Loading...
HomeMy WebLinkAboutASCENT STUDIO CLIMBING & FITNESS - FDP - FDP150023 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY1 Kate Penning From: toddb@tjbconsulting.com Sent: Monday, July 21, 2014 3:05 PM To: Kate Penning Subject: FW: Timberline center climbing gym Lots 12/13, traffic study waiver From: toddb@tjbconsulting.com Sent: Friday, April 11, 2014 2:59 PM To: Noah Beals (nbeals@fcgov.com); Tyler Siegmund (tsiegmund@fcgov.com) Cc: 'Joe Hosek'; 'Tiffany Carlson' Subject: FW: Timberline center climbing gym Lots 12/13, traffic study waiver Hi All, See below from Martina‐‐traffic study is waived for Ascent Studios proposal. Have a good weekend, Todd Borger, PE TJB Consulting Group Colorado Survey Civil Engineering, Land Surveying 105 South Sunset Street, Suite H P.O. Box 1348 Longmont, CO 80502 303.532.2268 office 303.517.7116 mobile toddb@tjbconsulting.com  Think Green before printing this e-mail From: Martina Wilkinson [mailto:mwilkinson@fcgov.com] Sent: Friday, April 11, 2014 2:47 PM To: toddb@tjbconsulting.com Subject: RE: Timberline center climbing gym Lots 12/13 Hi Todd – I’ve taken a look at the materials you sent, including the notes from the conceptual review last fall. I’ve compared the likely trip generation for your revised use (climbing gym) with the approved use for those lots in Timberline Center (retail/office/restaurant). The trip generation is either similar or lower than what was approved – so in this case I believe we can waive the requirement for the TIS. Sounds like this is the same general conclusion reached last fall. I agree with that conclusion. Let me know if you need anything further. Martina Martina Wilkinson, P.E. PTOE City of Fort Collins Traffic Operations P.O. Box 580 2 Fort Collins, CO 80522‐0580 mwilkinson@fcgov.com 970‐221‐6887 From: toddb@tjbconsulting.com [mailto:toddb@tjbconsulting.com] Sent: Wednesday, April 09, 2014 2:19 PM To: Martina Wilkinson Subject: Timberline center climbing gym Lots 12/13 Martina, Thanks for your help, Attached is what I understand to be the original submittal materials for concept plan review, as well as the staff comments on the submittal. Let me know if you have other questions, Todd Borger, PE TJB Consulting Group Colorado Survey Civil Engineering, Land Surveying 105 South Sunset Street, Suite H P.O. Box 1348 Longmont, CO 80502 303.532.2268 office 303.517.7116 mobile toddb@tjbconsulting.com  Think Green before printing this e-mail