HomeMy WebLinkAboutPARKING AT 620 S. LEMAY AVE. - MJA/FDP - FDP150009 - SUBMITTAL DOCUMENTS - ROUND 2 - UTILITY PLANSCOVER SHEET
C1.0.... COVER SHEET
C1.1.... GENERAL NOTES I
C1.2... GENERAL NOTES II
C2.0.... UTILITY & HORIZONTAL CONTROL PLAN
C3.0... GRADING PLAN
C4.0.... DRAINAGE PLAN
C5.0.... EROSION CONTROL PLAN
C6.0.... POUDRE RIVER DRIVE PLAN & PROFILE
C6.1.... HOFFMAN MILL ROAD PLAN & PROFILE
C7.0.... WATER AND SANITARY SEWER PLAN & PROFILE
C8.0... TYPICAL CROSS SECTIONS
C8.1.... STREET DETAILS I
C8.2.... STREET DETAILS II
C8.3... SANITARY SEWER DETAILS
C8.4.... WATER DETAILS
C8.5.... STORM SEWER DETAILS
C8.6.... EROSION CONTROL DETAILS
G
UP
UT
SS
X
W
SS
SYMBOL LEGEND
ABBREVIATIONS
6010.00
0.55%
C1.0
OWNER PLANNER
SURVEYOR
FINAL UTILITY PLANS FOR
620 S. LEMAY AVENUE, FORT COLLINS, CO
POUDRE RIVER BUSINESS PARK
APRIL 2015
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CIVIL ENGINEER
ENGINEER AFFIRMATION STATEMENT
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
PARKING AT 620 S. LEMAY AVENUE
LOT 1, POUDRE RIVER BUSINESS PARK, FOURTH FILING
C1.1
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
C1.2
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
00 10' 20' 40'
1"=20'
UTILITY & HORIZONTAL CONTROL PLAN
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
C2.0
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
00 10' 20' 40'
1"=20'
GRADING PLAN
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
C3.0
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
00 10' 20' 40'
1"=20'
DRAINAGE PLAN
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
C4.0
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
EXISTING STORM SEWER
CONTINUES NORTH TO
POUDRE RIVER
(1.) THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO
ANY CONSTRUCTION ON THIS SITE.
(2.) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED
PLANS.
(3.) ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND
DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION
CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE
AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL
REPORT.
(4.) AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND
CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO
MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND
MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
(5.) PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL
OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR
IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
(6.) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS,
STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG
LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR
PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS
OTHERWISE APPROVED BY THE CITY/COUNTY.
(7.) IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL
MEASURES SHALL:
(A.) BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM
EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION.
(B.) REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY
STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(C.) BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE
EROSION CONTROL INSPECTOR.
(8.) WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE
RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE
INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
(9.) THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY
DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE
STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.
(10.) ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS
OF THE UNITED STATES.
(11.) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT
FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED.
(12.) THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER
LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE
OVER TO THE CITY/COUNTY OR HOMEOWNERS ASSOCIATION (HOA).
