Loading...
HomeMy WebLinkAboutLEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY - PDP - PDP150009 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYLEMAY AVENUE MICROBREWERY & SELF-STORAGE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JULY 2015 Prepared for: JR Engineering 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034 Project #1512 DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES TABLE OF CONTENTS I. INTRODUCTION ........................................................................................................ 1 II. EXISTING CONDITIONS .......................................................................................... 2 Land Use ......................................................................................................................... 2 Roads .............................................................................................................................. 2 Existing Traffic ................................................................................................................. 5 Existing Operation ........................................................................................................... 5 Pedestrians Facilities ...................................................................................................... 9 Bicycle Facilities .............................................................................................................. 9 Transit Facilities .............................................................................................................. 9 III. PROPOSED DEVELOPMENT ............................................................................... 10 Trip Generation ............................................................................................................. 10 Trip Distribution ............................................................................................................. 10 Background Traffic Projections ..................................................................................... 10 Trip Assignment ............................................................................................................ 15 Signal Warrants ............................................................................................................. 15 Geometry ...................................................................................................................... 15 Operation Analysis ........................................................................................................ 19 Vine/Lemay Adequate Public Facitlies .......................................................................... 21 Pedestrian Level of Service ........................................................................................... 23 Bicycle Level of Service ................................................................................................ 23 Transit Level of Service ................................................................................................. 23 IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 24 LIST OF TABLES 1. Current Peak Hour Operation .................................................................................... 8 2. Trip Generation ....................................................................................................... 12 3. Short Range (2020) Background Peak Hour Operation .......................................... 20 4. Short Range (2020) Total Peak Hour Operation ..................................................... 22 DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES LIST OF FIGURES 1. Site Location ............................................................................................................. 3 2. Existing Intersection Geometry.................................................................................. 4 3. Recent Peak Hour Traffic .......................................................................................... 6 4. Balanced/Adjusted Recent Peak Hour Traffic ........................................................... 7 5. Site Plan .................................................................................................................. 11 6. Trip Distribution ....................................................................................................... 13 7. Short Range (2020) Background Peak Hour Traffic ................................................ 14 8. Site Generated Peak Hour Traffic ........................................................................... 16 9. Short Range (2020) Total Peak Hour Traffic ........................................................... 17 10. Short Range (2020) Geometry ................................................................................ 18 APPENDICES A. Base Assumptions Packet B. Recent Peak Hour Traffic C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standards D. Signal Warrant E. Short Range (2020) Background Peak Hour Operation F. Short Range (2020) Total Peak Hour Operation G. Pedestrian/Bicycle Level of Service DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 1 I. INTRODUCTION This intermediate transportation impact study (TIS) addresses the capacity, geometric, and control requirements at and near the proposed Lemay Avenue Microbrewery & Self-Storage. The proposed Lemay Avenue Microbrewery & Self-Storage is located in the southwest quadrant of the Lemay/Buckingham intersection in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project civil engineer/planner (JR Engineering) and the Fort Collins Traffic Engineering staff. This study generally conforms to the format set forth in the Fort Collins transportation impact study guidelines contained in the “Larimer County Urban Area Street Standards” (LCUASS). Appendix A contains the Transportation Impact Study Base Assumptions form and related attachments for the Lemay Avenue Microbrewery & Self-Storage. The study involved the following steps: • Collect physical, traffic, and development data; • Perform trip generation, trip distribution, and trip assignment; • Determine peak hour traffic volumes; • Conduct capacity and operational level of service analyses on key intersections; • Analyze signal warrants; • Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 2 II. EXISTING CONDITIONS The location of Lemay Avenue Microbrewery & Self-Storage is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are primarily commercial and residential. There are residential uses to the northeast and southeast (future) of the site. There are commercial uses to the south and west of the site. The center of Fort Collins lies to the southwest of the proposed Lemay Avenue Microbrewery & Self-Storage site. Land adjacent to the site is flat (<2% grade) from a traffic operations perspective. Roads The primary streets near Lemay Avenue Microbrewery & Self-Storage site are Lemay Avenue, Lincoln Avenue, Buckingham Street, and Vine Drive. The existing geometry at the key intersections is shown in Figure 2. Lemay Avenue is to the east of (adjacent to) the proposed Lemay Avenue Microbrewery & Self-Storage site. It is a north-south street classified as a four-lane arterial according to the Fort Collins Master Street Plan. North of Lincoln Avenue, the four-lane arterial classification assumes that Lemay Avenue will have a grade separation over Vine Drive. The segment of Lemay Avenue, adjacent to this site, is classified as a local street. It is not known when the Lemay Avenue grade separation will occur. Until that happens, Lemay Avenue does/will carry volumes commensurate with that of an arterial street. Currently, Lemay Avenue has a four-lane cross section, south of Lincoln and a two-lane cross section, north of Lincoln. At the Lemay/Lincoln intersection, Lemay Avenue has a northbound and a southbound left-turn lane, a through lane in each direction, and a northbound right-turn lane. While not marked with a right-turn arrow, the bike lane on the west side of Lemay Avenue widens to a 12 foot lane (approximately 105 feet long). This lane appears to be a shared motor vehicle/ bicycle lane. It functions as a southbound right-turn lane. At the Lemay/Buckingham intersection, Lemay Avenue has all northbound and southbound movements combined into single lanes. At the Lemay/Vine intersection, Lemay Avenue has all northbound and southbound movements combined into single lanes. The Lemay/Lincoln and Lemay/Vine intersections have signal control. The Lemay/Buckingham intersection has stop sign control on Buckingham Street. The posted speed limit in this area of Lemay Avenue is 35 mph, south of Lincoln Avenue, 30 mph from Lincoln to Vine Drive, and 35 mph, north of Vine Drive. Lincoln Avenue is to the south of the proposed Lemay Avenue Microbrewery & Self-Storage site. It is an east-west street classified as a two-lane arterial according to the Fort Collins Master Street plan. Currently, Lincoln Avenue has a two-lane cross Mulberry Lincoln Vine Lemay College Buckingham SCALE: 1"=2000' SITE LOCATION Figure 1 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 3 EXISTING INTERSECTION GEOMETRY Figure 2 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 4 Lincoln Buckingham Vine Lemay - Denotes Lane DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 5 section. At the Lemay/Lincoln intersection, Lincoln Avenue has an eastbound and a westbound left-turn lane, a through lane in each direction, and an eastbound and a westbound right-turn lane. The posted speed limit in this area of Lincoln Avenue is 35 mph. Buckingham Street is to the north of the proposed Lemay Avenue Microbrewery & Self-Storage site. It is an east-west street classified as a two-lane collector according to the Fort Collins Master Street plan. Currently, Buckingham Street has a two-lane cross section. At the Lemay/Buckingham intersection, Buckingham Street has all eastbound and westbound movements combined into single lanes. The east and west legs of Buckingham Street are offset by approximately 18 feet at the Lemay/ Buckingham intersection. West of Lemay Avenue, Buckingham Street is approximately 32 feet wide. East of Lemay Avenue, Buckingham Street is approximately 18 feet wide. The posted speed limit in this area on Buckingham Street is 30 mph, west of Lemay Avenue and 25 mph, east of Lemay Avenue. Vine Drive is to the north of the proposed Lemay Avenue Microbrewery & Self- Storage site. It is an east-west street classified a two-lane collector according to the Fort Collins Master Street plan. Currently, Vine Drive has a two-lane cross section. At the Lemay/Vine intersection, Vine Drive has an eastbound and a westbound left-turn lane and a through/right-turn lane in each direction. The posted speed limit in this area of Vine Drive is 35 mph, west of Lemay Avenue and 45 mph, east of Lemay Avenue. Existing Traffic Figure 3 shows recent peak hour traffic counts at the Lemay/Lincoln, Lemay/ Buckingham, and Lemay/Vine intersections. The traffic counts at the Lemay/Lincoln intersection were obtained in April 2014 by the City of Fort Collins. The traffic counts at the Lemay/Vine intersection were obtained in May 2014 by the City of Fort Collins. The traffic counts at the Lemay/Buckingham intersection were obtained in April 2015. Raw traffic count data are provided in Appendix B. Since the counts were done on different days, the counts were adjusted/balanced. The adjusted/balanced recent peak hour traffic is shown in Figure 4. The Lemay/Vine intersection counts were not adjusted, since they are the basis of the Adequate Public Facilities analysis. Existing Operation The Lemay/Lincoln, Lemay/Buckingham, and Lemay/Vine intersections were evaluated using techniques provided in the 2010 Highway Capacity Manual and 2000 Highway Capacity Manual (for Lemay/Vine intersection). Calculation forms are provided in Appendix C. Using the morning and afternoon peak hour traffic shown in Figure 4, the peak hour operation and the calculated delay for levels of service E & F are shown in Table 1. The key intersections will meet the City of Fort Collins Motor Vehicle LOS Standard during in the morning and afternoon peak hours, except the AM/PM RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 6 35/54 294/684 29/117 23/36 543/450 48/75 6/13 119/194 74/100 88/115 172/155 43/53 42/40 355/888 6/17 12/15 691/584 1/1 4/2 1/6 27/87 0/2 2/4 2/3 Lincoln Buckingham Vine