Number: 19 Comment Originated: 01/20/2015
01/20/2015: If you are planning on phasing the project the phasing will need to be
shown on the utility plans. BHA: Acknowledged.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-2401, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/20/2015
01/20/2015: With respect to landscaping and design, the City of Fort Collins Land
Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses
in your landscaping or re landscaping and reduce bluegrass lawns as much as
possible. BHA: Acknowledged. Landscape plans are provided for the Harmony Road
buffer area and Technology Parkway media as part of this project and are designed
to meet applicable code requirements.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
01/20/2015: WATER SUPPLY
Hydrant spacing and flow must meet minimum requirements based on type of
occupancy. Based upon the proposed site plans, it is unclear if buildings on the interior
of the site have adequate access to a fire hydrant. Code language provided below. BHA:
Acknowledged.
> COMMERCIAL REQUIREMENTS: Hydrants to provide 1,500 gpm at 20 psi
residual pressure, spaced not further than 300 feet to the building, on 600-foot
centers thereafter.
Comment Number: 2 Comment Originated: 01/20/2015
01/20/2015: FIRE LANES
Fire lanes shall be provided to within 150' of all portions of any building. Fire access is
not measured from arterial roads. As such, and Emergency Access Easement
will be required within the site to serve the needs of some buildings. Also be advised
that buildings over 30' in height as defined by the fire code, require increased fire access
requirements. See Fire Lane Specifications and other code language provided below.
BHA: Acknowledged.
> Approved fire Lanes shall be provided for every facility, building or portion of a building
hereafter constructed or moved into or within the jurisdiction. The fire apparatus access
road shall comply with the requirements of this section and shall extend to within 150
feet of all portions of the facility and all portions of the exterior walls of the first story of
the building as measured by an approved route around the exterior of the building or
facility. When any portion of the facility or any portion of an exterior wall of the first story
of the building is located more than 150 feet from fire apparatus access, the fire code
official is authorized to increase the dimension if the building is equipped throughout with
an approved, automatic fire-sprinkler system. BHA: Acknowledged.
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the
design criteria already contained in relevant standards and policies, any new fire lane
must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
> Dead-end fire access roads in excess of 150 feet in length shall be provided with an
approved area for turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum of 25
feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all times.
> Additional access requirements exist for buildings greater than 30' in height. Refer to
Appendix D of the 2012 IFC or contact PFA for details.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC
3.6.2(B)2006 and Local Amendments. BHA: Acknowledged.
Comment Number: 3 Comment Originated: 01/20/2015
01/20/2015: TURNING TEMPLATE
As part of the plan set, the fire marshal is requesting that all projects provide turning
templates to indicate fire apparatus movement along private drives and throughout
Emergency Access Easements within the development site. BHA: No site development
is proposed with this project.
01/20/2015: FIRE CONTAINMENT VS FIRE SPRINKLERING
Buildings exceeding 5000 square feet shall be sprinklered or fire contained. If
containment is used, the containment construction shall be reviewed and approved
by the Poudre Fire Authority prior to installation. There may be additional sprinklering
requirements based on the occupancy group classification of a building. BHA:
Acknowledged.
Comment Number: 5 Comment Originated: 01/21/2015
01/21/2015: PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM
New buildings require a fire department, emergency communication system
evaluation after the core/shell but prior to final build out. For the purposes of this
section, fire walls shall not be used to define separate buildings. Where adequate
radio coverage cannot be established within a building, public-safety radio
amplification systems shall be designed and installed in accordance with criteria
established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy
#07-01 BHA: Acknowledged.
Comment Number: 6 Comment Originated: 01/21/2015
01/21/2015: PREMISE IDENTIFICATION
New and existing buildings shall have approved address numbers, building numbers
or approved building identification placed in a position that is plainly legible, visible
from the street or road fronting the property, and posted with a minimum of six-inch
numerals on a contrasting background. Where access is by means of a private road
and the building cannot be viewed from the public way, a monument, pole or other
sign or means shall be used to identify the structure. BHA: Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 01/20/2015
01/20/2015: The site disturbs more than 10,000 sq-ft and in a sensitive area,
therefore Erosion and Sediment Control Materials need to be submitted for FDP.
The erosion control requirements are in the Stormwater Design Criteria under the
Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control
Materials Submitted does not meet requirements. Please submit; Erosion Control
Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com BHA: Acknowledged.
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 01/21/2015
01/21/2015: A drainage report, erosion control report, and construction plans are
required and they must be prepared by a Professional Engineer registered in
Colorado. The drainage report must address the four-step process for selecting
structural BMPs. Standard operating procedures (SOPs) for all onsite drainage
facilities need to be prepared by the drainage engineer and there is a final site
inspection required when the project is complete and the maintenance is handed
over to an HOA or another maintenance organization. The erosion control report
requirements are in the Fort Collins Stormwater Manual, Section 1.3.3, Volume 3,
Chapter 7 of the Fort Collins Amendments. If you need clarification concerning this
section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or
jschlam@fcgov.com.
