Loading...
HomeMy WebLinkAboutLEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY - PDP - PDP150009 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPDP DRAINAGE REPORT FOR LEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY Prepared For: FORT COLLINS SELF-STORAGE, LLC 5013 Bluestem Court Fort Collins, CO 80525 July 1, 2015 Project No. 39708.02 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................................... i Vicinity Map ......................................................................................................................................................... 1 General Description and Location .................................................................................................................. 2 Location And Existing Site Characteristics ................................................................................................. 2 Site Soils ........................................................................................................................................................... 2 Floodplain ........................................................................................................................................................ 2 Drainage Basins and Sub-Basins ....................................................................................................................... 3 Major Basin ...................................................................................................................................................... 3 Historic Sub-Basins ........................................................................................................................................ 3 Developed Sub-Basins.................................................................................................................................... 4 Drainage Design Criteria .................................................................................................................................. 6 Regulations ...................................................................................................................................................... 6 Low-Impact Development ............................................................................................................................ 6 Hydrologic Criteria ........................................................................................................................................ 6 Hydraulic Criteria........................................................................................................................................... 6 Drainage Facility Design .................................................................................................................................... 8 General Concept ............................................................................................................................................ 8 Water Quality/ Detention Facilities ............................................................................................................ 8 Stormwater Pollution Prevention ..................................................................................................................10 Temporary Erosion Control ......................................................................................................................10 Permanent Erosion Control .......................................................................................................................10 Summary & Conclusions .................................................................................................................................11 References .........................................................................................................................................................12 APPENDIX Appendix A – Site & Soil Descriptions and Characteristics Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Existing & Proposed Drainage Plans Appendix E – LID Exhibit Page ii Engineer’s Certification Block I hereby certify that this Project Development Plan Drainage Report for Lemay Avenue Craft Brewery & Self-Storage Facility was prepared by me (or under my direct supervision) for JR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Timothy