Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
THE SUMMIT ON COLLEGE PARKING GARAGE - MJA/FDP - FDP130056 - CORRESPONDENCE - APPLICANT COMMUNICATION
Date: 2/17/2014 Section Description Unit Unit Cost Qty Cost 1 Plantings Evergreen Trees (8' Height) EA $ 500.00 8 $ 4,000.00 Shade Trees (3" Caliper) EA $ 450.00 7 $ 3,150.00 Ornamental Trees (2" Caliper) EA $ 350.00 9 $ 3,150.00 Shrubs (5 Gallon) EA $ 50.00 37 $ 1,850.00 Ornamental Grass EA $ 15.00 57 $ 855.00 Soil Amendments CY $ 32.00 10 $ 320.00 Perennials EA $ 11.57 0 $ ‐ Native Seed and Crimped Straw Mulch SF $ 0.05 16000 $ 800.00 2 Irrigation LS $ 3,000.00 1 $ 3,000.00 Sub Total $ 17,125.00 25% Contingency $ 4,281.25 10 Years of Irrigation Water EA $ 250.00 10 $ 2,500.00 Grand Total $ 23,906.25 Summit Parking Garage Buffer Fee in Lieu Estimate 1"=40' 40 20 BUFFER QTY BOTANICAL NAME / COMMON NAME 9 2" CONCEPTUAL ORNAMENTAL TREE 5 8' CONCEPTUAL EVERGREEN TREE 3 8' CONCEPTUAL EVERGREEN TREE 7 3" CALIPER CONCEPTUAL SHADE TREE BUFFER QTY BOTANICAL NAME / COMMON NAME 17 CONCEPTUAL LARGE SHRUB -- 5 GALLON 57 CONCEPTUAL ORNAMENTAL GRASS -- 1 GALLON 6 CONCEPTUAL LARGE SHRUB -- 5 GALLON 14 CONCEPTUAL LARGE SHRUB -- 5 GALLON PLANT SCHEDULE BUFFER EXISTING TREE (TYP) SPRING CREEK EXISTING BIKE PATH EDGE OF PARKING GARAGE REALIGNED STORM PIPE EXISTING STORM PIPE EXISTING SANITARY SEWER LINE EXISTING STORM PIPE EASEMENT