HomeMy WebLinkAboutCAPSTONE COTTAGES - PDP - PDP140004 - REPORTS - DRAINAGE REPORTDecember 10, 2014
PRELIMINARY DRAINAGE AND
EROSION CONTROL REPORT FOR
CAPSTONE COTTAGES
Fort Collins, Colorado
Prepared for:
Capstone Collegiate Communities
431 Office Park Drive
Birmingham, Alabama 35223
Prepared by:
200 South College Avenue, Suite 10
Fort Collins, Colorado 80524
Phone: 970.221.4158 Fax: 970.221.4159
www.northernengineering.com
Project Number: 939-001
This Drainage Report is consciously provided as a PDF.
Please consider the environment before printing this document in its entirety.
When a hard copy is absolutely necessary, we recommend double-sided printing.
December 10, 2014
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
RE: Preliminary Drainage and Erosion Control Report for
CAPSTONE COTTAGES
Dear Staff:
Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report
for your review. This report accompanies the Project Development Plan submittal for the
proposed Capstone Cottages development.
This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM),
and serves to document the stormwater impacts associated with the proposed project. We
understand that review by the City is to assure general compliance with standardized criteria
contained in the FCSCM.
If you should have any questions as you review this report, please feel free to contact us.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Aaron Cvar, PE
Project Engineer
Capstone Cottages
Preliminary Drainage Report
TABLE OF CONTENTS
I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1
A. Location ............................................................................................................................................. 1
B. Description of Property ..................................................................................................................... 2
C. Floodplain.......................................................................................................................................... 4
II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4
A. Major Basin Description .................................................................................................................... 4
B. Sub-Basin Description ....................................................................................................................... 4
III. DRAINAGE DESIGN CRITERIA ................................................................................... 5
A. Regulations........................................................................................................................................ 5
B. Four Step Process .............................................................................................................................. 5
C. Development Criteria Reference and Constraints ............................................................................ 6
D. Hydrological Criteria ......................................................................................................................... 6
E. Hydraulic Criteria .............................................................................................................................. 6
F. Modifications of Criteria ................................................................................................................... 6
IV. DRAINAGE FACILITY DESIGN .................................................................................... 7
A. General Concept ............................................................................................................................... 7
B. Specific Details .................................................................................................................................. 7
V. CONCLUSIONS ........................................................................................................ 8
A. Compliance with Standards .............................................................................................................. 8
B. Drainage Concept .............................................................................................................................. 8
APPENDICES:
APPENDIX A – Hydrologic Computations
APPENDIX B - Water Quality Design Computations
APPENDIX C – Stormwater Management Model (SWMM)
APPENDIX D – Erosion Control Report
Capstone Cottages
Preliminary Drainage Report
LIST OF TABLES AND FIGURES:
Figure 1 – Aerial Photograph ................................................................................................ 2
Figure 2– Proposed Site Plan ................................................................................................ 3
Figure 3 – Existing Floodplains ............................................................................................. 4
MAP POCKET:
Proposed Drainage Exhibit
Capstone Cottages
Preliminary Drainage Report 1
I. GENERAL LOCATION AND DESCRIPTION
A. Location
1. Vicinity Map
2. The project site is located in the west half of Section 7, Township 6 North, Range 68
West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of
Colorado .
3. The project site is located just northeast of the intersection of Lemay Avenue and
Lincoln Avenue.
4. The project site lies within the Dry Creek Basin. Detention requirements are to detain
the difference between the 100-year developed inflow rate and the historic 2-year
release rate. The historic release rate for this basin is 0.20 cfs per acre.
5. The Mulberry Street Walmart and the Buffalo Run Apartment complex exist just to the
south of the site, on the south side of Lincoln Avenue. The San Criso residential
development exists to the north of the site. The Sunward Condos development exists
to the east of the site. The Lincoln Channel (Storm Drainage) runs along the southern
boundary of the project site, and will be utilized as the storm outfall for the majority of
Capstone Cottages
Preliminary Drainage Report 2
developed site runoff.
6. No offsite flows enter the site from the north, south, or east. The Lincoln Channel
conveys regional flows from the west; this channel conveys flows east along the
southern boundary of the project site.