J. Halopoff, PE Registered Professional Engineer State of Colorado No. 37953 Page 1 VICINITY MAP Page 2 GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS Lemay Avenue Craft Brewery & Self- Storage is located in the northeast quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Lemay Avenue Craft Brewery & Self- Storage site is a 6.35 acre property that is currently undeveloped. The site is zoned I (Industrial) and will support the proposed craft brewery and self-storage facilities. The proposed use of the site is split into three lots. The first lot contains the craft brewery building with 7,912 total square feet. The second lot contains the self-storage facilities with 8 buildings totaling 104,000 square feet. The third lot is for a future development and will be a lawn area until the lot is developed, at which time the owner will be responsible for any additional water quality and detention necessary for the development of the site. The existing site generally slopes from the north to south with slopes ranging between 0.60% and 2.5%. The property is generally covered with sparse native grasses. The site currently drains to the southeast corner of the site where runoff is collected in an existing 30” CMP culvert and piped south in the City’s Lemay Avenue Right-Of-Way. SITE SOILS The Lemay Avenue Craft Brewery & Self- Storage site soils consist of loamy soil, predominately Nunn clay loam. Nunn clay loam belongs to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Supporting figures can be found in the Appendix, page A-1. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. The “City of Fort Collins Floodplain Review Checklist for 50% Submittals” checklist is not applicable for this PDP Drainage Report. Page 3 DRAINAGE BASINS AND SUB-BASINS MAJOR BASIN The proposed Lemay Avenue Craft Brewery & Self-Storage site is located in the Dry Creek major basin. The Dry Creek drainage basin is tributary to the Cache la Poudre River and extends from the Wyoming border to where it joins the river near Mulberry and Timberline. The Dry Creek basin is approximately 23 miles long and six miles wide and encompasses approximately 62 square miles. The land used in the upper and middle portion of the basin is primarily rangeland and irrigated hay meadows and pastures. The majority of the lower portion of the basin is developed and includes commercial, industrial and residential uses. The project site is a part of the lower Dry Creek basin. There are no major drainageways located within or immediately adjacent to the site. The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the 100yr floodplain, but within the 500yr floodplain. An annotated FIRM exhibit is included in Appendix A. HISTORIC SUB-BASINS Lemay Avenue Craft Brewery & Self-Storage is an infill development piece of property. It is governed by the City’s Reasonable Use policy, in which the proposed drainage basins will need to follow the generally accepted principle of releasing the 100-year developed condition flow rate at the same location and at a magnitude of 0.2cfs/acre as the pre-development condition. There are no offsite areas that flow across the proposed development site. Referring to the “Existing Drainage Plan”, included in the Appendix, the following describes the existing condition drainage basins. Existing Onsite Sub-Basins: The site has two existing onsite drainage basins. Sub-basin EX1 consists of a 6.20 acre area of undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to be 2% impervious. Runoff generally flows to the southeast across basin EX-1, at slopes ranging from 0.50% to 2.0%, generally leaving the site at the southeast corner, where it is piped south off-site through an existing 30” CMP culvert. Sub-basin EX2 consists of a 1.51 acre area of undeveloped open space with the same ground cover and percentage imperviousness as sub-basin EX-1. Runoff in sub-basin EX-1 collects in a roadside swale and flows south to the southeast corner, of the site where it is piped south, off-site through an existing 30” CMP culvert. Page 4 DEVELOPED SUB-BASINS The proposed developed condition sub-basins have been designed to mimic the historic basins’ runoff patterns. The following describes the proposed conditions on-site drainage basins. Refer to the “Proposed Drainage