Loading...
HomeMy WebLinkAboutPARKING AT 620 S. LEMAY AVE. - MJA/FDP - FDP150009 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSCOVER SHEET C1.0.... COVER SHEET C1.1.... GENERAL NOTES I C1.2... GENERAL NOTES II C2.0.... UTILITY & HORIZONTAL CONTROL PLAN C3.0... GRADING PLAN C4.0.... DRAINAGE PLAN C5.0.... EROSION CONTROL PLAN C6.0.... POUDRE RIVER DRIVE PLAN & PROFILE C6.1.... HOFFMAN MILL ROAD PLAN & PROFILE C7.0.... WATER AND SANITARY SEWER PLAN & PROFILE C8.0... TYPICAL CROSS SECTIONS C8.1.... STREET DETAILS I C8.2.... STREET DETAILS II C8.3... SANITARY SEWER DETAILS C8.4.... WATER DETAILS C8.5.... STORM SEWER DETAILS C8.6.... EROSION CONTROL DETAILS G UP UT SS X W SS SYMBOL LEGEND ABBREVIATIONS 6010.00 0.55% C1.0 OWNER PLANNER SURVEYOR FINAL UTILITY PLANS FOR 620 S. LEMAY AVENUE, FORT COLLINS, CO POUDRE RIVER BUSINESS PARK APRIL 2015 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CIVIL ENGINEER ENGINEER AFFIRMATION STATEMENT PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING PARKING AT 620 S. LEMAY AVENUE LOT 1, POUDRE RIVER BUSINESS PARK, FOURTH FILING C1.1 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R C1.2 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R 00 10' 20' 40' 1"=20' UTILITY & HORIZONTAL CONTROL PLAN FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL C2.0 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING 00 10' 20' 40' 1"=20' GRADING PLAN FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL C3.0 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING 00 10' 20' 40' 1"=20' DRAINAGE PLAN FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL C4.0 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING EXISTING STORM SEWER CONTINUES NORTH TO POUDRE RIVER (1.) THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. (2.) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. (3.) ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. (4.) AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. (5.) PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. (6.) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE CITY/COUNTY. (7.) IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL: (A.) BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. (B.) REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. (C.) BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. (8.) WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES. (9.) THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY. (10.) ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES. (11.) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED. (12.) THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE CITY/COUNTY OR HOMEOWNERS ASSOCIATION (HOA). (13.) CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. (14.) A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION 0+00 1+00 2+00 3+00 4+00 4+94 0+00 1+00 2+00 3+00 4+00 5+00 5+92 0+00 1+00 2+00 3+00 4+00 5+00 5+58 ELEVATION ELEVATION STATION STATION POUDRE RIVER DRIVE CL STA: 0+00.00 THRU 4+93.88 4953 4960 4953 4960 0+00 1+00 2+00 3+00 4+00 4+94 0.50% 0.55% -25.00% ELEVATION ELEVATION STATION STATION POUDRE RIVER DRIVE S FL STA: 0+00.00 THRU 5+58.50 4953 4960 4953 4960 0+00 1+00 2+00 3+00 4+00 5+00 5+58 PVI:0+25.00 ELEV: 4956.66 PVI:0+74.96 ELEV: 4956.95 PVI:2+20.49 ELEV: 4957.74 PVI:2+25.68 ELEV: 4956.45 0.57% 0.54% -24.77% ELEVATION STATION STATION POUDRE RIVER DRIVE N FL STA: 0+00.00 THRU 5+91.90 4953 ELEVATION ELEVATION STATION STATION HOFFMAN MILL CL STA: 1+15.00 THRU 4+36.43 4954 4960 4954 4960 1+15 2+00 3+00 4+00 4+36 0.90% 0.50% PVI:1+24.40 ELEV: 4957.34 PVI:1+60.00 ELEV: 4957.02 PVI:1+76.94 ELEV: 4956.94 PVI:2+07.95 ELEV: 4957.09 PVI:3+08.81 ELEV: 4957.60 PVI:3+32.96 ELEV: 4957.72 PVI:3+32.96 ELEV: 4957.72 PVI:4+02.00 ELEV: 4958.34 PVI:4+11.50 ELEV: 4958.39 0.50% 0.50% 0.50% -0.89% -0.50% ELEVATION ELEVATION STATION STATION HOFFMAN MILL E FL STA: 1+15.00 THRU 4+12.56 4954 4960 4954 4960 1+15 2+00 3+00 4+00 4+13 0.50% 1.30% 0.90% 0.90% 1.30% 1.70% 2.07% 1.70% PVI:3+18.39 0+00 1+00 1+99 0+50.00 1+50.00 0+00 1+00 2+00 2+57 34.18 LF 15" N-12 ADS PIPE @ 2.5% 199.34 LF 6" PVC WATER MAIN TYPE III BARRICADE REMOVE