Lemay 122/202 339/674 75/57 69/44 546/482 142/90 30/78 173/188 83/183 87/228 133/233 49/136 AM/PM BALANCED/ADJUSTED RECENT PEAK HOUR TRAFFIC Figure 4 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 7 35/54 294/684 29/117 23/36 543/450 48/75 6/13 119/194 74/100 88/115 172/155 43/53 43/40 365/893 6/17 12/15 706/578 1/1 4/2 1/6 28/86 0/2 2/4 2/3 Buckingham Vine Lincoln Lemay 122/202 330/671 75/57 68/48 543/534 130/100 29/77 173/188 83/183 85/227 133/233 49/136 DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 8 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Lemay/Lincoln (signal) EB LT D D EB T E (57.1 secs) D EB RT A D EB APPROACH D D WB LT D D WB T D E (56.4 secs) WB RT A D WB APPROACH D D NB LT A A NB T B B NB RT A A NB APPROACH B B SB LT A B SB T B A SB RT A A SB APPROACH B A OVERALL C C Lemay/Buckingham (stop sign) EB LT/T/RT C C WB LT/T/RT D F (69.2 secs) NB LT/T/RT A A SB LT/T/RT A B Lemay/Vine (signal) EB LT C D EB T/RT D D EB APPROACH D D WB LT D E (55.7 secs) WB T/RT D D WB APPROACH D D SB LT/T/RT A A NB LT/T/RT A A OVERALL B C DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 9 Lemay/Buckingham intersection in the afternoon peak hour. At the Lemay/Buckingham intersection, the calculated delay in the afternoon peak hour westbound approach was commensurate with level of service F. At the Lemay/Vine intersection, the calculated delay for the afternoon peak hour eastbound left turns was commensurate with level of service E. A description of level of service for signalized and unsignalized intersections from the 2010 Highway Capacity Manual is provided in Appendix C. Table 4-3 (revised per staff comments regarding type of intersection) showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. This site is in an area termed “all other areas” on the Fort Collins Structure Plan. In areas termed “all other areas,” acceptable overall operation at signalized intersections during the peak hours is defined as level of service D or better. At signalized intersections, acceptable operation of any leg and any movement is level of service E. At arterial/arterial and arterial/collector or local stop sign controlled intersections, acceptable operation is considered to be at level of service E. At collector/local stop sign controlled intersections, acceptable operation is considered to be at level of service C for any approach leg. Pedestrian Facilities There are sidewalks along Lincoln Avenue adjacent to developed properties. There are sidewalks along the west side of Lemay Avenue, between Lincoln Avenue and Vine Drive. There are sidewalks along the east side of Lemay Avenue, south of Lincoln Avenue. There is sidewalk/curb/gutter on the south side of Buckingham Street along the frontage of the property to the west of this site. It is expected that as properties in this area are developed or redeveloped, sidewalks will be installed as part of the street/property infrastructure. Bicycle Facilities Bicycle lanes exist along Lincoln Avenue, Lemay Avenue, Buckingham Street, and Vine Drive within the study area. The bike lane on the south side of Buckingham Street, adjacent to the property to the west of the site, is 10-11 feet wide. This segment appears to have on-street parking. Transit Facilities Currently, this area of Fort Collins is served by Transfort routes 5 and 14. DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 10 III. PROPOSED DEVELOPMENT Lemay Avenue Microbrewery & Self-Storage is a proposed commercial development. Figure 5 shows a site plan of Lemay Avenue Microbrewery & Self- Storage. Lemay Avenue Microbrewery & Self-Storage is proposed as an approximately 8,200 square foot microbrewery with taproom and approximately 104,575 square feet in a self-storage facility. Primary access to Lemay Avenue Microbrewery & Self-Storage will be via a full-movement access to/from Buckingham Street. The short range analysis (Year 2020) includes development of the Lemay Avenue Microbrewery & Self- Storage site and an appropriate increase in background traffic, due to normal growth, and other approved or expected developments in the area. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information contained in Trip Generation, 9 th Edition, ITE was used to estimate trips that would be generated by the self-storage portion of this site. For the self-storage, Land Use Code 151 – Mini-warehouse was used. Since “microbrewery” is not a land use category contained in the cited reference, a combination of trip generation sources was used. The Microbrewery will have a taproom at 2,285 square feet and a brew house at 5,052 square feet. For the taproom, Land Use Code 925 - Drinking Place was used from the cited reference. For the brew house portion of the Microbrewery, it assumed that a maximum of 6 employees would work in the brew house based upon the information from research (3 trips per day per employee & all ingress in AM and egress in PM). This employee trip generation was compared to Land Use Code 110 - Light Industrial. Since the trip generation was comparable, an average of the two was used. Table 2 shows the daily and peak hour trip generation for Lemay Avenue Microbrewery & Self- Storage. Full development of Lemay Avenue Microbrewery & Self-Storage resulted in 471 daily weekday trip ends, 20 morning peak hour trip ends, and 59 afternoon peak hour trip ends. Trip Distribution Trip distribution for the Lemay Avenue Microbrewery & Self-Storage was based on existing/future travel patterns, land uses in the area, consideration of trip attractions/ productions in the area, and engineering judgment. Figure 6 shows the trip distribution for the short range (2020) analysis future. The trip distribution was agreed to by City of Fort Collins staff in the scoping emails. Background Traffic Projections Figure 7 shows the short range (2020) background peak hour traffic projections. These forecasts assume that the current street network exists in this area. Background traffic projections for the short range were obtained by reviewing the North Front Range SCALE: 1"=100' SITE PLAN Figure 5 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 11 DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 12 TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out Self-Storage 151 Mini-warehouse 104.9 KSF 2.50 262 0.08 8 0.06 6 0.13 13 0.13 14 Microbrewery N/A Brew House 6 Employees N/A 18 N/A 6 N/A 0 N/A 0 N/A 6 110 Light Industrial 5.052 KSF 6.97 35 0.81 4 0.11 1 0.12 1 0.85 4 Average 27 5 1 1 5 925 Drinking Place 2.285 KSF N/A 182 N/A N/A N/A N/A 7.48 17 3.86 9 Total 471 13 7 31 28 Lincoln Vine Lemay Buckingham 5% NOM 45% 30% 10% 5% 5% SCALE: 1"=600' TRIP DISTRIBUTION Figure 6 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 13 AM/PM SHORT RANGE (2020) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 14 43/84 323/762 60/214 31/45 606/509 58/109 13/25 156/300 99/119 119/135 265/221 129/112 46/42 428/1104 6/17 15/17 854/715 1/1 5/3 1/6 30/90 0/2 2/4 2/3 Buckingham Vine Lincoln Lemay 234/301 369/837 87/111 95/86 710/605 153/156 43/165 208/309 128/240 128/273 201/328 122/204 DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 15 Regional Transportation Plan, engineering judgment, and various traffic studies prepared for this area of Fort Collins. Based upon these sources, it was determined that the traffic volumes would increase by approximately 1.0 percent per year. The Waterfield, Woodward Governor, and Capstone developments were added to the background traffic. The Lemay/Vine intersection traffic was increased due to approved projects in the area that are yet to be built or built out. This data was provided by Fort Collins City staff. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Using the trip distribution shown in Figure 6, Figure 8 shows the assignment of the site generated peak hour vehicle traffic. The site generated vehicle traffic was combined with the background traffic to determine the total forecasted vehicle traffic at the key intersections. Figure 9 shows the short range (2020) total peak hour vehicle traffic at the key intersections. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices. For the streets in the vicinity of the Lemay Avenue Microbrewery & Self-Storage development, four hour and/or eight hour signal warrants are applicable. These warrants require much data and are applied when the traffic is actually on the area street system. It is acknowledged that peak hour signal warrants should not be applied, but since the peak hour forecasts are readily available in a traffic impact study, it is reasonable to use them to get an idea whether other signal warrants may be met. If peak hour signal warrants will not be met at a given intersection, it is reasonable to conclude that it is not likely that other signal warrants would be met. If peak hour signal warrants are met, it merely indicates that further evaluation should occur in the future as the development occurs. However, a judgment can be made that some intersections will likely meet other signal warrants. Using the short range (2020) total peak hour traffic (Figure 9), the Lemay/Buckingham stop sign controlled intersection will meet the lower threshold volume for the minor street approach (100 vehicles) during the afternoon peak hour. The short range (2020) total peak hour warrant is provided in Appendix D. However, other signal warrants will not be met. It is not likely that the Lemay/Buckingham intersection will be signalized. Geometry Figure 10 shows a schematic of the short range (2020) geometry. The eastbound right-turn volumes, at the Lemay/Buckingham intersection, indicate the need for a right- turn lane. The eastbound right-turn lane may not be required when Lemay Avenue reverts AM/PM SITE GENERATED PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 16 0/1 0/1 1/2 0/1 Buckingham Vine 9/22 4/9 2/8 5/20 Site Access 8/19 2/3 0/2 5/18 Lincoln 6/14 1/3 3/13 1/2 1/3 1/2 Lemay AM/PM SHORT RANGE (2020) TOTAL PEAK HOUR TRAFFIC Figure 9 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 17 43/85 323/763 60/214 31/45 607/511 58/109 13/25 156/300 99/119 119/135 265/221 129/112 54/61 428/1104 6/17 16/20 854/715 1/1 5/5 1/6 35/108 0/2 2/4 2/3 Buckingham Vine 63/63 9/22 36/99 4/9 2/8 5/20 Site Access Lincoln Lemay 234/301 375/851 87/111 96/89 713/618 154/158 44/168 208/309 128/240 129/275 201/328 122/204 SHORT RANGE (2020) GEOMETRY Figure 10 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 Page 18 Lincoln Buckingham Vine Lemay - Proposed Lane - Existing Lane DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 19 to a local street classification. Therefore, it is recommended that the south curb of Buckingham Street (adjacent to this site) not be widened to provide a right-turn lane. Rather, the on-street parking lane and the bike lane be used (and striped) to provide for the right-turning motor vehicle traffic and the bike traffic. This will require temporary elimination of the on-street parking adjacent to this site. The eastbound left-turn and through movements will be in the same lane, which will approximately align with the existing east leg of Buckingham Street. This will require widening on the north side of the west leg of Buckingham Street. Design details will be prepared by the project civil engineer. Since Lemay Avenue does/will carry traffic volumes commensurate with that of an arterial street, Figure 10 shows that a northbound and a southbound left-turn lane is required at the Lemay/Buckingham intersection. These left-turn lanes are required with the current traffic volumes. It is doubtful that these left-turn lanes will be required when this segment of Lemay Avenue reverts to the local street classification. That said, implementation of these left-turn lanes would require widening Lemay Avenue, south and north of the subject intersection. This may require additional right-of-way to accomplish the widening. As noted in the “Operation Analysis” section, the addition of the northbound and southbound left-turn lanes results in a calculated reduction in delay on the minor street legs at the Lemay/Buckingham intersection. It is suggested that the practical difficulties of building these left-turn lanes be the subject of City and developer discussions as the proposed Lemay Avenue Microbrewery & Self-Storage project proceeds through the City development review process. The traffic volume on this segment of Lemay Avenue may approach/exceed the upper end of the