Plan” in the appendix for review. Proposed Onsite Sub-Basins: Sub-basin A consists of 0.93 acres on the northern portion of the subject property. Runoff from the proposed building and parking lot travels west to an LID basin in the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin B consists of 0.85 acres on the northwest corner of the subject property. Runoff from sub-basin b is collected in an LID basin on the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin C consists of 0.41 acres near the northwest corner of the subject property. Runoff from the proposed building and driveways travels west to an LID basin on the western edge of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin D consists of 0.16 acres on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin E consists of 0.39 acres in the western portion of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southwest corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub-basin F consists of 0.16 acres on the east side of the subject on the western edge of the subject property. Runoff is captured in a proposed soft swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin G consists of 0.77 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin and then flows south into the proposed detention pond on the southern edge of the property. Page 5 Sub-basin H consists of 0.68 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin I is comprised of 0.82 acres in the center of the subject property. Runoff from the proposed lawn area is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin J is comprised of 0.19 acres at the eastern edge of the subject property. Runoff from this basin is captured in a swale and flows south through an LID basin and into the proposed detention pond on the southern edge of the property. Sub-basin K is comprised of 0.32 acres near the southeast corner of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southeast corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub-basin L is comprised of 0.76 acres and contains the proposed detention pond area. Runoff from this basin is collected in the proposed detention pond on the southern edge of the property. Sub-basin M is comprised of 0.59 acres on the northern edge of the subject property. Runoff from this basin is collected in a proposed sump inlet along Buckingham Street. Captured flows are piped east to the corner of Buckingham Street and Lemay Avenue where they are release into a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off-site through and existing 30” CMP culvert. Sub-basin N is comprised of 1.48 acres on the eastern edge of the subject property. Runoff from this basin is collected in a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off-site through and existing 30” CMP culvert. Sub-basin O is comprised of 0.10 acres on the southern edge of the subject property. Runoff from this basin sheet flow south off-site. Page 6 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design Criteria and Construction Manual (with all current 2011 Revisions)(FCSDDCCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. LOW-IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP). The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. Site-specific LID BMPs are discussed in the following sections of this report and an illustrative LID/Surface map is provided in Appendix E. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-year, 1-hour rainfall depth of 0.82 inches and a 100-year, 1- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA This report demonstrates that the proposed stormwater detention concept is able to reduce the 100-year developed condition flows to a flow rate of 0.2 cfs/ acre; thereby satisfying the City’s Reasonable Use requirements. The Rational Formula-based Federal Aviation Administration (FAA) method is used to preliminarily size the detention pond in accordance with City criteria, as the tributary area is less than 20 acres in size. The resulting storage volume is increased by a factor of twenty (20) percent to better match the result that would be obtained from SWMM modeling, per City criteria. Page 7 The ultimate Lemay Avenue Craft Brewery & Self-Storage storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm sewer pipes, soft swales, and LID measures for the flows being calculated by this report. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. During the major developed condition 100-year storm, the accumulated water depth in the ponds will be held to a maximum level of one-foot below all building finished floor elevations. Additionally, this report summarizes if any, the expected changes to offsite conditions or flows. This project will eventually show that the flow rate released downstream is less than would historically be experienced, and that the sedimentation is lessened through increase infiltration. All swale and pipe outlets will be protected with turf mat or riprap; whichever is most appropriate. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the protection of downstream conveyance channels and culverts. Lid measures have been integrated into this design on higher levels than most City of Fort Collin’s projects to date. In all, 85% of this project’s impervious areas pass through and are treated in LID’s prior to reaching the detention pond. Page 8 DRAINAGE FACILITY DESIGN GENERAL CONCEPT The proposed improvements to the Lemay Avenue Craft Brewery & Self-Storage site will result in developed condition runoff being conveyed around the proposed buildings and to the south via concrete pans and swales. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, permeable pavement systems are proposed for portions of the parking lot, Lid infiltration forebay basins to treat roof and driveway drainage, and grass lined bio-swales (soft-swales) are proposed on the west and east sides of the site to improve water quality. Runoff from the site is captured in LID basins and swales located around the self-storage site and in open areas adjacent to the building. Runoff is conveyed via sheet flow, concrete pans and bio- swales in a southerly direction to the proposed detention pond at the southern end of the site. The existing drainage outfall from the site is in the southeast corner of the property. The proposed detention pond is sized to detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. Runoff collected from Buckingham Street and Lemay Avenue will combine with flows released from the proposed detention pond and will continue to flow south off-site through an existing 30” CMP culvert, similar to historic conditions. WATER QUALITY/ DETENTION FACILITIES Water quality will be provided for the site through the use of LID basins and swales. Detention will be provided for the site through the proposed detention pond on the southern edge of the site. Within the detention pond is located an underground gravel storm water infiltration basin for LID measures. The voids provided by the porous graded gravel in the depression increases infiltration with the supportive soils. The proposed detention pond will detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. The most recent version of the UD-Detention software (Version 2.35, January 2015) was used to determine the ultimate detention volume requirements. Per City of Fort Collins requirements, the calculated detention volume using the FAA method was increased by a factor of 1.20. This increase in detention volume will be provided via the void space in the gravel stormwater infiltration basin located at the bottom of the proposed detention pond and one-foot of freeboard is provided in this detention configuration. See Table 1, below, for detention pond sizing and release rates. Page 9 Table 1: Detention Pond Values Storage Volume Required (acre-ft) WQCV Volume Required (acre-ft) (provided in LID basins and swales) Total Volume Required (acre-ft) Volume required *1.2 Storage Volume Provided (acre-ft) 100-yr Max Inflow Rate (cfs) 100-yr Max Release Rate (cfs) 1.2 0.14 1.44 1.44 49.5 1.29 Page 10 STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. Page 11 SUMMARY & CONCLUSIONS The existing conditions drainage has two onsite sub-basins with the same outfall point in the southeast corner of the subject property. The proposed drainage condition was designed to mimic the historic basins’ runoff patterns. The existing conditions drainage patterns are maintained in the design of the project. The proposed improvements will have positive impacts on the timing, flow rate, and quality of runoff leaving the site; and will reduce potential impacts for flooding downstream of this site. The hydrologic and retention/detention calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements. This PDP Drainage Report and the complimenting drainage plans and LID plans propose appropriate grading, permanent landscaping, LID BMPs, and onsite facilities (e.g. storm sewer, inlets, detention facilities) that are shown in their preliminary configuration and will be designed for construction in the Final Drainage Report along with supporting calculations. The proposed concept for the development of the Lemay Avenue Craft Brewery & Self-Storage site involves routing developed condition flows to a proposed onsite detention pond. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the proposed detention pond. The site’s stormwater facilities are sixed to meet the City of Fort Collins “Storm Drainage Criteria Manual and Construction Standards” for both detention and water quality. Page 12 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997. 3. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [July 21, 2010] APPENDIX A SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 2 - SOILS MAP LEMAY AVE. CRAFT BREWERY & SELF-STORAGE DRAINAGE REPORT Project No. 39708.02 FIGURE 3 - FIRM MAP APPENDIX B HYDROLOGIC CALCULATIONS Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 7/1/15 A 0.93 100 0.69 74.19 5 0.14 0.80 90 0.10 9.70 84.69 B 0.85 100 0.00 0.00 5 0.85 5.00 90 0.00 0.00 5.00 C 0.41 100 0.23 56.10 5 0.00 0.00 90 0.18 39.50 95.60 D 0.16 100 0.00 0.00 5 0.08 2.50 90 0.08 45.00 47.50 E 0.39 100 0.21 53.85 5 0.00 0.00 90 0.18 41.50 95.35 F 0.16 100 0.00 0.00 5 0.06 1.90 90 0.10 56.30 58.20 G 0.77 100 0.36 46.75 5 0.00 0.00 90 0.41 47.90 94.65 H 0.68 100 0.33 48.53 5 0.00 0.00 90 0.35 46.30 94.83 I 0.82 100 0.00 0.00 5 0.82 5.00 90 0.00 0.00 5.00 J 0.19 100 0.00 0.00 5 0.19 5.00 90 0.00 0.00 5.00 K 0.32 100 0.16 50.00 5 0.00 0.00 90 0.16 45.00 95.00 L 0.76 100 0.00 0.00 5 0.76 5.00 90 0.00 0.00 5.00 M 0.59 100 0.43 72.88 5 0.16 1.40 90 0.00 0.00 74.28 N 1.48 100 0.45 30.41 5 0.96 3.20 90 0.07 4.30 37.91 O 0.10 100 0.00 0.00 5 0.10 5.00 90 0.00 0.00 5.00 Basins Total Weighted % Basin ID Total Area (ac) % Imp. Area (ac) Imp. Weighted % Imp. % Imp. Area (ac) Weighted % Imp. % Imp. 39708.02 COMPOSITE % IMPERVIOUS CALCULATIONS Paved Roads/ Drives Lawns Roof Area (ac) Weighted % Imp. X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 7/1/15 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) A 0.93 C 84.7 0.78 0.65 70 1.4 6.2 200 1.0 20.0 2.0 1.7 7.8 270.0 11.5 7.8 B 0.85 C 5.0 0.52 0.08 20 5.0 4.9 95 0.5 15.0 1.1 1.5 6.4 115.0 10.6 6.4 C 0.41 C 95.6 0.90 0.81 15 3.0 1.4 150 0.8 20.0 1.8 1.4 2.8 165.0 10.9 5.0 D 0.16 C 47.5 0.60 0.32 35 20.0 3.1 150 0.8 15.0 1.3 1.9 5.0 185.0 11.0 5.0 E 0.39 C 95.4 0.90 0.81 15 3.0 1.4 150 0.8 20.0 1.8 1.4 2.8 165.0 10.9 5.0 F 0.16 C 58.2 0.63 0.39 35 20.0 2.8 150 0.8 15.0 1.3 1.9 4.7 185.0 11.0 5.0 G 0.77 C 94.7 0.89 0.80 35 2.0 2.6 150 0.6 20.0 1.5 1.6 4.2 185.0 11.0 5.0 H 0.68 C 94.8 0.89 0.80 50 2.8 2.8 250 0.5 20.0 1.4 2.9 5.7 300.0 11.7 5.7 I 0.82 C 5.0 0.52 0.08 120 1.6 17.5 140 1.5 15.0 1.8 1.3 18.8 260.0 11.4 11.4 J 0.19 C 5.0 0.52 0.08 10 20.0 2.2 150 1.3 15.0 1.7 1.5 3.6 160.0 10.9 5.0 K 0.32 C 95.0 0.89 0.80 50 2.8 2.8 120 1.6 20.0 2.5 0.8 3.5 170.0 10.9 5.0 L 0.76 C 5.0 0.52 0.08 50 6.0 7.3 200 1.0 15.0 1.5 2.2 9.5 250.0 11.4 9.5 M 0.59 C 74.3 0.70 0.53 40 2.0 5.2 230 0.4 20.0 1.3 3.0 8.3 270.0 11.5 8.3 N 1.48 C 37.9 0.58 0.27 30 13.0 3.5 430 1.4 15.0 1.8 4.0 7.6 460.0 12.6 7.6 O 0.10 C 5.0 0.52 0.08 10 20.0 2.2 130 1.5 20.0 2.4 0.9 3.1 140.0 10.8 5.0 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 Grassed waterway TRAVEL TIME (Tt) Paved areas and shallow paved swales Type of Land Surface Heavy Meadow Tillage/field Short pasture and lawns Nearly bare ground STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Tc CHECK 39708.02 DATA (URBANIZED BASINS) INITIAL/OVERLAND (Ti) X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 7/1/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 1 A 0.93 0.65 7.8 0.60 2.81 1.7 1 B 0.85 0.08 6.4 0.07 3.01 0.21 7.8 0.67 2.81 1.88 0.8 1.88 150 1.8 1.4 Swale flow to DP2 2 C 0.41 0.81 5.0 0.33 3.22 1.06 2 D 0.16 0.32 5.0 0.05 3.22 0.16 5.00 0.38 3.22 1.22 Total flow at DP2 2 9.2 1.05 2.65 2.78 0.8 2.78 150 1.8 1.4 Swale flow to DP3 3 E 0.39 0.81 5.0 0.32 3.22 1.0 