June 15, 2015
Cole Evans
McWhinney
2725 Rocky Mountain Ave. Ste. 200
Loveland, CO 80538
RE: Fort Collins Hotel - Preliminary Design Review, PDR150011, Round Number
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions
about any comments, you may contact the individual commenter or direct your
questions through the Project Planner, Seth Lorson, at
970-224-6189 or slorson@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic:
Building
Elevations
Comment Number: 1 Comment
Originated: 06/09/2015
06/09/2015: Section 4.16(D)(2) A modification of standard (2.8) is required
for the building height to exceed 4 stories or 56 feet. Noted.
The contextual comparisons are very helpful in making the argument that
the modification is nominal and inconsequential as noted in Section 2.8. It
may be helpful to provide us with the 3D model so it can be inserted into
the greater downtown model that is being created for the Downtown Plan.
This will facilitate flexibility in the contextual review. We have provided a
3D model with the electronic PDP submission. Please understand that
though this model appears to have a high level of detail, it represents the
project at the end Schematic Design. The massing provided approximates
what we understand today and may not be representative of the final floor-
to-floor dimensions, exterior façade details, material selection or
coordination with our consultants.
Comment Number: 2 Comment
Originated: 06/09/2015
06/09/2015: Section 4.16(D)(4) Buildings over 3 stories in height shall
reduce massing by setting back the forth story at a 35 degree angle
measured at the intersection of the floor plan of the 4th story and the
property line along the public street frontage. Noted. We are studying the
comment and its implications. It was originally intended that the hotel
approximate the massing and stepbacks of the Mitchell Building across
Walnut Street in terms of absolute vertical dimensions and not specifically
the number of stories. As the floor-to-floor of an office building differs from
that of a hotel, and we viewed comparative massing as more important than
the number of stories, the stepback is currently occurring at the fourth floor
to better align with the Mitchell Building’s stepback at their third level.
Three stories is the percevied height maximum in this area (thus the 4th story
setback). The cornice line should be placed at the third story to facilitate this
pattern. – Noted. Please refer to previous answer.
Consider constructing the 5th floor of material similar to that on the Mitchell
Block that helps it fade into the background: black/dark metal. – Noted.
Several options as the design progresses.
Comment Number: 3 Comment
Originated: 06/09/2015
06/09/2015: What is the canopy feature on the second floor roof? We have
some concern about the compatibility of this feature. The roof canopy is
intended to be a metal screen. We will present this idea in more detail as it
develops further.
06/09/2015: Although it is apparent you have already used the Old Town Design
Guidelines, they will continue to be informative when further developing the
architectural details:
http://www.fcgov.com/planning/pdf/ftc_oldtown_final_july2014_low.pdf
Page 85 Noted.
Topic: General
Comment Number: 1 Comment Originated: 06/09/2015
06/09/2015: The proposed hotel is in the Downtown (D) District - Old City Center
Subdistrict. "Lodging establishments" are subject to review and approval by the
Planning and Zoning Board (Type 2). – Noted.
Comment Number: 2 Comment Originated: 06/09/2015
06/09/2015: Section 4.16(D)(5) requires the building character and facade to
provide interest and activity related to plazas, decks, and fenestration. -
Noted.
Comment Number: 3 Comment Originated: 06/09/2015
06/09/2015: If a parking structure were considered for this site the following
requirements apply: We are currently discussing with the City some options
on a parking structure and will work closely with the City on the design of
the structure to meet the code and desire of all parties.
Section 4.16(D)(6) Parking Structures. To the extent reasonably feasible, all parking
structures shall meet the following design criteria:
(a) Where parking structures abut streets, retail and other uses shall be required
along the ground level frontage to minimize interruptions in pedestrian interest and
activity. The decision maker may grant an exception to this standard for all or part of
the ground level frontage on streets with low pedestrian interest or activity.
(b) Parking and awnings, signage and other architectural elements shall be
incorporated to encourage pedestrian activity at the street-facing level.
(c) Architectural elements, such as openings, sill details, emphasis on vertical
proportions such as posts, recessed horizontal panels and other architectural
features shall be used to establish human scale at the street-facing level.
(d) The architectural design of structures shall be compatible in architectural design
with adjacent buildings in terms of style, mass, material, height, roof pitch and other
exterior elements.