range for a two-lane arterial street. However, since this segment of Lemay Avenue will revert to a local street in the future, it is likely that it will not be widened. Operation Analysis Operation analyses were performed at the key intersections. The operation analyses were conducted for the short range analysis, reflecting a year 2020 condition. In the intersection operation tables, the calculated delay for each movement/leg is provided when the level of service falls in the LOS E/F categories. Using the short range (2020) background peak hour traffic volumes, the key intersections operate as indicated in Table 3. The background traffic analyses at the Lemay/Buckingham intersection were run with the existing geometry on Buckingham Street and Lemay Avenue. It was also run with the geometry shown in Figure 10. Calculation forms for these analyses are provided in Appendix E. The key intersections operate acceptably with existing control and geometry in the morning and afternoon peak hours, except for the Lemay/Vine and Lemay/Buckingham intersections in the afternoon peak hour. At the Lemay/Vine intersection, the calculated delay for the afternoon peak hour westbound left-turn will be commensurate with level of service F. At the Lemay/Buckingham intersection, the calculated delay for the afternoon peak hour eastbound and westbound approaches is commensurate with level of service F with and DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 20 TABLE 3 Short Range (2020) Background Peak Hour Operation Intersection Movement Level of Service AM PM Lemay/Lincoln (signal) EB LT D D EB T E (65.3 secs) D EB RT D D EB APPROACH E (61.0 secs) D WB LT D D WB T D E (57.3 secs) WB RT D D WB APPROACH D D NB LT C B NB T B D NB RT B B NB APPROACH B D SB LT B D SB T B A SB RT A A SB APPROACH B B OVERALL C D Lemay/Buckingham (stop sign) EB LT/T/RT C E (45.9 secs) WB LT/T/RT E (46.1 secs) F (169.6 secs) NB LT/T/RT B (10.3 secs) A (9.7 secs) SB LT/T/RT A (8.3 secs) B (11.5 secs) Lemay/Buckingham (stop sign) (With NB & SB LT-lanes and EB RT-lane) EB LT/T E (45.7 secs) F (131.1 secs) EB RT C C EB APPROACH C D WB LT/T/RT E (44.3 secs) F (135.5 secs) NB LT B (10.3 secs) A (9.7 secs) SB LT A (8.3 secs) B (11.5 secs) Lemay/Vine (signal) EB LT D C EB T/RT D D EB APPROACH D D WB LT E (60.8 secs) F (176.4 secs) WB T/RT D D WB APPROACH D E (72.5 secs) SB LT/T/RT B D NB LT/T/RT B C OVERALL C D DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 21 without the northbound and southbound left-turn lanes on Lemay Avenue, and the eastbound right-turn lane on Buckingham Street. In an urban environment along arterial streets, this level of delay is normal during the peak hours. The addition of the northbound and southbound left-turn lanes on Lemay Avenue results in a calculated reduction in delay on the minor street legs at this intersection. The calculated delay on the west leg of Buckingham Street is further reduced with the eastbound right-turn lane. The calculated delay on the west leg of Buckingham Street is further reduced with the eastbound right- turn lane. However, there is no change in the calculated delay to the northbound and southbound legs on Lemay Avenue. This is counter-intuitive. The analyses show zero delay to the through movements even though there is delay shown for the left-turn movements. It is acknowledged that the through traffic on Lemay Avenue would be delayed without the left-turn lanes whenever a left-turning vehicle is present. However, this is not reflected in the calculated delay for the Lemay Avenue legs as shown in Table 3. Using the traffic volumes shown in Figure 9, the key intersections operate in the short range (2020) total condition as indicated in Table 4. Calculation forms for these analyses are provided in Appendix F. The key intersections operate similar to the background operation with existing control and geometry in the morning and afternoon peak hours. At the Lemay/Vine intersection, the calculated delay for the afternoon peak hour westbound left-turn will be commensurate with level of service F. However, this project does not have a significant negative impact at the Lemay/Vine intersection since the project traffic causes less than a two percent increase in the intersection delay. At the Lemay/Buckingham intersection, the analyses were conducted with and without the eastbound right-turn lane on Buckingham Street and the northbound and southbound left- turn lanes on Lemay Avenue. The calculated delay for the eastbound and westbound approaches during the afternoon peak hour is commensurate with level of service F with and without the additional lanes. In an urban environment along arterial streets, this level of delay is normal during the peak hours. The addition of the northbound and southbound left-turn lanes on Lemay Avenue results in a calculated reduction in delay on the minor street legs at this intersection. However, there is no change in the calculated delay to the northbound and southbound legs on Lemay Avenue. This is counter-intuitive. The analyses show zero delay to the through movements even though there is delay shown for the left-turn movements. It is acknowledged that the through traffic on Lemay Avenue would be delayed without the left-turn lanes whenever a left-turning vehicle is present. However, this is not reflected in the calculated delay for the Lemay Avenue legs as shown in Table 4. Vine/Lemay Adequate Public Facilities Proposed developments in Northeast Fort Collins are required to address the operation at the Vine/Lemay intersection. This intersection has operational and geometric constraints that may create an adequate public facilities (APF) issue. Succinctly, if this intersection does not meet the overall level of service (LOS) criteria, then a development may add traffic such that the overall intersection delay is not increased by more than 2 percent over the base condition. The intersection falls under the operational criteria of “All other areas.” In this area, acceptable operation at signalized intersections during the peak hours is defined as level of service D or better for the overall intersection. DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 22 TABLE 4 Short Range (2020) Total Peak Hour Operation Intersection Movement Level of Service AM PM Lemay/Lincoln (signal) EB LT D D EB T E (65.3 secs) D EB RT D D EB APPROACH E (61.0 secs) D WB LT D D WB T D E (57.3 secs) WB RT D D WB APPROACH D D NB LT C B NB T B D NB RT B B NB APPROACH B D SB LT B E (62.1 secs) SB T B A SB RT A A SB APPROACH B B OVERALL C D Lemay/Buckingham (stop sign) EB LT/T/RT C F (79.4 secs) WB LT/T/RT E (49.1 secs) F (237.9 secs) NB LT/T/RT B (10.4 secs) A (9.9 secs) SB LT/T/RT A (8.3 secs) B (11.5 secs) Lemay/Buckingham (stop sign) (With NB & SB LT-lanes and EB RT-lane) EB LT/T E (47.1 secs) F (168.8 secs) EB RT C C EB APPROACH C D WB LT/T/RT E (46.5 secs) F (156.5 secs) NB LT B (10.4 secs) A (9.9 secs) SB LT A (8.3 secs) B (11.5 secs) Buckingham/Site Access (stop sign) NB LT/RT A A WB LT/T A A Lemay/Vine (signal) EB LT D C EB T/RT D D EB APPROACH D D WB LT E (61.3 secs) F (176.4 secs) WB T/RT D D WB APPROACH D E (72.5 secs) SB LT/T/RT B D NB LT/T/RT B C OVERALL C D DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 23 City of Fort Collins Traffic Operations staff has developed the base condition. The base condition is described as the current traffic (2012) plus traffic from those development projects that have a commitment at this intersection. Figure 7 shows the base condition peak hour traffic. Table 3 shows the operation at the Vine/Lemay intersection with the base condition traffic and using the 2000 Highway Capacity Manual techniques. In the morning and afternoon peak hours, this intersection meets the overall level of service criteria. Therefore, under the base condition, there is not an APF issue at this intersection. Figure 9 shows the base condition plus the site traffic at the Vine/Lemay intersection. Table 4 shows the base condition plus site traffic operation at the Vine/Lemay intersection. In the morning and afternoon peak hours, this intersection continues to meet the overall level of service criteria. Therefore, there is not an APF issue at this intersection. Pedestrian Level of Service Appendix G shows a map of the area that is within 1320 feet of the Lemay Avenue Microbrewery & Self-Storage development. There are two pedestrian destinations within 1320 feet of the Lemay Avenue Microbrewery & Self-Storage development. These are: 1) the residential area to the northeast of this site and 2) future residential to the southeast (if approved). The Lemay Avenue Microbrewery & Self-Storage site is located within an area termed as “transit corridor,” which sets the level of service threshold at LOS B for directness and security and LOS C for all other measured categories. Pedestrian level of service is achieved. The Pedestrian LOS Worksheet is provided in Appendix G. Bicycle Level of Service Appendix G shows a map of the area that is within 1320 feet of the Lemay Avenue Microbrewery & Self-Storage development. There is one bicycle destination within 1320 feet of the Lemay Avenue Microbrewery & Self-Storage development, the commercial to the south. The Bicycle LOS Worksheet is provided in Appendix G. The minimum level of service for this site is C. This site is connected to bike lanes on Lemay Avenue and Buckingham Street. Therefore, it is concluded that level of service A can be achieved. Transit Level of Service This area of Fort Collins is served by Transfort Routes 5 and 14. DELICH Lemay Avenue Microbrewery & Self-Storage TIS, July 2015 ASSOCIATES Page 24 IV. CONCLUSIONS/RECOMMENDATIONS This study assessed the impacts of the Lemay Avenue Microbrewery & Self- Storage development on the short range (2020) street system in the vicinity of the proposed development. As a result of this analysis, the following is concluded: • The development of the Lemay Avenue Microbrewery & Self-Storage site is feasible from a traffic engineering standpoint. At full development, the Lemay Avenue Microbrewery & Self-Storage site will generate approximately 471 daily weekday trip ends, 20 morning peak hour trip ends, and 59 afternoon peak hour trip ends. • Current operation at the key intersections is acceptable with existing control and geometry. • Figure 10 shows a schematic of the short range (2020) geometry. The eastbound right-turn volumes, at the Lemay/Buckingham intersection, indicate the need for a right-turn lane. The eastbound right-turn lane may not be required when Lemay Avenue reverts to a local street classification. Since Lemay Avenue will carry traffic volumes commensurate with that of an arterial street, northbound and southbound left-turn lanes are required at the Lemay/Buckingham intersection with the current traffic volumes. It is suggested that the practical difficulties of building these auxiliary lanes be the subject of City and developer discussions as the proposed Lemay Avenue Microbrewery & Self-Storage project proceeds through the City development review process. • In the short range (2020) future, given development of the Lemay Avenue Microbrewery & Self-Storage and an increase in background traffic, the Lincoln/Lemay, Lemay/Buckingham, Buckingham/Site Access, and Lemay/Vine intersections will meet the City of Fort Collins Motor Vehicle LOS Standard, except for the Lemay/Vine and Lemay/Buckingham intersections in the afternoon peak hour. At the Lemay/Vine intersection, the calculated delay for the afternoon peak hour westbound left-turn will be commensurate with level of service F. However, this project does not have a significant negative impact at the Lemay/Vine intersection since the project traffic causes less than a two percent increase in the intersection delay. At the Lemay/Buckingham intersection, the calculated delay for the afternoon peak hour eastbound and westbound approaches is commensurate with level of service F with and without the northbound and southbound left-turn lanes on Lemay Avenue and the eastbound right-turn lane on Buckingham Street. Although the Lemay/Buckingham intersection operates at this level of service, a signal is not likely in the short range (2020) future. In an urban environment along arterial streets, this level of delay is normal during the peak hours at stop sign controlled intersections. • Acceptable level of service is achieved for pedestrian, bicycle, and transit modes based upon