7. An existing 36-inch diameter storm line runs along the west side of the site, which
will be utilized in the proposed site design to serve as an outfall for the proposed
paver detention system shown in drainage Basin 4 on the proposed drainage exhibit.
The existing storm line will also serve as an outfall for the proposed inlets within the
future Realigned Lemay Avenue (drainage Basin 14). The existing 36-inch diameter
line begins to the north of the proposed site and serves as the outfall for the existing
San Cristo neighborhood detention pond.
B. Description of Property
1. The development area is roughly 28.33 net acres.
Figure 1 – Aerial Photograph
2. The subject property is an undeveloped parcel with native ground cover. Existing
ground slopes are mild to moderate (i.e., 1 - 6±%) through the interior of the
property. General topography slopes from northwest to southeast. The Lincoln
Channel, running along the southern boundary of the project site, collects the majority
of historic site runoff.
Capstone Cottages
Preliminary Drainage Report 3
3. According to the United States Department of Agriculture (USDA) Natural Resources
Conservation Service (NRCS) Soil Survey website:
http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx,
the site consists of Caruso Clay Loam, Loveland Clay Loam, and Nunn Clay Loam,
which all fall into Hydrologic Soil Group C.
4. The proposed project site plan is composed of residential and commercial
development. Associated roadways, water and sewer lines will be constructed with
the development. Onsite detention is proposed within the subgrade of a permeable
paver system. The proposed paver system is to be located throughout the site,
predominantly within proposed parking areas. This paver system is anticipated to
meet or exceed the current City LID requirements.
Figure 2– Proposed Site Plan
Capstone Cottages
Preliminary Drainage Report 4
5. There are no known irrigation laterals crossing the site.
6. The proposed land use is residential and commercial.
C. Floodplain
1. The project site is not encroached by any City or FEMA 100-year floodplain. The site
is located within the 500-year floodplain of the Cache La Poudre Rive.
Figure 3 –Area Floodplain Mapping
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin Description
2. The project site lies within the Dry Creek Basin. Detention requirements are to detain
the difference between the 100-year developed inflow rate and the historic 2-year
release rate. The historic release rate for this basin is 0.20 cfs per acre. The site
outfall is the existing Lincoln Channel, running along the southern boundary of the
site.
B. Sub-Basin Description
1. The subject property historically drains overland from northwest to southeast. Runoff
Capstone Cottages
Preliminary Drainage Report 5
from the majority of the site has historically been collected in the Lincoln Channel,
running along the southern boundary of the site. The Lincoln Channel captures
regional flows from the west and conveys these flows east.
2. A more detailed description of the project drainage patterns follows in Section IV.A.4.,
below.
III. DRAINAGE DESIGN CRITERIA
A. Regulations
There are no optional provisions outside of the FCSCM proposed with the proposed
project.
B. Four Step Process
The overall stormwater management strategy employed with the proposed project utilizes
the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters.
The following is a description of how the proposed development has incorporated each
step.
Step 1 – Employ Runoff Reduction Practices
Several techniques have been utilized with the proposed development to facilitate the
reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the
current use by implementing multiple Low Impact Development (LID) strategies including:
Conserving existing amenities in the site including the existing vegetated areas.
Providing vegetated open areas throughout the site to reduce the overall impervious
area and to minimize directly connected impervious areas (MDCIA).
Routing flows, to the extent feasible, through vegetated swales to increase time of
concentration, promote infiltration and provide initial water quality.
Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with
Slow Release
The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban
development of this intensity will still generate stormwater runoff that will require
additional BMPs and water quality. The majority of stormwater runoff from the site will
ultimately be intercepted and treated using extended detention methods prior to exiting the
site.
Step 3 – Stabilize Drainageways
There are no major drainageways within the subject property (the Lincoln Channel is
located outside of the property boundary). While this step may not seem applicable to
proposed development, the project indirectly helps achieve stabilized drainageways
nonetheless. By providing water quality where none previously existed, sediment with
erosion potential is removed from the downstream drainageway systems. Furthermore,
this project will pay one-time stormwater development fees, as well as ongoing monthly
stormwater utility fees, both of which help achieve City-wide drainageway stability.
Step 4 – Implement Site Specific and Other Source Control BMPs.
