Loading...
HomeMy WebLinkAboutTHE SUMMIT ON COLLEGE PARKING GARAGE - MJA/FDP - FDP130056 - REPORTS - TRAFFIC STUDY~ ELBEngineerins, LIe -;. Transportation Engineering Solutions Memorandum .!,",<~:;.~'::~-:-£"":~~~-r\- TO: Mr. Walker May, Capstone Development, LLC. (5:~~~::·':\:;f,:.;~';~(th Mr. Ward Stanford, Traffic Engineer, City of Fort Collins·Y·• '.oj:: ,,;':>'i":'}4;, FROM: EricL.Bracke,P.E.,P.T.O.E {nr- ., \~:'t~:':~ DATE: January 28, 2014~\_;\.= ••l ~tl-{~<,.~~i SUBJECT: The Summit - TIS Addendum - Parking Structure Addz1i~~iif~Y Supplemental Memorandum ~ This brief memorandum addresses comments from the City of Fort Collins Transportation Department requesting a sensitivity analysis on the proposed parking structure located near the intersection of College Avenue and Stuart Street. The requested analysis is for the redistribution of the site generated all over to Stuart Street to see if there is sufficient capacity at the intersection if all of the residents use the parking structure. The original trip distribution is found in Figure 1. The request from the city asked for the total traffic analysis for the intersection of College and Stuart Street for the year 2028. The revised site genererated traffic is displayed in Figure 2. The revised numbers were then adjusted to the year 2028 traffic for the intersection of College Ave and Stuart Street. The total traffic project for the key intersection is shown in Figure 3. Capacity analysis was performed for the key intersection for both the morning and afternoon peak hours. Capacity sheets for the two runs are attached. As can be seen from the capacity worksheets, the intersection of College and Stuart will operate at acceptable levels. In the PM peak, some left turn failures start to occur without additional improvements such as protected left turn phases for east and westbound traffic. However, the evidence to suggest that all traffic from the Summit will enter and exit at Stuart Street is not available at this time. Please let me know if additional information is required. ELB Engineering, LLC 5401 Taylor Lane Fori Collins, CO 80528 Phone: 970-988-7551 I FAX 970-225-8942 ELBEngineering@lpbroadband.net 1 o U"I -"- " __ 0 U"I "" < oo '" '" Q) 5 '€o z U"I U"IN N -- __ 0 U"IN Prospect Road -...".,=-----------1,..-= ..:".:".:.:.; :.,,;;: .,: ... ~~ ~~ 5/15 10115 ELB Engineering, LLC 5401 Tay/or Lane Fort Collins, CO 80528 Phone: 970-988-755/ I FAX: 970-225-8942 ELBEngineering@lpbroadband.net 2 ..................................... --"-:.:.t------ Parker Street ·····························--.r -- Stuart Street § Q) ~ --Q) eo Q) o U North 1 [ FIGURE 1: SITE DISTRIBUTED TRAFFIC (AM/PM) 1 Stuart Street ........................ § Q) ~ --en Q) Q) o U North 1 FIGURE 2: SITE DISTRIBUTED TRAFFIC @ COLLEGE/STUART (AMlPM) ELB Engineering. LLC 5401 Taylor Lane Fort Collins, CO 80528 Phone: 970-988-7551 I FAX' 970-225-8942 ELBEngineering@/pbroadband.net 3 Stuart Street 130/120 5/20 90/265 751130 25/25 35/80 o N N NO 0-- N '<C(, )<r--n~ , -- <nO 0 MN •.••. [~F_I_G_URE __ 3_:_RE_VI_SE_D_YE_AR_2_0_28_T_O_T_AL_T__RAF _ F_I_C__(AMIP _ M) J ELB Engineering, LLC 5401 Taylor Lane Fort Collins, CO 80528 Phone: 970-988-755/ I FAX: 970-225-8942 ELBEngineering@/pbroadband.net 1 North 4 HCM Signalized Intersection Capacity Analysis 6: Stuart Street & College Avenue 1/28/2014 .",. "). • +- '- "" t ". \.. -+ ! ~ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations lIj ft lIj ft lIj ttft lIj ttft Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frt 1.00 0.91 1.00 0.86 1.00 1.00 