Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MAINSTREET HEALTH & WELLNESS SUITES - PDP - PDP140018 - PLANS - ELEVATIONS
FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 41' - 3 1/2" 36' - 0" Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 1/13/2015 8:44:20 PM A201 OVERALL EXTERIOR ELEVATIONS MAINSTREET HEALTH & WELLNESS SUITES 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 01/16/15 PDP SUBMITTAL NOT FOR CONSTRUCTION 1/16" = 1'-0" A201 3 WEST ELEVATION-OVERALL 1/16" = 1'-0" A201 4 EAST ELEVATION-OVERALL 1/16" = 1'-0" A201 1 SOUTH ELEVATION-OVERALL FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 3 3 3 3 5 5 9 6 6 9 1 1 18 1 10 14 8 14 4 2 12 22 7 2 12 21 10 5 4 8 2 A503 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 3 3 3 6 3 3 4 4 6 5 9 1 1 18 12 18 1 12 8 14 16 19 8 10 14 10 2 7 22 2 TYP. TYP. TYP. TYP. TYP. 14 4 5 TYP. 9 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 1/13/2015 8:03:51 PM A209 SOUTH ELEVATION MAINSTREET HEALTH & WELLNESS SUITES 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 3 4 5 3 6 6 9 1 12 1 13 13 8 13 18 8 7 TYP 3 2 3 8 TYP 10 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 4 4 3 5 5 5 22 9 6 9 1 12 8 14 8 14 7 2 6 2 TYP TYP TYP 10 10 3 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 1/13/2015 8:48:28 PM A210 WEST ELEVATION MAINSTREET HEALTH & WELLNESS SUITES 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 01/16/15 PDP SUBMITTAL NOT FOR CONSTRUCTION 1/8" = 1'-0" FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 3 3 3 3 3 13 4 9 5 6 5 6 9 19 12 1 18 1 18 12 18 1 18 18 14 13 8 13 16 8 18 24 22 17 PART A PART B 10 2 4 10 23 20 25 18 TYP. TYP. FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" 3 3 3 3 3 3 4 4 5 5 6 22 9 9 18 18 18 12 18 12 18 1 1 1 24 13 8 13 14 2 2 2 TYP. TYP. TYP. TYP. TYP. TYP. PART A PART B 18 TYP. TYP. 2 10 2 10 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 3 5 3 5 5 6 22 6 9 9 21 12 1 7 8 14 8 10 4 5 2 2 14 10 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 9 3/4" LOWER ROOF TRUSS BRG 111' - 4" UPPER TRUSS BRG 122' - 0" PART A PART B 3 4 3 4 5 5 6 6 9 1 12 1 8 13 13 8 TYP. TYP. TYP. 10 2 3 2 3 5 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 1/13/2015 8:03:58 PM A212 EAST ELEVATION MAINSTREET HEALTH & WELLNESS SUITES 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 01/16/15 PDP SUBMITTAL NOT FOR CONSTRUCTION 1/8" = 1'-0" A212 1 EAST ELEVATION-PART A 1/8" = 1'-0" A212 2 EAST ELEVATION-PART B KEYED ELEVATION NOTES (NOTED WITH ) 1 GROUND FACE BURNISHED CMU - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 PREFINISHED FIBER CEMENT PANEL W/ PREFINISHED MATCHING JOINTS 14 PREFINISHED METAL PARAPET COPING 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE ROLL EDGE - SEE A300 SHEETS 24 PREFINISHED SHEET METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS, PAINTED - SEE STRUCTURAL SHEETS 31 BRICK CONTROL JOINT - SEE DETAIL XXX 32 INSTALL END PANELS AT GUTTERS WHERE TERMINATED ON EITHER SIDE OF EXPANSION JOINT KEYPLAN N 2B 1B 2A 1A 2C 1C 1 2 1 REVISION SCHEDULE NO. DESCRIPTION DATE 1/13/2015 8:03:56 PM A211 NORTH ELEVATION MAINSTREET HEALTH & WELLNESS SUITES 2014.00421 ZIEGLER ROAD FT. COLLINS, CO 80528 01/16/15 PDP SUBMITTAL NOT FOR CONSTRUCTION 1/8" = 1'-0" A211 1 NORTH ELEVATION-PART A 1/8" = 1'-0" A211 2 NORTH ELEVATION-PART B KEYED ELEVATION NOTES (NOTED WITH ) 1 GROUND FACE BURNISHED CMU - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 PREFINISHED FIBER CEMENT PANEL W/ PREFINISHED MATCHING JOINTS 14 PREFINISHED