Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ASCENT STUDIO CLIMBING & FITNESS - FDP - FDP150023 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLAN
JOSEPH ALLEN DRIVE (72' PUBLIC ROW) (2006-0045462) 4943.98 1219 ELECVLT VAULT ELEC ASCENT STUDIO CLIMBING & FITNESS INDOOR RECREATIONAL 51' MAX HEIGHT 18,543 sf FAR: 0.30 BUILDING COVERAGE 15,289 SF - 25% LOT: 62,120 SF 1.43 ACRES ZONING: (I) INDUSTRIAL (N)CONCRETE WALK (N)CONCRETE WALK (E)CONCRETE WALK (E)TREES TO REMAIN TOTAL PARKING: 60 SPACES (9'X19' TYP) PLANTING BED TO SCREEN PARKING - SEE LANDSCAPE PLANS DRIVE AND PARKING: 31,121 SF - 50% LANDSCAPED AREA: 15,710 SF - 25% FIRE LANE PROPOSED EDGE OF ASPHALT ORIGINAL LOT LINE PER PLAT OF "TIMBERLINE CENTER" TO BE VACATED PORTION OF UTILITY, DRAINAGE, ACCESS & EMERGENCY EASEMENT TO BE VACATED BY THIS PLAT UTILITY, DRAINAGE, ACCESS & EMERGENCY EASEMENT (HATCHED AREA) (N) LOT EDGE CUT EXISTING CURB AS NECESSARY SAIL SHADE COVERED 12 SPACE BIKE RACK SPLIT FACE CMU TRASH ENCLOSURE (N)EDGE OF ASPHALT (E)CURB AND GUTTER AND ADA RAMP TO REMAIN (N) CURB AND GUTTER, ASPHALT, SIDEWALK . LOT 2 (UNDER REPLAT) LOT 1 (UNDER REPLAT) PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY PROPERTY BOUNDARY (E) PAVING, CURB AND GUTTER (E) PAVING, CURB AND GUTTER ACCESSIBLE PARKING ACCESSIBLE PARKING SIGNAGE POROUS UNIT PAVERS (E) CONTOURS NOTE: ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO ONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. NOTE: ALL SIGNAGE AND LOCATIONS ARE NOT APPROVED WITH THIS MAJOR AMENDMENT AND REQUIRE A SEPARATE SIGN PERMIT. REMOVABLE POST W/ACCESSIBLE PARKING SIGNAGE, FOR OWNER'S USE OF RAMP LOT 8 LOT 9 LOT 10 19'-0" 114'-5" 14'-10" 142'-11" 47'-10" 21'-0" 18'-0" 25'-0" 38'-0" 22'-0" 17'-0" 8'-0" 17'-0" 22'-0" 38'-0" 10'-0" 8'-0" 10'-0" 8'-0" 10'-0" 7'-11" R 25'-0" R 25'-0" PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT ASCENT STUDIO RIFFENBURGH ELEMENTARY EDORA COMMUNITY PARK LIBERTY COMMON ELEMENTARY PROSPECT PONDS NATURAL AREA COTTONWOOD HOLLOW NATURAL AREA T E POL RC RC UE LMN RL MMN MMN POL MMN NC I MMN LMN E T E I R = 1/2 MILE OWNER'S CERTIFICATION THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF THE REAL PROPERTY DESCRIBED IN THESE SITE PLANS AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH ON SAID SITE PLANS. EXECUTED THIS ________ DAY OF _____________, A.D., 20_______ OWNER: TIMBERLINE DEVELOPMENT, LLC, A WYOMING LIMITED LIABILITY COMPANY BY:________________________________________ KRIS FLEISHLI, MANAGER (STATE OF COLORADO) (COUNTY OF LARIMER) S.S. (CITY OF FORT COLLINS) THE FOREGOING DEDICATION WAS ACKNOWLEDGED BEFORE ME THIS ________ DAY OF _____________, A.D., 20_______ BY: ________________________________________ MY COMISSION EXPIRES _______________________. WITNESS MY HAND AND SEAL ____________________________________________ NOTARY PUBLIC LIENHOLDER: JONA,INC. A WYOMING CORPORTATION BY:_______________________________ (STATE OF COLORADO) (COUNTY OF LARIMER) S.S. (CITY OF FORT COLLINS) THE FOREGOING DEDICATION WAS ACKNOWLEDGED BEFORE ME THIS ________ DAY OF _____________, A.D., 20_______ BY: ________________________________________ MY COMISSION EXPIRES _______________________. WITNESS MY HAND AND SEAL ____________________________________________ NOTARY PUBLIC COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES APPROVED BY THE PLANNING SERVICES OF THE CITY OF FORT COLLINS, COLORADO, THIS ________ DAY OF _____________, A.D., 20_______ ________________________________________ DIRECTOR OF CURRENT DEVELOPMENT & NEIGHBORHOOD SERVICES LOT 62,120 SF LANDSCAPED AREA 15,710 SF BUILDING COVERAGE 15,289 SF BUILDING AREA 18,543 SF BUILDING FAR 0.30 BUILDING HEIGHT 51' PARKING, WALK AND OTHER HARDSCAPE 31,121 SF PARKING SPOTS 60 SPACES BICYCLE PARKING 12 SPACES - PLOT DATE A A 1 2 3 4 5 1 2 3 4 5 SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT ISSUE DATE: PROJECT #: Architects, Inc. CONSULTANT B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2012 www.rbbarchitects.com 7/1/2015 10:27:39 AM AS101 1317 SITE PLAN ASCENT STUDIO CLIMBING AND FITNESS Lot 2 Fort Collins, CO Timberline Center FINAL DEVELOPMENT PLAN 7/1/15 A3 1" = 30'-0" SITE PLAN N C3 1/2" = 1'-0" VICINITY MAP SHEET INDEX AS101 SITE PLAN AS102 SHADOW STUDY AND STREET PERSPECTIVE L101 LANDSCAPE PLAN L102 LANDSCAPE PLANTING PLAN L103 RAIN GARDEN PLANTING A201 EXTERIOR ELEVATIONS A202 EXTERIOR ELEVATIONS PM.1 ELECTRICAL PHOTOMETRIC PLAN PM.2 ELECTRICAL PHOTOMETRIC SCHEDULES SIGNATURE BLOCK SITE PLAN SCHEDULE