HomeMy WebLinkAboutMAINSTREET HEALTH & WELLNESS SUITES - FDP - FDP150006 - PLANS - LANDSCAPE PLAN (3)Dry Pond
(3) Gle-t
(2) Cat-s
(3) Gle-t
(3) Gym-d
(1) Que-m
(3) Gym-d
(5) Gle-t
(1) Gle-t
(4) Cat-s
(4) Gym-d
(3) Gym-d
(1) Que-m
(1) Que-m
(1) Que-m (1) Que-m (1) Que-m
(4) Ulm-x
(4) Ulm-x
(6) Til-c
(4) Pic-f
(3) Pic-f
(3) Pic-g
(3) Mal-t
(2) Pic-d
(3) Syr-r
(59) Gai-a
(22) Spo-h
(7) Jam-a
(36) Spo-h
(5) Jam-a
(12) Pan-v
(20) Jun-b
(20) Tax-x
(20) Tax-x
(20) Jun-b
(28) Tax-x
(24) Jun-b
(20) Jun-b
(27) Pan-v
(9) Fal-p
(19) Fal-p
(15) Gai-a
(17) Rhu-t
(4) Fal-p
(1) Que-m
(2) Gle-t
(4) Gle-t
(3) Que-m
(3) Mal-t
(1) Til-a (2) Til-a
(1) Til-c
(3) Syr-r
(3) Cat-s
(126) Ber-l
(2) Cat-s
(2) Gym-d
(2) Cat-s
(3) Pic-p
(4) Phy-o
(110) Ber-l
(85) Sch-s
(2) Ace-t
(1) Gym-d
(2) Ace-t
(2) Syr-r
(2) Syr-r
(11) Pan-v
(7) Pic-b
(3) Fal-p
(14) Chr-n
(47) Sch-s
(1) Pic-c
(44) Bou-g
(13) Jun-s
(9) Chr-n
(44) Sal-v
(21) Pan-v
(87) Mah-r
(9) Chr-n
(10) Bux-g
(3) Pic-d
(1) Pic-c
(1) Pic-c
(1) Fal-p
(15) Pan-v
(104) Aqu-r
(6) Jam-a
(7) Pic-b
(20) Jun-b
(33) Spo-h
(35) Pen-s
(3) Spo-h
(22) Phy-o
(17) Rhu-t
(106) Ach-m
(25) Sal-v
(21) Jun-b
(1) Pic-c
(56) Heu-m
(6) Sym-x (9) Sym-x
(8) Jun-b
(1) Hyd-a
(1) Hyd-a
(2) Hyd-a
(19) Phy-o
(1) Pic-c
(30) Spo-h
(56) Heu-m
(57) Aqu-r
(2) Pic-c
(14) Sch-s
(32) Ach-m
(27) Jun-b
(23) Sol-c
(1) Hyd-a
(11) Rhu-t
(1) Hyd-a
(13) Jun-s
(17) Cha-m
(1) Hyd-a
(42) Spo-h
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
MAINSTREET
HEALTH & WELLNESS
SUITES
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
01/30/2015
BID DOCUMENTS
REVISION SCHEDULE
NO. DESCRIPTION DATE
PLANTING DETAILS
1 L103
PLANT SCHEDULE
Symbol Qty % of
Trees Botanical Name Common Name Size Container
Water
Needs Notes
SHADE TREES
Cat-s 19 11.4% Catalpa speciosa Northern Catalpa 2" cal. B&B L-M strong central leader, matched
Cel-o 8 4.8% Celtis occidentalis Northern Hackberry 2" cal. B&B M full, strong central leader, matched
Gle-t 18 10.8% Gleditsia triacanthos inermis 'Skycole'' Skyline Honeylocust 2" cal. B&B L-M full, strong central leader, matched