(e) Auto entrances shall be located to minimize pedestrian/auto conflicts. (See
3.10.4 for detail as to how this can be accomplished.)
Additional design guidelines can be found in the River District Design Guidelines on
page 64: http://www.fcgov.com/planning/pdf/ftc_riverdg_adoption_web.pdf
Comment Number: 4 Comment Originated: 06/09/2015
06/09/2015: Section 3.2.2(C)(4) Bicycle parking is required at 1 per 4 rooms at a
ratio of 60% enclosed and 40% fixed. - We would also like to discuss with staff
the bike parking requirements for the hotel. We understand the City requires 1
stall for every 4 rooms but since Hotels are a destination where majority of the
guests come from outside the City, we would like discuss options of reducing that
or a bike share program through the Hotel as mentioned above. We will still park
according to the retail and restaurant spaces.
Another good idea would be to offer bike rental or share program through the hotel.
This option is being explored with the Hotel Operator.
The alternative compliance section (3.2.2(C)(4)(c)) may be useful for your bike
parking approach. – Noted and as we finalize the bike parking requirements we will
respond accordingly.
06/09/2015: Per our discussion regarding the desired schedule for the project:
Hotel Development Review Schedule:
June 23 – PDP Submittal – June 24 per latest phone conversation with Seth.
(2 week CITY review)
July 8 – First Staff Review Meeting
(2 week APPLICANT revision turn-around)
July 21 – Revision Submittal
(2 week CITY review)
August 5 – Second Staff Review Meeting
(2 weeks to shore up any outstanding comments)
August 19 – Deadline for P&Z
September 10 – P&Z Hearing
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/09/2015
06/09/2015: Section 3.2.1(E)(4) The parking lot is required to be landscaped both
on the (a)perimeter and the (b)interior (6% of the interior if <100 spaces; 10% if
greater). – Depending if a surface lot or parking structure is built, it will dictate the
design.
Topic: Site Plan
Comment Number: 1 Comment Originated: 06/09/2015
06/09/2015: Section 4.16(D)(1) requires building setbacks to be compatible with
established setbacks of existing building on the same block. And, landscaping shall
be designed as an integral part of the development plan. – Currently the buildings
along Walnut, Chestnut and Jefferson are built right up to the property line. Our
plan would continue with that and we would build our building right up against the
property line.
Comment Number: 2 Comment Originated: 06/09/2015
06/09/2015: The current configuration of the parking lot will require a couple
modifications of standards: - We have submitted a modification of standard
for the surface lot at this time. However if a parking structure is built the
design will change as well as the potential modifications. The modifications
of standard mentioned are enclosed as a component of this submittal
package.
Sec. 4.16(E)(1)(a)Parking lots shall be located behind buildings in the interior of
blocks, in side yards, underground or in a parking structure, to the maximum
extent feasible. As the overall project parking requirements are significant and the
project site is constrained as an infill/redevelopment site, the current configuration
represents the highest level of feasibility and activates the downtown core
intersection of Walnut St., Chestnut St. and Mountain Ave. Efforts have been
made to improve the streetscape condition along Jefferson St. and screen parking,
however, the project cannot accommodate additional building frontage along
Jefferson St. without sacrificing required parking quantities.
Sec. 3.2.2(J) Parking lot setback. Minimum landscape setback along an arterial
street is 15 feet; nonarterial is 10 feet. The parking lot setback currently shown
from Jefferson Street is 6’ including a 5’ planting buffer as well as a 30”
masonry wall to match the hotel materials. See request for modification of
standard for further detail and rationale.
The proposed masonry wall will provide some of the screening for the parking
lot to offset the impact of the modifications. Some additional interest such as
seatwalls, planters, landscaping and pocket plazas should be considered to
fully activate the pedestrian edge. Additional planting has been added as well
as seatwalls/plazas at corners and along the Jefferson St. frontage.
See Section 3.2.1(E)(4)(b) for parking lot screening.
Additionally, see the Old Town Design Standards, page 78 for more parking lot
buffer ideas: http://www.fcgov.com/planning/pdf/ftc_oldtown_final_july2014_low.pdf
06/09/2015: Outdoor cafes as proposed in the canopy along the alley, in the ROW
on Walnut, and on the rooftop shall comply to the following standards: - Noted.