the measures in the multi-modal transportation guidelines. APPENDIX A Mulberry Lincoln Vine Lemay College Buckingham SCALE: 1"=2000' SITE LOCATION Figure 1 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, April 2015 Page 3 SCALE: 1"=100' SITE PLAN Figure 5 DELICH ASSOCIATES Lemay Avenue Self Storage TIS, April 2015 Page 7 DELICH Lemay Avenue Microbrewery & Self-Storage TIS, April 2015 ASSOCIATES Page 9 TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out Self-Storage 151 Mini-warehouse 104.575 KSF 2.50 261 0.08 8 0.06 6 0.13 13 0.13 14 Microbrewery N/A Brew House 6 Employees N/A 18 N/A 6 N/A 0 N/A 0 N/A 6 110 Light Industrial 6.0 KSF 6.97 42 0.81 5 0.11 1 0.12 1 0.85 5 Average 30 6 1 1 6 925 Drinking Place 2.2 KSF N/A 175 N/A N/A N/A N/A 7.48 16 3.86 9 Total 466 14 7 30 29 Lincoln Vine Lemay Buckingham 5% NOM 45% 30% 10% 5% 5% SCALE: 1"=600' TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, April 2015 Page 3 APPENDIX B DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 4/15/2014 Observer: City of Fort Collins Day: Tuesday Jurisdiction: Fort Collins R = right turn Intersection: Lemay/Lincoln S = straight L = left turn Time Northbound: Lemay Southbound: Lemay Total Eastbound: Lincoln Westbound: Lincoln Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 30 82 17 129 43 169 10 222 351 11 44 22 77 8 21 14 43 120 471 7:45 38 91 36 165 42 152 28 222 387 10 59 23 92 6 38 25 69 161 548 8:00 28 70 15 113 30 103 15 148 261 8 36 19 63 19 35 30 84 147 408 8:15 26 96 7 129 27 122 16 165 294 1 34 19 54 16 39 18 73 127 421 7:30-8:30 122 339 75 536 142 546 69 757 1293 30 173 83 286 49 133 87 269 555 1848 PHF 0.8 0.88 0.52 0.81 0.83 0.81 0.62 0.85 0.68 0.73 0.9 0.78 0.64 0.85 0.73 0.8 0.84 4:30 46 165 7 218 24 127 7 158 376 11 39 41 91 31 52 56 139 230 606 4:45 45 180 12 237 25 113 15 153 390 20 46 39 105 35 51 34 120 225 615 5:00 48 154 22 224 19 126 12 157 381 29 43 41 113 37 64 74 175 288 669 5:15 63 175 16 254 22 116 10 148 402 18 60 62 140 33 66 64 163 303 705 4:30-5:30 202 674 57 933 90 482 44 616 1549 78 188 183 449 136 233 228 597 1046 2595 PHF 0.8 0.94 0.65 0.92 0.9 0.95 0.73 0.97 0.67 0.78 0.74 0.8 0.92 0.88 0.77 0.85 0.92 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 4/16/2015 Observer: Andy Day: Thursday Jurisdiction: Fort Collins R = right turn Intersection: Lemay/Buckingham S = straight L = left turn Time Northbound: Lemay Southbound: Lemay Total Eastbound: Buckingham Westbound: Buckingham Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 16 82 2 100 0 197 6 203 303 1 0 6 7 0 0 0 0 7 310 7:45 15 96 3 114 0 178 2 180 294 1 1 12 14 1 1 0 2 16 310 8:00 5 93 0 98 1 156 4 161 259 1 0 6 7 1 1 0 2 9 268 8:15 6 84 1 91 0 160 0 160 251 1 0 3 4 0 0 0 0 4 255 7:30-8:30 42 355 6 403 1 691 12 704 1107 4 1 27 32 2 2 0 4 36 1143 PHF 0.66 0.92 0.5 0.88 0.25 0.88 0.5 0.87 1 0.25 0.56 0.57 0.5 0.5 n/a 0.5 0.92 4:30 11 236 2 249 0 182 3 185 434 1 2 23 26 1 0 0 1 27 461 4:45 8 190 2 200 1 117 6 124 324 0 3 15 18 1 1 1 3 21 345 5:00 10 234 7 251 0 169 4 173 424 0 0 27 27 1 1 0 2 29 453 5:15 11 228 6 245 0 116 2 118 363 1 1 22 24 0 2 1 3 27 390 4:30-5:30 40 888 17 945 1 584 15 600 1545 2 6 87 95 3 4 2 9 104 1649 PHF 0.91 0.94 0.61 0.94 0.25 0.8 0.63 0.81 0.5 0.5 0.81 0.88 0.75 0.5 0.5 0.75 0.89 DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 5-15-2014 Observer: City of Fort Collins Day: Thursday Jurisdiction: Fort Collins R = right turn Intersection: Lemay/Vine S = straight L = left turn Time Northbound: Lemay Southbound: Lemay Total Eastbound: Vine Westbound: Vine Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 8 86 7 101 14 143 4 161 262 2 30 22 54 8 45 23 76 130 392 7:45 9 72 9 90 17 164 5 186 276 2 32 27 61 14 57 19 90 151 427 8:00 7 62 10 79 6 122 7 135 214 1 29 12 42 12 41 26 79 121 335 8:15 14 74 3 91 11 114 7 132 223 1 28 13 42 9 29 20 58 100 323 7:30-8:30 38 294 29 361 48 543 23 614 975 6 119 74 199 43 172 88 303 502 1477 PHF 0.68 0.85 0.73 0.89 0.71 0.83 0.82 0.83 0.75 0.93 0.69 0.82 0.77 0.75 0.85 0.84 0.86 4:30 14 167 26 207 16 121 8 145 352 3 56 29 88 17 31 46 94 182 534 4:45 17 130 23 170 23 104 16 143 313 2 37 20 59 11 35 25 71 130 443 5:00 8 185 36 229 25 113 6 144 373 6 41 25 72 10 50 29 89 161 534 5:15 15 202 32 249 11 112 6 129 378 2 60 26 88 15 39 15 69 157 535 4:30-5:30 54 684 117 855 75 450 36 561 1416 13 194 100 307 53 155 115 323 630 2046 PHF 0.79 0.85 0.81 0.86 0.75 0.93 0.56 0.97 0.54 0.81 0.86 0.87 0.78 0.78 0.63 0.86 0.96 APPENDIX C HCM 2010 Signalized Intersection Summary Recent AM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent AM.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 29 173 83 49 133 85 122 330 75 130 543 68 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 1.00 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1937 1937 1937 1937 1937 1863 1937 1937 1937 1863 1863 1863 Adj Flow Rate, veh/h 34 204 0 58 156 0 144 388 33 153 639 26 Adj No. of Lanes 111111111111 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 222222222222 Cap, veh/h 219 261 222 191 288 235 502 1190 1009 668 1151 955 Arrive On Green 0.03 0.13 0.00 0.05 0.15 0.00 0.06 0.61 0.61 0.06 0.62 0.62 Sat Flow, veh/h 1845 1937 1647 1845 1937 1583 1845 1937 1643 1774 1863 1546 Grp Volume(v), veh/h 34 204 0 58 156 0 144 388 33 153 639 26 Grp Sat Flow(s),veh/h/ln 1845 1937 1647 1845 1937 1583 1845 1937 1643 1774 1863 1546 Q Serve(g_s), s 1.7 11.2 0.0 2.9 8.2 0.0 3.1 10.6 0.9 3.4 21.9 0.7 Cycle Q Clear(g_c), s 1.7 11.2 0.0 2.9 8.2 0.0 3.1 10.6 0.9 3.4 21.9 0.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 219 261 222 191 288 235 502 1190 1009 668 1151 955 V/C Ratio(X) 0.16 0.78 0.00 0.30 0.54 0.00 0.29 0.33 0.03 0.23 0.56 0.03 Avail Cap(c_a), veh/h 293 299 254 240 299 245 550 1190 1009 741 1151 955 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.1 46.0 0.0 38.3 43.4 0.0 9.1 10.2 8.3 7.0 12.2 8.2 Incr Delay (d2), s/veh 0.3 11.1 0.0 0.9 1.8 0.0 0.3 0.7 0.1 0.2 1.9 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 6.8 0.0 1.5 4.5 0.0 1.6 5.8 0.4 1.6 11.8 0.3 LnGrp Delay(d),s/veh 39.4 57.1 0.0 39.2 45.2 0.0 9.4 11.0 8.4 7.2 14.2 8.2 LnGrp LOS D E D D ABAABA Approach Vol, veh/h 238 214 565 818 Approach Delay, s/veh 54.5 43.6 10.4 12.7 Approach LOS D D B B Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 9.1 73.0 8.1 19.8 9.5 72.6 6.6 21.3 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 59.0 7.0 16.0 10.0 57.0 7.0 16.0 Max Q Clear Time (g_c+I1), s 5.1 23.9 4.9 13.2 5.4 12.6 3.7 10.2 Green Ext Time (p_c), s 0.1 4.3 0.0 0.3 0.2 4.3 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay 21.0 HCM 2010 LOS C Notes User approved pedestrian interval to be less than phase max green. Timing Report, Sorted By Phase Recent AM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent AM.syn Phase Number 12345678 Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 12 65 11 22 14 63 11 22 Maximum Split (%) 10.9% 59.1% 10.0% 20.0% 12.7% 57.3% 10.0% 20.0% Minimum Split (s) 11 30 11 29 11 30 11 25 Yellow Time (s) 3 3.5 3 3.5 3434 All-Red Time (s) 1 2.5 1 2.5 1212 Minimum Initial (s) 47474747 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 17 13 17 12 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 20 32 97 108 20 34 97 108 End Time (s) 32 97 108 20 34 97 108 20 Yield/Force Off (s) 28 91 104 14 30 91 104 14 Yield/Force Off 170(s) 28 74 104 1 30 74 104 2 Local Start Time (s) 39 51 6 17 39 53 6 17 Local Yield (s) 47 0 13 33 49 0 13 33 Local Yield 170(s) 47 93 13 20 49 93 13 21 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 85 Offset: 91 (83%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 1: Lemay & Lincoln HCM 2010 Signalized Intersection Summary Recent PM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent PM.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 77 188 183 136 233 227 202 671 57 100 534 48 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1937 1937 1937 1937 1937 1863 1937 1937 1937 1863 1863 1863 Adj Flow Rate, veh/h 84 204 20 148 253 30 220 729 14 109 580 3 Adj No. of Lanes 111111111111 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222222222222 Cap, veh/h 210 299 248 248 313 250 681 1156 977 399 1078 891 Arrive On Green 0.06 0.15 0.15 0.07 0.16 0.16 0.07 0.60 0.60 0.10 1.00 1.00 Sat Flow, veh/h 1845 1937 1604 1845 1937 1544 1845 1937 1638 1774 1863 1539 Grp Volume(v), veh/h 84 204 20 148 253 30 220 729 14 109 580 3 Grp Sat Flow(s),veh/h/ln 1845 1937 1604 1845 1937 1544 1845 1937 1638 1774 1863 1539 Q Serve(g_s), s 4.5 11.9 1.3 8.0 15.1 2.0 5.6 29.2 0.4 3.0 0.0 0.0 Cycle Q Clear(g_c), s 4.5 11.9 1.3 8.0 15.1 2.0 5.6 29.2 0.4 3.0 0.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 210 299 248 248 313 250 681 1156 977 399 1078 891 V/C Ratio(X) 0.40 0.68 0.08 0.60 0.81 0.12 0.32 0.63 0.01 0.27 0.54 0.00 Avail Cap(c_a), veh/h 223 420 348 248 428 341 681 1156 977 430 1078 891 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.8 48.0 43.4 40.5 48.5 43.0 8.1 15.7 9.8 11.8 0.0 0.0 Incr Delay (d2), s/veh 1.2 2.7 0.1 3.9 7.9 0.2 0.3 2.6 0.0 0.4 1.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 6.6 0.6 0.9 8.8 0.9 2.9 16.4 0.2 1.5 0.6 0.0 LnGrp Delay(d),s/veh 41.0 50.7 43.6 44.3 56.4 43.2 8.4 18.3 9.9 12.2 1.9 0.0 LnGrp LOS DDDDEDABABAA Approach Vol, veh/h 308 431 963 692 Approach Delay, s/veh 47.6 51.3 15.9 3.5 Approach LOS D D B A Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 11.0 74.5 11.0 23.5 8.9 76.6 10.1 24.4 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 * 6 Max Green Setting (Gmax), s 7.0 61.0 7.0 25.0 7.0 61.0 7.0 * 26 Max Q Clear Time (g_c+I1), s 7.6 2.0 10.0 13.9 5.0 31.2 6.5 17.1 Green Ext Time (p_c), s 0.0 5.8 0.0 1.3 0.0 5.6 0.0 1.1 Intersection Summary HCM 2010 Ctrl Delay 22.8 HCM 2010 LOS C Notes * HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier. Timing Report, Sorted By Phase Recent PM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent PM.syn Phase Number 12345678 Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 11 67 11 31 11 67 11 31 Maximum Split (%) 9.2% 55.8% 9.2% 25.8% 9.2% 55.8% 9.2% 25.8% Minimum Split (s) 11 30 11 29 11 30 11 24.5 Yellow Time (s) 3 3.5 3 3.5 3434 All-Red Time (s) 1 2.5 1 2.5 1 2 1 1.5 Minimum Initial (s) 47474747 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 17 13 17 12 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 92 103 50 61 92 103 50 61 End Time (s) 103 50 61 92 103 50 61 92 Yield/Force Off (s) 99 44 57 86 99 44 57 86.5 Yield/Force Off 170(s) 99 27 57 73 99 27 57 74.5 Local Start Time (s) 48 59 6 17 48 59 6 17 Local Yield (s) 55 0 13 42 55 0 13 42.5 Local Yield 170(s) 55 103 13 29 55 103 13 30.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 85 Offset: 44 (37%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 1: Lemay & Lincoln HCM 2010 TWSC Recent AM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 9 Light Report Recent AM.syn Intersection Int Delay, s/veh 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 4 1 28 2 2 0 43 365 6 1 706 12 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 1 30 2 2 0 47 397 7 1 767 13 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1271 1273 774 1285 1276 400 780 0 0 403 0 0 Stage 1 776 776 - 493 493 - - - - - - - Stage 2 495 497 - 792 783 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 145 167 398 142 167 650 837 - - 1156 - - Stage 1 390 407 - 558 547 - - - - - - - Stage 2 556 545 - 382 404 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 135 155 398 123 155 650 837 - - 1156 - - Mov Cap-2 Maneuver 135 155 - 123 155 - - - - - - - Stage 1 362 406 - 518 508 - - - - - - - Stage 2 514 506 - 351 403 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 18.1 32.1 1 0 HCM LOS C D Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 837 - - 310 137 1156 - - HCM Lane V/C Ratio 0.056 - - 0.116 0.032 0.001 - - HCM Control Delay (s) 9.6 0 - 18.1 32.1 8.1 0 - HCM Lane LOS A A - C D A A - HCM 95th %tile Q(veh) 0.2 - - 0.4 0.1 0 - - Lanes and Geometrics Recent AM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 9 Light Report Recent AM.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.884 0.998 0.998 Flt Protected 0.994 0.976 0.995 Satd. Flow (prot) 0 1637 0 0 1818 0 0 1850 0 0 1859 0 Flt Permitted 0.994 0.976 0.995 Satd. Flow (perm) 0 1637 0 0 1818 0 0 1850 0 0 1859 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 605 715 1281 1365 Travel Time (s) 13.8 16.3 29.1 31.0 Intersection Summary Area Type: Other HCM 2010 TWSC Recent PM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 9 Light Report Recent PM.syn Intersection Int Delay, s/veh 1.