Gym-d 16 9.6% Gymnocladus dioicus 'Espresso' Espresso Kentucky Coffeetree 2" cal. B&B L-M full, strong central leader
Pop-s 10 6.0% Populus sargentii 'Jeronimus' Jeronimus Sargent Poplar 2" cal. B&B M full, strong central leader, matched
Que-m 14 8.4% Quercus macrocarpa Bur Oak - Bullet Gall Resistant 2" cal. B&B L-M dug in spring, symmetrical
Til-a 12 7.2% Tilia americana 'Bailyard' Frontyard American Linden 2" cal. B&B M full, strong central leader, matched
Til-c 10 6.0% Tilia cordata 'Greenspire' Greenspire Littleleaf Linden 2" cal. B&B M full, strong central leader, matched
Ulm-x 11 6.6% Ulmus x 'Accolade' Accolade Elm 2" cal. B&B L-M full, strong central leader, matched
ORNAMENTAL TREES
Ace-t 4 2.4% Acer tataricum 'Hotwings' Hotwings Tatarian Maple 1.5" cal. B&B L single trunk, symmetrical, matched
Mal-t 6 3.6% Malus 'Thunderchild' Thunderchild Crabapple 1.5" cal. B&B L-M single trunk, symmetrical, matched
Syr-r 12 7.2% Syringa reticulata 'Ivory Silk' Ivory Silk Japanese Tree Lilac 1.5" cal. B&B L-M single trunk, symmetrical, matched
EVERGREEN TREES
Pic-d 8 4.8% Picea glauca 'Densata' Black Hills Spruce min. 6' ht. B&B M symmetrical, full
Pic-p 5 3.0% Picea pungens Colorado Spruce min. 6' ht. B&B M-H symmetrical, full
Pic-f 7 4.2% Picea pungens glauca 'Fat Albert' Fat Albert Colorado Blue Spruce min. 6' ht. B&B M-H symmetrical, full
Pic-g 6 3.6% Picea pungens glauca Colorado Blue Spruce min. 6' ht. B&B M-H symmetrical, full
DECIDUOUS SHRUBS
Atr-c 22 n/a Atriplex canescens Fourwing Saltbush 24" ht., #5 container VL-L space @ 5'-0" o.c., allow to mass
Cha-m 27 n/a Chamaebatiara millefolium Fernbush 24" ht., #5 container VL-L Space @ 4'-0" o.c., allow to mass
Chr-y 19 n/a Chrysothamnus nauseosus Rubber Rabbitbrush 24" ht., #5 container VL-L space @ 5'-0" o.c., allow to mass
Chr-n 32 n/a Chrysothamnus nauseosus var.
nauseosus Dwarf Rabbitbrush 18" ht., #5
container VL-L space @ 3'-0" o.c., allow to mass
Fal-p 50 n/a Fallugia paradoxa Apache Plume 24" ht., #5 container VL-L space @ 5'-0" o.c., allow to mass
Hyd-a 8 n/a Hydrangea arborescens 'Abetwo' Incrediball Hydrangea 24" ht., #5 container M-H space @ 4'-0" o.c.