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1770 1699 1770 1593 1770 5060 1770 5065 Fit Permitted 0.45 1.00 0.72 1.00 0.18 1.00 0.06 1.00 Satd. Flow (perm) 838 1699 1334 1593 326 5060 115 5065 Volume (vph) 75 25 35 90 5 130 35 2075 70 55 1130 30 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 79 26 37 95 5 137 37 2184 74 58 1189 32 RTOR Reduction (vph) 0 33 0 0 113 0 0 2 0 0 2 0 Lane Group Flow (vph) 79 30 0 95 29 0 37 2256 0 58 1219 0 Turn Type Perm Perm pm+pt pm+pt Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 13.2 13.2 13.2 13.2 88.8 79.9 72.6 67.7 Effective Green, g (s) 13.2 13.2 13.2 13.2 88.8 79.9 72.6 67.7 Actuated glC Ratio 0.12 0.12 0.12 0.12 0.81 0.73 0.66 0.62 Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 101 204 160 191 488 3675 150 3117 vIs Ratio Prot 0.02 0.02 0.01 cO.45 cO.02 0.24 vIs Ratio Perm cO.09 0.07 0.05 0.24 vlc Ratio 0.78 0.15 0.59 0.15 0.08 0.61 0.39 0.39 Uniform Delay, d1 47.0 43.4 45.9 43.4 3.1 7.4 7.3 10.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 2.72 0.94 Incremental Delay, d2 31.6 0.3 5.8 0.4 0.3 0.8 1.6 0.4 Delay (s) 78.6 43.7 51.7 43.8 3.4 8.2 21.4 10.5 Level of Service E D D D A A C B Approach Delay (s) 63.1 46.9 8.1 11.0 Approach LOS E D A B Intersection Summary HCM Average Control Delay 13.3 HCM Level of Service B HCM Volume to Capacity ratio 0.63 Actuated Cycle Length (s) 110.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 68.2% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Choice Center 1/28/20142028 Total Traffic AM REVISED Eric L. Bracke, PE. PTOE Synchro 6 Report 1/28/2014 HCM Signalized Intersection Capacity Analysis 6: Stuart Street & College Avenue 1/28/2014 ~ "l- • +- "- "\ t ~ \... ! ..I -+ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 'i 'ft 'i 'ft Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 'i tt'ft 1900 1900 1900 'i tt'ft 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frt 1.00 0.89 1.00 0.87 1.00 0.99 1.00 0.99 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1770 1649 1770 1623 1770 5046 1770 5053 Fit Permitted 0.56 1.00 0.63 1.00 0.05 1.00 0.05 1.00 Satd. Flow (perm) 1044 1649 1177 1623 96 5046 91 5053 Volume (vph) 130 25 80 265 20 120 80 2220 120 130 2875 125 Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 137 26 84 279 21 126 84 2337 126 137 3026 132 RTOR Reduction (vph) 0 51 0 0 63 0 0 4 0 0 4 0 Lane Group Flow (vph) 137 59 0 279 84 0 84 2459 0 137 3154 0 Turn Type Perm Perm pm+pt pm+pt Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 31.0 31.0 31.0 31.0 82.7 77.7 91.0 82.0 Effective Green, g (s) 31.0 31.0 31.0 31.0 82.7 77.7 91.0 82.0 Actuated glC Ratio 0.24 0.24 0.24 0.24 0.64 0.60 0.70 0.63 Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Vehicle ~xtension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 249 393 281 387 125 3016 184 3187 vIs Ratio Prot 0.04 0.05 0.03 0.49 cO.05 cO.62 vIs Ratio Perm 0.13 cO.24 0.40 0.47 vlc Ratio 0.55 0.15 0.99 0.22 0.67 0.82 0.74 0.99 Uniform Delay, d1 43.4 39.1 49.4 39.7 63.1 20.5 35.0 23.6 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.6 0.2 51.5 0.3 25.2 2.6 15.0 13.7 Delay (s) 46.0 39.3 100.9 40.0 88.3 23.1 50.1 37.3 Level of Service D D F D F C D D Approach Delay (s) 43.0 79.9 25.2 37.8 Approach LOS D E C D Intersection Summary HCM Average Control Delay 35.9 HCM Level of Service D HCM Volume to Capacity ratio 0.96 Actuated Cycle Length (s) 130.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 97.0% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Choice Center 1/28/20142028 Total Traffic PM Scenario Eric L. Bracke. PE. PTOE Synchro 6 Report 1/28/2014