3 F 0.16 0.39 5.0 0.06 3.22 0.2 5.0 0.38 3.22 1.2 Total flow at DP3 3 10.6 1.43 2.51 3.6 1.0 3.6 100 2.0 0.8 Swale flow to DP8 4 G 0.77 0.80 5.0 0.62 3.22 2.0 1 2.0 100 2.0 0.8 Swale flow to DP8 5 H 0.68 0.80 5.7 0.54 3.11 1.7 5 I 0.82 0.08 11.4 0.07 2.43 0.2 11.4 0.61 2.43 1.5 1.3 1.5 150 2.3 1.1 Swale flow to DP6 6 J 0.19 0.08 5.0 0.02 3.22 0.1 Total flow at DP6 6 12.5 0.63 2.34 1.5 0.65 1.5 70 1.6 0.7 Swale flow to DP7 7 K 0.32 0.80 5.0 0.26 3.22 0.8 Total flow Flow at DP7 7 13.3 0.89 2.28 2.0 1.0 2.0 100 2.0 0.8 Swale flow to DP8 Detention Pond Area 8 L 0.76 0.08 9.5 0.06 2.62 0.2 Detention Pond Outlet Total flow at DP8 8 14.1 4.32 2.22 9.6 Piped to DP10 Sump Inlet 9 M 0.59 0.53 8.3 0.31 2.76 0.9 1.4 0.9 700 2.4 4.9 Piped/ Swale flow to DP10 10 N 1.48 0.27 7.6 0.40 2.84 1.1 Total flow at DP 10 10 13.2 0.71 2.29 1.6 0.3 Total Release from site 10 1.9 Flow Off-site south O 0.10 0.08 5.0 0.01 3.22 0.03 Add Pond Release Pond Release STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 7/1/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS 1 A 0.93 0.65 7.8 0.60 7.91 4.7 1 B 0.85 0.08 6.4 0.07 8.45 0.6 7.8 0.67 7.91 5.3 0.8 5.30 150 1.8 1.4 Swale flow to DP2 2 C 0.41 0.81 5.0 0.33 9.06 3.0 2 D 0.16 0.32 5.0 0.05 9.06 0.5 5.00 0.38 9.06 3.4 Total flow at DP2 2 9.2 1.05 7.45 7.8 0.8 7.82 150 1.8 1.4 Swale flow to DP3 3 E 0.39 0.81 5.0 0.32 9.06 2.9 3 F 0.16 0.39 5.0 0.06 9.06 0.5 5.0 0.38 9.06 3.4 Total flow at DP3 3 10.6 1.43 7.05 10.1 1.0 10.1 100 2.0 0.8 Swale flow to DP8 4 G 0.77 0.80 5.0 0.62 9.06 5.6 1 5.6 100 2.0 0.8 Swale flow to DP8 5 H 0.68 0.80 5.7 0.54 8.73 4.7 5 I 0.82 0.08 11.4 0.07 6.84 0.5 11.4 0.61 6.84 4.2 1.3 4.2 150 2.3 1.1 Swale flow to DP6 6 J 0.19 0.08 5.0 0.02 9.06 0.2 Total flow at DP6 6 12.5 0.63 6.58 4.1 0.65 4.1 70 1.6 0.7 Swale flow to DP7 7 K 0.32 0.80 5.0 0.26 9.06 2.4 Total flow Flow at DP7 7 13.3 0.89 6.41 5.7 1.0 5.7 100 2.0 0.8 Swale flow to DP8 Detention Pond Area 8 L 0.76 0.08 9.5 0.06 7.37 0.4 Detention Pond Outlet Total flow at DP8 8 14.1 7.94 6.24 49.5 Piped to DP10 Sump Inlet 9 M 0.59 0.53 8.3 0.31 7.76 2.4 1.4 2.4 700 2.4 4.9 Piped/ Swale flow to DP10 10 N 1.48 0.27 7.6 0.40 7.99 3.2 Total flow at DP 10 10 13.2 0.71 6.43 4.6 1.3 Total Release from site 10 5.9 Flow Off-site south O 0.10 0.08 5.0 0.01 9.06 0.1 Add Pond Release Pond Release STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 39708.02 Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: Calculated By: BAB Checked By: 0 Date: 7/1/15 FINAL BASIN D.A. Hydrologic Impervious C100 C 2 L S Ti L S Cv VEL. Tt COMP. T c TOTAL Urbanized Tc Tc ID (AC) Soils Group (%) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) EX1 1.51 C 2.0 0.51 0.06 30 3.0 7.2 750 0.6 5.0 0.4 32.3 39.5 780.0 14.3 14.3 EX2 6.20 C 12.3 0.54 0.12 350 0.9 34.8 200 1.5 5.0 0.6 5.4 40.2 550.0 13.1 13.1 NOTES: Ti = (0.395*(1.1 - C 5)*(L)^0.5)/((S)^0.33), S in ft/ft Tt=L/60V (Velocity From Fig. 501) Velocity V=Cv*S^0.5, S in ft/ft Tc Check = 10+L/180 For Urbanized basins a minimum Tc of 5.0 minutes is required. For non-urbanized basins a minimum Tc of 10.0 minutes is required Cv 2.5 5 7 10 15 20 (Tt) Tillage/field Short pasture and lawns Nearly bare ground Grassed waterway Paved areas and shallow paved swales DATA Heavy Meadow (URBANIZED BASINS) Type of Land Surface STANDARD FORM SF-2 EXISTING TIME OF CONCENTRATION 39708.02 SUB-BASIN INITIAL/OVERLAND TRAVEL TIME Tc CHECK (Ti) X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 Project Name: Lemay Ave. Craft Brewery & Self-Storage Subdivision: 0 Project No.: Location: Fort Collins Calculated By: BAB Design Storm: Checked By: 0 Date: 7/1/15 TRAVEL TIME STREET Design Point Basin ID Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Slope (%) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) REMARKS Existing 2-yr Flows EX1 EX1 1.51 0.06 14.3 0.09 1.90 0.2 EX2 6.20 0.12 13.1 0.74 1.98 1.5 14.3 0.83 1.90 1.6 Existing 100-yr Flows EX1 EX1 1.51 0.51 14.3 0.77 6.63 5.1 EX2 6.20 0.54 13.1 3.35 6.92 23.2 14.3 4.12 6.63 27.3 STANDARD FORM SF-3 EXISTING STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 39708.02 2-Year DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 APPENDIX C HYDRAULIC CALCULATIONS Subdivision: 0 Project Name: Lemay Ave. Craft Brewery & Self-Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: 0 Date: 7/1/15 