METAL PARAPET COPING 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE ROLL EDGE - SEE A300 SHEETS 24 PREFINISHED SHEET METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS, PAINTED - SEE STRUCTURAL SHEETS 31 BRICK CONTROL JOINT - SEE DETAIL XXX 32 INSTALL END PANELS AT GUTTERS WHERE TERMINATED ON EITHER SIDE OF EXPANSION JOINT KEYPLAN N 2B 1B 2A 1A 2C 1C 1 2 1 REVISION SCHEDULE NO. DESCRIPTION DATE A210 1 WEST ELEVATION-PART A 1/8" = 1'-0" A210 2 WEST ELEVATION-PART B KEYED ELEVATION NOTES (NOTED WITH ) 1 GROUND FACE BURNISHED CMU - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 PREFINISHED FIBER CEMENT PANEL W/ PREFINISHED MATCHING JOINTS 14 PREFINISHED METAL PARAPET COPING 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE ROLL EDGE - SEE A300 SHEETS 24 PREFINISHED SHEET METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS, PAINTED - SEE STRUCTURAL SHEETS 31 BRICK CONTROL JOINT - SEE DETAIL XXX 32 INSTALL END PANELS AT GUTTERS WHERE TERMINATED ON EITHER SIDE OF EXPANSION JOINT KEYPLAN N 2B 1B 2A 1A 2C 1C 1 REVISION SCHEDULE NO. DESCRIPTION DATE 1 2 01/16/15 PDP SUBMITTAL NOT FOR CONSTRUCTION KEYED ELEVATION NOTES (NOTED WITH ) 1 GROUND FACE BURNISHED CMU - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 PREFINISHED FIBER CEMENT PANEL W/ PREFINISHED MATCHING JOINTS 14 PREFINISHED METAL PARAPET COPING 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE ROLL EDGE - SEE A300 SHEETS 24 PREFINISHED SHEET METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS, PAINTED - SEE STRUCTURAL SHEETS 31 BRICK CONTROL JOINT - SEE DETAIL XXX 32 INSTALL END PANELS AT GUTTERS WHERE TERMINATED ON EITHER SIDE OF EXPANSION JOINT 1/8" = 1'-0" A209 1 SOUTH ELEVATION-PART A 1/8" = 1'-0" A209 2 SOUTH ELEVATION-PART B KEYPLAN N 2B 1B 2A 1A 2C 1C 1 1 2 REVISION SCHEDULE NO. DESCRIPTION DATE 1/16" = 1'-0" A201 2 NORTH ELEVATION-OVERALL KEYED ELEVATION NOTES (NOTED WITH ) 1 GROUND FACE BURNISHED CMU - SEE SPECIFICATIONS 2 CAST STONE CAP - SEE DETAIL XXX 3 ALLURA FIBER CEMENT BOARD SIDING, PAINTED 4 VINYL DOUBLE HUNG WINDOW - SEE A600 SHEETS 5 FIBER CEMENT BOARD TRIM, PAINTED 6 PREFINISHED 6" METAL GUTTER AND 3"x4" DOWNSPOUT 7 INSULATED HOLLOW METAL DOOR AND FRAME 8 FASCIA BOARD TRIM, PAINTED, TYPICAL 9 ASPHALT SHINGLE ROOFING 10 CONTINUOUS RIDGE VENT, TYPICAL 11 PREFINISHED METAL FLASHING 12 PTAC UNIT - SEE MECHANICAL DRAWINGS 13 PREFINISHED FIBER CEMENT PANEL W/ PREFINISHED MATCHING JOINTS 14 PREFINISHED METAL PARAPET COPING 16 ROOF EXPANSION JOINT - SEE DETAIL XXX 17 PORT COCHERE DROP OFF CANOPY 18 ALUMINUM STOREFRONT - SEE A600 SHEETS 19 WALL EXPANSION JOINT - SEE DETAIL XXX 20 INSULATED METAL CANOPY - SEE A300 SHEETS 21 PREFINISHED METAL GATE 22 PREFINISHED METAL 18"X12" SCUPPER CONDUCTOR W/3"X4" D.S. 23 ROOF MEMBRANE ROLL EDGE - SEE A300 SHEETS 24 PREFINISHED SHEET METAL WRAP - SEE A300 SHEETS 25 STRUCTURAL STEEL COLUMNS, PAINTED - SEE STRUCTURAL SHEETS 31 BRICK CONTROL JOINT - SEE DETAIL XXX 32 INSTALL END PANELS AT GUTTERS WHERE TERMINATED ON EITHER SIDE OF EXPANSION JOINT KEYPLAN N 2B 1B 2A 1A 2C 1C 1 3 2 4 1 REVISION SCHEDULE NO. DESCRIPTION DATE NOTE: THE INCREASED HEIGHT OF +40 FEET AT THE BUILDING ENTRANCE IS REQUESTED TO CREATE DESIGN CONTINUITY PER THE FT. COLLINS LAND USE CODE SECTION 3.5.G.1.C, PARTS 2 AND 5. SOLAR STUDIES HAVE BEEN PERFORMED FOR THE TIMES OF GREATEST SHADOW (05.45PM, 06/21/2014 AND 04.20PM, 12/21/2014) AT WHICH TIMES THE SHADOW CREATED BY THIS INCREASED HEIGHT DOES NOT EXTEND BEYOND THE PROPERTY BOUNDARIES FOR THIS FACILITY.