December 22, 2014
January 9, 2015 comment responses
Angela Milewski
BHA Design, Inc.
1603 Oakridge Drive
Fort Collins, CO 80525
RE: Poudre Valley Health System Harmony Campus - Freestanding Emergency Department,
FDP140029, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/17/2014
12/17/2014: The sidewalk along the south needs to extend to the east property line.
Response: Acknowledged.
Comment Number: 2 Comment Originated: 12/17/2014
12/17/2014: A note needs to be added that signs are not approved with the PDP/FP. Signage
(size and location) requires separate sign permit.
Response: A note has been added to the Site Plan.
The medical symbol made with the building material will be counted as signage.
Response: : Acknowledged. Medical symbol and other signage has been modified on elevations.
Comment Number: 3 Comment Originated: 12/17/2014
12/17/2014: Need to identify the existing landscaping on the landscape plan.
Response: Acknowledged.
Comment Number: 4 Comment Originated: 12/17/2014
12/17/2014: We are glad to have color copy of the elevations. However, is there an additional
set of elevations that are more refined with less embellishment?
Response: Hardline elevations are attached.
Comment Number: 5 Comment Originated: 12/17/2014
12/17/2014: The sheet index should reference the multiple sheets of the each sub-set of plans.
Response: The sheet index has been updated.
Comment Number: 6 Comment Originated: 12/17/2014
12/17/2014: The lighting plan should include a light near the south crosswalk and east drive
access.
Response: A fixture has been added near the south crosswalk.
Comment Number: 7 Comment Originated: 12/17/2014
12/17/2014: The top landings on some of the sidewalk ramps appear too small, please verify
they are OK.
Response: Ramp landing widths were increased, as applicable.
Comment Number: 8 Comment Originated: 12/17/2014
12/17/2014: There is no legend for the turf on the landscape plan.
Response: The landscape plan has been revised to indicate turf type.
Is there any type of Mulch in the planting beds?
Response: Yes, the landscape plan has been revised to indicate mulch type.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 12/16/2014
12/16/2014: Sheet 004 identifies the land to the east of this site as an existing drainage and
grading easement. How was this dedicated as it was not dedicated by the prior plats?
Response: This area is being dedicated by separate document.
Comment Number: 7 Comment Originated: 12/16/2014
12/16/2014: Sheet 008. This sheet is missing a signature block.
Response: Signature block has been added.
Comment Number: 8 Comment Originated: 12/16/2014
12/16/2014: Need to show the perforated pipe that will be under the pavers on the utility plan
sheet and/or of the grading plans sheet. Where do they run and where do they outfall to?
Response: Aspen met with Stormwater staff and underdrains have been added for east paver areas, with
no underdrains required for west paver areas.
Comment Number: 9 Comment Originated: 12/16/2014
12/16/2014: The utility plans note generally where the transformer will be located, but do not
show the concrete pad that will need to be installed for this.
Response: The transformer is located on a concrete pavement area and will have bollards around the
transformer, per Light & Power request.
Topic: Plat
Comment Number: 1 Comment Originated: 12/16/2014
12/16/2014: The following two notes need to be added to the plat.
Response: Notes added to Plat.
1. There shall be no private conditions, covenants or restrictions that prohibit or limit the
installation of resource conserving equipment or landscaping that are allowed by Sections 12-
120 – 12-122 of the City Code.
2. The Development Agreement and all Amendment Agreements for Poudre Valley Health
System Harmony Campus Medical Center Second Filing shall continue to apply to the lot
created by this plat.
Comment Number: 2 Comment Originated: 12/16/2014
12/16/2014: A portion of the emergency access and access easement needs to be dedicated
as a utility easement (where the water main runs in the driveway) and a portion needs to be
dedicated as drainage easement (where the drainage pipe crosses the driveway).
Response: The blanket Access, Utility and Drainage Easement covers this area.
Comment Number: 3 Comment Originated: 12/16/2014
12/16/2014: The SE corner of the plat also needs to be a drainage area. This is where the wet
well is located and the drainage off the end of the driveway goes across.
