HomeMy WebLinkAboutPARKING AT 620 S. LEMAY AVE. - MJA/FDP - FDP150009 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTDRAINAGE REPORT FOR Parking at 620 S. Lemay Avenue 620 S. Lemay Fort Collins, CO 80524 Prepared for: CS Design, Inc. 2519 S. Shields St. #129 Fort Collins, CO 80526 Prepared by: www.quality-engineering.com 1501 Academy Court, #201 Fort Collins, Colorado 80524 (970) 416-7891 QE Project No: 1060-003 Date: April 29, 2015 Parking at 620 S. Lemay Avenue FINAL DRAINAGE REPORT ENGINEER’S CERTIFICATION I hereby certify that this Final Drainage Report for the design of stormwater management facilities for the Parking at 620 S. Lemay Avenue Project was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the owners thereof. Cody Geisendorfer, P.E. Registered Professional Engineer State of Colorado No. 41326 I. Table of Contents I. GENERAL LOCATION AND DESCRIPTION ......................................... 1 A. Location .................................................................................................................... 1 B. Description of Property ........................................................................................... 1 II. DRAINAGE BASINS AND SUB-BASINS .................................................. 2 A. Major Basin Description ......................................................................................... 2 B. Sub-Basin Description ............................................................................................. 2 III. DRAINAGE CRITERIA ............................................................................... 3 A. Regulations ............................................................................................................... 3 B. Implementation of the “Four Step Process” .......................................................... 3 C. Development Criteria Reference and Constraints ................................................ 4 D. Hydrological Criteria............................................................................................... 4 E. Hydraulic Criteria ................................................................................................... 5 F. Modifications of Criteria ......................................................................................... 5 IV. DRAINAGE FACILITY DESIGN ............................................................... 5 A. General Concept....................................................................................................... 5 B. Specific Details ......................................................................................................... 6 C. Rain Garden/Detention Pond.................................................................................. 6 V. CONCLUSIONS ............................................................................................. 7 A. Compliance with Standards .................................................................................... 7 B. Drainage Concept..................................................................................................... 7 VI. REFERENCES ............................................................................................... 7 VII. APPENDICES A. Hydrologic Computations Vicinity Map FEMA FIRM Exhibit USGS Soil Map Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO-3 Recommended Percentage Imperviousness Values Rational Method Calculated Composite C Tables Rational Method Calculated Imperviousness Rational Method Calculated Flows B. Hydraulic Computations Rain Garden Outlet Area Inlet Calculations Rain Garden Outlet Pipe Calculations C. Water Quality Design Calculations UD BMP Rain Garden Calculations D. Standard Operating Procedures Standard Operating Procedures I. GENERAL LOCATION AND DESCRIPTION A. Location The proposed site is located in the northwest quarter (NW ¼) of the northwest quarter (NW ¼) of Section 18, Township 7 North, Range 68 West of the 6th P.M. in Larimer County, Colorado. Specifically, the property is located at the southeast corner of Poudre River Drive and Hoffman Mill Road. More generally, the property is located at the northeast corner of Lemay Avenue and Riverside Avenue. The property address is 620 S. Lemay Avenue, Fort Collins, Colorado, 80524. (Please see the vicinity map located in the