HomeMy WebLinkAboutHARMONY & I-25 GRADING PLAN WEITZEL PIT #1 - PDP/FDP - FDP140028 - SUBMITTAL DOCUMENTS - ROUND 2 - REVISIONSJanuary 28, 2015
Attn: Clark Mapes, AICP
City Planner
City of Fort Collins
281 College Ave
Fort Collins CO 80524
RE: Harmony and I-25 Grading Plan, FDP140028, Response to comments dated 12/11/2014
Mr. Mapes:
Please find that attached responses to your comments dated December 11th
2014. Please do not hesitate to
contact me with any questions.
Thanks
Brian Williamson
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes@fcgov.com
Topic: Easements
Comment Number: 1 Comment Originated:
12/02/2014
12/02/2014: From Boxelder Ditch Co.: Plans for any work crossing or along Boxelder Ditch must be
reviewed and approved by Boxelder Ditch Company. Weed control needs to be addressed on this
project, especially the area to the south of the ponds shown on these plans, on south to Kechter
Road.
Response: We have met with Les Thompson from the Boxelder Ditch Co to review the plans. Les
indicated that he was fine with the plans and would sign them. He isn’t too concerned about the “filling
operations” because it doesn’t propose to change or impact the Boxelder ditch in any way.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
12/01/2014
12/01/2014: I need a legal for the property to be used for the agreement. All work proposed needs to
be within this legally described area.
Response: A metes and bounds legal description is now provided in the Weitzel Pond #1 (formerly
named “Harmony & I-25 PDP SOUTH”) submittal supporting documentation sheet (updated January
13, 2015).
Comment Number: 2 Comment Originated:
12/01/2014
12/01/2014: Need ownership information for the Agreement.
Response: Ownership information is also provided on the updated Weitzel Pond #1 (formerly “Harmony & I-25 PDP
SOUTH”) submittal supporting documentation sheet.
Comment Number: 3 Comment Originated:
12/01/2014
12/01/2014: Label the plans as Overlot Grading Plans for: rather than calling these utility plans. That
way we will be able to distinguish them later in the agreements.
Response: The plan title has been changed to “Overlot Grading Plans for…” as requested.
Comment Number: 4 Comment Originated: 12/01/2014
12/01/2014: Please note that any filling within areas that are to be future right-of-ways are to be tested
and meet certain criteria. Since there are going to be areas of future right-of-way that are not identified
on these plans the Developer needs to know that those areas may require different fill/ compaction/
treatment/ mitigation at such time those areas become right-of-way and infrastructure improvements are
constructed.
Response: We have added a note to the Grading Plan (note #9) to address this concern.
Comment Number: 5 Comment Originated: 12/01/2014
12/01/2014: Site plan doesn’t show that all the trees within the LOD are going to be removed. How
are you going to fill and keep these? Will there be a tree mitigation plan?
Response: A Tree Mitigation Plan has been included with this submittal that indicates the trees to
remain, as well as some notes on the grading plan that indicate specific grading around the existing
trees.
Comment Number: 6 Comment Originated: 12/01/2014
12/01/2014: Sheet 5 of 6 of the utility plans notes work outside of the LOD. Is this work actually
proposed? If so the LOD needs to be modified. If the work is not to be done than remove the note.
Response: The LOD has been modified to include all improved areas. Grading and Erosion control
sheets have been modified to show the area that shows grading (removal) of the illegally placed fill
in the floodway.
Comment Number: 7 Comment Originated: 12/01/2014
12/01/2014: Can’t tell from the contours if the bank of the ditch is the highest spot and thus no
additional drainage goes into the ditch or if the new fill will be the highest spot and additional drainage
will go into the ditch. Ditch company will need to sign the plans if there is any impact to the ditch or
work within the ditch companies easement.
Response: The top of bank on the east side of the Boxelder ditch is a local high spot. The proposed
contours show a high point ridge (running north-south) that would direct some runoff toward the
direction of the Boxelder ditch, but the ditch bank will prevent stormwater from directly running into the
ditch and the grading plan now shows a swale along a portion of the Boxelder on the east side to
accept runoff.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-2401, sblochowiak@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/02/2014
12/02/2014: Please delineate and label the Top of Bank line on the site and grading plans.
Response: Top of Bank line included as requested.
Comment Number: 2 Comment Originated: 12/02/2014
12/02/2014: Please delineate and label the Buffer Zone for the Resource of Special Concern at this
site, namely, the Great Blue Heron Colonial Nesting Site. The Buffer Standard for the City of Fort
Collins is 825 ft. As discussed and agreed upon at the October 30, 2014, meeting, please delineate
using the Colorado Parks and Wildlife Buffer Standard of 1,640 ft.
