Loading...
HomeMy WebLinkAboutASCENT STUDIO CLIMBING & FITNESS - FDP - FDP150023 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSCULTURED STONE - TAN ARCHITECTURAL METAL PANEL, HORIZONTAL PATTERN - LIGHT GRAY CULTURED STONE- TAN METAL FASCIA - DARK GRAY WINDOW FRAMES - BRUSHED ALUMINUM WINDOW FRAMES - BRUSHED ALUMINUM METAL FASCIA - DARK GRAY CULTURED STONE - TAN WITH ACCENT BANDS STANDING SEAM METAL ROOF - GREEN ELECTRICAL METER/ SERVICE ENTRY, PAINTED TO MATCH BUILDING SIGNAGE AND LOCATIONS ARE NOT TO BE APPROVED WITH THIS MAJOR AMENDMENT AND REQUIRE A SEPARATE SIGN PERMIT BIKE RACK SAIL SHADES METAL FASCIA - DARK GRAY STEEL SUNSHADE FEATURE - MEDIUM GRAY CULTURED STONE - TAN WINDOW FRAMES - BRUSHED ALUMINUM ARCHITECTURAL METAL PANEL, HORIZONTAL PATTERN - LIGHT GRAY ARCHITECTURAL METAL PANEL, HORIZONTAL PATTERN - LIGHT GRAY METAL FASCIA - DARK GRAY CULTURED STONE - TAN WITH ACCENT BANDS - PLOT DATE A A 1 2 3 4 5 1 2 3 4 5 SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT ISSUE DATE: PROJECT #: Architects, Inc. CONSULTANT B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2012 www.rbbarchitects.com 6/30/2015 4:59:00 PM A201 1317 EXTERIOR ELEVATIONS ASCENT STUDIO CLIMBING AND FITNESS Lot 2 Fort Collins, CO Timberline Center FINAL DEVELOPMENT PLAN CULTURED STONE - TAN ARCHITECTURAL METAL PANEL, HORIZONTAL PATTERN - LIGHT GRAY CULTURED STONE - TAN WITH ACCENT BANDS METAL FASCIA - DARK GRAY WINDOW FRAMES - BRUSHED ALUMINUM WINDOW FRAMES - BRUSHED ALUMINUM CULTURED STONE - TAN ARCHITECTURAL METAL PANEL, HORIZONTAL PATTERN - LIGHT GRAY WINDOW FRAMES - BRUSHED ALUMINUM CULTURED STONE - TAN METAL FASCIA - DARK GRAY STANDING SEAM METAL ROOF - GREEN GAS METER, PAINTED TO MATCH BUILDING - PLOT DATE A A 1 2 3 4 5 1 2 3 4 5 SHEET INFORMATION PROJECT INFORMATION PROJECT PHASE SEAL ARCHITECT ISSUE DATE: PROJECT #: Architects, Inc. CONSULTANT B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2012 www.rbbarchitects.com 6/30/2015 4:59:10 PM A202 1317 EXTERIOR ELEVATIONS ASCENT STUDIO CLIMBING AND FITNESS Lot 2 Fort Collins, CO Timberline Center FINAL DEVELOPMENT PLAN 7/1/15 C1 NORTH 3/16" = 1'-0" A1 3/16" = 1'-0" WEST 7/1/15 A1 3/16" = 1'-0" EAST C1 3/16" = 1'-0" SOUTH