Basin EX1 Basin Area % Impervious A 0.93 84.7 B 0.85 5.0 C 0.41 95.6 D 0.16 47.5 E 0.39 95.4 F 0.16 58.2 G 0.77 94.7 H 0.68 94.8 I 0.82 5.0 J 0.19 5.0 K 0.32 95.0 L 0.76 5.0 TOTAL 6.44 54.8 WQCV = 6,167 cf WQCV = 0.14 acre-ft Pond and Forebay Sizing WQCV = (0.91I 3 - 1.19I 2 + 0.78I) * A/12 Forebay release rate = 2% of 100-year in flow X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 54.80 percent Catchment Drainage Imperviousness I a = 54.80 percent Catchment Drainage Area A = 6.440 acres Catchment Drainage Area A = 6.440 acres Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 14 minutes Time of Concentration of Watershed Tc = 14 minutes Allowable Unit Release Rate q = 0.04 cfs/acre Allowable Unit Release Rate q = 0.20 cfs/acre One-hour Precipitation P1 = 0.82 inches One-hour Precipitation P 1 = 2.86 inches Design Rainfall IDF Formula i = C1* P1 /(C2+Tc )^C3 Design Rainfall IDF Formula i = C1 * P1/(C2 +Tc)^C3 Coefficient One C1 = 28.50 Coefficient One C 1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C 2 = 10 Coefficient Three C3 = 0.786 Coefficient Three C 3 = 0.786 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.37 Runoff Coefficient C = 0.62 Inflow Peak Runoff Qp-in = 4.58 cfs Inflow Peak Runoff Qp-in = 26.77 cfs Allowable Peak Outflow Rate Qp-out = 0.26 cfs Allowable Peak Outflow Rate Qp-out = 1.29 cfs Mod. FAA Minor Storage Volume = 8,614 cubic feet Mod. FAA Major Storage Volume = 52,428 cubic feet Mod. FAA Minor Storage Volume = 0.198 acre-ft Mod. FAA Major Storage Volume = 1.204 acre-ft 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 5 2.78 0.046 1.00 0.26 0.002 0.044 5 9.70 0.267 1.00 1.29 0.009 0.258 10 2.22 0.073 1.00 0.26 0.004 0.069 10 7.74 0.426 1.00 1.29 0.018 0.408 15 1.86 0.092 0.97 0.25 0.005 0.087 15 6.49 0.536 0.97 1.25 0.026 0.510 20 1.61 0.106 0.85 0.22 0.006 0.100 20 5.63 0.619 0.85 1.09 0.030 0.589 25 1.43 0.117 0.78 0.20 0.007 0.110 25 4.98 0.685 0.78 1.00 0.035 0.651 30 1.29 0.127 0.73 0.19 0.008 0.119 30 4.49 0.740 0.73 0.94 0.039 0.701 35 1.17 0.135 0.70 0.18 0.009 0.126 35 4.09 0.787 0.70 0.90 0.043 0.744 40 1.08 0.142 0.68 0.17 0.010 0.132 40 3.77 0.828 0.68 0.87 0.048 0.780 45 1.00 0.148 0.66 0.17 0.010 0.137 45 3.49 0.865 0.66 0.84 0.052 0.812 50 0.94 0.154 0.64 0.16 0.011 0.142 50 3.26 0.897 0.64 0.82 0.057 0.840 55 0.88 0.159 0.63 0.16 0.012 0.146 55 3.06 0.927 0.63 0.81 0.061 0.866 60 0.83 0.163 0.62 0.16 0.013 0.150 60 2.89 0.954 0.62 0.79 0.066 0.888 65 0.78 0.167 0.61 0.16 0.014 0.153 65 2.74 0.979 0.61 0.78 0.070 0.909 70 0.75 0.171 0.60 0.15 0.015 0.157 70 2.60 1.002 0.60 0.77 0.075 0.927 75 0.71 0.175 0.59 0.15 0.016 0.159 75 2.48 1.024 0.59 0.76 0.079 0.945 80 0.68 0.179 0.59 0.15 0.017 0.162 80 2.37 1.044 0.59 0.76 0.083 0.960 85 0.65 0.182 0.58 0.15 0.018 0.164 85 2.27 1.063 0.58 0.75 0.088 0.975 90 0.63 0.185 0.58 0.15 0.018 0.166 90 2.18 1.081 0.58 0.74 0.092 0.989 95 0.60 0.188 0.57 0.15 0.019 0.169 95 2.10 1.098 0.57 0.74 0.097 1.001 100 0.58 0.191 0.57 0.15 0.020 0.170 100 2.03 1.114 0.57 0.73 0.101 1.013 105 0.56 0.193 0.57 0.15 0.021 0.172 105 1.96 1.130 0.57 0.73 0.106 1.024 110 0.54 0.196 0.56 0.15 0.022 0.174 110 1.89 1.145 0.56 0.73 0.110 1.035 115 0.53 0.198 0.56 0.14 0.023 0.175 115 1.83 1.159 0.56 0.72 0.114 1.045 120 0.51 0.201 0.56 0.14 0.024 0.177 120 1.78 1.173 0.56 0.72 0.119 1.054 125 0.49 0.203 0.56 0.14 0.025 0.178 125 1.72 1.186 0.56 0.72 0.123 1.063 130 0.48 0.205 0.55 0.14 0.026 0.180 130 1.68 1.199 0.55 0.71 0.128 1.071 Project: Basin ID: UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 DETENTION VOLUME BY THE MODIFIED FAA METHOD Lemay Ave. Craft Brewery & Self Storage 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 0 50 100 150 200 250 300 350 Volume (acre-feet) Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Minor Storm Inflow Volume Minor Storm Outflow Volume Minor Storm Storage Volume Major Storm Inflow Volume Major Storm Outflow Volume Major Storm Storage Volume 3970802 UD-Detention_v2.35.xls, Modified FAA 6/30/2015, 7:42 PM APPENDIX D EXISTING & PROPOSED DRAINAGE PLANS A Westrian Company LEMAY AVE. CRAFT BREWERY & SELF-STORAGE FACILITY EXISTING CONDITIONS DRAINAGE MAP Know what's tc Q5 Q100 C100 C5 (min) (cfs) (cfs) EX1 1.51 0.51 0.06 14.3 0.2 4.8 EX2 6.20 0.54 0.12 13.1 1.7 21.6 Existing Runoff Summary Table Basin ID Area (acres) LEMAY