Loading...
HomeMy WebLinkAboutFORT COLLINS HOTEL (DOWNTOWN HOTEL) - PDP - PDP150008 - SUBMITTAL DOCUMENTS - ROUND 1 - MODIFICATION REQUESTThe applicant requests a modification of standard to allow surface parking to be located approximately 6’ from the R.O.W. along an arterial, rather than 15’ as stated in section 3.2.2(J): 1. Section 3.2.2(J): Setbacks (parking). Any vehicular use area containing six (6) or more parking spaces or one thousand eight hundred (1,800) or more square feet shall be set back from the street right of way 15’ along an arterial street. As an infill site, the project is spatially constrained and providing the requisite number of parking spaces is a difficult task. A 5’ landscaped setback to a 30” masonry buffer wall is shown along the Jefferson Street ROW. The buffer wall effectively provides screening of the parking area from the street, accomplishing the intent of the 15’ landscaped setback, while accommodating a required number of parking spaces. In addition, Plazas are depicted at either corner of the property, framed by masonry seat walls. Seatwalls are also shown as raised planters along the streetscape. This enhanced streetscape, with a combination of masonry wall, landscaping, and seating areas, in addition to street trees in grates along Jefferson St. creates an overall streetscape condition that is pedestrian oriented, uses quality materials and screens views to the lot. This condition is equal to or better than a simple 15’ landscaped area as a buffer for parking. The applicant requests a modification of standard to allow surface parking to be located along an arterial, rather than behind a building as stated in section 4.16(E)(1)(a). 2. Section 4.16(E)(1)(a): Parking lots shall be located behind buildings in the interior of blocks, in side yards, underground or in a parking structure, to the maximum extent feasible. As the overall project parking requirements are significant and the project site is constrained as an infill/redevelopment site, the current configuration represents the highest level of feasibility and activates the downtown core intersection of Walnut St., Chestnut St. and Mountain Ave. Efforts have been made to improve the streetscape condition along Jefferson St. and screen parking, however, the project cannot accommodate additional building frontage along Jefferson St. without sacrificing required parking quantities. This streetscape condition coupled with the landscape buffer is equal to or better than a building frontage in terms of activating the overall streetscape condition and providing a buffer from parking along the arterial.