Response: The City of Fort Collins standard 825’ buffer for the rookery is shown on the site plan and
grading plan. Per the discussion with CPW their standard is at max 300 meters and this has been
shown on the site plan.
Comment Number: 3 Comment Originated: 12/02/2014
12/02/2014: The Ecological Characterization Study relates that at this time, the effects of development
on the Great Blue Heron Colonial Nesting site is uncertain, whether development activities in PDP
South occur during heron nesting season or outside of heron nesting season, or whether changes in
habitat occur during or outside heron nesting season. Therefore, a heron expert needs to be
consulted to review this situation in order to provide further information and expert recommendations
moving forward. With this information, the City of Fort Collins will have a better estimate of how the
filling of the pond(s) will or will not impact the heron rookery, which is currently the most critical
resource located on this site.
Response: Nancy Howard and Mike Sherman from the CPW have agreed to serve as the Heron
Experts for this project. They were present at a meeting on 1/26/2015 and gave their advice on the
rookery and the impacts of construction. A course of action was agreed upon and TST will generate
a draft of the language for the Development Agreement to outline this course of action. An updated
ECS was also submitted prior to the 1/26/15 meeting.
Comment Number: 4 Comment Originated: 12/02/2014
12/02/2014: 6. If the ponds can be filled without negatively impacting the heron rookery, then, a
Conceptual Mitigation Plan will need to be created to mitigate for the lost ecological value from the
loss of the ponds and the surrounding wetlands. I suggest a meeting to review the written and drawn
plans with myself, the applicant, and the ecological consultant. As discussed in the October 30, 2014
meeting, the priority area for mitigation is in the Wellington Downs Pit (via permanent protection of this
area). If this is not able to be achieved, then mitigation in the pre-1981 pond can be explored.
Please note that the Mitigation Plan will need to include estimated mitigation costs associated with this
PDP South development in order to determine the amount of bond that the City of Fort Collins would
require. This bond will be included as a part of the project’s Development Agreement.
Response: We are continuing to work with Environmental Planning directly on the Mitigation Plan, we
have included a draft inventory of the mitigation areas with this submittal.
Comment Number: 5 Comment Originated: 12/02/2014
12/02/2014: 6.7. If a Tree Inventory is required and a Tree Mitigation Plan, please note that tree
removal or pruning should occur outside of migratory songbird nesting season (February 1 – July 31),
or, that a survey should be completed prior to removal or pruning to ensure that no active nests are
present. A note should be added to the site/landscape plans accordingly.
Response: A Tree Mitigation Plan is provided with this submittal. The requested note has been added
to the plans.
Comment Number: 6 Comment Originated: 12/02/2014
12/02/2014: Please add an Environmental Planner signature to the grading plans. The Natural
Resources line can simply be edited.
Response: Environmental Planner signature space added to signature block. Natural Resources and Parks &
Recreation spaces removed.
Comment Number: 7 Comment Originated: 12/02/2014
12/02/2014: Please add the following statement to the notes on any sheets that show a Habitat Buffer:
Please see Section 3.4.1 of the Land Use Code for allowable uses within the buffer zone.
Response: Added to Site Plan map sheet as note 1, the Mitigation Plan as note 2, and to Grading Plan
as note 10.
Comment Number: 8 Comment Originated: 12/02/2014
12/02/2014: A note should be added to the site and grading plans that the natural habitat area is meant
to be maintained in a native landscape. This will help preserve the intention behind the buffer zones and
the natural features into the future.
Response: This note has been added to the plan.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/02/2014
12/02/2014:
See comment number 5, 07/22/2014, from Lindsay Ex Environmental Planning about retaining existing
significant trees and mitigation.
Please schedule an on-site meeting with the City Forester and Environmental Planning Technician to
determine any tree mitigation and additional information related to the specific species, diameter, tree
condition and tree protection specifications to include.
Response: A tree inventory and survey visit was conducted, and the mitigation plans are continuing to
be developed.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 12/05/2014
12/05/2014: No PFA comments for the purpose of grading only at the site. Prior comments relative to
future development of the site remain outstanding.
Response: Noted.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 11/20/2014
11/20/2014: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current
Erosion Control Plan Submitted does not meet requirements please correct redlines (included in the
Stormwater Plans). Please submit; Erosion Control Report and an Escrow / Security Calculation. If you
need clarification concerning this section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Response: Revised erosion control plans and a Stormwater Management Plan has been submitted with this re-
submittal for the project. We would ask that you review the updated erosion control plans and let us know if you
require any further changes prior to us calculating the escrow.
Contact: Mark Taylor, 970-416-2494, mtaylor@fcgov.com
Topic: Floodplain
Comment Number: 2 Comment Originated: 12/03/2014
12/03/2014: Please add a note to the Site Plan, Grading Plan, and Drainage Plan stating that the
effective floodplain information shown on this plan is based upon LOMR 14-08-058OP, dated
December 15, 2014.