Response: The blanket Access, Utility and Drainage Easement covers this area.
Comment Number: 4 Comment Originated: 12/16/2014
12/16/2014: The area to the south – the plat identifies that an off-site emergency access and
access easement needs to be dedicated by separate document. Per the 3rd Filing plat this
area is already an access easement so it only needs to be an emergency access easement
that is dedicated.
Response: Acknowledged.
Comment Number: 5 Comment Originated: 12/16/2014
12/16/2014: The Harmony Road sidewalk crosses over the cable television easement and the
exclusive easement for the Harmony Transmission Main. Access easement for this sidewalk
needs to be dedicated across these easements where it has been built to maintain public
access. Because the FCLWD easement is an exclusive easement they will need to sign the
plat accepting the access easement where it crosses their easement.
Response: Access Easements across the City of Fort Collins exclusive easement have been added and
City of Fort Collins signature block has been added.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/17/2014
12/17/2014:
Evaluate the opportunity to include Oak trees in the frontage along Harmony, which could
provide the Harmony Oaks concept for this project.
Response: The landscape plan has been revised to include oak species.
Comment Number: 2 Comment Originated: 12/17/2014
12/17/2014:
The Poudre Valley Hospital A-wing Replacement PDP 140019 project has recently been
submitted. It appears that this project will include a significant amount of tree mitigation of which
some may need to occur off-site. A tree mitigation plan for the A-wing replacement project will
likely soon be in place.
It is suggested that the Poudre Valley Health System Harmony Campus Free Standing
Emergency Department project could be considered as a location for mitigation trees from
PDP 140019 if off-site tree planting is needed from the Lemay and Doctors Lane project.
If this occurs provide appropriate documentation on both project plans.
Response: We have met with the City Forester regarding the A-Wing site and have indicated mitigation tree
locations for A-Wing on both sets of plans. The total amount of mitigation trees required for the A-Wing
project is 75. We plan to use 40 mitigation trees on the A-Wing redevelopment site, so 35 mitigation trees
are included in our plans for the Harmony Emergency Department project.
Comment Number: 3 Comment Originated: 12/17/2014
12/17/2014:
Please review numbers of individual trees used for the Minimum Species Diversity standard in
the LUC. Provide actual percentage used of trees in the plant list.
Response: The plant list has been modified to include % of species and to meet LUC standards.
Comment Number: 4 Comment Originated: 12/17/2014
12/17/2014:
Forestry Comments pertain only to trees and tree related items.
Response: Acknowledged
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 2 Comment Originated: 12/17/2014
12/17/2014:
Building Permit Pre-Submittal Meeting
Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi-family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early
to mid-design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting. Applicants of new commercial or multi-family projects are
advised to call 416-2341 to schedule a pre-submittal meeting. Applicants should be prepared
to present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these
requirements can be obtained at the Building Office or contact the above phone number.
City of Fort Collins
Building Services
Plan Review
416-2341
Response: Acknowledged. A Building Department pre-submittal meeting is set for January 8.
Contact: Tod Reidenbach, ,
Topic: General
Comment Number: 1 Comment Originated: 12/17/2014
12/17/2014:
1. Addresses will be assigned by the GIS Department after the plans have met final approval
through Development Review and are recorded with the City.
Response: Acknowledged.
2. Curve table missing from subdivision plat.
Response: Curve table has been added.
Todd Reidenbach, GISP
GIS Mapping Specialist
treidenbach@fcgov.com
970.416.2483 Work
970.221.6329 Fax
Department: Light And Power
Contact: Justin Fields, 970-224-6150, jfields@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/15/2014
12/15/2014: The transformer needs to have 3 feet of clearance around the sides and back, and
8 feet of clearance in front. If the transformer is located in the trash enclosure, bollards need to
be installed to protect the transformer from the dumpsters.
Response: The utility transformer shall have 3 feet of clearance around the sides and a minimum of 8 feet
in front. Bollards will be installed to protect the transformer from the dumpsters.
Comment Number: 2 Comment Originated: 12/15/2014
12/15/2014: The meter location needs to be coordinated with Light and Power Engineering,
970-221-6700.
Response: The meter location is shown and shall be confirmed/coordinated with Light and Power
Engineering if a different location is desired.
Comment Number: 3 Comment Originated: 12/15/2014
12/15/2014: In order to provide a redundant electrical feed to this building an easement will
need to be granted from the transformer on the Mountain Crest facility west to the site of the
proposed emergency room.
Response: This building will have a diesel generator (which will serve as the redundant electrical feed to
the building). This is no longer applicable and the electric feed shown has been approved by Luke Unruh.
Comment Number: 4 Comment Originated: 12/15/2014
12/15/2014:
A C-1 form and 1-line diagram will need to be submitted to Light and Power Engineering. The
C-1 form is available at http://www.fcgov.com/utilities/img/site_specific/uploads/c-1_form.pdf.
Response: A one-line diagram and C-1 form shall be submitted to Light and Power as the design
progresses.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 12/19/2014
12/19/2014: EMERGENCY ACCESS EASEMENT
As currently proposed, the EAE does not allow access to within 150' of all portions of the
building as is required by code. The building is approximately 220' out of access given the
current proposal. Adjusting the EAE to include the drive aisle on the NE portion of the site will
reduce the out of access condition to approximately 115'. As the building will have a fire
sprinkler system installed, this would be more within range of acceptance for an out of access
condition.
Response: The EAE has been extended to the north, as requested by PFA.
Comment Number: 2 Comment Originated: 12/19/2014
12/19/2014: CANOPY HEIGHT
In order to allow fire apparatus to pass under the canopy. PFA is requesting the underside,
canopy height to be no less than 14 feet.
Response: Acknowledged. Ambulance canopy on east side of building has been raised to 14 feet clear.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 12/17/2014
12/17/2014: Please provide a table showing that LID requirements are met.
Response: LID table has been added to drainage exhibit and approved by Stormwater staff.
Comment Number: 3 Comment Originated: 12/17/2014
12/17/2014: Please verify that drainage easement exists for outfall.
Response: Proposed easement by separate document is being utilized for SE corner.
Comment Number: 4 Comment Originated: 12/17/2014
12/17/2014: Please quantify the undetained release from the .379 acres on the north edge.
Response: Release is to existing open ditch along Harmony, as historically occurs, and is mentioned in the
drainage report.
Comment Number: 5 Comment Originated: 12/17/2014
12/17/2014: Please revise the specific details paragraph on Basin 3 - confusing.
Response: Corrected.
Comment Number: 6 Comment Originated: 12/17/2014
12/17/2014: Please show adequate conveyance to pond from Basin 9 - expan note 1 on sheet
C-006 and bring into the drainage report.
Response: Note 6 incorporated into drainage report.
Comment Number: 7 Comment Originated: 12/17/2014
12/17/2014: Please provide street capacity calculations as additional flows are added to Snow
Mesa and the private drive to the south.
Response: As noted on drainage plan, 100-year flow is 1.24 cfs which is considered negligible. Aspen has
provided language in report addressing this issue.
Comment Number: 8 Comment Originated: 12/17/2014
12/17/2014: Please explain purpose of dry well and how it will function with the LID
swale/basin.
Response: Dry well was discussed with Dan Mogen and approved, as shown.
Comment Number: 9 Comment Originated: 12/17/2014
12/17/2014: Please note the slope of the soft pan/LID swale. Slope needs to be a minimum of
1%.
Response: Slopes have been added for all swales. The 0.7% slope within the LID basin was approved by
stormwater, due to grading constraints onsite and to maintain a depth of 1’ for the LID basin.
Comment Number: 10 Comment Originated: 12/17/2014
12/17/2014: Please update details with current versions.
Response: Aspen is continuing to work with Dan on detail updates and will incorporate once City provides
updated electronic details.
Comment Number: 11 Comment Originated: 12/17/2014
12/17/2014: Please see redlines.
Response: Redlines have been corrected.
Comment Number: 12 Comment Originated: 12/17/2014
12/17/2014: Please work with Stormwater to come up with an acceptable design for the paver
systems as no underdrain is currently designed.
Response: Aspen met with stormwater and has incorporated underdrains into east paver areas, as
approved by stormwater.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/02/2014
12/02/2014: The erosion control requirements are in the Stormwater Design Criteria under the
Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted does not meet requirements. Redlines were attached to the Stormwater/Water
Utilities Plans. Please submit; Corrected Erosion Control Plan, Erosion Control Report (SWMP
Documents), and an Escrow / Security Calculation will need to be reclaculated for the project. If
you need clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Response: A SWMP will be provided to prior to mylars and will address the items mentioned above.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 12/16/2014
12/16/2014: There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Response: Hard lined elevations have been provided with material legend in lieu of callouts.
Comment Number: 2 Comment Originated: 12/16/2014
12/16/2014: Please remove "Emergency Department" from the title, and replace it with
"Medical Center". See redlines.
Response: Titleblock has been modified as requested.
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 12/16/2014
12/16/2014: Please remove "Emergency Department" from the title & title block, and replace it
with "Medical Center". See redlines.
Response: Title has been updated accordingly.
Comment Number: 4 Comment Originated: 12/16/2014
12/16/2014: The City has moved to the NAVD88 vertical datum. Please provide the following
information in the format shown below.
If your project is started on NAVD88 datum:
1) PROJECT DATUM: NAVD88
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
OR, if project has already been surveyed in NAVD29 Unadjusted datum:
2) PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM)
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
If using NGVD29 UNADJUSTED the following equation statement will be needed.
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED + X.XX’
Response: Benchmarks have been updated accordingly.
Comment Number: 5 Comment Originated: 12/16/2014
12/16/2014: The Basis Of Bearings statements need to match the Subdivision Plat.
Response: Basis of bearing was updated to match plat by adding “Second Filing” to end of statement.
Comment Number: 6 Comment Originated: 12/16/2014
12/16/2014: There are line over text issues. See redlines.
Response: Corrected.
Comment Number: 7 Comment Originated: 12/16/2014
12/16/2014: There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Response: Corrected.
Comment Number: 8 Comment Originated: 12/16/2014
12/16/2014: All reception numbers for documents recorded by separate document, must be
added prior to producing mylars.
Response: Acknowledged.
Comment Number: 9 Comment Originated: 12/16/2014
12/16/2014: Please tie the coordinate values on sheet C-008 to the property boundary.
Response: Coordinates have been added at four property pin locations/corners.
Topic: Landscape Plans
Comment Number: 10 Comment Originated: 12/16/2014
12/16/2014: Please remove "Emergency Department" from the title, and replace it with
"Medical Center". See redlines.
Response: Plans have been corrected.
Comment Number: 11 Comment Originated: 12/16/2014
12/16/2014: There are line over text issues. See redlines.’
Response: Plans have been corrected.
Topic: Lighting Plan
Comment Number: 12 Comment Originated: 12/16/2014
12/16/2014: Please remove "Emergency Department" from the title, and replace it with
"Medical Center". See redlines.
Response: Plans have been corrected.
Topic: Plat
Comment Number: 13 Comment Originated: 12/16/2014
12/16/2014: Please remove "Emergency Department" from the title, Statement Of Ownership
And Subdivision & title block, and replace it with "Medical Center". See redlines.
Response: Plat has been revised.
Comment Number: 14 Comment Originated: 12/16/2014
12/16/2014: Please add "Name" & "Title" to the signature blocks as marked. See redlines.
Response: Names are unknown at this time and will be added prior to mylar.
Comment Number: 15 Comment Originated: 12/16/2014
12/16/2014: Please label all surrounding properties with "Unplatted" or the subdivision name.
See redlines.
Response: Added subdivision information for north of Harmony Road.
Comment Number: 16 Comment Originated: 12/16/2014
12/16/2014: Please show the right of way lines on the opposite side of all adjacent streets.
See redlines.
Response: Added North ROW line of Harmony Road.
Comment Number: 17 Comment Originated: 12/16/2014
12/16/2014: Please add dedication information for all street rights of way. See redlines.
Response: Plat has been revised.
Comment Number: 18 Comment Originated: 12/16/2014
12/16/2014: Please add a curve & line table.
Response: Plat has been revised.
Comment Number: 19 Comment Originated: 12/16/2014
12/16/2014: Please make changes to boundary information as marked. See redlines.
Response: Plat has been revised.
Comment Number: 20 Comment Originated: 12/16/2014
12/16/2014: All reception numbers for documents recorded by separate document, must be
added prior to producing mylars.
Response: Acknowledged.
Comment Number: 21 Comment Originated: 12/16/2014
12/16/2014: You may show existing offsite easements on if you choose, but it is not
necessary.
Response: Acknowledged.
Comment Number: 22 Comment Originated: 12/16/2014
12/16/2014: Please provide current acceptable monument records for the aliquot corners
shown. These should be emailed directly to Jeff at jcounty@fcgov.com.
Response: Will be emailed. N1/4 needs an updated monument record.
Topic: Site Plan
Comment Number: 23 Comment Originated: 12/16/2014
12/16/2014: The sheet index is missing the sheet numbering. See redlines.
Response: Plans have been corrected.
Comment Number: 24 Comment Originated: 12/16/2014
12/16/2014: There are line over text issues. See redlines.
Response: Plans have been corrected.
Comment Number: 25 Comment Originated: 12/16/2014
12/16/2014: Please add "Poudre Valley Health System Medical Center, Fifth Filing" to the legal
description. See redlines. The metes & bounds legal description can be removed, if you
prefer.
Response: Plans have been corrected.
Comment Number: 26 Comment Originated: 12/16/2014
12/16/2014: Please remove "Emergency Department" from the title & title block, and replace it
with "Medical Center". See redlines.
Response: Plans have been corrected.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/16/2014
12/16/2014: The lane allocation for northbound Snow Mesa needs to be shown as existing.
What is shown on the plans (and greyed out is if its existing) is not what is on the ground.
Response: No change to existing striping is proposed. Striping indication has been removed from site plan.
Department: Transportation Planning
Contact: Emma Belmont, 970-224-6197, ebelmont@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/03/2014
12/03/2014: Please provide a bus stop on the Harmony Road frontage (SE corner of Harmony
and Snow Mesa). The bus stop shally be located between 50' - 80' from the cross walk. Bus
stop sizing is generally 25' wide by 12' deep and be connected to the curb and adjacent
sidewalk with a 5' concrete path and within a transit easement or in public right of way. Please
feel free to contact me with any questions on locating the bus stop.
Response: Aspen has received approval from Emma (Transfort) for the location and layout of the bus stop
and continues to work with the Warren Lake Reservoir attorney on the submittal application for
encroachment/crossing of the existing irrigation ditch. Aspen is coordinating with Transfort, UCH, and
Warren Lake to complete the approval.
Department: Water-Wastewater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/17/2014
12/17/2014: Please verify curb stop and meter pit meet City landscape separation
requirements.
Response: Trees and shrubs have been offset from curb stop and meter pit as required.
Comment Number: 2 Comment Originated: 12/17/2014
12/17/2014: Please extend prop 8" water stub to eastern property boundary.
Response: Per meeting with Dan, the water is being stubbed just east of the roadway, as shown, as the
waterline is on the south side of the private drive, which is on the property to the south, not the PVH ED
site.
Comment Number: 3 Comment Originated: 12/17/2014
12/17/2014: Please update details with current versions.
Response: Aspen is continuing to work with Dan on detail updates and will incorporate once City provides
updated electronic details.
Comment Number: 4 Comment Originated: 12/17/2014
12/17/2014: Please see redlines.
Response: Corrected.