Appendix A). B. Description of Property The property is parcel number 8718200035 of the Poudre River Business Park and is currently 0.99 acres of undeveloped land surrounded by undeveloped property to the north and east, medical offices to the northwest, Concentra Urgent Care to the west, and East Laurel St. to the south. Hoffman Mill Road is located directly west of the property and acts as its only access. Both existing Hoffman Mill Road and Poudre River Drive are paved with curb, gutter, sidewalk, and utilities installed. Hoffman Mill Road to the southwest and E. Laurel Street to the south of the property are unpaved, gravel roads. E. Laurel Street is a private street. The existing property is mainly natural vegetation that has no general drainage patterns. It appears that onsite flows pond and infiltrate, without leaving the site. Existing Hoffman Mill Road drains north to the existing inlet, where it is conveyed to the Poudre River. Existing Poudre River Drive drains east towards the existing storm inlet, where it joins flows from Hoffman Mill Road. There are generally no offsite flows that drain toward the property. The entire site is located entirely outside of any 100-year flood plain (see FIRMETTE in Appendix A). According to the NRCS soils map survey, the native soils consist of the Type “B” soils. These soils consist of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils produce moderate infiltration rates when thoroughly wet. There are no irrigation facilities located within the proposed site area. The proposed development will consist of the construction of a 37 space parking lot that will act as overflow parking for the Concentra Urgent Care directly across Hoffman Mill Road. The parking lot will be paved asphalt with curb and gutter. Parking stalls will consist of pervious pavers. A rain garden will be installed on the northwest corner of the proposed site. II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description The proposed site is located within the Cache la Poudre River Basin. The basin is a major tributary to the South Platte River and the major confluence of many of Fort Collins’ sub- basins. As determined in the Final Drainage Report for Poudre River Business Park, First Filing, onsite detention is not required due to the close proximity to the Cache la Poudre River. The Poudre River Business Park, First Filing development installed the storm drain system along Poudre River Drive, including the curb inlets and storm pipe that conveys flow north to the Poudre River. This 24” ADS pipe (downstream of the 620 S. Lemay system) has a capacity of 23 cfs. Once the pipe reaches capacity, onsite detention will be required for future developments within the Poudre River Business Park. The Poudre River Business Park, First Filing uses 7.98 cfs of the 23 cfs. The Poudre River Business Park, Second Filing produces an additional 5.92 cfs of flow into this system. The Poudre River Business Park, Third Filing produces an additional 1.0 cfs into this system. The total receiving flow of the storm system from the first three filings is 14.9 cfs; allowing for an additional 8.1 cfs of flow into the existing storm system before the system is at capacity and onsite detention is required. B. Sub-Basin Description Historically, most of the site ponds and infiltrates within the property. The surrounding roads are at a high elevation than the proposed site, so no historic flows drain to these roads. The developed site is delineated into one sub-basin, with a rain garden designed to provide the required water quality capture volume. Sub-basin B1, (0.99 acres), consists of asphalt/concrete, landscaped area, and natural vegetation. Rainfall travels via overland flow from the center of the parking area to the exterior of the lot, where it will concentrate in valley pans and will be conveyed to the rain garden where the WQCV is treated. Overland flow will also infiltrate the permeable pavers in the parking stalls, where it will be treated. Sub-basin OS1 accounts for the south half of the Poudre River Drive extension. Rainfall in this basin will travel via overland flow where it will concentrate in gutter flow and travel west to the existing curb inlet on the southeast side of Poudre River Drive and Hoffman Mill Road. Sub-basin OS2 accounts for the Hoffman Mill Road extension. Rainfall in this basin will travel via overland flow where it will concentrate in gutter flow and travel south where it will meet the existing Hoffman Mill Road and will be conveyed as it has historically. The total additional flow to the existing storm sewer system is 5.55 cfs; less than the maximum allowable increase of 8.1 cfs. Therefore, the downstream existing storm system will still be under capacity even with the inclusion of the entire 100-year flow. Currently, offsite flows do not enter the site property. This will not change after the site has been developed. III. DRAINAGE CRITERIA A. Regulations Drainage design criteria specified in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual (FCSDCM) and the Urban Storm Drainage Criteria Manual, Volume 3 by the Urban Drainage and Flood Control District (UDFCD) have been referenced in the preparation of this study. B. Implementation of the “Four Step Process” The overall stormwater management strategy employed with this parking lot expansion project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By selecting a site with historically undetained runoff, the burden of development will be significantly less with a WQCV pond. Also, for Basin B1, permeable pavers and rain gardens are used to convey the runoff from impervious surfaces, reducing the effects of imperviousness. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release. Urban development will cause stormwater runoff to increase from the site. The primary water quality will occur in the rain garden on the northwest side of the lot. Refer to the map pocket for rain garden and permeable paver details and cross-sections. The rain garden and permeable pavers will increase water quality and promote infiltration. Step 3 – Stabilize Drainageways. The Poudre River is the governing drainageway for the proposed site. The proposed project indirectly helps achieve a better stabilized drainageway nonetheless. By improving the water quality and increasing infiltration, the likelihood of bed and bank erosion from this site is greatly reduced. Step 4 – Implement Site Specific and Other Source Control BMPs. The Parking at 620 S. Lemay Avenue site contains a plethora of source control BMPs. Permeable Pavement Systems: Flow from the parking lot will directly flow into the void area of the pavers avoiding any extra pollutant-flow contact time. Additional flow from the sidewalks will be captured by the pavers and be treated before an underdrain system transfers flow to the Rain Garden. Rain Garden: All Unconnected Impervious Areas (UIA) are drained through the on-site rain garden, reducing the impact of the impervious areas on water quality. The rain garden will increase the water quality of released flows, and will aid in the infiltration of these capture flows. C. Development Criteria Reference and Constraints The criteria used as the basis for analysis and design of stormwater management improvements for this site are those found in the references cited. To the knowledge of the author, there are no other capital drainage improvements planned for this portion of the Poudre River Business Park; aside from those referred to above, that would constrain or otherwise influence the design of the stormwater improvements for this site. D. Hydrological Criteria Stormwater runoff from the respective sub-basins of the site is analyzed for storms with 2- year and 100-year return frequencies. Due to the relatively small aggregate area of the tributary drainage sub-basins, the Rational Method was chosen for use in the design of the stormwater management improvements. The Rational Method provides that: Q = CIA, where: Q = Design flow in cubic feet per second (cfs) C = Coefficient of runoff for the area under consideration I = Rainfall intensity for the design storm duration (in/hr) A = Area of the drainage sub-basin under consideration (ac) Peak flows were calculated using the Rational Method for the 2-year and 100-year storm events. This software uses the local 1-hour rainfall depth and Fort Collins rainfall intensities developed calculate rainfall intensities as a function of the time of concentration. These values were obtained by the City of Fort Collins Rainfall Intensity-Duration- Frequency (IDF) curve/table; Figure 3-1 and Table 3-1a, and can be found in the Appendix. Additionally, per City of Fort Collins, the coefficients have been multiplied by the appropriate storm factors. Percent imperviousness values were taken from Table RO-3, Recommended Percentage Imperviousness Values, UDCM (See Appendix). Soils of hydrologic soil type “B” dominate the site. Onsite runoff was calculated to determine the runoff differential between existing and developed conditions for use in sizing the rain garden as required by the FCSDM. The hydrologic basin parameters and runoff rates are included in the Appendices and include quantification of the allowable volume reduction. The USDFCD software UD-BMP v3.03 was used to calculate the required WQCV and the size for the proposed rain garden. The design worksheets included in the Appendices to this Final Drainage Report present documentation of the hydrologic calculations for the on-site storm drainage systems. E. Hydraulic Criteria Within this development, all runoff will be conveyed on the surface, initially as sheet flow and subsequently as concentrated flow in shallow pans and gutters. The assessment of required capacity and the sizing of the respective components of the drainage system are based on the anticipated runoff from the 100-year storm event. The surface runoff will culminate into the rain garden at the northwest portion of the site. The pond outlet will consist of a 100-year drop inlet outlet structure. Flows above the required WQCV will be released into the storm system via this outlet. F. Modifications of Criteria There are no modifications or variances requested in connection with the design of the stormwater management for the Parking at 620 S. Lemay Avenue site development. IV. DRAINAGE FACILITY DESIGN A. General Concept The storm drainage system is designed to safely convey developed storm flows by sheet flow and concentrated pan, underdrain, and gutter flow to the rain garden located at the northwest corner of the property. The rain garden has been sized for the total required WQCV and will safely release all flows greater than this into the storm system, as intended to per the Poudre River Business Park, Filing One. The design worksheets included in the Appendices to this Final Drainage Report present details of the hydrologic and hydraulic calculations pertinent to the design of the on-site storm drainage system. A drainage plan, showing the proposed development of the site and developed drainage patterns is included in the map pocket following the Appendices. B. Specific Details There are a number of collection and conveyance scenarios within the drainage regime associated with this development. The respective scenarios are described below. Sub-basin B1, (0.99 acres), consists of asphalt/concrete, landscaped area, and natural vegetation. Rainfall travels via overland flow from the center of the parking area to the exterior of the lot, where it will concentrate in valley pans and will be conveyed to the rain garden at a minimum of 0.6% slope, where the WQCV is treated. Overland flow will also infiltrate the permeable pavers in the parking stalls, where it will be treated. The 100-year flow is released via a 24” drop inlet into the back of the existing curb inlet located on the south side of Poudre River Drive. After treatment within the rain garden and the permeable pavers, the WQCV will also be released into the back of the curb inlet, where it will be eventually be conveyed to the Poudre River. Sub-basin B1 produces a 100-year flow of 4.29 cfs. If the paver system overflows due to clogging, the runoff will be directed to the rain garden where it will be treated and released through the outlet structure. Sub-basin OS1 accounts for the south half of the Poudre River Drive extension. Rainfall in this basin will travel via overland flow where it will concentrate in gutter flow and travel west to the existing curb inlet on the southeast side of Poudre River Drive and Hoffman Mill Road. From this inlet, flow will be conveyed through the existing system to the Poudre River. Sub-basin OS1 produces a 100-year flow of 1.26 cfs. Sub-basin OS2 accounts for the Hoffman Mill Road extension. Rainfall in this basin will travel via overland flow where it will concentrate in gutter flow and travel south where it meets the existing Hoffman Mill Road. From this point, it will be conveyed as it has