(13.) CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT
UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER
FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING
MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE
THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND
ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
(14.) A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA
SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50)
FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION
0+00 1+00 2+00 3+00 4+00
4+94
0+00
1+00 2+00 3+00 4+00
5+00
5+92
0+00
1+00 2+00 3+00
4+00
5+00
5+58
ELEVATION
ELEVATION
STATION
STATION
POUDRE RIVER DRIVE CL STA: 0+00.00 THRU 4+93.88
4953
4960
4953
4960
0+00
1+00
2+00
3+00
4+00
4+94
0.50%
0.55%
-25.00%
ELEVATION
ELEVATION
STATION
STATION
POUDRE RIVER DRIVE S FL STA: 0+00.00 THRU 5+58.50
4953
4960
4953
4960
0+00
1+00
2+00
3+00
4+00
5+00
5+58
PVI:0+25.00
ELEV: 4956.66
PVI:0+74.96
ELEV: 4956.95
PVI:2+20.49
ELEV: 4957.74
PVI:2+25.68
ELEV: 4956.45
0.57% 0.54%
-24.77%
ELEVATION
STATION
STATION
POUDRE RIVER DRIVE N FL STA: 0+00.00 THRU 5+91.90
4953
ELEVATION
ELEVATION
STATION
STATION
HOFFMAN MILL CL STA: 1+15.00 THRU 4+36.43
4954
4960
4954
4960
1+15
2+00
3+00
4+00
4+36
0.90%
0.50%
PVI:1+24.40
ELEV: 4957.34
PVI:1+60.00
ELEV: 4957.02
PVI:1+76.94
ELEV: 4956.94
PVI:2+07.95
ELEV: 4957.09
PVI:3+08.81
ELEV: 4957.60
PVI:3+32.96
ELEV: 4957.72
PVI:3+32.96
ELEV: 4957.72
PVI:4+02.00
ELEV: 4958.34
PVI:4+11.50
ELEV: 4958.39
0.50% 0.50%
0.50%
-0.89%
-0.50%
ELEVATION
ELEVATION
STATION
STATION
HOFFMAN MILL E FL STA: 1+15.00 THRU 4+12.56
4954
4960
4954
4960
1+15
2+00
3+00
4+00
4+13
0.50%
1.30% 0.90%
0.90%
1.30%
1.70%
2.07%
1.70%
PVI:3+18.39
0+00
1+00
1+99
0+50.00 1+50.00
0+00
1+00
2+00 2+57
34.18 LF 15" N-12 ADS PIPE @ 2.5%
199.34 LF 6" PVC WATER MAIN
TYPE III
BARRICADE
REMOVE CAP, INSTALL
6" GATE VALVE,
CONSTRUCT NEW 6"
PVC WATER MAIN
33.00' UTILITY
EASEMENT
TEMPORARY
CONSTRUCTION
EASEMENT
TEMPORARY
FIRE HYDRANT
ASSEMBLY
ADJUST EXISTING MANHOLE TO
PROPOSED GRADE AS NECESSARY
00 10' 20' 40'
1"=20'
WATER AND SANITARY SEWER
PLAN & PROFILE
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
C7.0
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
CONNECTOR LOCAL STREET
(POUDRE RIVER DRIVE)
CONNECTOR LOCAL STREET
(HOFFMAN MILL ROAD)
C8.0
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
00 2.5' 5' 10'
1"=5'
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
C8.1
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
C8.2
ONSITE PAVEMENT SECTION
ONSITE 2' VALLEY PAN DETAIL
ONSITE SIDEWALK SECTION
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
ONSITE 18" CURB/GUTTER
C8.3
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
LOWER LIMIT OF
TRENCH WALL
SLOPING
INITIAL LIFT *
12 IN. MIN.
PIPE O.D.
4 IN. MIN.
TRENCH WIDTH AS SPECIFIED
IN SECTION 02221
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
C8.4
6 6 6 6 6 6 6 6 6 6 6 6
6 6 6 6 6 6 6 6 6 6 6 6 6 6
6
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
C8.5
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
5.04" Ponding Depth
(MODIFED) BIORETENTION / BIOSWALE CROSS SECTION
6" Perforated PVC Pipe
10" Thick Layer of CDOT No. 4
Aggregate
EL. = 4954.00
EL. = 4954.42