Jam-a 39 n/a Jamesia americana Waxflower 24" ht., #5 container L-M Space @ 4'-0" o.c., allow to mass
Phy-o 86 n/a Physocarpus opulifolius 'Nanus' Dwarf Ninebark 18" ht., #5 container L-M space @ 3'-0" o.c., allow to mass
Rhu-s 20 n/a Rhus trilobata Three-leaf Sumac 24" ht., #5 container VL-L space @ 5'-0" o.c., allow to mass
Rhu-t 144 n/a Rhus trilobata 'Autumn Amber' Autumn Amber Sumac 24" ht., #5 container VL-L space @ 3'-0" o.c., allow to mass
Ros-w 20 n/a Rosa woodsii Wood's Rose 24" ht., #5 container M space @ 5'-0" o.c., allow to mass
Sym-x 29 n/a Symphoricarpos x chenault 'Hancock' Hancock Coralberry 24" ht., #5 container L-M space @ 3'-0" o.c., allow to mass
EVERGREEN SHRUBS
Bux-x 6 n/a Buxus x koreana 'Winter Gem' Winter Gem Boxwood 24" ht., #5 container M-H space @ 3'-0" o.c., allow to mass
Bux-g 37 n/a Buxus 'Green Mountain' Green Mountain Boxwood 24" ht., #5 container M-H space @ 3'-0" o.c., allow to mass
Dry Pond
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
MAINSTREET
HEALTH & WELLNESS
SUITES
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
01/30/2015
BID DOCUMENTS
REVISION SCHEDULE
NO. DESCRIPTION DATE
0
Scale 1" = 30'-0"
15 30 60
North
HYDROZONE PLAN
L104
Low Water Needs Area: 29,370 s.f./15%
Moderate Water Needs Area: 164,290 s.f./85%
High Water Needs Area: 0 s.f./0%
SHEET 4 OF 4
Jun-s 78 n/a Juniperus sabina 'Tamariscifolia' Tammy Juniper 24" ht., #5 container L space @ 3'-0" o.c., allow to mass
Jun-b 159 n/a Juniperus squamata 'Blue Star' Blue Star Singleseed Juniper 24" ht., #5 container L space @ 3'-0" o.c., allow to mass
Pic-c 9 n/a Picea glauca 'Conica' Dwarf Alberta Spruce 36" ht., #5 container M space @ 4'-0" o.c.
Pic-b 28 n/a Picea pungens 'Globe' Globe Spruce 24" ht., #5 container M Space @ 4'-0" o.c., allow to mass
Tax-x 68 n/a Taxus x media 'Tautonii' Dense Tauton Yew 30" spd., #5 container H space @ 4'-0" o.c., allow to mass
ORNAMENTAL GRASSES AND PERENNIALS
Ach-m 324 n/a Achillea 'Moonshine' Moonshine Yarrow #1 pot VL-M space @ 18" o.c., triangular spacing
Aqu-r 161 n/a Aquilegia 'Redstar' Red Star Columbine #1 pot M space @ 15" o.c., triangular spacing
Ber-l 251 n/a Berlandiera lyrata Chocolate Flower #1 pot VL-L space @ 18" o.c., triangular spacing
Bou-g 44 n/a Bouteloua gracilis Blue Grama Grass #1 pot L space @ 18" o.c., triangular spacing
Gai-a 74 n/a Gaillardia aristata 'Oranges and Lemons' Oranges and Lemons Gaillardia #1 pot L-M space @ 18" o.c., triangular spacing
Heu-m 178 n/a Heuchera micrantha 'Purple Palace' Purple Palace Coral Bells #1 pot M space @ 12" o.c., triangular spacing
Mah-r 111 n/a Mahonia repens Creeping Oregon Grape Holly #1 pot L-M space @ 18" o.c., triangular spacing
Pan-v 131 n/a Panicum virgatum 'Heavy Metal' Heavy Metal Switchgrass #1 pot L space @ 3'-0" o.c.
Pen-s 54 n/a Penstemon strictus Rocky Mountain Penstemon #1 pot L-M space @ 15" o.c., triangular spacing
Sal-v 69 n/a Salvia verticillata 'Purple Rain' Purple Rain Salvia #1 pot M space @ 18" o.c., triangular spacing
Sch-s 546 n/a Schizachyrium scoparium 'The Blues' The Blues Little Bluestem #1 pot L space @ 2'-0" o.c.
Sol-c 23 n/a Solidago canadensis 'Golden Baby' Golden Baby Goldenrod #1 pot L space @ 18" o.c.
Spo-h 271 n/a Sporobolus heterolepis Prairie Dropseed #1 pot M space @ 2'-0" o.c.
Slope & scarify sides of pit.
Excavated soil or topsoil backfill.
Set root ball on undisturbed
soil cone at bottom of pit.
times ball diameter.
Width of pit to be two
Finish grade
4" shredded hardwood bark mulch
1
2 dia. of
root ball
Do NOT cut main leader
TREE PLANTING
Not to Scale
Remove all burlap & wire
from top 1/3 of root ball.