CAP, INSTALL 6" GATE VALVE, CONSTRUCT NEW 6" PVC WATER MAIN 33.00' UTILITY EASEMENT TEMPORARY CONSTRUCTION EASEMENT TEMPORARY FIRE HYDRANT ASSEMBLY ADJUST EXISTING MANHOLE TO PROPOSED GRADE AS NECESSARY 00 10' 20' 40' 1"=20' WATER AND SANITARY SEWER PLAN & PROFILE FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL C7.0 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING CONNECTOR LOCAL STREET (POUDRE RIVER DRIVE) CONNECTOR LOCAL STREET (HOFFMAN MILL ROAD) C8.0 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING 00 2.5' 5' 10' 1"=5' CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R C8.1 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING C8.2 ONSITE PAVEMENT SECTION ONSITE 2' VALLEY PAN DETAIL ONSITE SIDEWALK SECTION PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING ONSITE 18" CURB/GUTTER C8.3 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 LOWER LIMIT OF TRENCH WALL SLOPING INITIAL LIFT * 12 IN. MIN. PIPE O.D. 4 IN. MIN. TRENCH WIDTH AS SPECIFIED IN SECTION 02221 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING C8.4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING C8.5 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING 5.04" Ponding Depth (MODIFED) BIORETENTION / BIOSWALE CROSS SECTION 6" Perforated PVC Pipe 10" Thick Layer of CDOT No. 4 Aggregate EL. = 4954.00 EL. = 4954.42 (MODIFED) INTERLOCKING CONCRETE PAVERS CROSS SECTION 6" Perforated PVC Pipe Sub-Drain 12" Layer of #2 Rock Sub-Base 6" Layer of #57 Base Elev. = 4957.14 Inv Elev. = 4955.27 Elev. = 4956.27 Elev. = 4956.77 C8.6 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING ELEV: 4957.02 PVI:3+30.00 ELEV: 4957.12 PVI:3+40.00 ELEV: 4957.25 PVI:3+50.00 ELEV: 4957.42 PVI:3+60.00 ELEV: 4957.63 PVI:3+70.00 ELEV: 4957.80 PVI:3+75.00 ELEV: 4957.87 PVI:3+80.17 ELEV: 4957.91 PVI:3+87.56 ELEV: 4957.95 PVI:1+20.15 ELEV: 4956.83 PVI:1+45.00 ELEV: 4956.52 PVI:1+59.27 ELEV: 4956.39 PVI:1+76.21 ELEV: 4956.31 PVI:2+07.22 ELEV: 4956.46 PVI:2+91.44 ELEV: 4956.89 PVI:3+18.39 ELEV: 4957.02 PVI:3+18.48 ELEV: 4957.02 0.50% 0.50% 0.50% -0.90% -0.50% -1.24% ELEVATION ELEVATION STATION STATION HOFFMAN MILL W FL STA: 1+15.00 THRU 4+60.57 4954 4960 4954 4960 1+15 2+00 3+00 4+00 4+61 0.50% 0.50% 0.50% -0.79% -0.50% 0.50% -0.50% PVI STA: 3+90.00 PVI ELEV: 4958.19 K: 54.41 LVC: 70.00 PVC: 3+55.00 EL: 4958.02 PCT: 4+25.00 EL: 4957.92 HIGH PT STA: 3+82.21 HIGH PT ELEV: 4958.09 PVI:1+60.73 ELEV: 4957.22 PVI:1+77.67 ELEV: 4957.13 PVI:2+08.69 ELEV: 4957.29 PVI:3+26.12 ELEV: 4957.87 PVI:3+47.51 ELEV: 4957.98 PVI:4+30.00 ELEV: 4957.88 PVI:4+35.57 ELEV: 4957.85 1+00 2+00 3+00 4+00 4+36 1+00 2+00 3+00 4+00 4+13 1+00 2+00 3+00 4+00 4+61 HOFFMAN MILL ROAD PLAN AND PROFILE 00 10' 20' 40' 1"=20' C6.1 FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING 4960 0+00 1+00 2+00 3+00 4+00 5+00 5+92 0.81% 0.55% -25.00% 0.74% -0.50% PVI:4+93.88 ELEV: 4958.46 0.55% 0.50% -1.00% -0.90% -0.50% PVI:4+15.00 ELEV: 4957.81 PVI:4+49.03 ELEV: 4957.51 PVI:4+83.06 ELEV: 4957.34 PVI:5+91.90 ELEV: 4957.88 PVI STA: 3+50.00 PVI ELEV: 4958.46 K: 45.15 LVC: 70.00 PVC: 3+15.00 EL: 4958.27 PCT: 3+85.00 EL: 4958.11 HIGH PT STA: 3+39.83 HIGH PT ELEV: 4958.34 0.55% -0.50% 0.50% PVI STA: 3+49.31 PVI ELEV: 4958.45 K: 66.67 LVC: 70.00 PVC: 3+14.31 EL: 4958.26 PCT: 3+84.31 EL: 4958.27 HIGH PT STA: 3+50.98 HIGH PT ELEV: 4958.36 PVI STA: 3+48.71 PVI ELEV: 4959.19 K: 56.62 LVC: 70.00 PVC: 3+13.71 EL: 4958.93 PCT: 3+83.71 EL: 4959.01 HIGH PT STA: 3+55.40 HIGH PT ELEV: 4959.08 PVI:0+24.11 ELEV: 4957.19 PVI:0+74.33 ELEV: 4957.44 PVI:2+19.89 ELEV: 4958.24 PVI:2+26.47 ELEV: 4956.59 PVI:0+25.00 ELEV: 4956.55 PVI:0+75.06 ELEV: 4956.95 PVI:2+21.18 ELEV: 4957.75 PVI:2+25.40 ELEV: 4956.70 PVI:2+20.49 ELEV: 4957.74 PVI:5+10.25 ELEV: 4957.64 PVI:5+58.50 ELEV: 4957.88 POUDRE RIVER DRIVE PLAN AND PROFILE 00 10' 20' 40' 1"=20' C6.0 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED. (15.) TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR. (A.) ALONG LOT PERIMETER. (B.) OTHER LOCATIONS, IF NEEDED. (16.) CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY. EROSION CONTROL PLAN 00 10' 20' 40' 1"=20' C5.0 FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING