HomeMy WebLinkAboutFOOTHILLS MALL MULTI-FAMILY - MAJOR AMENDMENT - MJA150002 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT5285 McWhinney Blvd., Suite 160 TEL 303.237.2072
Loveland, CO 80538 FAX 303.237.2659 www.olssonassociates.com
April 24, 2015
Stormwater Engineering
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80524
RE: Drainage Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, and 5 of Foothills Mall Redevelopment)
Dear Sir or Madam:
Olsson has completed an analysis of the drainage design for Lot 3, 4, and 5 of Foothills Mall
Redevelopment to determine the changes from the original to the proposed design. The original
design is defined within the following drainage report: Storm Water Management Plan for
Foothills Redevelopment, prepared by R.A. Smith National, dated Revised December 5, 2013
(existing drainage report).
The lots fall within Basin 25 of the Existing Drainage Report. The original basin’s
imperviousness was compared to the imperviousness of the proposed design to determine if
further analysis would be required. The original design’s overall composite percent
imperviousness was determined to be 68 percent. The percent imperviousness of the proposed
design was calculated to be 63 percent. Based on the calculations, a reduction of the developed
runoff would be anticipated. See attached calculations and supporting material. Since the
intended drainage patterns will remain the same, detailed analysis will not be required.
In addition, the runoff for original design was intended to drain to sand filters and rain gardens
within the Foothills Mall Redevelopment: Sand Filters SF-2.0 and SF-4.0; and Rain Gardens
RG-29 and RG-31. These drainage systems have been designed per the existing drainage
report and are being constructed as part of the Foothills Redevelopment Planning Area 2 Final
Plans. The rain garden and sand filter design’s assumed the contributing area was 90 percent
imperviousness. Based on that assumption, additional analyses will not be required. Since rain
garden RG-33 was being constructed as part of Foothills Redevelopment Planning Area 3 Final
Plans, analysis of the rain garden was completed for the proposed design. Based on the
analysis a rain garden will be provided in the northeast corner of Lot 3 meeting the original
intent.
The following calculations and supporting material are attached for your reference:
• Exhibit A – Vicinity Map
• Exhibit B – Existing Drainage Basins
• Exhibit C – Percent Imperviousness
Drainage Analysis for the
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
(Lots 3, 4, and 5 of Foothills Mall Redevelopment)
Page 2
April 24, 2015
• Exhibit D – Lot Map (Rain Garden Locations)
• Exhibit E – Revised Rain Garden, RG-33
• Exhibit F – Revised Rain Garden, RG33, Calculations
If you have any questions or need additional information, please contact me.
Sincerely,
Olsson Associates
Daniel Hull, PE
Senior Project Engineer
Enclosures
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family R
Exhibit A
Vicinity Map
Map taken from Storm Water Management Plan for Foothills Redevelopment,
prepared by R.A. Smith National, dated Revised December 5, 2013
Lot 3, 4 and 5
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family Exhibit B R
Existing Drainage Basins
Lot 3 , 4, and 5
Map taken from Storm Water Management Plan for Foothills Redevelopment,
prepared by R.A. Smith National, dated Revised December 5, 2013
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Family Exhibit C R
Lot Map
LOT 3
LOT 4
LOT 5
SAND
FILTER 2.0
SAND
FILTER 4.0
RAIN
GARDEN 29.0
RAIN
GARDEN 31.0
RAIN
GARDEN 33.0
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
Foothills Mall Multi-Famliy Exhibit D R
Percent Imperviousness
Lot Area (SF) AREA (AC) Landscape Paved Roof Walks
Percent
Impervious
0% 100% 90% 90% NA
3 170,929 3.92 47,519 47,007 58,191 18,212 68%
4 112,588 2.58 36,461 1,162 66,796 8,169 61%
5 101,716 2.34 15,199 1,782 68,600 16,135 77%
Total 385,233 8.84 99,179 49,951 193,587 42,516 68%
Imperviousness
Existing Design, Planning Area 3
Lot Area (SF) AREA (AC) Landscape Paved Roof Walks
Percent
Impervious
0% 100% 90% 90% NA
3 170,929 3.92 50,093 59,087 59,234 2,515 67%
4 112,588 2.58 39,573 32,060 32,372 8,583 61%
5 101,716 2.34 38,113 25,111 34,096 4,396 59%
Total 385,233 8.84 127,778 116,258 125,702 15,494 63%
Imperviousness
Proposed Design
TEL 970.431.7733
Loveland, CO 80538
Suite 160
5285 McWhinney Boulevard
R
T T
Foothills Mall Multi-Family
Exhibit E
Revised Rain Garden RG-33
Contributing Area
1.56 acres
Rain Garden
RG-33.0
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia = 68.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.680
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 68,348 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,213 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.00 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum) DWQCV = 12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin = 809 sq ft
D) Actual Flat Surface Area AActual = 993 sq ft
E) Area at Design Depth (Top Surface Area) ATop = 1692 sq ft
F) Rain Garden Total Volume VT= 1,343 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y = 60.0 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 = 1,213 cu ft
iii) Orifice Diameter, 3/8" Minimum DO = 0.40 in
Design Procedure Form: Rain Garden (RG)
Daniel Hull
Olsson Associates
April 24, 2015
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
Modified Rain Garden 33
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Rain Garden 33.0 Calcs.xlsm, RG 4/24/2015, 1:57 PM
Exhibit F
Modified Rain Garden, RG33
1of 2
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Daniel Hull
Olsson Associates
April 24, 2015
Major Amendment to a Portion of Foothills Mall Redevelopment Planning Area 3
Modified Rain Garden 33
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Rain Garden 33.0 Calcs.xlsm, RG 4/24/2015, 1:57 PM
Exhibit F
Modified Rain Garden, RG33
1of 2