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 2 6 86 3 4 2 40 893 17 1 578 15 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 2 7 97 3 4 2 45 1003 19 1 649 17 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1766 1772 658 1815 1772 1013 666 0 0 1022 0 0 Stage 1 660 660 - 1103 1103 - - - - - - - Stage 2 1106 1112 - 712 669 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 65 83 464 60 83 290 923 - - 679 - - Stage 1 452 460 - 256 287 - - - - - - - Stage 2 255 284 - 423 456 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 56 73 464 40 73 290 923 - - 679 - - Mov Cap-2 Maneuver 56 73 - 40 73 - - - - - - - Stage 1 401 459 - 227 255 - - - - - - - Stage 2 220 252 - 329 455 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 22.5 69.2 0.4 0 HCM LOS C F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 923 - - 310 66 679 - - HCM Lane V/C Ratio 0.049 - - 0.341 0.153 0.002 - - HCM Control Delay (s) 9.1 0 - 22.5 69.2 10.3 0 - HCM Lane LOS A A - C F B A - HCM 95th %tile Q(veh) 0.2 - - 1.5 0.5 0 - - Lanes and Geometrics Recent PM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 9 Light Report Recent PM.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.876 0.970 0.998 0.997 Flt Protected 0.999 0.984 0.998 Satd. Flow (prot) 0 1630 0 0 1778 0 0 1855 0 0 1857 0 Flt Permitted 0.999 0.984 0.998 Satd. Flow (perm) 0 1630 0 0 1778 0 0 1855 0 0 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 590 866 1312 1334 Travel Time (s) 13.4 19.7 29.8 30.3 Intersection Summary Area Type: Other HCM Signalized Intersection Capacity Analysis Recent AM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent AM.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 6 119 74 43 172 88 35 294 29 48 543 23 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 16 12 12 16 8 12 13 12 12 14 12 Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.94 1.00 0.95 0.99 0.99 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (prot) 1770 1954 1770 1950 1890 1967 Flt Permitted 0.28 1.00 0.43 1.00 0.90 0.94 Satd. Flow (perm) 531 1954 803 1950 1700 1855 Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Adj. Flow (vph) 7 138 86 50 200 102 41 342 34 56 631 27 RTOR Reduction (vph) 0 20 0 0 16 0030010 Lane Group Flow (vph) 7 204 0 50 286 0 0 414 0 0 713 0 Confl. Peds. (#/hr) 22 Confl. Bikes (#/hr) 2 4 9 Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4862 Permitted Phases 4862 Actuated Green, G (s) 24.0 24.0 24.0 24.0 75.5 76.0 Effective Green, g (s) 25.0 25.0 25.0 25.0 76.5 77.0 Actuated g/C Ratio 0.23 0.23 0.23 0.23 0.70 0.70 Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5 Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lane Grp Cap (vph) 120 444 182 443 1182 1298 v/s Ratio Prot 0.10 c0.15 v/s Ratio Perm 0.01 0.06 0.24 c0.38 v/c Ratio 0.06 0.46 0.27 0.65 0.35 0.55 Uniform Delay, d1 33.3 36.7 35.0 38.5 6.7 8.0 Progression Factor 1.00 1.00 1.00 1.00 0.80 1.00 Incremental Delay, d2 0.6 2.1 2.3 5.2 0.8 1.7 Delay (s) 33.9 38.8 37.3 43.7 6.2 9.7 Level of Service C D D D A A Approach Delay (s) 38.6 42.8 6.2 9.7 Approach LOS D D A A Intersection Summary HCM 2000 Control Delay 19.6 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 110.0 Sum of lost time (s) 8.5 Intersection Capacity Utilization 71.9% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Timing Report, Sorted By Phase Recent AM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent AM.syn Phase Number 2468 Movement SBTL EBTL NBTL WBTL Lead/Lag Lead-Lag Optimize Recall Mode C-Min None C-Min None Maximum Split (s) 81 29 81 29 Maximum Split (%) 73.6% 26.4% 73.6% 26.4% Minimum Split (s) 21.5 22.5 22 22.5 Yellow Time (s) 3.5 4 3.5 4.5 All-Red Time (s) 1 1.5 1.5 1 Minimum Initial (s) 7777 Vehicle Extension (s) 6666 Minimum Gap (s) 3333 Time Before Reduce (s) 0000 Time To Reduce (s) 0000 Walk Time (s) 7777 Flash Dont Walk (s) 10 10 10 10 Dual Entry Yes Yes Yes Yes Inhibit Max Yes Yes Yes Yes Start Time (s) 76 47 76 47 End Time (s) 47 76 47 76 Yield/Force Off (s) 42.5 70.5 42 70.5 Yield/Force Off 170(s) 32.5 60.5 32 60.5 Local Start Time (s) 29 0 29 0 Local Yield (s) 105.5 23.5 105 23.5 Local Yield 170(s) 95.5 13.5 95 13.5 Intersection Summary Cycle Length 110 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 47 (43%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 4: Lemay & Vine HCM Signalized Intersection Capacity Analysis Recent PM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent PM.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 13 194 100 53 155 115 54 684 117 75 450 36 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 16 12 12 16 8 12 13 12 12 14 12 Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.95 1.00 0.94 0.98 0.99 Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99 Satd. Flow (prot) 1770 1950 1770 1921 1877 1953 Flt Permitted 0.29 1.00 0.25 1.00 0.93 0.80 Satd. Flow (perm) 549 1950 459 1921 1758 1573 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Adj. Flow (vph) 14 202 104 55 161 120 56 712 122 78 469 38 RTOR Reduction (vph) 0 16 0 0 24 0040020 Lane Group Flow (vph) 14 290 0 55 257 0 0 886 0 0 583 0 Confl. Peds. (#/hr) 2 2 Confl. Bikes (#/hr) 2435 Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4862 Permitted Phases 4862 Actuated Green, G (s) 24.9 24.9 24.9 24.9 84.6 85.1 Effective Green, g (s) 25.9 25.9 25.9 25.9 85.6 86.1 Actuated g/C Ratio 0.22 0.22 0.22 0.22 0.71 0.72 Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5 Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lane Grp Cap (vph) 118 420 99 414 1254 1128 v/s Ratio Prot c0.15 0.13 v/s Ratio Perm 0.03 0.12 c0.50 0.37 v/c Ratio 0.12 0.69 0.56 0.62 0.71 0.52 Uniform Delay, d1 37.9 43.3 41.9 42.6 9.9 7.6 Progression Factor 1.00 1.00 1.00 1.00 0.54 1.00 Incremental Delay, d2 1.3 7.0 13.8 4.9 2.7 1.7 Delay (s) 39.1 50.4 55.7 47.5 8.1 9.3 Level of Service D D E D A A Approach Delay (s) 49.9 48.9 8.1 9.3 Approach LOS D D A A Intersection Summary HCM 2000 Control Delay 21.1 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.70 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.5 Intersection Capacity Utilization 85.6% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Timing Report, Sorted By Phase Recent PM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 9 Light Report Recent PM.syn Phase Number 2468 Movement SBTL EBTL NBTL WBTL Lead/Lag Lead-Lag Optimize Recall Mode C-Min None C-Min None Maximum Split (s) 85 35 85 35 Maximum Split (%) 70.8% 29.2% 70.8% 29.2% Minimum Split (s) 21.5 22.5 22 22.5 Yellow Time (s) 3.5 4 3.5 4.5 All-Red Time (s) 1 1.5 1.5 1 Minimum Initial (s) 7777 Vehicle Extension (s) 6666 Minimum Gap (s) 3333 Time Before Reduce (s) 0000 Time To Reduce (s) 0000 Walk Time (s) 7777 Flash Dont Walk (s) 10 10 10 10 Dual Entry Yes Yes Yes Yes Inhibit Max Yes Yes Yes Yes Start Time (s) 48 13 48 13 End Time (s) 13 48 13 48 Yield/Force Off (s) 8.5 42.5 8 42.5 Yield/Force Off 170(s) 118.5 32.5 118 32.5 Local Start Time (s) 35 0 35 0 Local Yield (s) 115.5 29.5 115 29.5 Local Yield 170(s) 105.5 19.5 105 19.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 13 (11%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 4: Lemay & Vine UNSIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50 SIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 20 C > 20 and < 35 D > 35 and < 55 E > 55 and < 80 F > 80 Table 4-3 Fort Collins (GMA and City Limits) Motor Vehicle LOS Standards (Intersections) Intersection type Land Use (from structure plan) Commercial corridors Other corridors within: Mixed use districts Low density mixed use residential All other areas Signalized intersections (overall) D E* D D Any Leg E E D E Any Movement E E D E Stop sign control (arterial/arterial, arterial/collector or local- any approach leg) N/A F** F** E Stop sign control (collector/local--any approach leg) N/A C C C * mitigating measures required ** considered normal in an urban environment APPENDIX D 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 100 200 300 400 500 600 EB AM 41 VPH AM 1359 VPH 1 LANE & 1 LANE 2 OR MORE LANES & 1 LANE 2 OR MORE LANES & 2 OR MORE LANES *100 *150 PM 1918 VPH 1900 EB PM 119 VPH MINOR STREET APPROACH - VPH MAJOR STREET - TOTAL OF BOTH APPROACH - VEHICLES PER HOUR (VPH) *Note: 150 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 100 vph applies as the lower threshold volume for a minor-street approach with one lane. SHORT RANGE TOTAL PEAK HOUR WARRANT AT LEMAY/BUCKINGHAM MUTCD, 2003 EDITION, PAGE 4C-7 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 100 200 300 400 500 600 EB AM 41 VPH AM 1359 VPH 1 LANE & 1 LANE 2 OR MORE LANES & 1 LANE 2 OR MORE LANES & 2 OR MORE LANES *100 *150 PM 1918 VPH 1900 EB PM 119 VPH 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 100 200 300 400 500 600 EB AM 41 VPH AM 1359 VPH 1 LANE & 1 LANE 2 OR MORE LANES & 1 LANE 2 OR MORE LANES & 2 OR MORE LANES *100 *150 PM 1918 VPH 1900 EB PM 119 VPH 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 APPENDIX E HCM 2010 Signalized Intersection Summary Short Bkgrd AM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 43 208 128 122 201 128 234 369 87 153 710 95 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1937 1937 1937 1937 1937 1863 1937 1937 1937 1863 1863 1863 Adj Flow Rate, veh/h 51 245 2 144 236 4 275 434 43 180 835 37 Adj No. of Lanes 111111111111 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 222222222222 Cap, veh/h 210 294 246 217 344 278 405 1127 956 599 1046 867 Arrive On Green 0.04 0.15 0.15 0.07 0.18 0.18 0.09 0.58 0.58 0.09 0.75 0.75 Sat Flow, veh/h 1845 1937 1625 1845 1937 1565 1845 1937 1642 1774 1863 1545 Grp Volume(v), veh/h 51 245 2 144 236 4 275 434 43 180 835 37 Grp Sat Flow(s),veh/h/ln 1845 1937 1625 1845 1937 1565 1845 1937 1642 1774 1863 1545 Q Serve(g_s), s 2.8 14.7 0.1 7.8 13.7 0.3 7.1 14.5 1.3 5.1 33.8 0.8 Cycle Q Clear(g_c), s 2.8 14.7 0.1 7.8 13.7 0.3 7.1 14.5 1.3 5.1 33.8 0.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 210 294 246 217 344 278 405 1127 956 599 1046 867 V/C Ratio(X) 0.24 0.83 0.01 0.66 0.69 0.01 0.68 0.39 0.05 0.30 0.80 0.04 Avail Cap(c_a), veh/h 257 323 271 217 344 278 459 1127 956 599 1046 867 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.7 49.4 43.2 39.4 46.2 40.7 17.0 13.5 10.8 9.8 11.0 6.8 Incr Delay (d2), s/veh 0.6 15.8 0.0 7.5 5.6 0.0 3.4 1.0 0.1 0.3 6.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 9.2 0.1 4.4 7.9 0.1 4.9 8.0 0.6 2.5 18.9 0.3 LnGrp Delay(d),s/veh 41.3 65.3 43.3 46.9 51.8 40.7 20.4 14.5 10.9 10.0 17.3 6.9 LnGrp LOS D E DDDDCBBBBA Approach Vol, veh/h 298 384 752 1052 Approach Delay, s/veh 61.0 49.9 16.5 15.7 Approach LOS E D B B Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 13.5 72.4 11.0 23.2 11.0 74.8 7.9 26.3 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 13.0 61.0 7.0 19.0 7.0 67.0 7.0 19.0 Max Q Clear Time (g_c+I1), s 9.1 35.8 9.8 16.7 7.1 16.5 4.8 15.7 Green Ext Time (p_c), s 0.3 5.7 0.0 0.2 0.0 6.1 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay 26.7 HCM 2010 LOS C Notes User approved pedestrian interval to be less than phase max green. Timing Report, Sorted By Phase Short Bkgrd AM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb am.syn Phase Number 12345678 Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 17 67 11 25 11 73 11 25 Maximum Split (%) 14.2% 55.8% 9.2% 20.8% 9.2% 60.8% 9.2% 20.8% Minimum Split (s) 11 30 11 29 11 30 11 25 Yellow Time (s) 3 3.5 3 3.5 3434 All-Red Time (s) 1 2.5 1 2.5 1212 Minimum Initial (s) 47474747 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 17 13 17 12 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 42 59 6 17 42 53 6 17 End Time (s) 59 6 17 42 53 6 17 42 Yield/Force Off (s) 55 0 13 36 49 0 13 36 Yield/Force Off 170(s) 55 103 13 23 49 103 13 24 Local Start Time (s) 42 59 6 17 42 53 6 17 Local Yield (s) 55 0 13 36 49 0 13 36 Local Yield 170(s) 55 103 13 23 49 103 13 24 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 105 Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 1: Lemay & Lincoln HCM 2010 Signalized Intersection Summary Short Bkgrd PM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 165 309 240 204 328 273 301 837 111 156 605 86 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1937 1937 1937 1937 1937 1863 1937 1937 1937 1863 1863 1863 Adj Flow Rate, veh/h 179 336 77 222 357 136 327 910 63 170 658 34 Adj No. of Lanes 111111111111 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222222222222 Cap, veh/h 266 436 364 277 420 337 549 952 805 202 916 755 Arrive On Green 0.09 0.23 0.23 0.08 0.22 0.22 0.07 0.49 0.49 0.13 0.98 0.98 Sat Flow, veh/h 1845 1937 1617 1845 1937 1554 1845 1937 1637 1774 1863 1536 Grp Volume(v), veh/h 179 336 77 222 357 136 327 910 63 170 658 34 Grp Sat Flow(s),veh/h/ln 1845 1937 1617 1845 1937 1554 1845 1937 1637 1774 1863 1536 Q Serve(g_s), s 8.9 19.5 4.6 10.0 21.2 9.0 8.0 54.0 2.4 5.8 2.4 0.0 Cycle Q Clear(g_c), s 8.9 19.5 4.6 10.0 21.2 9.0 8.0 54.0 2.4 5.8 2.4 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 266 436 364 277 420 337 549 952 805 202 916 755 V/C Ratio(X) 0.67 0.77 0.21 0.80 0.85 0.40 0.60 0.96 0.08 0.84 0.72 0.05 Avail Cap(c_a), veh/h 266 500 418 277 484 389 549 952 805 202 916 755 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.1 43.6 37.8 37.5 45.1 40.3 15.4 29.2 16.1 25.2 0.5 0.5 Incr Delay (d2), s/veh 6.5 6.3 0.3 15.6 12.1 0.8 1.7 20.2 0.2 26.0 4.8 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.0 11.2 2.1 3.5 12.8 3.9 3.1 34.2 1.1 4.2 1.6 0.0 LnGrp Delay(d),s/veh 40.6 49.9 38.1 53.0 57.3 41.1 17.1 49.4 16.3 51.2 5.4 0.6 LnGrp LOS DDDDEDBDBDAA Approach Vol, veh/h 592 715 1300 862 Approach Delay, s/veh 45.6 52.9 39.7 14.2 Approach LOS D D D B Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 11.0 64.0 13.0 32.0 11.0 64.0 14.0 31.