Sec. 4.16(E)(1)(b)
1. To allow for pedestrian circulation, a minimum of seven (7) feet of sidewalk
along the curb and leading to the entrance to the establishment shall be
maintained free of tables and other encumbrances. The plan currently shows in
excess of 7’ of sidewalk area.
2. Planters, posts with ropes or other removable enclosures are permitted as a
way of defining the area occupied by the cafe. These options will be explored
as the design progresses.
3. Extended awnings, canopies or large umbrellas shall be permitted. Colors
shall complement building colors. Umbrellas/café tables are currently
proposed in the outdoor seating area along the alley between the hotel and
parking.
4. Outdoor cafes shall be required to provide additional trash receptacles in
the outdoor eating area. Noted.
5. Tables, chairs, planters, trash receptacles and other elements of street
furniture shall be compatible with the architectural character of the building
where the establishment is located in terms of style, color, materials and
similar elements. Noted.
6. The operators of outdoor cafes shall be responsible for maintaining a clean,
litter-free and well-kept appearance within and immediately adjacent to the
area of their activities. Noted.
7. Outdoor spaces. To the extent reasonably feasible, outdoor spaces shall be
placed next to activity that generates the users (such as street corners, offices,
day care, shops and dwellings). Outdoor spaces shall be linked to and made
visible from streets and sidewalks to the extent reasonably feasible. The corner
of Chestnut and Walnut, the hotel drop-off and enhanced Old Firehouse Alley
are all envisioned as outdoor spaces such as mentioned above.
Comment Number: 4 Comment Originated:
06/09/2015
06/09/2015: The sidewalk at the guest drop off needs to maintain a clear space
for pedestrians to pass by. – noted and as the design progresses we will
maintain a clear space.
Comment Number: 5 Comment Originated:
06/09/2015
06/09/2015: Section 3.2.2(K)(2) Parking Requirement for lodging
establishments is a minimum of 0.5 per room and a maximum of 1 per room. –
Noted.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
06/10/2015
06/10/2015: Tyler Siegmund tsiegmund@fcgov.com or 221-6501 will be the
Engineer assigned to this project.
Comment Number: 2 Comment Originated:
06/10/2015
06/10/2015: Larimer County Road Impact Fees and Street Oversizing Fees are
due at the time of building permit. Please contact Matt Baker at 224-6108 if you
have any questions. – Noted.
Comment Number: 3 Comment Originated:
06/10/2015
06/10/2015: The City's Transportation Development Review Fee (TDRF) is
due at the time of submittal. For additional information on these fees, please
see: http://www.fcgov.com/engineering/dev-review.php
06/10/2015: Any damaged curb, gutter and sidewalk existing prior to construction,
as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed
due to construction of this project, shall be replaced or restored to City of Fort
Collins standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
All public sidewalk, driveways and ramps existing or proposed adjacent or within the
site need to meet ADA standards, if they currently do not, they will need to be
reconstructed so that they do meet current ADA standards as a part of this project. –
Noted.
Comment Number: 5 Comment Originated: 06/10/2015
06/10/2015: Any public improvements must be designed and built in accordance
with the Larimer County Urban Area Street Standards (LCUASS). They are available
online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm – Noted.
Comment Number: 6 Comment Originated: 06/10/2015
06/10/2015: This project is responsible for dedicating any right-of-way and
easements that are necessary for this project. – Noted.
Comment Number: 7 Comment Originated: 06/10/2015
06/10/2015: Utility plans will be required and a Development Agreement will be
recorded once the project is finalized. – Noted.
Comment Number: 8 Comment Originated: 06/10/2015
06/10/2015: A Development Construction Permit (DCP) will need to be obtained
prior to starting any work on the site. – Noted.
Comment Number: 9 Comment Originated: 06/10/2015
06/10/2015: LCUASS parking setbacks (Figure 19-6) apply and will need to be
followed for the parking lot. – Modification of Standard is attached for the
parking setbacks.
Comment Number: 10 Comment Originated: 06/10/2015
06/10/2015: All fences, barriers, posts or other encroachments within the public
right-of-way are only permitted upon approval of an encroachment permit.
Applications for encroachment permits shall be made to Engineering Department for
review and approval prior to installation. Encroachment items shall not be shown on
the site plan as they may not be approved, need to be modified or moved, or if the
permit is revoked then the site/ landscape plan is in non-compliance. – Noted.