The proposed project will improve upon site specific source controls compared to historic
conditions:
Trash, waste products, etc. that were previously left exposed with the historic trailer
park will no longer be allowed to exposure to runoff and transport to receiving
Capstone Cottages
Preliminary Drainage Report 6
drainageways. The proposed development will eliminate these sources of potential
pollution.
C. Development Criteria Reference and Constraints
The subject property is surrounded by currently developed properties. Thus, several
constraints have been identified during the course of this analysis that will impact the
proposed drainage system including:
Existing elevations along the property lines will generally be maintained.
As previously mentioned, overall drainage patterns of the existing site will be
maintained.
Elevations of existing downstream facilities that the subject property will release to
will be maintained.
D. Hydrological Criteria
1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in
Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations
associated with the proposed development. Tabulated data contained in Table RA-7
has been utilized for Rational Method runoff calculations.
2. The Rational Method has been employed to compute stormwater runoff utilizing
coefficients contained in Tables RO-11 and RO-12 of the FCSCM.
3. Three separate design storms have been utilized to address distinct drainage
scenarios. A fourth design storm has also been computed for comparison purposes.
The first design storm considered is the 80th percentile rain event, which has been
employed to design the project’s water quality features. The second event analyzed is
the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third
event considered is the “Major Storm,” which has a 100-year recurrence interval.
The fourth storm computed, for comparison purposes only, is the 10-year event.
4. No other assumptions or calculation methods have been used with this development
that are not referenced by current City of Fort Collins criteria.
E. Hydraulic Criteria
1. As previously noted, the subject property maintains historic drainage patterns.
2. All drainage facilities proposed with the project are designed in accordance with
criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District
(UDFCD) Urban Storm Drainage Criteria Manual.
3. As stated above, the subject property is not located in a City or FEMA regulatory
floodplain.
4. The proposed project does not propose to modify any natural drainageways.
F. Modifications of Criteria
1. The proposed development is not requesting any modifications to criteria at this time.
Capstone Cottages
Preliminary Drainage Report 7
IV. DRAINAGE FACILITY DESIGN
A. General Concept
1. The main objectives of the project drainage design are to maintain existing drainage
patterns, and to ensure no adverse impacts to any adjacent properties.
2. Onsite detention will be provided within the subgrade of the proposed permeable
pavement systems for Basin 4, and in the pond within Basin 7 for the majority of the
site (please see exceptions discussed below). Water quality capture volume for the
purpose of water quality treatment conforming to extended detention criteria will also
be provided in the lower stage of the pond within Basin 7. Detention and water
quality release rates will be controlled through sub-surface control structures.
3. The site has been broken into 14 sub-basins for preliminary design purposes.
Anticipated drainage patterns for proposed drainage basins are described below.
Onsite Basins 1-7, 10, 12, 13
Basins 1-7, 10, 12, 13 will generally drain via overland flow and curb and gutter flow
into inlets and storm line systems within the project site. A series of permeable paver
systems will be designed to both capture direct runoff and collect runoff from storm
line systems. The permeable paver sub-grade material will be utilized for a portion
(up to 0.99 acre-feet) of onsite detention volume for Basin 4. Detention for Basins 1
through 3, 5 through 7, and 10, 12, 13 will be provided within the detention/water
quality pond in Basin 7.
Basins 8, 9, 11, and 14
Due to site grading constraints Basins 8, 9, 11, and 14 are currently shown to drain
offsite undetained. Basin 14 will drain into the proposed inlets shown within the
future Realigned Lemay Avenue, which will convey flows into the existing 36-inch
diameter storm line running along the west side of the site (discussed above in Section
I.A).
Please see further discussion of water quality and detention requirements in Section
IV.B, below.
A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of
this report.
B. Specific Details
1. Quantity detention is a requirement for the site, and portion (0.99 acre-feet) of
quantity detention is proposed to be provided within the permeable paver sub-
grade material within Basin 4. The majority of the site will be directed into
the onsite pond within Basin 7 which will be designed at Final in order to
provide the required water quality capture volume and to maintain the required
site release rate. The current stipulation for release rate is 0.20 cfs per acre
per the Dry Creek Master Plan. The project site encompasses 26.66 acres,
thus, a release rate of 5.33 cfs for the overall site is required by this criteria.