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 7.0 54.0 9.0 30.0 7.0 54.0 10.0 29.0 Max Q Clear Time (g_c+I1), s 10.0 4.4 12.0 21.5 7.8 56.0 10.9 23.2 Green Ext Time (p_c), s 0.0 8.6 0.0 2.2 0.0 0.0 0.0 1.8 Intersection Summary HCM 2010 Ctrl Delay 37.1 HCM 2010 LOS D Timing Report, Sorted By Phase Short Bkgrd PM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb pm.syn Phase Number 12345678 Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 11 60 13 36 11 60 14 35 Maximum Split (%) 9.2% 50.0% 10.8% 30.0% 9.2% 50.0% 11.7% 29.2% Minimum Split (s) 11 30 11 29 11 30 11 25 Yellow Time (s) 3 3.5 3 3.5 3434 All-Red Time (s) 1 2.5 1 2.5 1212 Minimum Initial (s) 47474747 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 17 13 17 12 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 99 110 50 63 99 110 50 64 End Time (s) 110 50 63 99 110 50 64 99 Yield/Force Off (s) 106 44 59 93 106 44 60 93 Yield/Force Off 170(s) 106 27 59 80 106 27 60 81 Local Start Time (s) 55 66 6 19 55 66 6 20 Local Yield (s) 62 0 15 49 62 0 16 49 Local Yield 170(s) 62 103 15 36 62 103 16 37 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 95 Offset: 44 (37%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 1: Lemay & Lincoln HCM 2010 TWSC Short Bkgrd AM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report sb am.syn Intersection Int Delay, s/veh 1.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 1 30 2 2 0 46 428 6 1 854 15 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 1 33 2 2 0 50 465 7 1 928 16 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1509 1511 936 1523 1515 468 945 0 0 472 0 0 Stage 1 939 939 - 568 568 - - - - - - - Stage 2 570 572 - 955 947 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 99 120 321 97 119 595 726 - - 1090 - - Stage 1 317 343 - 508 506 - - - - - - - Stage 2 506 504 - 310 340 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 90 109 321 80 108 595 726 - - 1090 - - Mov Cap-2 Maneuver 90 109 - 80 108 - - - - - - - Stage 1 288 342 - 461 459 - - - - - - - Stage 2 457 457 - 277 339 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 24 46.1 1 0 HCM LOS C E Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 726 - - 228 92 1090 - - HCM Lane V/C Ratio 0.069 - - 0.172 0.047 0.001 - - HCM Control Delay (s) 10.3 0 - 24 46.1 8.3 0 - HCM Lane LOS B A - C E A A - HCM 95th %tile Q(veh) 0.2 - - 0.6 0.1 0 - - Lanes and Geometrics Short Bkgrd AM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report sb am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.886 0.998 0.998 Flt Protected 0.994 0.976 0.995 Satd. Flow (prot) 0 1640 0 0 1818 0 0 1850 0 0 1859 0 Flt Permitted 0.994 0.976 0.995 Satd. Flow (perm) 0 1640 0 0 1818 0 0 1850 0 0 1859 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 192 715 1281 1365 Travel Time (s) 4.4 16.3 29.1 31.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd PM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report sb pm.syn Intersection Int Delay, s/veh 3.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 3 6 90 3 4 2 42 1104 17 1 715 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 3 7 101 3 4 2 47 1240 19 1 803 19 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2163 2169 813 2213 2169 1250 822 0 0 1260 0 0 Stage 1 815 815 - 1344 1344 - - - - - - - Stage 2 1348 1354 - 869 825 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 34 47 378 31 47 211 807 - - 552 - - Stage 1 371 391 - 187 220 - - - - - - - Stage 2 186 218 - 347 387 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 26 38 378 17 38 211 807 - - 552 - - Mov Cap-2 Maneuver 26 38 - 17 38 - - - - - - - Stage 1 299 390 - 151 177 - - - - - - - Stage 2 144 175 - 249 386 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 45.9 169.6 0.4 0 HCM LOS E F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 807 - - 194 31 552 - - HCM Lane V/C Ratio 0.058 - - 0.573 0.326 0.002 - - HCM Control Delay (s) 9.7 0 - 45.9 169.6 11.5 0 - HCM Lane LOS A A - E F B A - HCM 95th %tile Q(veh) 0.2 - - 3.1 1 0 - - Lanes and Geometrics Short Bkgrd PM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report sb pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.877 0.970 0.998 0.997 Flt Protected 0.999 0.984 0.998 Satd. Flow (prot) 0 1632 0 0 1778 0 0 1855 0 0 1857 0 Flt Permitted 0.999 0.984 0.998 Satd. Flow (perm) 0 1632 0 0 1778 0 0 1855 0 0 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 187 866 1312 1334 Travel Time (s) 4.3 19.7 29.8 30.3 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd AM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb am lt lane at buckingham.syn Intersection Int Delay, s/veh 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 1 30 2 2 0 46 428 6 1 854 15 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - - 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 1 33 2 2 0 50 465 7 1 928 16 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1509 1511 936 1507 1515 468 945 0 0 472 0 0 Stage 1 939 939 - 568 568 - - - - - - - Stage 2 570 572 - 939 947 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 99 120 321 99 119 595 726 - - 1090 - - Stage 1 317 343 - 508 506 - - - - - - - Stage 2 506 504 - 317 340 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 92 112 321 84 111 595 726 - - 1090 - - Mov Cap-2 Maneuver 92 112 - 84 111 - - - - - - - Stage 1 295 343 - 473 471 - - - - - - - Stage 2 469 469 - 284 340 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 22.2 44.3 1 0 HCM LOS C E Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 726 - - 95 321 96 1090 - - HCM Lane V/C Ratio 0.069 - - 0.069 0.102 0.045 0.001 - - HCM Control Delay (s) 10.3 - - 45.7 17.5 44.3 8.3 - - HCM Lane LOS B - - E C E A - - HCM 95th %tile Q(veh) 0.2 - - 0.2 0.3 0.1 0 - - Lanes and Geometrics Short Bkgrd AM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb am lt lane at buckingham.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 100 0 0 150 0 150 0 Storage Lanes 0 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.850 0.998 0.997 Flt Protected 0.960 0.976 0.950 0.950 Satd. Flow (prot) 0 1788 1583 0 1818 0 1770 1859 0 1770 1857 0 Flt Permitted 0.960 0.976 0.950 0.950 Satd. Flow (perm) 0 1788 1583 0 1818 0 1770 1859 0 1770 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 192 715 1281 1365 Travel Time (s) 4.4 16.3 29.1 31.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd PM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb pm lt lane at buckingham.syn Intersection Int Delay, s/veh 2.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 3 6 90 3 4 2 42 1104 17 1 715 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - - 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 3 7 101 3 4 2 47 1240 19 1 803 19 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2163 2169 813 2163 2169 1250 822 0 0 1260 0 0 Stage 1 815 815 - 1344 1344 - - - - - - - Stage 2 1348 1354 - 819 825 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 34 47 378 34 47 211 807 - - 552 - - Stage 1 371 391 - 187 220 - - - - - - - Stage 2 186 218 - 369 387 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 30 44 378 21 44 211 807 - - 552 - - Mov Cap-2 Maneuver 30 44 - 21 44 - - - - - - - Stage 1 349 390 - 176 207 - - - - - - - Stage 2 170 205 - 265 386 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 28.3 135.5 0.4 0 HCM LOS D F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 807 - - 38 378 37 552 - - HCM Lane V/C Ratio 0.058 - - 0.266 0.268 0.273 0.002 - - HCM Control Delay (s) 9.7 - - 131.1 18 135.5 11.5 - - HCM Lane LOS A - - F C F B - - HCM 95th %tile Q(veh) 0.2 - - 0.9 1.1 0.9 0 - - Lanes and Geometrics Short Bkgrd PM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb pm lt lane at buckingham.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 100 0 0 150 0 150 0 Storage Lanes 0 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.850 0.970 0.998 0.997 Flt Protected 0.985 0.984 0.950 0.950 Satd. Flow (prot) 0 1835 1583 0 1778 0 1770 1859 0 1770 1857 0 Flt Permitted 0.985 0.984 0.950 0.950 Satd. Flow (perm) 0 1835 1583 0 1778 0 1770 1859 0 1770 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 187 866 1312 1334 Travel Time (s) 4.3 19.7 29.8 30.3 Intersection Summary Area Type: Other HCM Signalized Intersection Capacity Analysis Short Bkgrd AM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 13 156 99 129 265 119 43 323 60 58 606 31 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 16 12 12 16 8 12 13 12 12 14 12 Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.94 1.00 0.95 0.98 0.99 Flt Protected 0.95 1.00 0.95 1.00 0.99 1.00 Satd. Flow (prot) 1770 1953 1770 1959 1871 1964 Flt Permitted 0.15 1.00 0.37 1.00 0.87 0.92 Satd. Flow (perm) 281 1953 685 1959 1634 1818 Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Adj. Flow (vph) 15 181 115 150 308 138 50 376 70 67 705 36 RTOR Reduction (vph) 0 19 0 0 13 0050010 Lane Group Flow (vph) 15 277 0 150 433 0 0 491 0 0 807 0 Confl. Peds. (#/hr) 22 Confl. Bikes (#/hr) 2 4 9 Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4862 Permitted Phases 4862 Actuated Green, G (s) 33.0 33.0 33.0 33.0 76.5 77.0 Effective Green, g (s) 34.0 34.0 34.0 34.0 77.5 78.0 Actuated g/C Ratio 0.28 0.28 0.28 0.28 0.65 0.65 Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5 Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lane Grp Cap (vph) 79 553 194 555 1055 1181 v/s Ratio Prot 0.14 c0.22 v/s Ratio Perm 0.05 0.22 0.30 c0.44 v/c Ratio 0.19 0.50 0.77 0.78 0.47 0.68 Uniform Delay, d1 32.6 35.9 39.5 39.6 10.8 13.2 Progression Factor 1.00 1.00 1.00 1.00 1.59 1.00 Incremental Delay, d2 3.3 2.0 21.3 8.6 1.4 3.2 Delay (s) 35.9 37.9 60.8 48.2 18.5 16.4 Level of Service D D E D B B Approach Delay (s) 37.8 51.4 18.5 16.4 Approach LOS D D B B Intersection Summary HCM 2000 Control Delay 29.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.72 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.5 Intersection Capacity Utilization 84.5% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Timing Report, Sorted By Phase Short Bkgrd AM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb am.syn Phase Number 2468 Movement SBTL EBTL NBTL WBTL Lead/Lag Lead-Lag Optimize Recall Mode C-Min None C-Min None Maximum Split (s) 83 37 83 37 Maximum Split (%) 69.2% 30.8% 69.2% 30.8% Minimum Split (s) 21.5 22.5 22 22.5 Yellow Time (s) 3.5 4 3.5 4.5 All-Red Time (s) 1 1.5 1.5 1 Minimum Initial (s) 7777 Vehicle Extension (s) 6666 Minimum Gap (s) 3333 Time Before Reduce (s) 0000 Time To Reduce (s) 0000 Walk Time (s) 7777 Flash Dont Walk (s) 10 10 10 10 Dual Entry Yes Yes Yes Yes Inhibit Max Yes Yes Yes Yes Start Time (s) 37 0 37 0 End Time (s) 0 37 0 37 Yield/Force Off (s) 115.5 31.5 115 31.5 Yield/Force Off 170(s) 105.5 21.5 105 21.5 Local Start Time (s) 37 0 37 0 Local Yield (s) 115.5 31.5 115 31.5 Local Yield 170(s) 105.5 21.5 105 21.