historically. Sub-basin OS2 produces a 100-year flow of 0.88 cfs. C. Rain Garden The rain garden has been designed to accommodate volume and release requirements for the proposed site in its entirety. The WQCV required is 490 cubic feet. The WQCV infiltrates completely through the rain garden media. At a depth of 5 inches, the rain garden requires a flat surface area of 327 square feet; a flat surface area of 390 square feet has been provided. The outlet structure has been designed to release the flows above the WQCV into the storm sewer system. A 6” PVC underdrain will be installed beneath the rain garden. A detail of this rain garden has been provided in the attached map pockets. The entire overflow from the rain garden and the permeable pavers will be conveyed through the rain garden outlet structure and to the existing storm system to the north. This existing storm sewer system has the capacity to convey the entire 100-year flow from the proposed development. There will be no new facilities required offsite for the conveyance of the minor or major flows to the Poudre River. V. CONCLUSIONS A. Compliance with Standards The drainage design for the Parking at 620 S. Lemay Avenue is in compliance with the requirements of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual as well as the City’s floodplain regulations. The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the design of the drainage systems. B. Drainage Concept The drainage design for the Parking at 620 S. Lemay Avenue will be adequate to safely convey onsite and offsite flows through the development. Development of the site, as proposed, should have a beneficial impact on water quality in downstream drainage facilities and drainage ways by reducing and delaying the initial discharge of runoff from the site such that sediments and other potential pollutants typically carried by this first flush are removed from the flow. VI. REFERENCES “City of Fort Collins Stormwater Criteria Manual”, City of Fort Collins, Adopted December 2011 “City of Fort Collins Municipal Code”, Chapter 10 – Flood Protection and Prevention City of Fort Collins, 1987 Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3, Urban Drainage and Flood Control District, April 2008 VII. APPENDICIES APPENDIX A: Hydrologic Computations Vicinity Map FEMA FIRM Exhibit USGS Soil Map Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO-3 Recommended Percentage Imperviousness Values Rational Method Calculated Composite C Tables Rational Method Calculated Imperviousness Rational Method Calculated Flows +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI                                   ƒ  1 ƒ  : ƒ  1 ƒ  : ƒ  1 ƒ  : ƒ  1 ƒ  : 1 0DSSURMHFWLRQ:HE0HUFDWRU&RUQHUFRRUGLQDWHV:*6(GJHWLFV870=RQH1:*6      )HHW      0HWHUV 0DS6FDOHLISULQWHGRQ$ODQGVFDSH [ 0$3/(*(1' 0$3,1)250$7,21 $UHDRI,QWHUHVW $2, $UHDRI,QWHUHVW $2, 6RLOV 6RLO5DWLQJ3RO\JRQV $ $' % %' & &' ' 1RWUDWHGRUQRWDYDLODEOH 6RLO5DWLQJ/LQHV $ $' % %' & &' ' 1RWUDWHGRUQRWDYDLODEOH 6RLO5DWLQJ3RLQWV $ $' % %' & &' ' 1RWUDWHGRUQRWDYDLODEOH :DWHU)HDWXUHV 6WUHDPVDQG&DQDOV 7UDQVSRUWDWLRQ 5DLOV ,QWHUVWDWH+LJKZD\V 865RXWHV 0DMRU5RDGV /RFDO5RDGV %DFNJURXQG $HULDO3KRWRJUDSK\ 7KHVRLOVXUYH\VWKDWFRPSULVH\RXU$2,ZHUHPDSSHGDW :DUQLQJ6RLO0DSPD\QRWEHYDOLGDWWKLVVFDOH (QODUJHPHQWRIPDSVEH\RQGWKHVFDOHRIPDSSLQJFDQFDXVH PLVXQGHUVWDQGLQJRIWKHGHWDLORIPDSSLQJDQGDFFXUDF\RIVRLOOLQH SODFHPHQW7KHPDSVGRQRWVKRZWKHVPDOODUHDVRIFRQWUDVWLQJ VRLOVWKDWFRXOGKDYHEHHQVKRZQDWDPRUHGHWDLOHGVFDOH 3OHDVHUHO\RQWKHEDUVFDOHRQHDFKPDSVKHHWIRUPDS PHDVXUHPHQWV 6RXUFHRI0DS 1DWXUDO5HVRXUFHV&RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\85/ KWWSZHEVRLOVXUYH\QUFVXVGDJRY &RRUGLQDWH6\VWHP :HE0HUFDWRU (36* 0DSVIURPWKH:HE6RLO6XUYH\DUHEDVHGRQWKH:HE0HUFDWRU SURMHFWLRQZKLFKSUHVHUYHVGLUHFWLRQDQGVKDSHEXWGLVWRUWV GLVWDQFHDQGDUHD$SURMHFWLRQWKDWSUHVHUYHVDUHDVXFKDVWKH $OEHUVHTXDODUHDFRQLFSURMHFWLRQVKRXOGEHXVHGLIPRUHDFFXUDWH FDOFXODWLRQVRIGLVWDQFHRUDUHDDUHUHTXLUHG 7KLVSURGXFWLVJHQHUDWHGIURPWKH86'$15&6FHUWLILHGGDWDDVRI WKHYHUVLRQGDWH V +\GURORJLF6RLO*URXS +\GURORJLF6RLO*URXS²6XPPDU\E\0DS8QLW²/DULPHU&RXQW\$UHD&RORUDGR &2 0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2, 3HUFHQWRI$2,  /RYHODQGFOD\ORDPWR SHUFHQWVORSHV &    6DWDQWDORDPWR SHUFHQWVORSHV %   7RWDOVIRU$UHDRI,QWHUHVW   'HVFULSWLRQ +\GURORJLFVRLOJURXSVDUHEDVHGRQHVWLPDWHVRIUXQRIISRWHQWLDO6RLOVDUH DVVLJQHGWRRQHRIIRXUJURXSVDFFRUGLQJWRWKHUDWHRIZDWHULQILOWUDWLRQZKHQWKH VRLOVDUHQRWSURWHFWHGE\YHJHWDWLRQDUHWKRURXJKO\ZHWDQGUHFHLYHSUHFLSLWDWLRQ IURPORQJGXUDWLRQVWRUPV 7KHVRLOVLQWKH8QLWHG6WDWHVDUHDVVLJQHGWRIRXUJURXSV $%&DQG' &RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG 7LHEUHDN5XOH+LJKHU +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family * Multi-unit (detached) 60 Multi-unit (attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. C K 1 . 