A total detention volume of 5.11 acre-feet with a release rate of 4.5 cfs has
been estimated for preliminary purposes for the detention/water quality pond
in Basin 7. A detention volume of 0.82 acre-feet with a release rate of 0.7 cfs
has been estimated for preliminary purposes for the paver system detention in
Capstone Cottages
Preliminary Drainage Report 8
Basin 4. Detention volumes have been estimated using the computer program
EPA SWMM (please see Appendix C).
2. Water quality capture volume will be provided in the lower stage of the
detention/water quality pond in Basin 7. A required water quality capture
volume based on a 40-hour holding time has been estimated at 0.43 acre-feet
for the pond.
3. LID features will be incorporated in the design of the overall site at Final
design. The site plan currently shows the majority of LID measures proposed
with the development plan as consisting of a very significant permeable paver
system. The site plan shows 1.58 acres of pavers to be placed within the
drive and parking areas in Basins 1, 2, 4, 5 and 10; while the paved drive
and parking surface area within the proposed site consists of roughly 4.13
acres. This results in 28% of paved drive and parking surfaces being
composed of permeable pavers. The site will be designed at Final to ensure a
minimum of 25% of paved drive and parking areas to consist of permeable
pavers. Additionally, paver systems will be designed at Final to meet the 2:1
flow-on ratio. The paver system will greatly enhance filtration of storm runoff,
and will provide significant storm runoff infiltration.
4. Final design details, construction documentation, and Standard Operating
Procedures (SOP) Manual shall be provided to the City of Fort Collins for
review prior to Final Development Plan approval. A final copy of the approved
SOP manual shall be provided to City and must be maintained on-site by the
entity responsible for the facility maintenance. Annual reports must also be
prepared and submitted to the City discussing the results of the maintenance
program (i.e. inspection dates, inspection frequency, volume loss due to
sedimentation, corrective actions taken, etc.).
5. Proper maintenance of the drainage facilities designed with the proposed
development is a critical component of their ongoing performance and effectiveness.
The water quality pond in Basin 7 will be designed at Final to be easily accessed by
maintenance staff via gentle slopes provided to the bottom of the pond.
6. The drainage features associated with the proposed project are all private facilities,
located on private property.
V. CONCLUSIONS
A. Compliance with Standards
1. The drainage design proposed with the proposed project complies with the City of Fort
Collins’ Stormwater Criteria Manual.
2. The drainage design proposed with this project complies with requirements for the
Dry Creek Basin.
3. The drainage plan and stormwater management measures proposed with the
proposed development are compliant with all applicable State and Federal regulations
governing stormwater discharge.
B. Drainage Concept
1. The drainage design proposed with this project will effectively limit any potential
damage associated with its stormwater runoff by providing detention and water
Capstone Cottages
Preliminary Drainage Report 9
quality mitigation features.
2. The drainage concept for the proposed development is consistent with requirements
for the Dry Creek Basin.
Capstone Cottages
Preliminary Drainage Report 10
References
1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities,
November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services.
2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No.
174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code.
3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and
Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007.
4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation
Service, United States Department of Agriculture.
5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control
District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008.
APPENDIX A
HYDROLOGIC COMPUTATIONS
CHARACTER OF SURFACE:
Runoff
Coefficient
Percentage
Impervious Project: 335-008
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC
Asphalt ……....……………...……….....…...……………….………………………………… 0.95 100% Date:
Concrete …….......……………….….……….………………..….…………………………… 0.95 90%
Gravel ……….…………………….….…………………………..…………………………… 0.50 40%
Roofs …….…….………………..……………….……………………………………………. 0.95 90%
Pavers…………………………...………………..……………………………………………. 0.40 22%
Lawns and Landscaping
Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0%
Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf
= 1.00 100-year Cf = 1.25
Basin ID
Basin Area
(s.f.)
Basin Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Roofs
(ac)
Area of
Pavers (ac)
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite
Runoff
Coefficient
100-year
Composite
Runoff
Coefficient
Composite
% Imperv.