Comment Number: 11 Comment Originated: 06/10/2015
06/10/2015: Any rain gardens within the right-of-way cannot be used to treat the
development/ site storm runoff. We can look at the use of rain gardens to treat
street flows – the design standards for these are still in development. Noted, a
meeting will be setup with Basil Hamdan upon his return from vacation to
determine the best way to address the LID requirement for this site.
Comment Number: 12 Comment Originated: 06/10/2015
06/10/2015: Doors are not allowed to open out into the right-of-way. They need to
be inset so that when they are opened they will not hit someone walking along the
public sidewalk or walking or driving down the alley. – Noted.
Comment Number: 13 Comment Originated: 06/10/2015
06/10/2015: Bike parking required for the project cannot be placed within the
right-of-way and if placed just behind the right-of-way need to be placed so that
when bikes are parked they do not extend into the right-of-way. – Noted. We
would also like to discuss with staff the bike parking requirements for the hotel.
We understand the City requires 1 stall per every 4 rooms but since Hotels are
a destination where majority of the guests come from outside the City , we
would like discuss options of reducing that or a bike share program through the
Hotel. We will still park according to the retail and restaurant spaces.
Comment Number: 14
Comment Number: 14 Comment Originated: 06/10/2015
06/10/2015: This site is adjacent to a CDOT roadway and all access off of
Jefferson is subject to CDOT approval. CDOT has identified that access to
Chestnut Street will need to be limited to right-in right-out movements and these
movements will need to be controlled by a physical barrier (a median in Jefferson or
a pork chop). The project will be responsible for the design and construction of this
improvement. A pork chop maybe the easiest to implement as a median in
Jefferson will require some other extensive improvements and coordination since
room does not currently exist in the roadway in which a median can be constructed.
Both solutions will impact existing parking – likely on both streets.
Plans will be routed to CDOT for review and approval and the applicant will need to
obtain an access permit from CDOT for Chestnut and the service connection. –
Noted.
Comment Number: 15 Comment Originated: 06/10/2015
06/10/2015: The plans have one plan that shows head in parking on Chestnut and
one plan that shows diagonal parking. City Engineering and Transportation staff see
the diagonal parking as in more keeping with what exists on the adjacent
surrounding street and is the parking type that needs to be utilized if parking islands
are to be provided in the street (bump ins). These need to be designed as they are
on adjacent streets with radius and curves that allow for street sweeper to get in and
sweep the inset parking areas. This also helps the City facilitate snow removal.
This does impact the number of parking spaces. - The sheets have been updated to
show consistency.
Comment Number: 16 Comment Originated: 06/10/2015
06/10/2015: The plans have one plan that shows head in parking on Chestnut and
one plan that shows diagonal parking. City Engineering and Transportation staff see
the diagonal parking as in more keeping with what exists on the adjacent
surrounding street and is the parking type that needs to be utilized if parking islands
are to be provided in the street (bump ins). These need to be designed as they are
on adjacent streets with radius and curves that allow for street sweeper to get in and
sweep the inset parking areas. This also helps the City facilitate snow removal.
This does impact the number of parking spaces. – The sheets have been updated to
show consistency.
Comment Number: 17 Comment Originated: 06/10/2015
06/10/2015: Drainage within the street will need to be discussed when you have a
proposal. Changing of the curb lines and locations along Chestnut, Walnut,
Mountain and Jefferson will impact the curb flow pattern and additional inlets or other
improvements may be necessary to accommodate the drainage changes. - Noted.
Comment Number: 18 Comment Originated: 06/10/2015
06/10/2015: For any proposed islands within the public streets a water tap will need
to be provided and you will need to work with Parks Department regarding the
proposed plantings and whether they will accept the proposed improvements for
maintenance. – Noted and we will discuss with Parks as the design progresses.
Comment Number: 19 Comment Originated: 06/10/2015
06/10/2015: The applicant will need to work with parking services on how the
parking adjacent to the circle drive will be managed and signed. – Noted. We
would also like to discuss how private pull-up and drop-off can be done within
the ROW (easement or permit)?
Comment Number: 20 Comment Originated: 06/10/2015
06/10/2015: Improvements to the street frontages will need to be looked at.