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 55 Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 4: Lemay & Vine HCM Signalized Intersection Capacity Analysis Short Bkgrd PM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 25 300 119 112 221 135 84 762 214 109 509 45 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 16 12 12 16 8 12 13 12 12 14 12 Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.96 1.00 0.94 0.97 0.99 Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99 Satd. Flow (prot) 1770 1967 1770 1937 1857 1949 Flt Permitted 0.28 1.00 0.19 1.00 0.89 0.67 Satd. Flow (perm) 512 1967 347 1937 1667 1310 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Adj. Flow (vph) 26 312 124 117 230 141 88 794 223 114 530 47 RTOR Reduction (vph) 0 12 0 0 18 0080020 Lane Group Flow (vph) 26 424 0 117 353 0 0 1097 0 0 689 0 Confl. Peds. (#/hr) 2 2 Confl. Bikes (#/hr) 2435 Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4862 Permitted Phases 4862 Actuated Green, G (s) 34.5 34.5 34.5 34.5 75.0 75.5 Effective Green, g (s) 35.5 35.5 35.5 35.5 76.0 76.5 Actuated g/C Ratio 0.30 0.30 0.30 0.30 0.63 0.64 Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5 Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lane Grp Cap (vph) 151 581 102 573 1055 835 v/s Ratio Prot 0.22 0.18 v/s Ratio Perm 0.05 c0.34 c0.66 0.53 v/c Ratio 0.17 0.73 1.15 0.62 1.04 0.82 Uniform Delay, d1 31.3 37.9 42.2 36.4 22.0 16.6 Progression Factor 1.00 1.00 1.00 1.00 0.64 1.00 Incremental Delay, d2 1.5 6.4 134.1 3.4 30.3 9.1 Delay (s) 32.9 44.3 176.4 39.8 44.4 25.7 Level of Service C D F D D C Approach Delay (s) 43.7 72.5 44.4 25.7 Approach LOS D E D C Intersection Summary HCM 2000 Control Delay 44.6 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 1.07 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.5 Intersection Capacity Utilization 106.1% ICU Level of Service G Analysis Period (min) 15 c Critical Lane Group Timing Report, Sorted By Phase Short Bkgrd PM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report sb pm.syn Phase Number 2468 Movement SBTL EBTL NBTL WBTL Lead/Lag Lead-Lag Optimize Recall Mode C-Min None C-Min None Maximum Split (s) 80 40 80 40 Maximum Split (%) 66.7% 33.3% 66.7% 33.3% Minimum Split (s) 21.5 22.5 22 22.5 Yellow Time (s) 3.5 4 3.5 4.5 All-Red Time (s) 1 1.5 1.5 1 Minimum Initial (s) 7777 Vehicle Extension (s) 6666 Minimum Gap (s) 3333 Time Before Reduce (s) 0000 Time To Reduce (s) 0000 Walk Time (s) 7777 Flash Dont Walk (s) 10 10 10 10 Dual Entry Yes Yes Yes Yes Inhibit Max Yes Yes Yes Yes Start Time (s) 53 13 53 13 End Time (s) 13 53 13 53 Yield/Force Off (s) 8.5 47.5 8 47.5 Yield/Force Off 170(s) 118.5 37.5 118 37.5 Local Start Time (s) 40 0 40 0 Local Yield (s) 115.5 34.5 115 34.5 Local Yield 170(s) 105.5 24.5 105 24.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 80 Offset: 13 (11%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 4: Lemay & Vine APPENDIX F HCM 2010 Signalized Intersection Summary Short Total AM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 44 208 128 122 201 129 234 375 87 154 713 96 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1937 1937 1937 1937 1937 1863 1937 1937 1937 1863 1863 1863 Adj Flow Rate, veh/h 52 245 2 144 236 5 275 441 43 181 839 38 Adj No. of Lanes 111111111111 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Percent Heavy Veh, % 222222222222 Cap, veh/h 210 294 246 217 343 277 402 1127 956 594 1046 867 Arrive On Green 0.04 0.15 0.15 0.07 0.18 0.18 0.09 0.58 0.58 0.09 0.75 0.75 Sat Flow, veh/h 1845 1937 1625 1845 1937 1565 1845 1937 1642 1774 1863 1545 Grp Volume(v), veh/h 52 245 2 144 236 5 275 441 43 181 839 38 Grp Sat Flow(s),veh/h/ln 1845 1937 1625 1845 1937 1565 1845 1937 1642 1774 1863 1545 Q Serve(g_s), s 2.8 14.7 0.1 7.8 13.7 0.3 7.1 14.8 1.3 5.1 34.2 0.8 Cycle Q Clear(g_c), s 2.8 14.7 0.1 7.8 13.7 0.3 7.1 14.8 1.3 5.1 34.2 0.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 210 294 246 217 343 277 402 1127 956 594 1046 867 V/C Ratio(X) 0.25 0.83 0.01 0.66 0.69 0.02 0.68 0.39 0.05 0.30 0.80 0.04 Avail Cap(c_a), veh/h 256 323 271 217 343 277 456 1127 956 594 1046 867 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.7 49.4 43.2 39.4 46.3 40.8 17.2 13.6 10.8 9.8 11.0 6.8 Incr Delay (d2), s/veh 0.6 15.8 0.0 7.5 5.7 0.0 3.6 1.0 0.1 0.3 6.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 9.2 0.1 4.4 7.9 0.1 5.0 8.2 0.6 2.5 19.0 0.3 LnGrp Delay(d),s/veh 41.3 65.3 43.3 46.9 52.0 40.8 20.8 14.6 10.9 10.1 17.5 6.9 LnGrp LOS D E DDDDCBBBBA Approach Vol, veh/h 299 385 759 1058 Approach Delay, s/veh 61.0 50.0 16.6 15.9 Approach LOS E D B B Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 13.5 72.4 11.0 23.2 11.0 74.8 8.0 26.2 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 13.0 61.0 7.0 19.0 7.0 67.0 7.0 19.0 Max Q Clear Time (g_c+I1), s 9.1 36.2 9.8 16.7 7.1 16.8 4.8 15.7 Green Ext Time (p_c), s 0.3 5.8 0.0 0.2 0.0 6.2 0.0 0.6 Intersection Summary HCM 2010 Ctrl Delay 26.7 HCM 2010 LOS C Notes User approved pedestrian interval to be less than phase max green. Timing Report, Sorted By Phase Short Total AM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Phase Number 12345678 Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 17 67 11 25 11 73 11 25 Maximum Split (%) 14.2% 55.8% 9.2% 20.8% 9.2% 60.8% 9.2% 20.8% Minimum Split (s) 11 30 11 29 11 30 11 25 Yellow Time (s) 3 3.5 3 3.5 3434 All-Red Time (s) 1 2.5 1 2.5 1212 Minimum Initial (s) 47474747 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 17 13 17 12 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 42 59 6 17 42 53 6 17 End Time (s) 59 6 17 42 53 6 17 42 Yield/Force Off (s) 55 0 13 36 49 0 13 36 Yield/Force Off 170(s) 55 103 13 23 49 103 13 24 Local Start Time (s) 42 59 6 17 42 53 6 17 Local Yield (s) 55 0 13 36 49 0 13 36 Local Yield 170(s) 55 103 13 23 49 103 13 24 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 105 Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 1: Lemay & Lincoln HCM 2010 Signalized Intersection Summary Short Total PM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 168 309 240 204 328 275 301 851 111 158 618 89 Number 7 4 14 3 8 18 1 6 16 5 2 12 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1937 1937 1937 1937 1937 1863 1937 1937 1937 1863 1863 1863 Adj Flow Rate, veh/h 183 336 77 222 357 138 327 925 63 172 672 38 Adj No. of Lanes 111111111111 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 222222222222 Cap, veh/h 266 436 364 277 420 337 542 952 805 194 916 755 Arrive On Green 0.09 0.23 0.23 0.08 0.22 0.22 0.07 0.49 0.49 0.13 0.98 0.98 Sat Flow, veh/h 1845 1937 1617 1845 1937 1554 1845 1937 1637 1774 1863 1536 Grp Volume(v), veh/h 183 336 77 222 357 138 327 925 63 172 672 38 Grp Sat Flow(s),veh/h/ln 1845 1937 1617 1845 1937 1554 1845 1937 1637 1774 1863 1536 Q Serve(g_s), s 9.1 19.5 4.6 10.0 21.2 9.2 8.0 55.7 2.4 6.2 2.6 0.1 Cycle Q Clear(g_c), s 9.1 19.5 4.6 10.0 21.2 9.2 8.0 55.7 2.4 6.2 2.6 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 266 436 364 277 420 337 542 952 805 194 916 755 V/C Ratio(X) 0.69 0.77 0.21 0.80 0.85 0.41 0.60 0.97 0.08 0.89 0.73 0.05 Avail Cap(c_a), veh/h 266 500 418 277 484 389 542 952 805 194 916 755 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.2 43.6 37.8 37.5 45.1 40.4 15.4 29.7 16.1 26.5 0.5 0.5 Incr Delay (d2), s/veh 7.2 6.3 0.3 15.6 12.1 0.8 1.9 23.0 0.2 35.7 5.2 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.2 11.2 2.1 3.5 12.8 4.0 3.1 35.9 1.1 7.4 1.7 0.0 LnGrp Delay(d),s/veh 41.4 49.9 38.1 53.0 57.3 41.2 17.3 52.7 16.3 62.1 5.7 0.6 LnGrp LOS DDDDEDBDBEAA Approach Vol, veh/h 596 717 1315 882 Approach Delay, s/veh 45.8 52.9 42.1 16.5 Approach LOS D D D B Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 11.0 64.0 13.0 32.0 11.0 64.0 14.0 31.0 Change Period (Y+Rc), s 4.0 6.0 4.0 6.0 4.0 6.0 4.0 6.0 Max Green Setting (Gmax), s 7.0 54.0 9.0 30.0 7.0 54.0 10.0 29.0 Max Q Clear Time (g_c+I1), s 10.0 4.6 12.0 21.5 8.2 57.7 11.1 23.2 Green Ext Time (p_c), s 0.0 8.9 0.0 2.2 0.0 0.0 0.0 1.8 Intersection Summary HCM 2010 Ctrl Delay 38.5 HCM 2010 LOS D Timing Report, Sorted By Phase Short Total PM 1: Lemay & Lincoln 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Phase Number 12345678 Movement NBL SBTL WBL EBTL SBL NBTL EBL WBTL Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag Lead-Lag Optimize Recall Mode None C-Max None None None C-Max None None Maximum Split (s) 11 60 13 36 11 60 14 35 Maximum Split (%) 9.2% 50.0% 10.8% 30.0% 9.2% 50.0% 11.7% 29.2% Minimum Split (s) 11 30 11 29 11 30 11 25 Yellow Time (s) 3 3.5 3 3.5 3434 All-Red Time (s) 1 2.5 1 2.5 1212 Minimum Initial (s) 47474747 Vehicle Extension (s) 33333333 Minimum Gap (s) 33333333 Time Before Reduce (s) 00000000 Time To Reduce (s) 00000000 Walk Time (s) 7777 Flash Dont Walk (s) 17 13 17 12 Dual Entry No Yes No Yes No Yes No Yes Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes Start Time (s) 99 110 50 63 99 110 50 64 End Time (s) 110 50 63 99 110 50 64 99 Yield/Force Off (s) 106 44 59 93 106 44 60 93 Yield/Force Off 170(s) 106 27 59 80 106 27 60 81 Local Start Time (s) 55 66 6 19 55 66 6 20 Local Yield (s) 62 0 15 49 62 0 16 49 Local Yield 170(s) 62 103 15 36 62 103 16 37 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 105 Offset: 44 (37%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow Splits and Phases: 1: Lemay & Lincoln HCM 2010 TWSC Short Total AM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Intersection Int Delay, s/veh 1.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 1 35 2 2 0 54 428 6 1 854 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 1 38 2 2 0 59 465 7 1 928 18 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1527 1529 938 1545 1535 468 947 0 0 472 0 0 Stage 1 940 940 - 586 586 - - - - - - - Stage 2 587 589 - 959 949 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 96 117 321 93 116 595 725 - - 1090 - - Stage 1 316 342 - 496 497 - - - - - - - Stage 2 496 495 - 309 339 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 86 104 321 74 103 595 725 - - 1090 - - Mov Cap-2 Maneuver 86 104 - 74 103 - - - - - - - Stage 1 281 341 - 441 442 - - - - - - - Stage 2 439 441 - 271 338 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 24.2 49.1 1.2 0 HCM LOS C E Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 725 - - 232 86 1090 - - HCM Lane V/C Ratio 0.081 - - 0.192 0.051 0.001 - - HCM Control Delay (s) 10.4 0 - 24.2 49.1 8.3 0 - HCM Lane LOS B A - C E A A - HCM 95th %tile Q(veh) 0.3 - - 0.7 0.2 0 - - Lanes and Geometrics Short Total AM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.883 0.998 0.997 Flt Protected 0.994 0.976 0.994 Satd. Flow (prot) 0 1635 0 0 1818 0 0 1848 0 0 1857 0 Flt Permitted 0.994 0.976 0.994 Satd. Flow (perm) 0 1635 0 0 1818 0 0 1848 0 0 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 384 715 1281 1365 Travel Time (s) 8.7 16.3 29.1 31.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 6 108 3 4 2 61 1104 17 1 715 19 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 6 7 121 3 4 2 69 1240 19 1 803 21 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2206 2213 814 2267 2214 1250 825 0 0 1260 0 0 Stage 1 816 816 - 1387 1387 - - - - - - - Stage 2 1390 1397 - 880 827 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 32 44 378 29 44 211 805 - - 552 - - Stage 1 371 391 - 177 210 - - - - - - - Stage 2 176 208 - 342 386 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 22 31 378 13 31 211 805 - - 552 - - Mov Cap-2 Maneuver 22 31 - 13 31 - - - - - - - Stage 1 264 390 - 126 150 - - - - - - - Stage 2 120 148 - 228 385 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 79.4 237.9 0.5 0 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 805 - - 168 24 552 - - HCM Lane V/C Ratio 0.085 - - 0.796 0.421 0.002 - - HCM Control Delay (s) 9.9 0 - 79.4 237.9 11.5 0 - HCM Lane LOS A A - F F B A - HCM 95th %tile Q(veh) 0.3 - - 5.3 1.3 0 - - Lanes and Geometrics Short Total PM 3: Lemay & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 0 0 0 0 Storage Lanes 0 0 0 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.878 0.970 0.998 0.997 Flt Protected 0.998 0.984 0.997 Satd. Flow (prot) 0 1632 0 0 1778 0 0 1853 0 0 1857 0 Flt Permitted 0.998 0.984 0.997 Satd. Flow (perm) 0 1632 0 0 1778 0 0 1853 0 0 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 373 866 1312 1334 Travel Time (s) 8.5 19.7 29.8 30.3 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total AM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st am lt lane at buckingham.syn Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 1 35 2 2 0 54 428 6 1 854 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - 0 - - - 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 1 38 2 2 0 59 465 7 1 928 18 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1527 1529 938 1526 1535 468 947 0 0 472 0 0 Stage 1 940 940 - 586 586 - - - - - - - Stage 2 587 589 - 940 949 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 96 117 321 96 116 595 725 - - 1090 - - Stage 1 316 342 - 496 497 - - - - - - - Stage 2 496 495 - 316 339 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 89 107 321 79 106 595 725 - - 1090 - - Mov Cap-2 Maneuver 89 107 - 79 106 - - - - - - - Stage 1 290 342 - 456 457 - - - - - - - Stage 2 453 455 - 277 339 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 22 46.5 1.2 0 HCM LOS C E Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 725 - - 92 321 91 1090 - - HCM Lane V/C Ratio 0.081 - - 0.071 0.119 0.048 0.001 - - HCM Control Delay (s) 10.4 - - 47.1 17.7 46.5 8.3 - - HCM Lane LOS B - - E C E A - - HCM 95th %tile Q(veh) 0.3 - - 0.2 0.4 0.1 0 - - Lanes and Geometrics Short Total AM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st am lt lane at buckingham.