1 175111 4.02 0.98 0.50 0.86 0.18 1.15 0.64 0.64 0.80 56%
2 158123 3.63 0.84 0.40 0.91 0.20 1.28 0.67 0.67 0.84 57%
3 84071 1.93 1.28 0.34 0.00 0.00 0.31 0.83 0.83 1.00 82%
4 159865 3.67 1.37 0.19 0.49 0.68 0.94 0.67 0.67 0.84 58%
5 312761 7.18 1.61 0.94 1.04 0.45 3.00 0.60 0.60 0.76 49%
6 40685 0.93 0.46 0.23 0.00 0.00 0.23 0.77 0.77 0.96 72%
7 60984 1.40 0.24 0.00 0.00 0.00 1.05 0.35 0.35 0.44 17%
8 8364 0.19 0.16 0.03 0.00 0.00 0.00 0.95 0.95 1.00 98%
9 15856 0.36 0.29 0.07 0.00 0.00 0.00 0.95 0.95 1.00 98%
10 62726 1.44 0.32 0.08 0.20 0.00 0.84 0.54 0.54 0.68 40%
11 3136 0.07 0.03 0.00 0.00 0.00 0.00 0.41 0.41 0.51 43%
Overland Flow, Time of Concentration:
Project: 335-008
Calculations By:
Date:
Gutter/Swale Flow, Time of Concentration:
Tt = L / 60V
Tc = Ti + Tt (Equation RO-2)
Velocity (Gutter Flow), V = 20·S½
Velocity (Swale Flow), V = 15·S½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf=1.00)
C*Cf
(10-yr
Cf=1.00)
C*Cf
(100-yr
Cf=1.25)
Length,
L
(ft)
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
2-yr
Tc
Rational Method Equation: Project: 335-008
Calculations By:
Date:
From Section 3.2.1 of the CFCSDDC
Rainfall Intensity:
1 1 4.02 7 7 6 0.64 0.64 0.80 2.60 4.44 9.63 6.7 11.4 31.0
2 2 3.63 6 6 5 0.67 0.67 0.84 2.67 4.56 9.95 6.5 11.1 30.4
3 3 1.93 8 8 8 0.83 0.83 1.00 2.46 4.21 8.59 4.0 6.8 16.6
4 4 3.67 5 5 5 0.67 0.67 0.84 2.85 4.87 9.95 7.0 11.9 30.5
5 5 7.18 19 19 18 0.60 0.60 0.76 1.68 2.86 6.01 7.3 12.4 32.6
6 6 0.93 10 10 10 0.77 0.77 0.96 2.26 3.86 7.88 1.6 2.8 7.1
7 7 1.40 16 16 14 0.35 0.35 0.44 1.84 3.14 6.82 0.9 1.5 4.2
8 8 0.19 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.5 0.9 1.9
9 9 0.36 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 1.0 1.7 3.6
10 10 1.44 5 5 5 0.54 0.54 0.68 2.85 4.87 9.95 2.2 3.8 9.7
11 11 0.07 5 5 5 0.41 0.41 0.51 2.85 4.87 9.95 0.1 0.1 0.4
12 12 0.35 5 5 5 0.48 0.48 0.60 2.85 4.87 9.95 0.5 0.8 2.1
13 13 0.32 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.9 1.5 3.1
14 14 5.50 35 35 33 0.55 0.55 0.69 1.17 2.00 4.24 3.5 6.0 16.0
Intensity,
i10
(in/hr)
Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1
C10
Area, A
(acres)
Intensity,
i2
(in/hr)
100-yr
Tc
(min)
DEVELOPED RUNOFF COMPUTATIONS
C100
Design
Point
Flow,
Q100
(cfs)
Flow,
Q2
(cfs)
10-yr
Tc
(min)
2-yr
Tc
(min)
C2
Flow,
Q10
(cfs)
Intensity,
i100
(in/hr)
Basin(s)
ATC
December 1, 2014
Q C f C i A
APPENDIX B
WATER WAWAWATER QUALITY DESIGN COMPUTATIONS
WATER QUALITY DESIGN CALCULATIONS
Total Req'd Water Quality Capture Volume
Project: 939-001
By: ATC
Date: 12/2/14
REQUIRED STORAGE & OUTLET WORKS:
BASIN AREA = 22.990 <-- INPUT from impervious calcs
BASIN IMPERVIOUSNESS PERCENT = 57.00 <-- INPUT from impervious calcs
BASIN IMPERVIOUSNESS RATIO = 0.5700 <-- CALCULATED
WQCV (watershed inches) = 0.226 <-- CALCULATED from Figure EDB-2
WQCV (ac-ft) = 0.434 <-- CALCULATED from UDFCD DCM V.3 Section 6.5
WQ Depth (ft) = ** <-- INPUT from stage-storage table
AREA REQUIRED PER ROW, a (in
2
) = ** <-- CALCULATED from Figure EDB-3
CIRCULAR PERFORATION SIZING:
dia (in) = ** <-- INPUT from Figure 5
n = ** <-- INPUT from Figure 5
t (in) = ** <-- INPUT from Figure 5
number of rows = ** <-- CALCULATED from WQ Depth and row spacing
**To be completed at final design
APPENDIX C
STORMWATER MANAGEMENT MODEL (SWMM)
Basins
Basin4
Outlet
Outlet_Pavers
Outlet_Overall
Pond
Detention_Pavers
FtCollins-100yr
11/21/2012 00:15:00
SWMM 5 Page 1
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... KINWAVE
Starting Date ............ NOV-21-2012 00:00:00
Ending Date .............. NOV-21-2012 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:15:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 30.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 8.152 3.669