(MODIFED) INTERLOCKING CONCRETE PAVERS CROSS SECTION
6" Perforated PVC Pipe Sub-Drain
12" Layer of #2
Rock Sub-Base
6" Layer of #57
Base
Elev. = 4957.14
Inv Elev. = 4955.27
Elev. = 4956.27
Elev. = 4956.77
C8.6
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
ELEV: 4957.02
PVI:3+30.00
ELEV: 4957.12
PVI:3+40.00
ELEV: 4957.25
PVI:3+50.00
ELEV: 4957.42
PVI:3+60.00
ELEV: 4957.63
PVI:3+70.00
ELEV: 4957.80
PVI:3+75.00
ELEV: 4957.87
PVI:3+80.17
ELEV: 4957.91
PVI:3+87.56
ELEV: 4957.95
PVI:1+20.15
ELEV: 4956.83
PVI:1+45.00
ELEV: 4956.52
PVI:1+59.27
ELEV: 4956.39
PVI:1+76.21
ELEV: 4956.31
PVI:2+07.22
ELEV: 4956.46
PVI:2+91.44
ELEV: 4956.89
PVI:3+18.39
ELEV: 4957.02
PVI:3+18.48
ELEV: 4957.02
0.50%
0.50%
0.50%
-0.90%
-0.50%
-1.24%
ELEVATION
ELEVATION
STATION
STATION
HOFFMAN MILL W FL STA: 1+15.00 THRU 4+60.57
4954
4960
4954
4960
1+15
2+00
3+00
4+00
4+61
0.50% 0.50% 0.50%
-0.79%
-0.50%
0.50%
-0.50%
PVI STA: 3+90.00
PVI ELEV: 4958.19
K: 54.41
LVC: 70.00
PVC: 3+55.00
EL: 4958.02
PCT: 4+25.00
EL: 4957.92
HIGH PT STA: 3+82.21
HIGH PT ELEV: 4958.09
PVI:1+60.73
ELEV: 4957.22
PVI:1+77.67
ELEV: 4957.13
PVI:2+08.69
ELEV: 4957.29
PVI:3+26.12
ELEV: 4957.87
PVI:3+47.51
ELEV: 4957.98
PVI:4+30.00
ELEV: 4957.88
PVI:4+35.57
ELEV: 4957.85
1+00
2+00
3+00
4+00
4+36
1+00
2+00
3+00
4+00
4+13
1+00
2+00
3+00
4+00
4+61
HOFFMAN MILL ROAD
PLAN AND PROFILE
00 10' 20' 40'
1"=20'
C6.1
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
4960
0+00
1+00
2+00
3+00
4+00
5+00
5+92
0.81%
0.55%
-25.00%
0.74%
-0.50%
PVI:4+93.88
ELEV: 4958.46
0.55%
0.50%
-1.00%
-0.90%
-0.50%
PVI:4+15.00
ELEV: 4957.81
PVI:4+49.03
ELEV: 4957.51
PVI:4+83.06
ELEV: 4957.34
PVI:5+91.90
ELEV: 4957.88
PVI STA: 3+50.00
PVI ELEV: 4958.46
K: 45.15
LVC: 70.00
PVC: 3+15.00
EL: 4958.27
PCT: 3+85.00
EL: 4958.11
HIGH PT STA: 3+39.83
HIGH PT ELEV: 4958.34
0.55%
-0.50%
0.50%
PVI STA: 3+49.31
PVI ELEV: 4958.45
K: 66.67
LVC: 70.00
PVC: 3+14.31
EL: 4958.26
PCT: 3+84.31
EL: 4958.27
HIGH PT STA: 3+50.98
HIGH PT ELEV: 4958.36
PVI STA: 3+48.71
PVI ELEV: 4959.19
K: 56.62
LVC: 70.00
PVC: 3+13.71
EL: 4958.93
PCT: 3+83.71
EL: 4959.01
HIGH PT STA: 3+55.40
HIGH PT ELEV: 4959.08
PVI:0+24.11
ELEV: 4957.19
PVI:0+74.33
ELEV: 4957.44
PVI:2+19.89
ELEV: 4958.24
PVI:2+26.47
ELEV: 4956.59
PVI:0+25.00
ELEV: 4956.55
PVI:0+75.06
ELEV: 4956.95
PVI:2+21.18
ELEV: 4957.75
PVI:2+25.40
ELEV: 4956.70
PVI:2+20.49
ELEV: 4957.74
PVI:5+10.25
ELEV: 4957.64
PVI:5+58.50
ELEV: 4957.88
POUDRE RIVER DRIVE
PLAN AND PROFILE
00 10' 20' 40'
1"=20'
C6.0
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING
ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR
TO THE AREA BEING RESTORED.
(15.) TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE
FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS
ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(A.) ALONG LOT PERIMETER.
(B.) OTHER LOCATIONS, IF NEEDED.
(16.) CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS
SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED
NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
EROSION CONTROL PLAN
00 10' 20' 40'
1"=20' C5.0
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
PARKING AT 620 S. LEMAY AVE.
620 S. LEMAY AVENUE
FORT COLLINS, CO 80524
POUDRE RIVER BUSINESS PARK, FOURTH FILING