31 i 3 1 . 44 i 2 1 . 135 i 0 . 12 A A for CA 0, otherwise CA = 0 (RO-6) C K 0 . 858 i 3 0 . 786 i 2 0 . 774 i 0 . 04 CD CD (RO-7) C 2 B A CD C C 2007-01 RO-9 Urban Drainage and Flood Control District Composite C Values 620 S. LEMAY AVE. PARKING EXPANSION Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Minor (2-YR) Major (100-YR) (C = 0.95) (C = 0.95) (C = 0.50) (C = 0.95) (C = 0.15) (acres) Composite "C" Composite "C" (Cf x C) P1 E1 0.00 0.00 0.00 0.00 0.99 0.99 0.15 0.19 D1 B1 0.35 0.06 0.00 0.00 0.59 0.99 0.48 0.59 D2 OS1 0.07 0.03 0.00 0.00 0.02 0.13 0.80 0.99 D3 OS2 0.05 0.02 0.00 0.00 0.04 0.11 0.66 0.83 Notes: Composite C values obtained from Table R0-11 Major Storm Runoff factored per Table R0-12 Developed Design Point Basin(s) Existing MAP 620 LEMAY_City of Fort Collins Rational Method.xlsx 5/5/2015 Impeviousness 620 S. LEMAY PARKING EXPANSION Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent (I = 100) (I = 100) (I = 40) (I = 90) (I = 0) (acres) Imperviousness P1 E1 0.000 0.000 0.0000 0.0000 0.9900 0.9900 0% D1 B1 0.35 0.06 0.00 0.00 0.59 0.99 41% D2 OS1 0.07 0.03 0.00 0.00 0.02 0.13 81% D3 OS2 0.05 0.02 0.00 0.00 0.04 0.11 64% Notes: Percent Impervious Values per Table R0-3, Urban Drainage Manual Developed Design Point Basin (s) Existing CAG 620 LEMAY_City of Fort Collins Rational Method.xlsx 5/5/2015 Basin Flow Calculations 620 S. LEMAY PARKING EXPANSION Area Minor Major (acres) Composite "C" Composite "C" Length (ft) Slope (%) Minor tov (min)a Major tov (min)a Length (ft) Slope (%) Channel Type Velocity (fps)c tt (min) Minor TC (min) Major TC (min) 2-yr 10-yr 100-yr 2-yr 10-yr 100-yr P1 E1 0.9900 0.15 0.19 175 0.82 25.11 24.12 0 0.00 HM 0.00 0.00 25.11 24.12 1.43 2.44 5.09 0.21 0.36 0.94 D1 B1 0.9900 0.48 0.59 123 1.00 12.93 10.48 113 1.00 PA 2.00 0.9417 13.88 11.42 1.92 3.29 7.29 0.90 1.55 4.29 D2 OS1 0.1275 0.80 0.99 18 2.00 1.92 0.67 97 0.50 PA 1.41 1.1373 5.00 5.00 2.85 4.87 9.95 0.29 0.49 1.26 D3 OS2 0.1070 0.66 0.83 36 2.00 3.91 2.43 70 0.50 PA 1.41 0.8250 5.00 5.00 2.85 4.87 9.95 0.20 0.34 0.88 D4 - - - - - - - - - - - - - - - - - - 1.39 2.39 6.43 Notes: a b HM = Heavy Meadow, TF = Tillage/field, PL = Short pasture and lawns, BG = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas c Velocity alues from Figure 3-3/Table RO-2 Estimate of Average Flow Velocity for use with the Rational Method Design Point Developed Existing Initial/Overland Time Final TC Intensity (in/hr) Basin Flows (cfs) Basin (s) Travel Time 1 / 3 1 . 87 ( 1 . 1 ) 1 / 2 S CC D t f ov − = CAG 620 LEMAY_City of Fort Collins Rational Method.xlsx 5/5/2015 APPENDIX B: Hydraulic Computations Rain Garden Outlet Area Inlet Calculation Rain Garden Outlet Pipe Calculation 4.29 0.32 RAIN GARDEN OUTLET Hydraulic Analysis Report Project Data Project Title: Designer: Project Date: Wednesday, March 04, 2015 Project Units: U.S. Customary Units Notes: Channel Analysis: RAIN GARDEN OUTLET PIPE Notes: Input Parameters Channel Type: Circular Pipe Diameter: 1.2500 ft Longitudinal Slope: 0.0249 ft/ft Manning's n: 0.0120 Flow: 4.2900 cfs Result Parameters Depth: 0.5409 ft Area of Flow: 0.5088 ft^2 Wetted Perimeter: 1.7947 ft Average Velocity: 8.4323 ft/s Top Width: 1.2386 ft Froude Number: 2.3186 Critical Depth: 0.8386 ft Critical Velocity: 4.9010 ft/s Critical Slope: 0.0060 ft/ft Critical Top Width: 1.1747 ft Calculated Max Shear Stress: 0.8404 lb/ft^2 Calculated Avg Shear Stress: 0.4404 lb/ft^2 APPENDIX C: Water Quality Design Calculations UD BMP Rain Garden Calculations Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 41.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.410 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.15 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 43,124 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 524.6 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 5 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 350 sq ft D) Actual Flat Surface Area AActual = 390 sq ft E) Area at Design Depth (Top Surface Area) ATop = 2445 sq ft F) Rain Garden Total Volume VT= 591 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 1.