Replacement of damage curb, gutter and sidewalk, street trees, drainage chases or
other drainage improvements, ADA ramps…
06/10/2015: Any sort of alternative material from the standard concrete/ asphalt for
the streets and standard downtown sidewalk treatment and pattern will need to be
reviewed and approved. A variance request identifying the request and the details of
the proposal and the design will need to be submitted so the proper City
departments can review and provide comment and input on the proposal.
(Aesthetics, construction details, long term maintenance, signage/striping
compatibility and maintenance, utility access, functionality). - Noted
Comment Number: 22 Comment Originated: 06/10/2015
06/10/2015: As proposed it is going to be difficult for those trying to get to the Hotel
when using Google or without a good knowledge of the downtown street system.
You have to be coming from the right direction in order to be able to get to the front
of the hotel. – Noted
Department: Environmental Planning
Contact: Kelly Kimple, , kkimple@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/10/2015
06/10/2015: With respect to landscaping and design, the City of Fort Collins Land
Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses
in your landscaping or re-landscaping and reduce bluegrass lawns as much as
possible. Noted.
Comment Number: 2 Comment Originated: 06/10/2015
06/10/2015: The applicant should make note of Article 3.2.1(C) that requires
developments to submit plans that "... (4) Protect significant trees, natural systems,
and habitat". Note that a significant tree is defined as a tree having DBH (Diameter
at Breast Height) of six inches or more. If any of the trees within this site have a
DBH of greater than six inches, a review of the trees shall be conducted with Tim
Buchanan, City Forester (221 6361) to determine the status of the existing trees and
any mitigation requirements that could result from the proposed development.
A meeting will be scheduled with Tim Buchanan to review the condition of existing
trees and determine required mitigation trees. Efforts have been made in the site
planning process to preserve as many large canopy trees as possible at the
intersection of Walnut and Chestnut Streets.
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/09/2015
06/09/2015: Light and Power has 3-phase electric facilities in this area for both of
the existing addresses. System modification and capacity charges may apply. –
Noted.
Comment Number: 2 Comment Originated: 06/09/2015
06/09/2015: Contact Light and Power Engineering to coordinate the transformer
and electric meter locations, please show the locations on the utility plans. –
Noted.
Comment Number: 3 Comment Originated: 06/09/2015
06/09/2015: Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at: – Noted.
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 4 Comment Originated: 06/09/2015
06/09/2015: Please contact Light & Power Engineering if you have any questions at
970.221.6700. Please reference our policies, development charge processes, and
use our fee estimator at – Noted.
http://www.fcgov.com/utilities/business/builders-and-developers
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 05/29/2015
05/29/2015: FIRE ACCESS
Poudre Fire Authority and the project team have been working off-line to resolve
outstanding fire access concerns and meeting alternative means of code
compliance. Further discussion is required. Initial conversations have been had
with PFA and as plans develop we will continue to have conversations with PFA
to make sure we meet the Fire Code.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 06/01/2015
06/01/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Please submit; Erosion Control Plan, Erosion
Control Report, and an Escrow / Security Calculation. If you need clarification
concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com - Noted.
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 06/12/2015
06/12/2015: It is important to document the existing impervious area since drainage
requirements and fees are based on new impervious area. An exhibit showing the
existing and proposed impervious areas with a table summarizing the areas is
required prior to the time fees are calculated for each building permit. We will
provide this information prior to the time fees are calculated for building permits.
Comment Number: 3 Comment Originated: 06/12/2015
06/12/2015: When a site is completely redeveloped (scraped) the standard
requirement is to provide onsite detention with a 2 year historic release rate for
water quantity. Parking lot detention for water quantity is allowed as long as it is not
deeper than one foot. A variance to the 2 year historic release rate may be justified
if the site has been paying fees for a higher imperviousness. Please contact Jean
Pakech at 221- 6375 to determine the present Stormwater fees and runoff
coefficient category. Noted, however it is our understanding per our conversations that
detention and water quality are not a requirement for this site due to this site being
situated in the River District and detention/water quality are being provided offsite per
Ayres Master Drainage Study.