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 1.418 0.638
Surface Runoff ........... 6.658 2.997
Final Surface Storage .... 0.128 0.058
Continuity Error (%) ..... -0.644
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 6.658 2.170
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 2.195 0.715
Internal Outflow ......... 0.000 0.000
Storage Losses ........... 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 4.463 1.454
Continuity Error (%) ..... -0.003
********************************
SWMM 5 Page 1
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 30.00 sec
Average Time Step : 30.00 sec
Maximum Time Step : 30.00 sec
Percent in Steady State : 0.00
Average Iterations per Step : 1.00
***************************
Subcatchment Runoff Summary
***************************
--------------------------------------------------------------------------------------------------------
Total Total Total Total Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Coeff
Subcatchment in in in in in 10^6 gal CFS
--------------------------------------------------------------------------------------------------------
Basins 3.67 0.00 0.00 0.64 2.99 1.87 170.37 0.816
Basin4 3.67 0.00 0.00 0.61 3.03 0.30 29.03 0.824
******************
Node Depth Summary
******************
---------------------------------------------------------------------
Average Maximum Maximum Time of Max
Depth Depth HGL Occurrence
Node Type Feet Feet Feet days hr:min
---------------------------------------------------------------------
Outlet_Overall OUTFALL 0.00 0.00 96.00 0 00:00
Pond STORAGE 2.52 2.99 99.99 0 02:12
Detention_Pavers STORAGE 2.19 2.58 99.58 0 02:11
*******************
Node Inflow Summary
*******************
-------------------------------------------------------------------------------------
Maximum Maximum Lateral Total
Lateral Total Time of Max Inflow Inflow
Inflow Inflow Occurrence Volume Volume
Node Type CFS CFS days hr:min 10^6 gal 10^6 gal
-------------------------------------------------------------------------------------
Outlet_Overall OUTFALL 0.00 5.18 0 02:12 0.000 0.715
Pond STORAGE 170.37 170.37 0 00:40 1.868 1.868
Detention_Pavers STORAGE 29.03 29.03 0 00:40 0.301 0.301
**********************
Node Surcharge Summary
**********************
SWMM 5 Page 2
Surcharging occurs when water rises above the top of the highest conduit.
---------------------------------------------------------------------
Max. Height Min. Depth
Hours Above Crown Below Rim
Node Type Surcharged Feet Feet
---------------------------------------------------------------------
Pond STORAGE 6.01 2.986 7.014
Detention_Pavers STORAGE 6.01 2.582 7.418
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
--------------------------------------------------------------------------------------------
Average Avg E&I Maximum Max Time of Max Maximum
Volume Pcnt Pcnt Volume Pcnt Occurrence Outflow
Storage Unit 1000 ft3 Full Loss 1000 ft3 Full days hr:min CFS
--------------------------------------------------------------------------------------------
Pond 173.202 7 0 222.951 9 0 02:12 4.48
Detention_Pavers 27.845 5 0 35.839 6 0 02:10 0.70
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg. Max. Total
Freq. Flow Flow Volume
Outfall Node Pcnt. CFS CFS 10^6 gal
-----------------------------------------------------------
Outlet_Overall 97.23 4.55 5.18 0.715
-----------------------------------------------------------
System 97.23 4.55 5.18 0.715
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
Outlet DUMMY 4.48 0 02:12
Outlet_Pavers DUMMY 0.70 0 00:47
*************************
Conduit Surcharge Summary
*************************
SWMM 5 Page 3
No conduits were surcharged.