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.850 0.998 0.997 Flt Protected 0.960 0.976 0.950 0.950 Satd. Flow (prot) 0 1788 1583 0 1818 0 1770 1859 0 1770 1857 0 Flt Permitted 0.960 0.976 0.950 0.950 Satd. Flow (perm) 0 1788 1583 0 1818 0 1770 1859 0 1770 1857 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 384 715 1281 1365 Travel Time (s) 8.7 16.3 29.1 31.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st pm lt lane at buckingham.syn Intersection Int Delay, s/veh 2.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 5 6 108 3 4 2 61 1104 17 1 715 19 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - 100 - - - 150 - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 6 7 121 3 4 2 69 1240 19 1 803 21 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2206 2213 814 2207 2214 1250 825 0 0 1260 0 0 Stage 1 816 816 - 1387 1387 - - - - - - - Stage 2 1390 1397 - 820 827 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 32 44 378 32 44 211 805 - - 552 - - Stage 1 371 391 - 177 210 - - - - - - - Stage 2 176 208 - 369 386 - - - - - - - Platoon blocked, % - - - - Mov Cap-1 Maneuver 27 40 378 18 40 211 805 - - 552 - - Mov Cap-2 Maneuver 27 40 - 18 40 - - - - - - - Stage 1 339 390 - 162 192 - - - - - - - Stage 2 155 190 - 246 385 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 32.8 156.5 0.5 0 HCM LOS D F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 805 - - 33 378 33 552 - - HCM Lane V/C Ratio 0.085 - - 0.375 0.321 0.306 0.002 - - HCM Control Delay (s) 9.9 - - 168.8 19 156.5 11.5 - - HCM Lane LOS A - - F C F B - - HCM 95th %tile Q(veh) 0.3 - - 1.2 1.4 1 0 - - Lanes and Geometrics Short Total PM 3: Lemay & Buckingham 2010 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st pm lt lane at buckingham.syn Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 0 100 0 0 150 0 150 0 Storage Lanes 0 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.850 0.970 0.998 0.996 Flt Protected 0.977 0.984 0.950 0.950 Satd. Flow (prot) 0 1820 1583 0 1778 0 1770 1859 0 1770 1855 0 Flt Permitted 0.977 0.984 0.950 0.950 Satd. Flow (perm) 0 1820 1583 0 1778 0 1770 1859 0 1770 1855 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 373 866 1312 1334 Travel Time (s) 8.5 19.7 29.8 30.3 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total AM 2: Site Access & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Intersection Int Delay, s/veh 1.1 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 36 4 10 63 2 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 42 5 12 74 2 6 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 47 0 143 45 Stage 1 - - - - 45 - Stage 2 - - - - 98 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1560 - 850 1025 Stage 1 - - - - 977 - Stage 2 - - - - 926 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1560 - 843 1025 Mov Cap-2 Maneuver - - - - 843 - Stage 1 - - - - 977 - Stage 2 - - - - 919 - Approach EB WB NB HCM Control Delay, s 0 1 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 965 - - 1560 - HCM Lane V/C Ratio 0.009 - - 0.008 - HCM Control Delay (s) 8.8 - - 7.3 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0 - - 0 - Lanes and Geometrics Short Total AM 2: Site Access & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.986 0.899 Flt Protected 0.993 0.988 Satd. Flow (prot) 1837 0 0 1850 1655 0 Flt Permitted 0.993 0.988 Satd. Flow (perm) 1837 0 0 1850 1655 0 Link Speed (mph) 30 30 30 Link Distance (ft) 244 384 270 Travel Time (s) 5.5 8.7 6.1 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 2: Site Access & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Intersection Int Delay, s/veh 1.9 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 99 9 21 63 9 20 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 110 10 23 70 10 22 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 120 0 232 115 Stage 1 - - - - 115 - Stage 2 - - - - 117 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1468 - 756 937 Stage 1 - - - - 910 - Stage 2 - - - - 908 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1468 - 744 937 Mov Cap-2 Maneuver - - - - 744 - Stage 1 - - - - 910 - Stage 2 - - - - 893 - Approach EB WB NB HCM Control Delay, s 0 1.9 9.3 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 867 - - 1468 - HCM Lane V/C Ratio 0.037 - - 0.016 - HCM Control Delay (s) 9.3 - - 7.5 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - Lanes and Geometrics Short Total PM 2: Site Access & Buckingham City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.989 0.907 Flt Protected 0.988 0.985 Satd. Flow (prot) 1842 0 0 1840 1664 0 Flt Permitted 0.988 0.985 Satd. Flow (perm) 1842 0 0 1840 1664 0 Link Speed (mph) 30 30 30 Link Distance (ft) 217 373 240 Travel Time (s) 4.9 8.5 5.5 Intersection Summary Area Type: Other HCM Signalized Intersection Capacity Analysis Short Total AM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 13 156 100 129 265 119 43 323 60 58 607 31 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 16 12 12 16 8 12 13 12 12 14 12 Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.94 1.00 0.95 0.98 0.99 Flt Protected 0.95 1.00 0.95 1.00 0.99 1.00 Satd. Flow (prot) 1770 1952 1770 1959 1871 1964 Flt Permitted 0.15 1.00 0.37 1.00 0.87 0.92 Satd. Flow (perm) 281 1952 682 1959 1633 1819 Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Adj. Flow (vph) 15 181 116 150 308 138 50 376 70 67 706 36 RTOR Reduction (vph) 0 19 0 0 13 0050010 Lane Group Flow (vph) 15 278 0 150 433 0 0 491 0 0 808 0 Confl. Peds. (#/hr) 22 Confl. Bikes (#/hr) 2 4 9 Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4862 Permitted Phases 4862 Actuated Green, G (s) 33.0 33.0 33.0 33.0 76.5 77.0 Effective Green, g (s) 34.0 34.0 34.0 34.0 77.5 78.0 Actuated g/C Ratio 0.28 0.28 0.28 0.28 0.65 0.65 Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5 Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lane Grp Cap (vph) 79 553 193 555 1054 1182 v/s Ratio Prot 0.14 c0.22 v/s Ratio Perm 0.05 0.22 0.30 c0.44 v/c Ratio 0.19 0.50 0.78 0.78 0.47 0.68 Uniform Delay, d1 32.6 35.9 39.5 39.6 10.8 13.2 Progression Factor 1.00 1.00 1.00 1.00 1.59 1.00 Incremental Delay, d2 3.3 2.0 21.8 8.6 1.4 3.2 Delay (s) 35.9 38.0 61.3 48.2 18.6 16.4 Level of Service D D E D B B Approach Delay (s) 37.9 51.5 18.6 16.4 Approach LOS D D B B Intersection Summary HCM 2000 Control Delay 29.4 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.72 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.5 Intersection Capacity Utilization 84.5% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Timing Report, Sorted By Phase Short Total AM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st am.syn Phase Number 2468 Movement SBTL EBTL NBTL WBTL Lead/Lag Lead-Lag Optimize Recall Mode C-Min None C-Min None Maximum Split (s) 83 37 83 37 Maximum Split (%) 69.2% 30.8% 69.2% 30.8% Minimum Split (s) 21.5 22.5 22 22.5 Yellow Time (s) 3.5 4 3.5 4.5 All-Red Time (s) 1 1.5 1.5 1 Minimum Initial (s) 7777 Vehicle Extension (s) 6666 Minimum Gap (s) 3333 Time Before Reduce (s) 0000 Time To Reduce (s) 0000 Walk Time (s) 7777 Flash Dont Walk (s) 10 10 10 10 Dual Entry Yes Yes Yes Yes Inhibit Max Yes Yes Yes Yes Start Time (s) 37 0 37 0 End Time (s) 0 37 0 37 Yield/Force Off (s) 115.5 31.5 115 31.5 Yield/Force Off 170(s) 105.5 21.5 105 21.5 Local Start Time (s) 37 0 37 0 Local Yield (s) 115.5 31.5 115 31.5 Local Yield 170(s) 105.5 21.5 105 21.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 55 Offset: 0 (0%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 4: Lemay & Vine HCM Signalized Intersection Capacity Analysis Short Total PM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 25 300 120 112 221 135 85 763 214 109 510 45 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width 12 16 12 12 16 8 12 13 12 12 14 12 Total Lost time (s) 4.5 4.5 4.5 4.5 4.0 3.5 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.99 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.96 1.00 0.94 0.97 0.99 Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99 Satd. Flow (prot) 1770 1966 1770 1937 1857 1949 Flt Permitted 0.28 1.00 0.19 1.00 0.89 0.67 Satd. Flow (perm) 512 1966 345 1937 1665 1310 Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Adj. Flow (vph) 26 312 125 117 230 141 89 795 223 114 531 47 RTOR Reduction (vph) 0 12 0 0 18 0080020 Lane Group Flow (vph) 26 425 0 117 353 0 0 1099 0 0 690 0 Confl. Peds. (#/hr) 2 2 Confl. Bikes (#/hr) 2435 Heavy Vehicles (%) 2% 5% 2% 2% 5% 2% 2% 2% 2% 2% 2% 2% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4862 Permitted Phases 4862 Actuated Green, G (s) 34.5 34.5 34.5 34.5 75.0 75.5 Effective Green, g (s) 35.5 35.5 35.5 35.5 76.0 76.5 Actuated g/C Ratio 0.30 0.30 0.30 0.30 0.63 0.64 Clearance Time (s) 5.5 5.5 5.5 5.5 5.0 4.5 Vehicle Extension (s) 6.0 6.0 6.0 6.0 6.0 6.0 Lane Grp Cap (vph) 151 581 102 573 1054 835 v/s Ratio Prot 0.22 0.18 v/s Ratio Perm 0.05 c0.34 c0.66 0.53 v/c Ratio 0.17 0.73 1.15 0.62 1.04 0.83 Uniform Delay, d1 31.3 38.0 42.2 36.4 22.0 16.7 Progression Factor 1.00 1.00 1.00 1.00 0.64 1.00 Incremental Delay, d2 1.5 6.5 134.1 3.4 30.8 9.2 Delay (s) 32.9 44.4 176.4 39.8 44.9 25.8 Level of Service C D F D D C Approach Delay (s) 43.8 72.5 44.9 25.8 Approach LOS D E D C Intersection Summary HCM 2000 Control Delay 44.8 HCM 2000 Level of Service D HCM 2000 Volume to Capacity ratio 1.08 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 8.5 Intersection Capacity Utilization 106.4% ICU Level of Service G Analysis Period (min) 15 c Critical Lane Group Timing Report, Sorted By Phase Short Total PM 4: Lemay & Vine 2000 HCM City of Fort Collins Signal Timing Synchro 8 Light Report st pm.syn Phase Number 2468 Movement SBTL EBTL NBTL WBTL Lead/Lag Lead-Lag Optimize Recall Mode C-Min None C-Min None Maximum Split (s) 80 40 80 40 Maximum Split (%) 66.7% 33.3% 66.7% 33.3% Minimum Split (s) 21.5 22.5 22 22.5 Yellow Time (s) 3.5 4 3.5 4.5 All-Red Time (s) 1 1.5 1.5 1 Minimum Initial (s) 7777 Vehicle Extension (s) 6666 Minimum Gap (s) 3333 Time Before Reduce (s) 0000 Time To Reduce (s) 0000 Walk Time (s) 7777 Flash Dont Walk (s) 10 10 10 10 Dual Entry Yes Yes Yes Yes Inhibit Max Yes Yes Yes Yes Start Time (s) 53 13 53 13 End Time (s) 13 53 13 53 Yield/Force Off (s) 8.5 47.5 8 47.5 Yield/Force Off 170(s) 118.5 37.5 118 37.5 Local Start Time (s) 40 0 40 0 Local Yield (s) 115.5 34.5 115 34.5 Local Yield 170(s) 105.5 24.5 105 24.5 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 65 Offset: 13 (11%), Referenced to phase 2:SBTL and 6:NBTL, Start of Red Splits and Phases: 4: Lemay & Vine APPENDIX G Lincoln Vine Lemay Buckingham SCALE: 1"=600' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, May 2015 Pedestrian LOS Worksheet Project Location Classification: Transit Corridor Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Neighborhood to northeast Residential Minimum B C C C C 1 Actual A C B C C Proposed A C B C C Neighborhood to the southeast Residential Minimum B C C C C 2 Actual A B B B B Proposed A B B B B Minimum 3 Actual Proposed Minimum 4 Actual Proposed Minimum 5 Actual Proposed Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed Lincoln Vine Lemay Buckingham SCALE: 1"=600' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Lemay Avenue Microbrewery & Self-Storage TIS, May 2015 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C B B Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification Commercial area to the 1 south of the site Commercial C A A 2 3 4 100 200 300 400 500 600 EB AM 41 VPH AM 1359 VPH 1 LANE & 1 LANE 2 OR MORE LANES & 1 LANE 2 OR MORE LANES & 2 OR MORE LANES *100 *150 PM 1918 VPH 1900 EB PM 119 VPH