Comment Number: 4 Comment Originated: 06/12/2015
06/12/2015: A portion of the existing site drains to the storm sewer system in
Walnut Street, which is conveyed south to Oak Street then to Udall. The remainder
of the site drains into the storm sewer system in Chestnut Street and is conveyed
north to the Poudre River. It is important to maintain existing runoff rates to each of
these systems in order to avoid causing increased flooding. Noted.
Comment Number: 5 Comment Originated: 06/12/2015
06/12/2015: Water quality treatment for the portion of the site draining to the Walnut
Street storm sewer system is provided for in the Udall Natural Area water treatment
facility. However additional onsite water quality treatment is encouraged as
described in the Fort Collins Stormwater Manual, Volume 3-Best Management
Practices (BMPs). Extended detention is the usual method selected for water
quality treatment; however the use of any of the BMPs is encouraged.
(http://www.fcgov.com/utilities/business/builders-and-developers/development-form
s-guidelines-regulations/stormwater-criteria) Noted, however it is our understanding
per our conversations that detention and water quality are not a requirement for this
site due to this site being situated in the River District and detention/water quality
are being provided offsite per Ayres Master Drainage Study.
Comment Number: 6 Comment Originated: 06/12/2015
06/12/2015: Water quality treatment for the portion of the site draining to the
Chestnut Street storm sewer system is provided for in a water quality vault near the
outfall to the river. However additional onsite water quality treatment is encouraged
as described in the Fort Collins Stormwater Manual, Volume 3-Best Management
Practices (BMPs). Extended detention is the usual method selected for water
quality treatment; however the use of any of the BMPs is encouraged.
(http://www.fcgov.com/utilities/business/builders-and-developers/development-form
s-guidelines-regulations/stormwater-criteria) Noted, however it is our understanding
per our conversations that detention and water quality are not a requirement for this
site due to this site being situated in the River District and detention/water quality
are being provided offsite per Ayres Master Drainage Study.
Comment Number: 7 Comment Originated: 06/12/2015
06/12/2015: Low Impact Development (LID) requirements are required on all new or
redeveloping property which includes sites required to be brought into compliance
with the Land Use Code. These require a higher degree of water quality treatment
for 50% of the new impervious area and 25% of new paved areas must be pervious.
More information and links can be found at:
http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impac
t-development Noted, a meeting will be setup with Basil Hamdan upon his return
from vacation to determine the best way to address the LID requirement for this
site.
Comment Number: 8 Comment Originated: 06/12/2015
06/12/2015: The streets surrounding this site are known to convey a significant
amount of stormwater during a larger storm event. The adjacent streets will need to
be analyzed to determine the 100-year water surface elevation (WSEL) at all
openings. The building will need to be elevated so that the minimum opening is at
least 1.0’ above the WSEL or floodproofed to the same elevation. Noted, this is
currently being addressed and a report/analysis has been submitted to Shane Boyle
under separate submittal.
Comment Number: 9 Comment Originated: 06/12/2015
06/12/2015: The city wide Stormwater development fee (PIF) is $7,817/acre
($0.1795 sq.-ft.) for new impervious area over 350 sq.-ft., and there is a
$1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing impervious
area. These fees are to be paid at the time each building permit is issued.
Information on fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de
velopment-fees or contact Jean Pakech at 221-6375 for questions on fees. There is
also an erosion control escrow required before the Development Construction
permit is issued. The amount of the escrow is determined by the design engineer,
and is based on the site disturbance area, cost of the measures, or a minimum
amount in accordance with the Fort Collins Stormwater Manual. Noted.
Comment Number: 10 Comment Originated: 06/12/2015
06/12/2015: The design of this site must conform to the drainage basin design of
the Old Town Master Drainage Plan as well the Fort Collins Stormwater Manual.
Noted.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/09/2015
06/09/2015: No comments.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/09/2015
06/09/2015: A Traffic Impact Study is needed with a future submittal. The study has
been scoped with the developer's engineer, but it has not been received by the City.
Comment Number: 2 Comment Originated: 06/09/2015
06/09/2015: Jefferson Street is a state highway and is under the jurisdiction of the
Colorado Department of Transportation. Those parts of the project impacting
Jefferson will need to meet their standards in the State Highway Access Code.
CDOT commented that a change of use permit will be needed for Chestnut (as well
as potentially the Alley access). - Noted.