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 525 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.61 in Design Procedure Form: Rain Garden (RG) MAP QUALITY ENGINEERING March 4, 2015 620 S. LEMAY AVE.PARKING EXPANSION FORT COLLINS, COLORADO Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_RAIN GARDEN.xlsm, RG 3/4/2015, 3:49 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MAP QUALITY ENGINEERING March 4, 2015 620 S. LEMAY AVE.PARKING EXPANSION FORT COLLINS, COLORADO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_RAIN GARDEN.xlsm, RG 3/4/2015, 3:49 PM APPENDIX D: Standard Operating Procedures Standard Operating Procedures Page 1 of 2 STANDARD OPERATING PROCEDURES (SOPs) Parking at 620 S. Lemay Avenue, Fort Collins, CO A. PURPOSE In order for physical stormwater Best Management Practices (BMPs) to be effective, proper maintenance is critical. Maintenance includes both routinely scheduled activities, as well as non- routine repairs that may be required after large storms, or as a result of other unforeseen problems. Standard Operating Procedures (SOPs) should clearly identify BMP Maintenance responsibility. BMP maintenance is typically the responsibility of the entity owning the BMP. Identifying who is responsible for maintenance of BMPs and ensuring that an adequate budget is allocated for maintenance is critical to the long-term success of BMPs. Maintenance responsibility may be assigned either publicly or privately. For this project, the privately owned BMPs shown in Section B below are to be maintained by the property owner, homeowner’s association (HOA), or property manager. B. BMPS SUBJECT TO SOP REQUIREMENTS The following stormwater facilities contained within the Parking at 620 S. Lemay Avenue project are subject to SOP requirements: - Rain Garden Detention Basin (RG) - Storm Sewers and Tree Roots - Permeable Pavers (PP) The location of said facilities can be found on the Site Plan, Landscape Plans, and Utility Plans for Parking at 620 S. Lemay Avenue. C. SITE-SPECIFIC STANDARD OPERATING PROCEDURES Inspection and maintenance procedures and frequencies, specific maintenance requirements and activities, as well as BMP-specific constraints and considerations shall follow the guidelines outlined in volume 3 of the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual, latest revision. The Storm Sewer maintenance procedures follow. The Storm Sewer Lines (Table 1), Rain Garden (Table 2), and Permeable Pavers (Table 3) maintenance plans are as follows: Storm Sewer Lines Maintenance Plan The storm sewer lines are located in close proximity to many trees. The situation is unavoidable; therefore, special maintenance has been identified to ensure these storm drain systems perform as they were designed. In addition, Inlets and outlet rip-rap will need to be maintained. Page 2 of 2 Table 1 – Routine Storm Sewer Line Maintenance Required Action Maintenance Objective Frequency of Action Line Inspections Use a video camera to inspect the condition of the storm sewer pipes. Cleanout pipes as needed. If the integrity of the pipe is compromised, then repair the damaged section(s). Routine -Annual inspection of hydraulic and structural facilities. Also check for obvious problems during routine maintenance visits, especially for plugging of outlets. Inlet Inspections Inspect and clean inlet weirs and boxes of any debris. Routine – Annual inspection of inlets to ensure proper operation and prevent plugging. Riprap Outlet Protection Inspections Maintain riprap (rock) storm sewer outlet protection to ensure proper operation. Routine – Annual inspection of riprap to replace dislodged stones, remove debris, etc. Rain Garden Maintenance Plan Table 2 – Routine EDB Maintenance (Summary from Table EDB-1, Chapter 6 of UDFCD) Required Action Maintenance Objective Frequency of Action Lawn mowing and Lawn care Occasional mowing to limit unwanted vegetation. Maintain irrigated turf grass as 2 to 4 inches tall and non-irrigated native turf grasses at 4 to 6 inches. Routine - Depending on aesthetic requirements. Sediment, Debris, and Litter removal