Loading...
HomeMy WebLinkAboutASCENT STUDIO CLIMBING & FITNESS - FDP - FDP150023 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTP.O. Box 1348 | Longmont, CO 80502 303.517.7116 | toddb@tjbconsulting.com Civil Engineering | Site Design | Project Management Infrastructure Design | Construction Assistance July 1, 2015 City of Fort Collins Community Development and Neighborhood Services 281 N. College Avenue PO Box 580 Ft. Collins, CO 80522 Re: Timberline Center Second Filing Lot 2 Drainage Report Compliance Sediment/Erosion Control Report Compliance Ascent Climbing Studios Building To Whom it may concern: We are preparing the letter associated with the site plan amendments for Lot 2 of Timberline Center Second Filing: Site Imperviousness: Per the concept review letter dated November 22, 2013, we have calculated a comparison of the proposed impervious area with the original assumed impervious area in the original approved plans and reports. The new lot covers 62,120 square feet of the original plan. Within that areas, we calculated for the proposed building: • 12,835 SF of building roof • 39,164 SF of parking, walks, and other hardscape • 10,212 SF of landscaped area The new plan provides: • 14,875 SF of building roof. • 31,858 SF of parking, walk, and other hardscape • 15,387 SF of landscaped area Therefore, as the new layout provides additional landscape area than assumed with the original approvals, the amended site plan for Ascent studios remains in compliance with the approved master drainage & erosion control plans & reports originally prepared for the overall site. Page 2 of 2 7/1/15 Ascent Studios TJB Consulting Group Drainage Basin Compliance: Site grading for the amendment site was prepared to comply with the basin boundaries and areas as presented in the originally approved plans. Sub-basins of the original basins are depicted within the separate utility plan submittal, and grading high points were set based on the original locations of high points the approved site grading plans. LID Standards: Site Compliance with City LID requirements are outlined in a separate document authored by Northern Engineering. Respectfully, TJB Consulting Group Todd J. Borger, P.E 32993 F:\TJBcg\RBB Ascent Studios\Drainage\Timeberline Center Second Filing Lot 2 drainage letter 2015 07 01.doc