Comment Number: 3 Comment Originated: 06/09/2015
06/09/2015: Jefferson Street has an adopted Plan and the City signed an
Intergovernmental Agreement with CDOT that outlines the future configuration of
Jefferson Street. This shows a restricted right-in, right-out movement at Chestnut.
With the added traffic of the hotel, it should be expected that this movement be
restricted with either a median (as shown in the plans) or an exaggerated porkchop
in the interim. CDOT also commented that this intersection (SH14/Chestnut)
should be evaluated as a right-in/right-out access only. - Noted.
Comment Number: 4 Comment Originated: 06/09/2015
06/09/2015: Please work with the engineering department on any improvements
needed along Jefferson (sidewalks, curb ramps, aesthetics etc.) per the adopted
plan. – At this time no improvements are planned along Jefferson.
Comment Number: 5 Comment Originated: 06/09/2015
06/09/2015: The plans and submittal will need to show vehicular turning templates
for the various turns into / out of the hotel area. This includes the U-turn from the
hotel drop off back towards the parking lot entrance. – Plans have been submitted.
Comment Number: 6 Comment Originated: 06/09/2015
06/09/2015: Don't forget about bike parking. The City has requirements for number
of spaces depending on land use. – We are looking at bike parking and some
options but until we understand if a structure or surface lot is going to be built, we
are not final on the location.
Comment Number: 7 Comment Originated: 06/09/2015
06/09/2015: There is apparently some discussion that the parking lot could be
enlarged (structured) for public use. The additional traffic related to more (non-hotel
related) parking will need to be evaluated with the traffic study in terms of
access/circulation. – Noted and initial conversations have started with staff and the
applicant.
Comment Number: 8 Comment Originated: 06/09/2015
06/09/2015: There is substantial concern among staff that the access to the site as
shown will be problematic. Having no access to and from the Mountain/College
area could lead to frustration, circuitous driving, and non-compliance with the
various right turn only configurations. Google maps or in-vehicle navigation may
direct guests incorrectly. This may not be a specific Level of Service issue, but we
see it as a significant functional, operational, and potential safety issue. - Noted.
Comment Number: 9 Comment Originated: 06/09/2015
06/09/2015: CDOT comment: "The circulation of the site might be a problem. The
applicant needs to recognize that signing for this hotel on the state system is very
limited. Do not assume that you can place directional signs to get to the hotel." -
Noted.
Department: Water-Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/12/2015
06/12/2015: Existing water and sewer mains in the vicinity include an 8-inch water
main in Walnut, a 16-inch water main in Jefferson, 8-inch sanitary sewer mains in
Chestnut and Old Firehouse Alley, a 6-inch sanitary sewer main in Walnut, and a
manhole at the terminus of an 8-inch sanitary sewer main near the southern corner
of the site. – Noted.
06/12/2015: Existing water services to the site include ¾-inch and 1-inch water
services tapped to the main in Walnut and an 8” fire line with 2” domestic teed from
the fire line that is tapped off the main in Jefferson. Existing sewer services for both
parcels are tapped from the main in Old Firehouse Alley. All services will need to be
reused or abandoned at the main. – Noted.
Comment Number: 3 Comment Originated: 06/12/2015
06/12/2015: The water conservation standards for landscape and irrigation will
apply. Information on these requirements can be found at:
http://www.fcgov.com/standards - Noted.
Comment Number: 4 Comment Originated: 06/12/2015
06/12/2015: Development fees and water rights will be due at building permit. - Noted.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 06/10/2015
06/10/2015: LUC 3.5.1 (I) (6) All mechanical equipment shall be screened from
public view from both above and below by integrating it into building and roof design
to the maximum extent feasible - Noted.
Topic: Lighting Plan
Comment Number: 1 Comment Originated: 06/10/2015
Light sources shall be concealed and fully shielded and shall feature sharp cut-off
capability so as to minimize up-light, spill-light, glare and unnecessary diffusion on
adjacent property. Noted.
Topic: Site Plan
Comment Number: 1 Comment Originated: 06/10/2015
06/10/2015: LUC 3.2.2(K)(5) Handicap parking spaces are required in numbers per
this section. If you have 98 parking spaces you’ll need 4 handicap spaces including
one van accessible handicap space. All of these will need to be on site. - Noted.
Comment Number: 2 Comment Originated: 06/10/2015
06/10/2015: Does the service access area include trash enclosures?
– Yes.