4" saucer rim sloped
gradually to finished grade
Fertilized topsoil mix.
Water thoroughly
when pit is half full.
Thoroughly loosen subsoil
at bottom of plant pit.
Lightly compacted topsoil mix
3'-0" min.
Finished grade
4" mulch
Set plant 2" to 4" above
finished grade.
#4 rebar painted flat black, tie to
trunk with 1/2" flexible vinyl strip.
1
2" Flexible vinyl strip -
black or green
NOTES: Do not cut leader.
1. This detail used for evergreens 6'
or less in size; other evergreens
staked in standard fashion.
2. Do not prune evergreens except
under direction of Landscape
Architect.
EVERGREEN TREE PLANTING
Not to Scale
Face of Wall
#6 - #10 washed river gravel, compacted
Spade Edge - See Detail this sheet
3'-0"
MOW STRIP
Not to Scale
Compacted Subgrade
Non woven geotextile fabric
Topsoil. See Specs
Slope & scarify sides of pit.
Excavated soil or topsoil backfill.
Set root ball on undisturbed
soil cone at bottom of pit.
times ball diameter.
Width of pit to be two
Finish grade
4" shredded hardwood bark mulch
1
2 dia. of
root ball
MULTI-STEM TREE PLANTING
Not to Scale
4" shredded hardwood bark mulch
Refer to Planting Schedule for On-Center
Note: All perennial beds shall be planted
12" prepared soil; see specifications
Remove container
using triangular planting scheme.
Compacted subgrade
planting dimension.
Existing grade.
PERENNIAL PLANTING
Not to Scale
NOTE: Remove burlap from top 1/3 of
Slope & scarify sides of pit.
3" high topsoil saucer for
Width of pit to be two
Excavated soil or topsoil backfill.
soil cone at bottom of pit.
4" shredded hardwood
Set root ball on undisturbed
Equal to
1/2 ball dia.
times ball diameter.
root ball or carefully remove container.
individual plants.
Finish grade.
bark mulch
SHRUB PLANTING
Not to Scale
Area to receive hardwood bark mulch
Topsoil (as specified)
Existing grade
3"
SPADE EDGE
Not to Scale
2
3
4
5
6
7
GENERAL LANDSCAPE AND PLANTING NOTES
STREET TREE NOTES
1. A permit must be obtained from the City Forester before any trees or shrubs as noted on this plan are planted, pruned, or removed on the
public right-of-way.This includes zones between the sidewalk and curb, medians and other City property. This permit shall approve the location
and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy.
2. Contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been
installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase.
3. Street trees shall be supplied and planted by the developer using a qualified landscape contractor.
4. The developer shall replace all dead and dying street trees after planting until final maintenance inspection and acceptance by the City of Fort
Collins Forestry Division. All street trees in the project must be established of an approved species and of acceptable condition prior to
acceptance.
5. Street tree locations and numbers may be adjusted to accommodate driveway locations, utility standards, separation between trees, street
signs and street lights. Street trees shall be centered in the middle of the parkway. Quantities shown on plan must be installed unless a reduction
occurs to meet separation standards.
A free permit must be obtained from the City Forester before any street trees are planted in parkways between the
sidewalk and curb. Street tree locations and numbers may change to meet actual utility/tree separation standards.
Landscape contractor must obtain approval of street tree location after utility locates. Street trees must be inspected and
approved before planting. Failure to obtain this permit is a violation of the Code of the City of Fort Collins.
SEEDED LAWN - See Spec Section 32 9200
GROUND PLAIN LEGEND
NATIVE SEED
Provide Detention Basin mix as produced by Applewood Seed, Arvada Colorado
(303) 431-7333, or approved equal, as indicated in Plans. Provide seed mixture
composed of annuals and perennials, proportions and minimum percentages of
purity, germination, and maximum percentage of weed seed, as follows.