Analysis begun on: Tue Dec 02 15:14:38 2014
Analysis ended on: Tue Dec 02 15:14:38 2014
Total elapsed time: < 1 sec
SWMM 5 Page 4
APPENDIX D
EROSION CONTROL REPORT
Capstone Cottages
Preliminary Erosion Control Report
EROSION CONTROL REPORT
A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included
with the final construction drawings. It should be noted, however, that any such Erosion and
Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of
the BMPs depicted, and additional or different BMPs from those included may be necessary during
construction, or as required by the authorities having jurisdiction.
It shall be the responsibility of the Contractor to ensure erosion control measures are properly
maintained and followed. The Erosion and Sediment Control Plan is intended to be a living
document, constantly adapting to site conditions and needs. The Contractor shall update the
location of BMPs as they are installed, removed or modified in conjunction with construction
activities. It is imperative to appropriately reflect the current site conditions at all times.
The Erosion and Sediment Control Plan shall address both temporary measures to be implemented
during construction, as well as permanent erosion control protection. Best Management Practices
from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are
not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways
and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill
containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site
restrooms shall also be provided by the Contractor.
Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a
full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In
addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere
to, the applicable requirements outlined in the Development Agreement for the development. Also,
the Site Contractor for this project will be required to secure a Stormwater Construction General
Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality
Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing
said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan
(SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and
document the ongoing activities, inspections, and maintenance of construction BMPs.
MAP POCKET
DRAINAGE EXHIBITS
TRASH
CLUB
HOUSE
DUFF DRIVE
WEBSTER AVENUE
INTERNATIONAL BOULEVARD
COTTAGE DRIVE
NORTH CLUB HOUSE DRIVE
LINCOLN AVENUE
LEMAY AVENUE
COTTAGE DRIVE
SOUTH CLUB HOUSE DRIVE
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
24" W 24" W 24" W
24" W 24" W
24" W 24" W 24" W 24" W 24" W
24" W 24" W
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
10" SS
10" SS
10" SS
6" W 6" W 6" W
6" W
6" W
12" SS
8" SS
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
/ / / / / / / / / / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / /
W
T
T
LEMAY AVENUE
THIRD ANNEXATION
LOT 4
SECOND REPLAT OF
NORTH LEMAY SUBDIVISION
SECOND FILING
LOT 4
SECOND REPLAT OF
NORTH LEMAY SUBDIVISION
SECOND FILING
LOT 3
SECOND REPLAT OF
NORTH LEMAY SUBDIVISION
SECOND FILING
BUFFALO RUN
APARTMENTS P.U.D.
FORT COLLINS BUSINESS
CENTER THIRD FILING
SUNWARD
CONDOS AMD.
FORT COLLINS BUSINESS
CENTER 3RD
FORT COLLINS BUSINESS
FORT COLLINS BUSINESS
CENTER ANNEXATION
FORT COLLINS BUSINESS
CENTER ANNEXATION
FORT COLLINS
BUSINESS CENTER ANNEXATION
UD
UD
UD
UD
UD
UD UD
UD UD
UD
UD
UD
UD
UD
UD
UD UD
UD
UD
UD UD UD UD UD
L
I
N
C
O
L
N
A
V
E
N U
E
R
E
A
L
I
G
N
E
D
L
E
M
A
Y
A
V
E
N U
E
WEBSTER AVENUE
DUFF DRIVE
MAINT.
TRASH
INTERNATIONAL BOULEVARD
CLUB
HOUSE
SOUTH CLUB HOUSE DRIVE
COTTAGE DRIVE
NORTH CLUB HOUSE DRIVE
1
2
3
6 7
14
1
14
4 5
6
7
10
2
3
4
5
8
9
11
12
13
8
9
10
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
PROJECT:
939-001
These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
N O R T H E RN
12/10/14
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
www.northernengineering.com
Phone: 970.221.4158
DATE:
DECEMBER 10,
2014
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
R
NORTH
LEGEND:
4953
PROPOSED CONTOUR 93
PROPOSED STORM DRAIN
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
1
DESIGN POINT
FLOW ARROW
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
PROJECT BENCHMARKS
NOTES:
1. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR
CAPSTONE COTTAGES" BY NORTHERN ENGINEERING, DATED DECEMBER 10, 2014
FOR ADDITIONAL INFORMATION.