Removal of sediment, debris, and litter from the entire pond to minimize outlet clogging and improve aesthetics. Routine - Including just before annual storm seasons (April and May), end of storm season after leaves have fallen, and following significant rainfall events. Major Pond Sediment removal* Remove accumulated sediment from the bottom of the basin. Non-routine - Performed when sediment accumulation occupies 20 percent of the WQCV. This may vary considerably, but expect to do this every 10 to 20 years, as necessary per inspection if no construction activities Page 3 of 2 Permeable Paver Maintenance Plan Table 3 – Routine EDB Maintenance (Summary from Table PPS-1, Chapter 6 of UDFCD) Required Action Maintenance Objective Frequency of Action Snow Removal Remove snow and ice from the pavement system by plowing. Conventional plowing should not cause damage to the pavement. Do not use sand. Routine – After all snow storms. Debris Removal, Sweeping, and Vacuuming Removal of sediment, debris, and litter from the pavement system to minimize clogging and improve aesthetics. Routine – Broom sweep frequently (weekly or monthly) and vacuum sweep as needed (monthly or yearly). Full and Partial Replacement of Pavement or Infill Material If surface is completely clogged and rendering a minimal surface infiltration rate, restoration of surface infiltration can be achieved by removing the first 1” of soiled aggregate infill with a vacuum sweeper. After cleaning, refill with clean aggregate infill material. Non-routine – Perform as needed. 00 10' 20' 40' 1"=20' DRAINAGE PLAN FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL C4.0 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING C8.5 PARKING AT 620 S. LEMAY AVE. 620 S. LEMAY AVENUE FORT COLLINS, CO 80524 POUDRE RIVER BUSINESS PARK, FOURTH FILING 5.04" Ponding Depth (MODIFED) BIORETENTION / BIOSWALE CROSS SECTION 6" Perforated PVC Pipe 10" Thick Layer of CDOT No. 4 Aggregate EL. = 4954.00 EL. = 4954.42 (MODIFED) INTERLOCKING CONCRETE PAVERS CROSS SECTION 6" Perforated PVC Pipe Sub-Drain 12" Layer of #2 Rock Sub-Base 6" Layer of #57 Base Elev. = 4957.14 Inv Elev. = 4955.27 Elev. = 4956.27 Elev. = 4956.77 take place in the tributary watershed. More often if they do. Inspections Inspect basins to insure that the basin continues to function as initially intended. Examine the outlet for clogging, erosion, slumping, excessive sedimentation levels, overgrowth, embankment and spillway integrity and damage to any structural element. Every two to five years. DQG WKUHHGXDOFODVVHV $'%'DQG&' 7KHJURXSVDUHGHILQHGDVIROORZV *URXS$6RLOVKDYLQJDKLJKLQILOWUDWLRQUDWH ORZUXQRIISRWHQWLDO ZKHQWKRURXJKO\ ZHW7KHVHFRQVLVWPDLQO\RIGHHSZHOOGUDLQHGWRH[FHVVLYHO\GUDLQHGVDQGVRU JUDYHOO\VDQGV7KHVHVRLOVKDYHDKLJKUDWHRIZDWHUWUDQVPLVVLRQ *URXS%6RLOVKDYLQJDPRGHUDWHLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVH FRQVLVWFKLHIO\RIPRGHUDWHO\GHHSRUGHHSPRGHUDWHO\ZHOOGUDLQHGRUZHOOGUDLQHG VRLOVWKDWKDYHPRGHUDWHO\ILQHWH[WXUHWRPRGHUDWHO\FRDUVHWH[WXUH7KHVHVRLOV KDYHDPRGHUDWHUDWHRIZDWHUWUDQVPLVVLRQ *URXS&6RLOVKDYLQJDVORZLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVHFRQVLVW FKLHIO\RIVRLOVKDYLQJDOD\HUWKDWLPSHGHVWKHGRZQZDUGPRYHPHQWRIZDWHURU VRLOVRIPRGHUDWHO\ILQHWH[WXUHRUILQHWH[WXUH7KHVHVRLOVKDYHDVORZUDWHRIZDWHU WUDQVPLVVLRQ *URXS'6RLOVKDYLQJDYHU\VORZLQILOWUDWLRQUDWH KLJKUXQRIISRWHQWLDO ZKHQ WKRURXJKO\ZHW7KHVHFRQVLVWFKLHIO\RIFOD\VWKDWKDYHDKLJKVKULQNVZHOO SRWHQWLDOVRLOVWKDWKDYHDKLJKZDWHUWDEOHVRLOVWKDWKDYHDFOD\SDQRUFOD\OD\HU DWRUQHDUWKHVXUIDFHDQGVRLOVWKDWDUHVKDOORZRYHUQHDUO\LPSHUYLRXVPDWHULDO 7KHVHVRLOVKDYHDYHU\VORZUDWHRIZDWHUWUDQVPLVVLRQ ,IDVRLOLVDVVLJQHGWRDGXDOK\GURORJLFJURXS $'%'RU&' WKHILUVWOHWWHULV IRUGUDLQHGDUHDVDQGWKHVHFRQGLVIRUXQGUDLQHGDUHDV2QO\WKHVRLOVWKDWLQWKHLU QDWXUDOFRQGLWLRQDUHLQJURXS'DUHDVVLJQHGWRGXDOFODVVHV 5DWLQJ2SWLRQV $JJUHJDWLRQ0HWKRG'RPLQDQW&RQGLWLRQ +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI OLVWHGEHORZ 6RLO6XUYH\$UHD /DULPHU&RXQW\$UHD&RORUDGR 6XUYH\$UHD'DWD 9HUVLRQ6HS 6RLOPDSXQLWVDUHODEHOHG DVVSDFHDOORZV IRUPDSVFDOHV RUODUJHU 'DWH V DHULDOLPDJHVZHUHSKRWRJUDSKHG $SU²1RY  7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUH FRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQG LPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJ RIPDSXQLWERXQGDULHVPD\EHHYLGHQW +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI VKHHW