HomeMy WebLinkAboutSPOONS-LIGHTFIELD ENTERPRISES, INC. - PDP/FDP - FDP150003 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSC1.0.... COVER SHEET
C1.1.... STANDARD NOTES SHEET
C1.2... STANDARD NOTES SHEET
C2.0.... SITE LAYOUT/HORIZONTAL CONTROL PLAN
C3.0... UTILITY PLAN
C4.0.... GRADING PLAN
C5.0.... DRAINAGE AND L.I.D. PLAN
C6.0.... EROSION CONTROL PLAN
C7.0.... STREET DETAILS
C7.1.... STREET DETAILS CONT'D
C7.2.... SANITARY SEWER DETAILS
C7.3... WATER DETAILS
C7.4.... STORM SEWER DETAILS
C7.5.... EROSION CONTROL DETAILS
G
UP
UT
SS
X
W
SS
SYMBOL LEGEND
ABBREVIATIONS
6010.00
0.55%
C1.0
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
OWNER PLANNER
SURVEYOR
SPOONS
FINAL UTILITY PLANS FOR
2590 MIDPOINT DRIVE, FORT COLLINS, CO
LOT 18, PROSPECT INDUSTRIAL PARK
CIVIL ENGINEER
CONTRACTOR GEOTECHNICAL ENGINEER
ARCHITECT
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
ENGINEER AFFIRMATION STATEMENT
C1.1
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C1.2
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
00 10' 20' 40'
1"=20'
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C2.0
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
00 10' 20' 40'
1"=20'
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C3.0
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
00 10' 20' 40'
1"=20'
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
GRADING PLAN
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
C4.0
FENCED
YARD
(ROAD BASE
SURFACE)
INV = 97.06
INV = 96.69
6" PVC
UNDERDRAIN
6" PVC
UNDERDRAIN
INV = 97.64
INV = 96.69
00 10' 20' 40'
1"=20'
DRAINAGE & L.I.D. PLAN
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
C5.0
00 10' 20' 40'
1"=20'
(1.) THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO
ANY CONSTRUCTION ON THIS SITE.
(2.) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED
PLANS.
(3.) ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND
DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION
CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE
AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL
REPORT.
(4.) AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND
CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO
MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND
MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
(5.) PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL
OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR
IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
(6.) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS,
STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG
LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR
PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS
OTHERWISE APPROVED BY THE CITY/COUNTY.
(7.) IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL
MEASURES SHALL:
(A.) BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM
EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED
PERFORMANCE OF THEIR INTENDED FUNCTION.
(B.) REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY
STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(C.) BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE
EROSION CONTROL INSPECTOR.
(8.) WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE
RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE
INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
(9.) THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY
DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE
STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.
(10.) ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS
OF THE UNITED STATES.
(11.) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT
FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED.
(12.) THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER
LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE
OVER TO THE CITY/COUNTY OR HOMEOWNERS ASSOCIATION (HOA).
(13.) CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT
UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER
FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING
MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE
THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND
ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
(14.) A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA
SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50)
FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION
ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C7.0
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
Wood float finish thru ramp Transition back of walk (typ.)
Curb (optional)
6"
(min.)
(min.)
6"
NOTES:
1. * 6" Thickness applies to entire ramp area.
2. ** 1:25 Unless a landing behind ramp (then ramp can be 1:12
with 1:20 on the truncated dome warning.)
3. See CONST. DWG. 1606(a) and 1607 for Fort Collins.
4. See CONST. DWG. 1614, 1615 and 1616 for Loveland.
Only if needed
or same
width as
the widest
walk
6' (max.)
at the corners of the
truncated dome warning
truncated dome warning
detection
C7.1
ONSITE PAVEMENT SECTION
ONSITE 2' VALLEY PAN DETAIL
ONSITE SIDEWALK SECTION
ASPHALT SURFACE
SCARIFY AND RECOMPACT SUBGRADE TO
95% MAX DRY DENSITY
ONSITE MONOLITHIC SIDWALK/CURB
SEE ONSITE PAVEMENT DETAIL FOR
SPECIFIC DEPTHS
6"X6"-10/10 W.W.F. OR
CONTROL JOINTS EVERY 10'
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C7.2
PLAN VIEW
CROSS VIEW
45 ELBOW
SERVICE WYE
8 IN. PVC SEWER PIPE
COMPACTED GRANULAR MATERIAL
AIR-TIGHT PLUG WITH
4 IN. X 4 IN. MARKER
UNYIELDING PIPE BEDDING
OF COMPACTED ROCK OR
LEAN CONCRETE
PVC SEWER PIPE
NOTE: WYE CONNECTION NOT
ALLOWED ON VCP
LEAN CONCRETE
o
20 MIN. o
45 MAX.
TRENCH
UNYIELDING PIPE BEDDING
OF COMPACTED ROCK OR
4 IN. X 4 IN.
AIR-TIGHT PLUG
o
MARKER
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
LOWER LIMIT OF
TRENCH WALL
SLOPING
INITIAL LIFT *
12 IN. MIN.
PIPE O.D.
4 IN. MIN.
TRENCH WIDTH AS SPECIFIED
IN SECTION 02221
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C7.3
6 6 6 6 6 6 6 6 6 6 6 6
6 6 6 6 6 6 6 6 6 6 6 6 6 6
6
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C7.4
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
LOWER LIMIT OF
TRENCH WALL
SLOPING
INITIAL LIFT *
12 IN. MIN.
PIPE O.D.
4 IN. MIN.
TRENCH WIDTH AS SPECIFIED
IN SECTION 02221
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C7.5
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
C7.6
TO THE AREA BEING RESTORED.
(15.) TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE
FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS
ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(A.) ALONG LOT PERIMETER.
(B.) OTHER LOCATIONS, IF NEEDED.
(16.) CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS
SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED
NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
SPOONS
2590 MIDPOINT DRIVE
FORT COLLINS, CO
EROSION CONTROL PLAN
C6.0
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R