Response: Added as note #2 on the Site Plan map sheet, note #11 on the Grading Plan, and note
#9 on the Drainage Plan.
Comment Number: 3 Comment Originated: 12/03/2014
12/03/2014: Change Note #7 on the drainage plan and the grading plan so it requires all structures in
the floodway "and flood fringe" to have an ERPP. Make the same change to Note #8 on the Site Plan.
Response: Notes revised as requested.
Comment Number: 4 Comment Originated: 12/03/2014
12/03/2014: Change Note #6 on the Site Plan, Grading Plan, and Drainage Plan to read the critical
facilities are prohibited in the "Poudre River Floodplain."
Response: Notes revised as requested.
Comment Number: 5 Comment Originated: 12/03/2014
12/03/2014: In the Drainage Report, in the 6th paragraph of 3.1 DRAINAGE PLAN DEVELOPMENT,
change 2.45 cfs to "2.45 ac-ft."
Response: Revised as requested.
Comment Number: 6 Comment Originated: 12/03/2014
12/03/2014: Change the Grading Plan and Drainage Plan to show the grading that will remove the fill
associated with the LOMR-F near PDP North.
Response: Grading Plan adjusted to show this area.
Comment Number: 7 Comment Originated: 12/03/2014
12/03/2014: Prior to beginning the floodway grading, a Floodplain Use Permit and No-Rise
Certification must be approved by the City of Fort Collins Floodplain Administration Division. The
No-Rise Certification must include existing and proposed grades and documentation that the proposed
grades will be the same as what existed prior to the LOMR-F. The pre-LOMR-F grades can be found
on the FEMA work maps (with 2-foot contours) that were in effect at that time. After the grading is
complete, we will need to be provided with a re-certification documenting that the finished grades do in
fact match the pre-LOMR-F grades.
Response: Noted. Thank you for clarifying the steps in the process.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 12/01/2014
12/01/2014: Please correct the spelling of "Larimer". See redlines.
Response: Corrected as requested.
12/01/2014: The City has moved to the NAVD88 vertical datum. Please provide the following
information in the format shown below.
If your project is started on NAVD88 datum:
1) PROJECT DATUM: NAVD88
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
OR, if project has already been surveyed in NAVD29 Unadjusted datum:
2) PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT COLLINS DATUM)
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
If using NGVD29 UNADJUSTED the following equation statement will be needed.
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NAVD88 = NGVD29 UNADJUSTED + X.XX’
Response: Version 1 of the above information provided on Cover Sheet and Notes Sheet.
Comment Number: 3 Comment Originated: 12/01/2014
12/01/2014: There is text that needs to be masked. Mask all text in hatched areas. See redlines.
Response: Addressed as requested.
Comment Number: 4 Comment Originated: 12/01/2014
12/01/2014: There are line over text issues. See redlines.
Response: Addressed as requested.
Comment Number: 5 Comment Originated: 12/01/2014
12/01/2014: There is text that needs the size increased. See redlines.
Response: Addressed as requested.
Topic: Site Plan
Comment Number: 6 Comment Originated: 12/01/2014
12/01/2014: Please make change to the title as shown. See redlines.
Response: Addressed as requested.
Comment Number: 7 Comment Originated: 12/01/2014
12/01/2014: Please remove text as marked. See redlines.
Response: Addressed as requested.
Comment Number: 8 Comment Originated: 12/01/2014
12/01/2014: There is text that needs to be rotated 180 degrees. See redlines.
Response: Addressed as requested.
Comment Number: 9
12/01/2014: Please remove the "And" from the legal description, unless the description shown is from a
deed. See redlines.
Response: Addressed as requested.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/02/2014
12/02/2014: Once the project is ready to move forward, we will need information on the haul operation.
This includes access location, haul route, # trucks/day etc. Work with Syl Mireles in Traffic Operations
or Rob Mosbey in Engineering.
Response: Noted. The contractor will likely be the party to provide this information to you.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/02/2014
12/02/2014: In the response letter it talks about seeding and irrigation for the disturbed and filled
areas. These notes will need to be on the plan with more details.
Response: Irrigation notes have been added to the mitigation plan along with a seed mix for
restoration.
Comment Number: 2 Comment Originated: 12/02/2014
12/02/2014: Are the existing trees remaining are they going to be removed? Need to be clear on the
plan.
Response: A tree mitigation plan has been developed and is included in the site plan set.
Comment Number: 3 Comment Originated: 12/02/2014
12/02/2014: ODP Mylars need to be approved and signed before the PDP can go to hearing.
Response: Noted. ODP mylars are printed and waiting for out of town signatures. As soon as
they are finished we will submit them to the City.