BASIN
DESIGNATION
BASIN
AREA (AC)
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
PROPOSED UNDERDRAIN UD
PERMEABLE PAVERS
1
BENCHMARK #1:
City of Fort Collins Benchmark 3-00
NGVD29 Elevation= 4964.15
(NAVD88 Elevation= 4967.33)
BENCHMARK #2:
City of Fort Collins Benchmark 12-07
NGVD29 Elevation= 4944.68
(NAVD88 Elevation= 4947.86)
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
C600
A. Reese
A. Boese
1"=80'
( IN FEET )
0
1 INCH = 80 FEET
80 80 160 240
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
11No0.95 0.95 1.00 120 2.00% 2.4 2.4 1.6 520 1.00% 2.00 4.3 0 0.00% N/A N/A 7 7 6
22No0.95 0.95 1.00 120 2.00% 2.4 2.4 1.6 460 1.00% 2.00 3.8 0 0.00% N/A N/A 6 6 5
33No0.95 0.95 1.00 40 2.00% 1.4 1.4 0.9 790 1.00% 2.00 6.6 0 0.00% N/A N/A 8 8 8
44No0.95 0.95 1.00 120 2.00% 2.4 2.4 1.6 250 1.00% 2.00 2.1 0 0.00% N/A N/A 5 5 5
55No0.25 0.25 0.31 150 2.00% 15.5 15.5 14.4 410 1.00% 2.00 3.4 0 0.00% N/A N/A 19 19 18
66No0.95 0.95 1.00 40 2.00% 1.4 1.4 0.9 1030 1.00% 2.00 8.6 0 0.00% N/A N/A 10 10 10
77No0.35 0.35 0.44 202 2.00% 15.8 15.8 13.9 0 1.00% N/A N/A 0 0.00% N/A N/A 16 16 14
88No0.95 0.95 1.00 40 2.00% 1.4 1.4 0.9 188 1.00% 2.00 1.6 0 0.00% N/A N/A 5 5 5
99No0.95 0.95 1.00 40 2.00% 1.4 1.4 0.9 416 1.00% 2.00 3.5 0 0.00% N/A N/A 5 5 5
10 10 No 0.95 0.95 1.00 120 2.00% 2.4 2.4 1.6 193 1.00% 2.00 1.6 0 0.00% N/A N/A 5 5 5
11 11 No 0.95 0.95 1.00 40 2.00% 1.4 1.4 0.9 35 1.00% 2.00 0.3 0 0.00% N/A N/A 5 5 5
12 12 N 095 095 100 40 2 00% 14 14 09 190 1 00% 200 16 0 0 00% N/A N/A 5 5 5
DEVELOPED TIME OF CONCENTRATION COMPUTATIONS
Gutter Flow Swale Flow
Design
Point
Basin
Overland Flow
ATC
December 1, 2014
Time of Concentration
(Equation RO-4)
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
12 12 No 0.95 0.95 1.00 40 2.00% 1.4 1.4 0.9 190 1.00% 2.00 1.6 0 0.00% N/A N/A 5 5 5
13 13 No 0.95 0.95 1.00 80 2.00% 2.0 2.0 1.3 0 1.00% N/A N/A 0 0.00% N/A N/A 5 5 5
14 14 No 0.25 0.25 0.31 334 0.60% 34.4 34.4 32.0 123 1.00% 2.00 1.0 0 0.00% N/A N/A 35 35 33
12 15333 0.35 0.18 0.00 0.00 0.00 0.00 0.48 0.48 0.60 51%
13 13721 0.32 0.28 0.00 0.03 0.00 0.00 0.95 0.95 1.00 99%
14 239462 5.50 2.176 0.169 0.00 0.00 3.15 0.55 0.55 0.69 42%
DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I.
10-year Cf = 1.00
December 1, 2014