Spread at a rate of 35 lbs/acre, or as required to achieve successful germination
and coverage rates listed within Spec Section 32 9216
Allegheny Monkeyflower
Annual Rye
Arrowhead
Awl-Fruited Sedge
Blue Vervain
Common Oats
Common Spike Rush
Cutleaf Coneflower
Ditch Stonecrop
Fowl Manna Grass
Fox Sedge
Path Rush
Prairie Cordgrass
Rice Cut Grass
Soft Rush
Softstem Bulrush
Swamp Milkweed
Switchgrass
Tickseed Sunflower
Virginaia Wildrye
Water Plantain SHEET 3 OF 4
1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for
additional information.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant
locations and plant bed conditions prior to installation. On-site adjustments may be required.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES
SHALL REMAIN INTACT.
4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with
approved, specified material.
5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using
drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor
to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities
shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions.
6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment.
7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity
and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source
and placement requirements)
8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect or Owner's
Representative. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at
the Contractor's expense.
9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted).
10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost.
11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless
otherwise noted.
12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance.
13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits
necessary to complete work.
14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit
drainage.
15. Trees shall be matched in groups unless otherwise noted.
16. All turf areas shall be irrigated with an automatic pop-up sprinkler system. All shrub beds shall be irrigated with automatic drip irrigation
system, or acceptable alternative. Refer to irrigation plans.
17. Trees shall not be planted closer than 4 feet to any gas, no closer than 6 feet to any water or sewer service line, no closer than 10 fee
to any water or sewer main, and no closer than 8 feet to a driveway. A horizontal distance of 40 feet between canopy street trees and
street lights and 15 feet between ornamental trees and street lights shall be maintained. Shrubs are not to be planted within 4 feet of
water or sewer mains.
18. The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than 8 inches, and
soil amendment shall be thoroughly incorporated into the soil of all landscape areas to the depth of at least 6 inches by tilling discing or
other suitable method, at a rate of at least 3 cubic yards of soil amendment per 1,000 square feet of landscape area.
19. Landscaping, including street trees, shall be installed or secured with a letter of credit, escrow, or performance bond for 125% of the
value of the landscaping and installation prior to the issuance of certificate of occupancy. All City street trees must be installed and
established, of an approved species and of acceptable condition prior to final release of financial security.
(16) Phy-o
(44) Heu-m
(24) Sch-s
(14) Sym-x
(1) Pic-c
(1) Pic-c
(19) Pen-s
(6) Bux-x
(10) Sch-s
(21) Spo-h
(1) Hyd-a
(9) Rhu-t
(14) Sch-s
(2) Pic-b (29) Ach-m
(24) Mah-r (22) Heu-m
(25) Phy-o
(29) Spo-h
(9) Pic-b
(15) Sch-s
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
MAINSTREET
HEALTH & WELLNESS
SUITES
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
01/30/2015
BID DOCUMENTS
REVISION SCHEDULE
NO. DESCRIPTION DATE
0
Scale 1" = 10'-0"
5 10 60
North
ENLARGED
COURTYARD
PLANTING PLAN
L102
SHEET 2 OF 4
GENERAL LANDSCAPE AND PLANTING NOTES
1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting
Details for additional information.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to
inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN
LEADERS OF ALL TREES SHALL REMAIN INTACT.
4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace
immediately with approved, specified material.
5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity
takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by
Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant
spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be
needed to meet spacing requirements and field conditions.
6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or
sod treatment.
7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall
coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation.
(Refer to specifications for topsoil source and placement requirements)
8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape
Architect or Owner's Representative. Any plant material installed in an incorrect location, by the judgment of the
Landscape Architect, shall be reinstalled at the Contractor's expense.
9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted).
10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no
additional cost.
11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape
Architect, unless otherwise noted.
12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final
Acceptance.
13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any
required permits necessary to complete work.
14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed
using tree pit drainage.