AVENUE BUCKINGHAM STREET A Westrian Company LEMAY AVE. CRAFT BREWERY & SELF-STORAGE FACILITY PROPOSED CONDITIONS DRAINAGE MAP Know what's tc Q5 Q100 C100 C5 (min) (cfs) (cfs) A 0.93 0.78 0.65 7.8 1.7 4.7 B 0.85 0.52 0.08 6.4 0.2 0.6 C 0.41 0.90 0.81 5.0 1.1 3.0 D 0.16 0.60 0.32 5.0 0.2 0.5 E 0.39 0.90 0.81 5.0 1.0 2.9 F 0.16 0.63 0.39 5.0 0.2 0.5 G 0.77 0.89 0.80 5.0 2.0 5.6 H 0.68 0.89 0.80 5.7 1.7 4.7 I 0.82 0.52 0.08 11.4 0.2 0.5 J 0.19 0.52 0.08 5.0 0.1 0.2 K 0.32 0.89 0.80 5.0 0.8 2.4 L 0.76 0.52 0.08 9.5 0.2 0.4 M 0.59 0.70 0.53 8.3 0.9 2.4 N 1.48 0.58 0.27 7.6 1.1 3.2 O 0.10 0.52 0.08 5.0 0.03 0.1 Runoff Summary Table Basin ID Area (acres) LEMAY AVENUE BUCKINGHAM STREET APPENDIX E LID EXHIBITS A Westrian Company LID SURFACE DRAINAGE PLAN IMPERVIOUS AREA TREATMENT PLAN AREA DESCRIPTION AREA (SF) % OF TOTAL NEW IMPERVIOUS AREA AFFLUENT TO L.I.D. BMP'S 175659 78% PICP AREA 16748 7% TOTAL TREATED AREA 192407 85% NEW IMPERVIOUS AREA NOT TREATED 33836 15% TOTAL IMPERVIOUS AREA 226243 100% IMPERVIOUS AREA TREATMENT RATIO 135 0.47 0.207 0.55 0.14 0.026 0.181 135 1.63 1.211 0.55 0.71 0.132 1.079 140 0.46 0.209 0.55 0.14 0.027 0.182 140 1.59 1.223 0.55 0.71 0.137 1.086 145 0.44 0.211 0.55 0.14 0.028 0.183 145 1.55 1.234 0.55 0.71 0.141 1.093 150 0.43 0.213 0.55 0.14 0.029 0.184 150 1.51 1.245 0.55 0.70 0.145 1.100 155 0.42 0.215 0.55 0.14 0.030 0.185 155 1.47 1.256 0.55 0.70 0.150 1.106 160 0.41 0.217 0.54 0.14 0.031 0.186 160 1.44 1.266 0.54 0.70 0.154 1.112 165 0.40 0.218 0.54 0.14 0.032 0.187 165 1.41 1.276 0.54 0.70 0.159 1.118 170 0.39 0.220 0.54 0.14 0.033 0.187 170 1.38 1.286 0.54 0.70 0.163 1.123 175 0.39 0.222 0.54 0.14 0.034 0.188 175 1.35 1.296 0.54 0.70 0.168 1.128 180 0.38 0.223 0.54 0.14 0.034 0.189 180 1.32 1.305 0.54 0.69 0.172 1.133 185 0.37 0.225 0.54 0.14 0.035 0.190 185 1.29 1.314 0.54 0.69 0.177 1.138 190 0.36 0.226 0.54 0.14 0.036 0.190 190 1.27 1.323 0.54 0.69 0.181 1.142 195 0.36 0.228 0.54 0.14 0.037 0.191 195 1.24 1.332 0.54 0.69 0.185 1.147 200 0.35 0.229 0.54 0.14 0.038 0.191 200 1.22 1.341 0.54 0.69 0.190 1.151 205 0.34 0.231 0.53 0.14 0.039 0.192 205 1.20 1.349 0.53 0.69 0.194 1.155 210 0.34 0.232 0.53 0.14 0.040 0.192 210 1.18 1.357 0.53 0.69 0.199 1.158 215 0.33 0.234 0.53 0.14 0.041 0.193 215 1.15 1.365 0.53 0.69 0.203 1.162 220 0.33 0.235 0.53 0.14 0.042 0.193 220 1.13 1.373 0.53 0.68 0.208 1.165 225 0.32 0.236 0.53 0.14 0.042 0.194 225 1.12 1.381 0.53 0.68 0.212 1.169 230 0.31 0.238 0.53 0.14 0.043 0.194 230 1.10 1.388 0.53 0.68 0.216 1.172 235 0.31 0.239 0.53 0.14 0.044 0.195 235 1.08 1.396 0.53 0.68 0.221 1.175 240 0.30 0.240 0.53 0.14 0.045 0.195 240 1.06 1.403 0.53 0.68 0.225 1.177 245 0.30 0.241 0.53 0.14 0.046 0.195 245 1.05 1.410 0.53 0.68 0.230 1.180 250 0.30 0.242 0.53 0.14 0.047 0.196 250 1.03 1.417 0.53 0.68 0.234 1.183 255 0.29 0.244 0.53 0.14 0.048 0.196 255 1.02 1.424 0.53 0.68 0.239 1.185 260 0.29 0.245 0.53 0.14 0.049 0.196 260 1.00 1.430 0.53 0.68 0.243 1.187 265 0.28 0.246 0.53 0.14 0.049 0.196 265 0.99 1.437 0.53 0.68 0.247 1.190 270 0.28 0.247 0.53 0.14 0.050 0.197 270 0.97 1.444 0.53 0.68 0.252 1.192 275 0.27 0.248 0.53 0.14 0.051 0.197 275 0.96 1.450 0.53 0.68 0.256 1.194 280 0.27 0.249 0.53 0.14 0.052 0.197 280 0.95 1.456 0.53 0.68 0.261 1.196 285 0.27 0.250 0.52 0.14 0.053 0.197 285 0.93 1.463 0.52 0.68 0.265 1.197 290 0.26 0.251 0.52 0.14 0.054 0.197 290 0.92 1.469 0.52 0.68 0.270 1.199 295 0.26 0.252 0.52 0.13 0.055 0.198 295 0.91 1.475 0.52 0.67 0.274 1.201 300 0.26 0.253 0.52 0.13 0.056 0.198 300 0.90 1.481 0.52 0.67 0.279 1.202 305 0.25 0.254 0.52 0.13 0.057 0.198 305 0.89 1.487 0.52 0.67 0.283 1.204 Mod. FAA Minor Storage Volume (cubic ft.) = 8,614 Mod. FAA Major Storage Volume (cubic ft.) = 52,428 Mod. FAA Minor Storage Volume (acre-ft.) = 0.1978 Mod. FAA Major Storage Volume (acre-ft.) = 1.2036 Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 Determination of MINOR Detention Volume Using Modified FAA Method DETENTION VOLUME BY THE MODIFIED FAA METHOD Lemay Ave. Craft Brewery & Self Storage 3970802 UD-Detention_v2.35.xls, Modified FAA 6/30/2015, 7:42 PM 100-Year DIRECT RUNOFF TOTAL RUNOFF STREET PIPE X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015 39708.02 DIRECT RUNOFF TOTAL RUNOFF STREET/SWALE PIPE X:\3970000.all\3970802\Excel\Drainage\3970802Drainage_Calcs.xls Page 1 of 1 6/30/2015