01/21/2015: In the McClellands drainage basin onsite detention is required with a
0.2 cfs/ac release rate for the 10 year storm and a 0.5 cfs/ac release rate for the
100 year storm. Per agreement with the City of Fort Collins Stormwater, interim,
cobble pits will be utilized south of Timberwood Drive and until adjacent
development occurs. A future, regional detention and water quality pond will be
provided with future development and will adhere to the HTP Masterplan and the
McClelland’s drainage basin criteria.
Comment Number: 4 Comment Originated: 01/21/2015
01/21/2015: There are existing storm sewer pipes that enter the site from Harmony
and Lady Moon at the northeast corner of the site. These pipes take drainage from
the adjacent streets and, as part of this development, this runoff needs to be safely
conveyed to the proposed detention pond and included in site detention and water
quality calculations. There is also a storm pipe leaving the site into Lady Moon,
presumably as a release point for the onsite detention pond. If this pipe is not used
as an outfall for this development, it will need to be plugged or removed.
Acknowledged. Future, adjacent development will provide for these measures.
Comment Number: 5 Comment Originated: 01/21/2015
01/21/2015: Fifty percent of the site runoff is required to be treated using the
standard water quality treatment as described in the Fort Collins Stormwater
Manual, Volume 3-Best Management Practices (BMPs).
(http://www.fcgov.com/utilities/business/builders-and-developers/development-form
s-guidelines-regulations/stormwater-criteria) Extended detention is the usual
method selected for water quality treatment; however the use of any of the BMPs is
encouraged. BHA: Acknowledged.
Comment Number: 6 Comment Originated: 01/21/2015
01/21/2015: Low Impact Development (LID) requirements are required on all new or
redeveloping property which includes sites required to be brought into compliance
with the Land Use Code. These require a higher degree of water quality treatment
for 50% of the new impervious area and 25% of new paved areas must be pervious.
For more information please refer to the City's website where additional information
and links can be found at:
http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impac
t-development BHA: Acknowledged.
Comment Number: 7 Comment Originated: 01/21/2015
01/21/2015: The city wide Stormwater development fee (PIF) is $7,817/acre
($0.1795 sq.-ft.) for new impervious area over 350 sq.-ft., and there is a
$1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing impervious
area. These fees are to be paid at the time each building permit is issued.
Information on fees can be found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de
velopment-fees or contact Jean Pakech at 221-6375 for questions on fees. There is
also an erosion control escrow required before the Development Construction
permit is issued. The amount of the escrow is determined by the design engineer,
and is based on the site disturbance area, cost of the measures, or a minimum
amount in accordance with the Fort Collins Stormwater Manual. BHA:
Acknowledged.
Comment Number: 8 Comment Originated: 01/21/2015
01/21/2015: The design of this site must conform to the drainage basin design of
the McClellands Creek Master Drainage Plan as well the Fort Collins Stormwater
Criteria Manual. BHA: Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/20/2015
01/20/2015: No comments. BHA: Acknowledged.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/21/2015
01/21/2015: Internal walkability and sidewalks could be improved. This includes a
walkable spine inside, and connections to Harmony. BHA: Connecting walks will be
provided with development of lots under separate review.
Comment Number: 2 Comment Originated: 01/21/2015
01/21/2015: The entire site is mostly just a parking lot. Some sort of circulation
pattern, including a "through road" would be helpful. BHA: No development is
proposed with this project. Subsequent development plans will provide required
circulation.
Comment Number: 3 Comment Originated: 01/21/2015
01/21/2015: We'll need a Traffic Impact Study. Please contact me to scope the
study. The signalization of Technology Parkway is problematic and needs to be
analyzed carefully. BHA: A TIS has been prepared and submitted.
Department: Water-Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/21/2015
01/21/2015: Existing water mains in this area include a 12" main in Technology
Parkway with a 12" stub out into the Timberwood Drive right-of-way and a 16"¿ main
in Lady Moon Drive with a 16" stub out into the Timberwood Drive right-of-way. As
part of this development, the installation of the water main in Timberwood Drive will
be required. BHA: Acknowledged.
Comment Number: 2 Comment Originated: 01/21/2015
01/21/2015: For sewer service, this site is not within the City of Fort Collins service
area. BHA: Acknowledged.
Comment Number: 3 Comment Originated: 01/21/2015
01/21/2015: The water conservation standards for landscape and irrigation will
apply. Information on these requirements can be found at:
http://www.fcgov.com/standards BHA: Acknowledged.
Comment Number: 4 Comment Originated: 01/21/2015
01/21/2015: Development fees and water rights will be due at building permit. BHA:
Acknowledged.