15. Trees shall be matched in groups unless otherwise noted.
16. All turf areas shall be irrigated with an automatic pop-up sprinkler system. All shrub beds shall be irrigated with
automatic drip irrigation system, or acceptable alternative. Refer to irrigation plans.
17. Trees shall not be planted closer than 4 feet to any gas, no closer than 6 feet to any water or sewer service line, no
closer than 10 fee to any water or sewer main, and no closer than 8 feet to a driveway. A horizontal distance of 40
feet between canopy street trees and street lights and 15 feet between ornamental trees and street lights shall be
maintained. Shrubs are not to be planted within 4 feet of water or sewer mains.
18. The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less
than 8 inches, and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to the depth
of at least 6 inches by tilling discing or other suitable method, at a rate of at least 3 cubic yards of soil amendment
per 1,000 square feet of landscape area.
19. Landscaping, including street trees, shall be installed or secured with a letter of credit, escrow, or performance bond
for 125% of the value of the landscaping and installation prior to the issuance of certificate of occupancy. All City
street trees must be installed and established, of an approved species and of acceptable condition prior to final
release of financial security.
SEEDED LAWN
GROUND PLAIN LEGEND
Refer to Sheet L103 for native seed and planting schedules
NATIVE SEED
(9) Jam-a
(32) Sch-s
(6) Rhu-t
(38) Sch-s
(3) Pic-b
(8) Jam-a
(10) Cha-m
(25) Sch-s
(2) Fall-p
(52) Jun-s
(55) Spo-h
(58) Ach-m
(15) Rhu-t
(38) Rhu-t
(93) Sch-s
(15) Fal-p
(17) Rhu-t
(133) Sch-s
(9) Fal-p
(3) Pic-g
(3) Cel-o
(3) Pop-s
(2) Pop-s
(1) Til-a
(2) Pic-p
(3) Ulm-x
(3) Ros-w
(4) Atr-c
(3) Chr-y
(3) Chr-y
(3) Chr-y
(3) Rhu-s
(3) Rhu-s
(5) Rhu-s
(9) Pan-v
(14) Bux-g
(67) Ach-m
(3) Til-c
(4) Sch-s
(62) Ach-m
(2) Syr-r
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:
9/10/2014 11:57:25 AM
MAINSTREET
HEALTH & WELLNESS
SUITES
2014.00421
ZIEGLER ROAD
FT. COLLINS, CO 80528
01/30/2015
BID DOCUMENTS
REVISION SCHEDULE
NO. DESCRIPTION DATE
0
Scale 1" = 30'-0"
15 30 60
North
OVERALL
PLANTING PLAN
L101
REFER TO SHEET L102
GENERAL LANDSCAPE AND PLANTING NOTES
LANDSCAPE ORDINANCE REQUIREMENTS
STREET TREES
1 Canopy Shade Tree per 30 to 40 LF of road
Ziegler Road: 425 LF / 30-40 LF = 11-14 Trees required, 12 Trees provided
Precision Drive: 520 LF / 30-40 LF = 13-18 Trees required, 13 Trees provided
PARKING LOT PERIMETER LANDSCAPING:
1 Tree / 40 LF along a side lot line
North: 209 LF / 40 LF = 6 Trees required and provided
East: 280 LF / 40 LF = 7 Trees required and provided
6FUHHQLQJIURPQRQUHVLGHQWLDOXVHVVKDOOKDYHDPLQLPXPKHLJKWRI´DORQJDPLQLPXPRIRIWKHSDUNLQJORW
PARKING LOT INTERIOR LANDSCAPING
1 Canopy Shade Tree per Landscape Island required and provided
1 Canopy Shade Tree per 40 LF required along each side of driveways and provided
MINIMUM SPECIES DIVERSITY
60 or more trees on site: 15% maximum percentage of any one species
FULL TREE STOCKING
Additional trees on high visibility sides of the building
North: 381 LF elevation / 30-40 LF = 10-13 Trees within 50' of the building required; 4 Canopy, 9 Ornamental, and
3 Evergreen Trees Provided
West: 233 LF elevation / 30-40 LF = 6-8 Trees within 50' of the building required; 2 Canopy, 3 Ornamental, and 3
Evergreen Trees Provided
South: 381 LF elevation / 30-40 LF = 10-13 Trees within 50' of the building required; 4 Canopy, 8 Ornamental, and
14 Evergreen Trees Provided
SCREENING
All trash collection, service areas, and loading docks shall be screened from off-site view
STREET TREE NOTES
1. A permit must be obtained from the City Forester before any trees or shrubs as noted on this plan are
planted, pruned, or removed on the public right-of-way.This includes zones between the sidewalk and
curb, medians and other City property. This permit shall approve the location and species to be planted.
Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of
occupancy.
2. Contact the City Forester to inspect all street tree plantings at the completion of each phase of the
development. All trees need to have been installed as shown on the landscape plan. Approval of street
tree planting is required before final approval of each phase.
3. Street trees shall be supplied and planted by the developer using a qualified landscape contractor.
4. The developer shall replace all dead and dying street trees after planting until final maintenance inspection
and acceptance by the City of Fort Collins Forestry Division. All street trees in the project must be
established of an approved species and of acceptable condition prior to acceptance.
5. Street tree locations and numbers may be adjusted to accommodate driveway locations, utility standards,
separation between trees, street signs and street lights. Street trees shall be centered in the middle of the
parkway. Quantities shown on plan must be installed unless a reduction occurs to meet separation
standards.
A free permit must be obtained from the City Forester before any street trees are planted in parkways between
the sidewalk and curb. Street tree locations and numbers may change to meet actual utility/tree separation
standards. Landscape contractor must obtain approval of street tree location after utility locates. Street trees
must be inspected and approved before planting. Failure to obtain this permit is a violation of the Code of the
City of Fort Collins.
SHEET 1 OF 4
1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting
Details for additional information.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to
inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required.
3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN
LEADERS OF ALL TREES SHALL REMAIN INTACT.
4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace
immediately with approved, specified material.
5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity
takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by
Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant
spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be
needed to meet spacing requirements and field conditions.
6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or
sod treatment.
7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall
coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation.
(Refer to specifications for topsoil source and placement requirements)
8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape
Architect or Owner's Representative. Any plant material installed in an incorrect location, by the judgment of the
Landscape Architect, shall be reinstalled at the Contractor's expense.
9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted).
10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no
additional cost.
11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape
Architect, unless otherwise noted.
12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final
Acceptance.
13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any
required permits necessary to complete work.
14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed
using tree pit drainage.
15. Trees shall be matched in groups unless otherwise noted.
16. All turf areas shall be irrigated with an automatic pop-up sprinkler system. All shrub beds shall be irrigated with
automatic drip irrigation system, or acceptable alternative. Refer to irrigation plans.
17. Trees shall not be planted closer than 4 feet to any gas, no closer than 6 feet to any water or sewer service line, no
closer than 10 fee to any water or sewer main, and no closer than 8 feet to a driveway. A horizontal distance of 40
feet between canopy street trees and street lights and 15 feet between ornamental trees and street lights shall be
maintained. Shrubs are not to be planted within 4 feet of water or sewer mains.
18. The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less
than 8 inches, and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to the depth
of at least 6 inches by tilling discing or other suitable method, at a rate of at least 3 cubic yards of soil amendment
per 1,000 square feet of landscape area.
19. Landscaping, including street trees, shall be installed or secured with a letter of credit, escrow, or performance bond
for 125% of the value of the landscaping and installation prior to the issuance of certificate of occupancy. All City
street trees must be installed and established, of an approved species and of acceptable condition prior to final
release of financial security.
SEEDED LAWN
GROUND PLAIN LEGEND
Refer to Sheet L103 for native seed and planting schedules
NATIVE SEED